Loading...
Stormwater Management narrative Stormwater Management Narrative PROPOSED RESIDENTIAL SITE IMPROVEMENTS Town of Queensbury Warren County, New York Owner and Applicant: Dunton Residence 18 Tall Timbers Road Lake George, NY 12845 September 2017 Prepared By: The Environmental Design Partnership, LLP 900 Route 146 Clifton Park, NY 12065 ENVIRONMENTAL DESIGN PARTNERSHIP, LLP. Shaping the physical environment ecoENVIRONMENTAL DESIGN PARTNERSHIP,LLP. Shapley lkie phy sical enviionntens TABLE OF CONTENTS Contents 1.0 Introduction........................................................................................................................................3 2.0 Technical Reference..........................................................................................................................3 3.0 Existing Conditions............................................................................................................................3 4.0 Post Development............................................................................................................................4 4.1 Town of Queensbury Stormwater Regulations........................................................................5 5.0 Summary...........................................................................................................................................6 Figures Figure 1 —Site Location Map Figure 2—Predevelopment Drainage Map Figure 3 -- Post-development Drainage Map Attachments Attachment A—Stormwater Modeling Calculations 2 900 Route 146, Clifton Park, New York 12065 phone(518) 371-7621 - fax(518)371-9540 e-mail: info@edpllp.com ecoENVIRONMENTAL DESIGN PARTNERSHIP,LLP. Shapmr�the physical eavnnuntent 1.0 Introduction The Applicant is proposing site improvements of an existing 1.29+/- acre parcel located along the west side of Tall Timbers Road in the Town of Queensbury, New York. The proposed site improvements shall consist of improvements to the existing garage and driveway, new building additions and construction of a replacement wastewater system. The area of proposed disturbance is on the order of 8,800 square feet which is greater than the 5,000 square foot disturbance threshold defined as a Minor project by Chapter 147 of the Queensbury Town Code. As discussed in Section 147-11.1.(2).(x) of the Queensbury Town Code, for Minor projects "Stormwater may be calculated in accordance with the methodology for determining stormwater volume and flow rates for major projects......" Given the existing physical constraints at the site, including high existing runoff, shallow and exposed bedrock and steep slopes, the stormwater runoff was modeled under the regulations of a Major project with less than 5 acres of disturbance. The objective of this report is to describe the proposed stormwater facilities to be constructed as part of the proposed development and confirm their adequacy for compliance with Chapter 147 of the Queensbury Town Code. 2.0 Technical Reference Applied Microcomputer Systems' program Hydrocad was used to model the detailed characteristics of the watershed and hydraulics of the stormwater management facilities. Hydrocad employs The United States Department of Agriculture's Soil Conservation Service (SCS) Technical Release 20 (TR-20). TR-20 is the benchmark hydraulic method for computation of storm volumes and peak runoff. It is in full compliance with the methodologies specified in Town Stormwater Management