Loading...
Staff Notes SP 63-2017 Giovanone_10 17 17 et Town of Queensbury Planning Board Community Development Department Staff Notes October 17, 2017 Site Plan 63-2017 GIOVANONE REAL ESTATE PARTNERS, LP Big Boom Road/ CLI—Commercial Light Industrial/Ward 4 SEQR Type Unlisted Material Review: application, site plan drawing—area to be used for activity, Parcel History: SUB 3-2003 Requested Action Planning Board review and approval to maintain an existing vacant lot with 21,497 sq. ft. gravel area for temporary storage of UPS vehicles as needed (typically winter months) and overflow storage for pools for Concord Pools (year round). Resolutions 1. SEQR 2. Planning Board Decision Prosect Description Applicant proposes to maintain an existing vacant lot with 21,497 sq. ft. gravel area for temporary storage of UPS vehicles as needed (typically winter months) and overflow storage for pools for Concord Pools (year round). Pursuant to Chapter 179-3-040 of the Zoning Ordinance, new storage yard use shall be subject to Planning Board review and approval. Staff Comments • Location- The project site is an existing vacant lot in front of G&G Boat N RV Storage at 74 Big Boom Rd. • Arrangement- The site is to be used for the placement of UPS staging vehicle that will allow UPS delivery vehicles to stop and pick up deliveries when the existing main facility is backed up due to the holiday. • Site Design UPS- The site has an existing 21, 497 sq ft gravel parking area that is used for the staging area. The applicant has indicated that one of the UPS Staging vehicles will be on site and allow access to the delivery vehicles. The drawing indicates there are four loading spots for delivery vehicles to pick up items. The conveyor belt unit is loaded on one end from a different vehicle so it can be sorted on the conveyor to distribute to the four vehicle loading spots. • Site Design Pool storage-The site is also proposed to be used for overflow storage area for the pools. The applicant has indicated 10-15 pools would be stored awaiting to be delivered to customers. • Site plan overall—The applicant has indicated there are no site changes proposed, no lighting or signage for the site. Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The application form identified as "Requirements" outlines the items to appear on the site plan or included as attachments. At the time of application the applicant has either requested waivers, indicated the item not applicable or has not addressed the item/ left check box blank. This includes the follow items listed under Requirements of the applicant's application: g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. SummaryThe applicant has completed a site plan application for the temporary storage for UPS Holiday staging vehicle and pool storage. Meeting_ Histor. PB: 1 st meeting;