Added information and sketch of UPS operation Laura Moore
lFrom, Tom <torn@,1-s;urvey.,corn>
Sent- Thursday, October 05, 2017 12,21 PM
'To: Laura Moore
Subject: RE- Giovanone UPS Site Plan Submission
Attachments: Giovanone UP'51,pdf
Laura,
In response to your questions [offer IN follawing:
1. It appears,that the merger of the two Boat,N RV lots has not yet occurred. Theownier has has committed to takiingi care of this
matter ASAP.
2. A rough sketch of how UPS utilizes the site is attached, Incoming trucks back up to a trailer mounted conveyor and sorting table
wbere they unload their packages,. Outgoingi delivery trucks load off the sides of,the coniveyorltirailer as shown. All trucks generally
stay within the gnavM ares-
3.Overflow pool storage is,generally kept Wthin the gravel area, The owner,anticipates,a maximum of 10,to 15 pool$to,be templorady
stored while they await delivery after being sold.
Let me know[if you have any further questions.
Tom Nace
From: "'Laura Moore" <Ung mor e@queensb,ury.,net>
Sent�, Monday, October 02, 2017 1:33 PM
T'ontomOl-survey.corn" <torn @1-$urVey,.0urn
>
CC: "Sunny Sweet" <sun nys@,q ueensbiury.net>
Subject,. RE: Gliovanone UPS Site Plan Subrnlslon
Torn,
I have few things to,follow up on,this project—
1) There was.suippose to be a lot mierg8r between the parcels but real property sti:ll has not merged them—can you
confirm if the paperwork was filed at the county.
2) A schematic of the UPS operations on the silte will need to be submitted —1 undderstoold there is,a vehicle with a
conveyor belt system but a drawing of the truck and how it loads onto the Lips deliver trucks will be needed
3) Do you know how many overflow pools might be stored on, the site and will they all be in the gravel area or is
there another area of stoiragle?
The packets will be miailed to the board members later this week—cain you forward the updated information b`y October
5 M.
Thank you. Laura
From;Tom, Imaillto-.,toml@l-s�urvey.com)
Sent:Thursday, September,28, 2017 12316 PM
To: Laura Moore <Imoore@queen5bury.net>
Subject:Giovanone U'PS Site Plan Submission
Laura.
Attached is PDF of G[ovanone UPS,Site Plan Submi[ssion
Turn Nalce