Regulations. Full results are included for the 10 and 25 year, 24 hour design storm events 3.0 Existing Conditions The existing site consists of a single family home, detached garage, gravel and paved travel surfaces and wooded/grassed areas with shallow to exposed bedrock. The topography of the land in the area of proposed development generally ranges from 5% to 30% and slopes west toward Lake George. The USDA Natural Resources Conservation Service Soil Survey indicates the soils on the site to be Bice-Woodstock very bouldery fine sandy loam. The Soil Survey identifies the Bice series as 3 900 Route 146, Clifton Park, New York 12065 phone(518) 371-7621 - fax(518)371-9540 e-mail: info@edpllp.com ENVIRONMENTAL DESIGN eco PARTNERSHIP,LLP. siinpiny the physical envirollmont well drained and classified as Hydrologic Soil Group (HSG) "B". The Soil Survey identifies the Woodstock series as shallow to exposed bedrock and classified as HSG "D". Test pits were observed by The Environmental Design Partnership at the site in May 2015 and found a medium sand and bedrock at a depth of 56 inches and 36 inches. Site visits have confirmed the presence of very shallow and exposed bedrock throughout the site, including the area proposed for development. Overall the soils and site conditions observed are consistent with the MRCS soil survey records. A hydraulic model of the existing site was prepared using the Hydrocad program. One subcatchment was used to represent the existing drainage characteristics, see figure 2. The existing parameters of topography, vegetation, slope and soil type are all incorporated into the predevelopment hydraulic model. The results for the existing condition model are summarized later in this report and have been included in Appendix A. 4.0 Post Development Site improvements to the property will consist of improvements to the existing garage and driveway and new building additions. Stormwater management practices have been designed to provide filtration, infiltration capacity and attenuation of stormwater runoff from the proposed impervious surfaces on the site. The proposed stormwater management system shall consist of one (1) shallow grass depression, one (1) area of permeable block pavers, and five (5) retained rain gardens. The shallow grass depression was designed to collect and provide infiltration capacity of stormwater runoff from the proposed driveway. The depression has been sized accordingly to provide attenuation of stormwater runoff for storms up to an including the 25-year design storm. Overflows from the shallow grass depression will be directed to the west, down the existing slope toward the Lake. One section of the proposed driveway will utilize permeable block pavers to reduce stormwater runoff and provide infiltration capacity. No additional runoff will contribute to the paver area, only precipitation that falls directly on the surface. The five (5) retained gardens were designed to collect runoff from the proposed and existing building rooftops and provide filtration and attenuation of the contributing runoff. Each rain garden is designed with perforated underdrains to collect filtered water and a standpipe to limit the achievable depth of water to 6 inches. The underdrains will discharge to the south, to a stabilized rip rap outfall, in the vicinity of existing retained planting beds. The existing planting beds and bouldery nature of the landscape will help dissipate excess runoff prior to entering the Lake. 4 900 Route 146, Clifton Park, New York 12065 phone (518)371-7621 - fax(598)371-9540 e-mail: info@edpllp.com ENVIRONMENTAL DESIGN PARTNERSHIP,LLP. Shapmy the physical en5'iron ntenl The post-development conditions were modeled using the HydroCAD program. Eight (8) subcatchments were used to represent the proposed site drainage characteristics (Figure 3). A Curve Number (CN) of 65 was used for all existing woods/grass areas, a CN of 82 was used for all existing woods/grass with exposed bedrock, a CN of 39 was used for all rain garden areas, and a CN of 98 was used for all impervious areas. The results of the post-development modeling have been summarized in the following subsections and included in Appendix B. 4.1 Town of Queensbuiy Stormwater Regulations The proposed project will consist of greater than 5,000 square feet of disturbance and therefore, in accordance with Chapter 147 of the Town Code, is considered a minor project. As previously discussed, given the existing physical constraints at the site, including high existing runoff, shallow and exposed bedrock and steep slopes, the stormwater runoff was modeled under the regulations of a Major project with less than 5 acres of disturbance. The proposed stormwater management system has been designed per the requirements in the Queensbury Town Code which mandates that the pre-development runoff volume for the 10-year storm be maintained post development and that the pre-development peak rate of runoff not be increased for the 25-year storm post development. Since the residential project will not disturb greater than 5 acres the stormwater management system does not require compliance with the NYSDEC Stormwater Management Design Manual. The following tables summarize the stormwater modeling results. Table 1: 10-Year Storm Runoff Volume Storm Event Predevelopment Runoff Post-Development Runoff Volume (ac-ft) Volume (ac-ft) 10-Year, 3.6" 0.08 0.063 Table 2: 25-Year Storm Runoff Rate Predevelopment Runoff Post-Development Runoff Storm Event Rate (cfs) Rate (cfs) 25-Year, 4.2" 2.16 1.42 5 900 Route 146, Clifton Park, New York 12065 phone(518) 371-7621 - fax(518) 371-9540 e-mail: info@edpllp.com ENVIRONMENTAL DESIGN ect) PARTNERSHIP,LLP. Shaping the nlsysical euviranmenl 5.0 Summary The proposed site improvements to the existing residence result in soil disturbance and increased impervious cover, which necessitate management for stormwater runoff. In order to attenuate runoff, practices have been design to provide filtration and infiltration capacity to attenuate site runoff. The proposed practices include one (1) shallow grass depression, one (1) area of permeable block pavers, and five (5) retained rain gardens. The stormwater management for the proposed site was has been designed in accordance with Chapter 147 of the Queensbury Town Code. Upon proper construction and maintenance of the storm facilities detailed on the plans, the proposed construction will have no significant adverse impacts on downstream properties and water bodies. Prepared by: Reviewed by: Kristopher LaPan, P.E. Dennis MacEiroy, P.E. The Environmental Design Partnership The Environmental Design Partnership 6 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax(518) 371-9540 e-mail: info@edpllp.com ENV[RONMENFAL DESIGN PAii NVRSHIP,LLP- REFERENCES IPREFERENCES HydroCAD version 850, Applied Microcomputer Systerns, Chocura, flew Hampshire. NYSDEC, 1990. "Technical and Operational Guidance Series (5.18) Stormwater Management Guidelines for New Development", New York State Department of Environmental Conservation, Division of Water. NYSOEC, 1992. "Reducing the Impacts of Stormwater Runoff from New Development", New York State Department of Environmental Conservation, Division of Water. NYSDEC, 2-015. "New York State Storrnwater Management Design Manual", Center for Watershed Protection, Ellicott City, MD. Rawls, W.J., Brakensiek, D.L., and Saxton, K. 6., 1982. "Estimation of Soil Properties", Transactions of the American Society of Agricultural Engineers, Vol. 25, No.J, pp. 1316-1320. S.C.S,, 1982. '713-20 Project Formulation-Hydrology, Technical Release No. 20", U.S. bepartment of Agriculture,°Soil Conservation Service, Hydrology Unit DTvision of Engineering. United States Department of Agriculture, Web Sail Survey. Retrieved from http5://websolisurvey.sc.egov.usda.gov 7 900 Rate 146, Clifton Park, Now York 72OB5 phone (518)371-7621 - fax{518) 371-9540 email; info@edpllp.com "� tt ENVIRONMENTAL BESIGM ti PARTNERSHIP,LLP Figures 1. Site Location Inap . Pre Development Drainage Map . Post Development Drainage Map 900 Route 148,Clifton Park. Now York 12065 phone (518) 371-7621 - fax(518)379-9W e-mail: info edpllp_oom _ G . ENWRON MENTAL DESMN PARTNERSHIP.LLP. . ,_,Lh) % § . . � z \ » a'Mirmin u k ` aQ_& Rocklkumt%+ W . �-- ~ ^ / 6 ELI $ SITE + } \ LOCATIONO % Lma , $ ®18 � _waw_. ?M=rr_1__0.2wL Figure 1: Site Locatlon Map 9 mo Route 146, ClIftoni kNew York1 phone<5 q 371-7621 - Gx$18) 1±«o e-mail: Wb&djAwPmm 1mm; MAP SUgCATCH 8C UM�IVC� I V I� IC SUBCATCHMENT ENT M. B., AL DESIGN F TORMxMWAT MMMPARTNERSHIP, Route 7461 Clifton Park MY 112065 IDE5M PONT (5118)371�-7621 >= i2 .. ................................ Uj x aL 01 UL Lim F3 F- cc I z d " -` � cc Z OF EXPOSED BEDROCK 1 WITHIN AREA OF D "ELOPMNT �. w SHEET TITLE ' E E' ELOPME1 T GRAPHIC SCALE: DRAINAGE MAP I 20 0 20 S'C'ALE: 1 "=.2601' SHEET NO, rMAP KEY „ BCATCHMFNT „f SYS S77ZWATER )EmcE PARTNERSHIP, 900 Route 146, 1206,51 E d T ' 8) 7 GE txa B pip. ire u 4 ° �._ DRAIINACE ARROW r w ICU A6r -� " 0 � q � fi yr x 10 Lul am z Z ce ca xOD L' Ul IN 0 Z 1 2 -1 LU APPROXIMATE XIMATE UMITS J WITHIN AREA, OF DMLOPMENT J F EXPOSM BEDROCK WICSA'"imp: * SHEE7 TITS. POST DEVELOPMENT GRAPHiIC SCALE. DRAINAGE MMP E3 20 0 20 SCALE. 1 ";=20' HE.ET 1410, 3 ; _ ENVIRON MENTAL 0ESIGN PARTNERSHIP, LLP Attachment A tormwater Modeling Calculations 10 906 Roue 148, Clifton Park, New York 12065 phone(518) 371-7621 - fax(51B) 371-9540 e-mall: infca,edpll4,ccm LAKE GEORGE Al aUbes teach on LICK{ drainage Diagram for PREDEVELOPNlENT DUNTON Prep&red by The Errvikonmwol neslgn Partnership, LLP, Printed 9YJ 2017 HydroCAM 8.54 sht 044475 0 20o I HydroCAD Software Solutions LLC PREDEVELOPIUIENT DUNTON Prepared by The Environmental Design Partnership, LLP Printed 9/14/2017 H droCAM 8,50 s!n 000476 0 20G7 H dro AD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) {subcatchment-numbers) 0.411 65 Woodstgrass comb., Fafr, HSG 8 (Al) 0.140 82 Woodsigrass comb., Fairy HSG D (Al) 0.013 85 Gravel roads, HSG D (A-1) 0,133 88 EXISTING IMPERVIOUS (Al) 0.697 TOTAL AREA PREDEVE ,OPMENT DUNTON Prepared by The Environmental Design Partnership, LLP Printed 911412017 HVdroCAa 8.50 sIn 000476 92007 HydroCAD Software Solutions LLC Pag 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Goup Numbers 0.000 HSG A 0.424 HSG B Al Q.ODO HSG 0.140 HSG D Al O_183 Other Al O.697 TOTAL AREA PREDEVELOPMENT DUNTON Type 8 4-hr 10-YR Pain fa11=3.60" Prepared by The Environmental Design Partnership, LLP Printed 9/14/2017 HydroCAD S.50 sin 030478 02007 Hydro AD Sofware S ciutions LLD Pa e 4 Time spa n=5.00-60.00 hrs, dt=O.05 hrs, 1101 points Runoff by SCS TR-20 method, H;--SCS Reach routing by for-Ind+Trans methal - Pond routing by Scor-Ind method ubcatchmermtAl. - Runoff Area=30,370 sf 19.13% Impervious Runoff depth=1.37° Flow Length=225' Slope=4.30047 Tc=6,8 min CN=75 Runoff;-1.63 cfs 0.080 of LinkA: LAKFGEC RGE Inflow-1_63Cfs 0.080af Prirnary=1.83 ofs 0.0B0 of Total Runoff Area = 0.697 ac Runoff Volume ;-- 0.080 of Average Runoff Depth = 1,37" 80.87% Pervious = 0.564 ac 19.13% Impervious = 0.133 ac PREDEV ELOPMENT_UUN J ON Type If 24-hr 1 - P Rain fr .60" Prepared by The Environmental Design Partnership, LLP Printed 911412017 HydrOCADD 5.50 s n 000476 0 2007 H droOAD Software Solutions LLC Page 5 Summary for Subcatchment Al: I urivff — 1.63 cfs @ 11.99 hrs, Volume= 0.080 af, Depth= 1.3711 Runoff by SOS TR-20 method, UH;--SCS, Time Span= 5.00-60.00 hrs, dt= 0.05 hr� Type [] 4-hr I 0-YR Rainfall-3.60" Areas CN Descr[plJon 8,080 82 Wbodslgrass oomb., Fair, HSG D * 5,810 98 EXISTING IMPERVIOUS 585 85 Pavel roads, HSG B 17,895 65 Woods! rays comb. Fair HSG B 30 370 75 Weighted Average 24,560 Pervious Area 5,810 Impervious Area Tc Length Slope Velocity Capacity Description min feet (Wft) # ec (ds) 5.9 70 0.3000 0,20 Sheet Flow, Woods, Light underbrush n= 0.4Q0 P2= 2.75"t 0.9 155 0.3000 2.74 Shallow Concentrated Flaw, Woodland Kir— 5.0 fps 6.8 225 Total Summary for Link A: LAKE GEORGE Mow Area = 0M7 ac, 19.13% Impervious, Inflow depth = 1.37" for I0-YR event Inflow — 1.63 cfs @ 11.99 hrs, Volume= 0.080 of Primary — '1.63 ds @ 11.99 hrs, Volume= 0.080 af, Men= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs PREDEVELOPNLENT DUNTON Type 11 .24-hr 5-YR Rainfefl=4.20" Prepared by The Environmental Design Partnership, LLP Printed 911412017 Hy dro AID 8.50 sin 000476 9 2007 W orp AD Software Solutions LLC Page Time spa n=6.04-60.00 hrs, dt=0.05 hrs, 3 303 points Runoff by SCS TR-20 method, UN= CS Reach routing by Stor-]rid+Trans method - Pond routing by to-Ind method SubcatchmentAl: - Runoff Area=30,370 sf 10.13° [rnpervious Runoff Depth=I AZ' Flow t_ength=225' Slope=4.3000 `1' Tc7--6.8 rnin CN=75 RurOf--2.16 ofs 0,306 of Link A. LAKE GEORGE Inflo:v=2.16 cfs 0.906 of Primary= .16 cfs 0.106 of Total Runoff Area = 0.697 ac Runoff Volume = 0.106 of Average Runoff Depth = 1.82" 80.87% Pervious = 0.564 ac 19.131/6 impervilo sw = 0.333 ac PF EDEVELOPMENT UUNTON Type If 4-hr s-YR Rafnfalf=4.20" Prepared by The Environmental Design Partnership, LLP Printed 911412017 H droDAD0 8.50 sin 000476 9 2007 H dro AD Software Solutions LI-C Page 7 Summary for Subcatchment Al. - Runoff - 2,16 cfs @ I`1.99 hrs, Volume;-- 0.106 af, Depth- 1.82" Runoff by SOS 7it-20 method, USI=SCS, Time Span= 5.00-60.00 hrs, dt= 0,05 hrs Type II 4-hr 25-`fR Rai nfal[m4.20" Areas DIN Description 6,080 82 Woodsigrass comb., Fair, HSG D 5,810 98 EXISTING IMPERVIOUS b85 85 Gravel roads, HSG B 17,895 65 Woodsigrass comb_, Fair HSG B 30,370 75 Weighted Average 24,560 Penr[ous Area 5,810 Impervious Area Tc Length [ope Velocity Capacity Description _ (rnin) (feet) (am) ftlsec) (CK 5.9 70 0.3000 0.20 Sheet Flory, Woods. Light underbrush n 0.400 P = 2.75" 0,9 155 0,0000 2.74 Shallow Concentrated Flow, Woo [ v= 5.0 fps 6,8 225 Total Summary for Link A: LAKE (GEORGE Infiow Area = 0,697 ac, 19.13 1mpervinus, Inflow Depth = 1.82" for 25-YR event I nflow 2.16 cfs @ 11.99 hrSL Vo'UMe^ 0.106 of Primary 2.16 cfs @ 19.99 hrs, Volijrnem 0.906 af, Atter= 0%, Lag= 0.0 rnin Primary c utflaw= inflow, Time Span= 5.000.00 hrs, cit 0.05 hrs } 5 3 P PE=1�4��EAC�LE PAVERSA3 A6 6PZ A4P RA114 CAR EN VA t� RAIN RDErq 42 7P � A7 IP 2P RAIN RDFNfL5 GRASS O I ESSC RAIN GARDEN#1 �y Z5,\P RAIN GARDEPJ�,'1 }fid} LAKE GEORGE UbC2t R Ch On LCCI�{ Dra-mage Diagram for POSTDEVELAPMENT DUNTON Prepared by The Lrlwlronrr ntgi DmWfl Partnership,LLP, Printed 9114 17 HydroCAC a&5D &M QDD473 02007 HydroCl40 Software SOutions LLC PO TDEVELOPMENT_DUNTON Prepared by The Environmental Design Partnership, LLP printed 9/14M17 HydroCADS 8.50 slur 00 476 0 2007 MVdroCAD Software Solutions Lt_ _ Page 2 Area Listing (all nodes) Area C h Description (acres) (subcatchment-numbers) 0,017 39 >75% Grass Over, GDod, HSG A (A3,A4,A7) 0.004 39 RAIN GARDEN (M,A6) 0.057 61 >75% Grass cover, Goad, HSG 8 (Al) 0.357 65 Woods1grass comb_, Fait, HSG 6 (AI,A8) 0.058 82 oodslgrass comb_, Fair, HSG 0 (A8) 0.225 98 Paved parking & roofs (A1,A2,A3,A4,A5,A6,A7,A8) 0,718 TOTAL AREA PO TDEVELOPMENT_DUNTON Prepared by The Environmental Design Partnership, LLP Printed 9114/2017 HydroOAD 8-50 sJ� 800476 0 2007 HydraCAD Software Solullons LLC —Rage a Soil Listing (all nodes) Area Soil Subcatchment {acres} Goup Numbers 0,017 HSG A A3, A4, A7 0,413 HSG B Al, AB 0.()00 HSG 0.058 HSG D A8 0.229 Otter Al, A2, A3, A4, A5, A6, A7, A8 0.718 TOTAL AREA PO TDEVELOPMENT_DiJNTON Type fi 4-far 10-YR Rainfall-3.60„ Prepared by The EnvironmentaI Design Partnership, LLP Printed 9114/2017 H V croa:ADO 8.50 s!n O40476 Q 2007 H droCAD Software Solutions l_LC Pacie 4 Tirne span=5.00-60,00 Ears, dt=0.05 hrs, 1101 points Runoff by SOS TR-20 method, UH=SOS Reach routing by StinrAnd+Trans method - Pond routing by for-Incl method ubcatchmentA'[: - Runoff Area=5,745 sf 36,81% Impervious Runoff Depth-1,37" Flow Length=170' 1!c,--E_0 rein CN=75 Runoff;=0.39 cfs 0.015 of Subcatc€ mentA : Runoff Area=435 sf 100.00% 1mpeMous Runoff Depth>3.29' Tc--6.() rNn ON=98 Runoff=0.05 cfs 0,003 of SuhcatchmentA3: - Runoff Area=830 sf 91.57% Impervious Runoff Depth>2.83" Tc�6_0 min C N=93 Runoff-O.09 cfs 0.004 of SubcatchmentA4: - Runoff Area=1,725 sf 68.12% [mpervlous Runoff Depth=1.64" Tc=6.0min CN=79 Runoff=0,71 cfs 0,0054i S ubcatchmentA : - Runoff Area=335 sf 78.16% Impervious Runoff Depth=2,10" Tc=6.0 rain CN=B5 Runaff=0.04 cfs 0,002 of S ubcatchmentA6: - Runoff Area�435 sf 78.16°!a 1mperviaLis Runoff Dopt h=2.10" Tc--6.0 min ON=85 Ruroff=0_04 cfs 0.002 of SubcatchmentA7: - Runoff Area=770 sf 82.47% Impervious Runoff Depth=2.36' Tc=6.0 miry ON=88 Runoff--0.07 cfs 0,003 of ubcetchrnentAS: - Runoff Area=20.900 st 19.14% Irnpervious Runoff Depth=1.28" Flew Length=225' Mope=0.3000 '!' Tc=6.8 min CN=73 Runoff=1.01 cfs 0,050 of Pond 1 P: GPAS S DEPRESSION#1 Peak Ele►4--337.60' Storage=300 cf ln#low=0.31 cfs 0.015 aI' Discard ed=0.01 cfs 0.015 of Primary=0.D0 cfs 0.000 of 0utfl0w=0.09 cfs 0.015 of Pond 2P: RAIN GARDEN#1 Peak Elev=359,49' Storage=47 of Inffcw=0.07 cfs 0.003 of Outflow=0.01 cfs 0,003 of Pond 3P: PERMEABLE PAVERS peak Elev=338.97' Stora geP;92 cf Inflow=0.05 cfs 0.003 of Outflov.-0.03 cfs a3.003 of Pond 4P: RAIN GARDEN 42 Peak Elev=351,57' Storage-40 of €nflow=0,09 cfs 0.004 of Outflow=0,10 cfs 0,004 of Pond 5P: MAIN GARDEN#3 Peak Elev=050.19' Storage=85 of Inflov--0.22 cfs 0.013 of Outflow=0.05 cfs 0.013 of Pond 6P: RAIN! GARDEN#4 Peale Elev=336.82' Storage=24 cf Inflow=0.04 cfs 0.002 of Discarded=0,01 cfs 0.002 of Primary=0.00 cfs 5.000 of Oiitffo =0,01 cfs 0,002 of Pond 7P: RAIN GARDEN#5 Peak EIev=336.82' Storage=24 cf Irl&Yw=0,04 cfs 0.002 of Discarded=0.41 cfs 0.002 of Primary=0.04 cfs 0.000 of 0utflow=0.01 cfs 0,002 of Link A: LAKE GEORGE Inflow=9.06 cfs 0.063 of Primary=1.05 cfs 0,063 of PO TDEVELOPMENT DUNTON Type fl 4-hr 10-YR RainfeJl=3.60" Prepared by The Environmental Design Partnership, LLP Printed 911412017 H dro AD 8.50 sM 000476 02007 HydroCAD Software Solutions LLC Page 5 Total runoff Area = X3.718 ac Runoff Volume = 0.085 of Average Runoff Depth = 1.41" 68.67% Pervious = 0.493 ac 31.33% Impervious = 0.225 ac POSTDEVELOPMENT DUNTON Type If 4-hr ?0-YR Rainfa#=3.60" Prepared by The Envirorrrnentai Design Partnership, LLP Printed 911412017 HVdroCADG) 8.50 sIr 500475 Q 2007 HydraAD Soffivare Solutions LLC Page 6 Summary for Subcatchment Al : - Runoff = 9.31 cfs @ 11.98 hrs, Volume= 0.015 af, Depth= 1.37" Runoff by SCS TR-20 method, LSH=SCS}, Time Span= 5.00-00,00 hrs, dt= 0.05 hrs Type II 24-hr I0- R Ralnfal1=3.60" Areas N Description 2,115 98 Paved parking & roofs 1,155 65 V1locdsfgra5s corn b-, Fair, H S G B 2,475 31 >75% Grass cover, Good, HSG B 5,745 75 Weighted Average 3,630 Pervious Area 2.115 kmpervious Area Tc Length Slope Velocity Capacity Description rein) (faet) # ftfsec cfs 4.5 50 4.3900 0.19 Shoot Plow, Woods: Light underbrush n= 0.400 P2= 2.75" 0.3 120 0.1500 7.86 Shallow Concentrated Flow, Paved Kv= 20.3 fps 4.8 170 Total, Increased to minimum Tc ;-- 6.0 rnin Summary for Suhcatchmerit A2: - Runoff = 0.05 cfs @ i 1.96 hrs, Volume= 0.003 af, Depth> 3.28" Runoff by SCS TR-20 method, UH=SCS, Time Spari= 5.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 14-YR RainfalI'm 3.60" Area (sf CN Description 435 98 Paved parkinIq & roofs 435 Impervious Ares Tc Length Slope Velocity Capacity Description min feet RUM ftfsec cfs 6,0 Direct Entry, MIRECT ummary for Subcatchment A3: Runoff = 0.09 cfs c 11.96 hrs, Volume= 0.004 af, Depth> 2.83" Runoff by SCS TR-29 method, UH-SCS, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Type 11 24-hr IO-YR Rai nfall=3.60" PO TDEVELOPMENT DUNTON Type 11 4-hr 10-YR Rainfall=3.60" Prepared by The Environmental [design Partnership, LLP Printed 911412017 HydroCADt 8.60 sin 000476 (0x,007 W ydro AD Software Solutions LLC Page 7 Area (sf) CN Description 760 98 Paned parking & roofs 70 39 >75% Grass cover. Good, HSG A 830 93 Weighted Average 70 Pervious Area 760 Impervious Area Tc Length Slope Ve[ocity Capacity Description (min) feet (ft/ft) fVsec) (cfs 6.0 Direct Entry, DIRECT Summary for Subcatchment A4: Runoff 0.11 cfs 0 11.97 hrs, Volume 0.008 af. Depth= 1,64" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-60.00 hrq, dt^ 0.05 hrs Type II 24-hr 10RYR Rainfa11;--3.60" Areas N Description 1,175 98 Paved park€ng & roofs 560 39 >75% Grass cover, Good HSG A 1,725 79 Weighted Average 554 pervious Area 1,175 Imper+rious Area Te Length Slope Velocity Capacity Description min feet fllsec ifs 6.0 Direct lEntry, DIRECT Summary for Subcatchment AS: Runoff = 0.04 cfs @ 11 ,97 hrs, Volume= 0.002 at Depth= 2.10" Runoff by SCS TR-20 method, €JH=SCS, Time Span= 8.00-60.00 hrs, dt= 0.05 hrs Type 11 4-hr 1 O-YR Rai nfall^8,60" Area (sfl CN Descri t€on 340 98 Paged parking & roofs 95 39 RAIN N GARDEN 435 85 We[ghted Average 95 Pervious Area 340 Impervious Area Tc Length Slope Velocity Capacity Description min feet ftJf# ftlsec as .0 Direct Entry, DIRECT PO TDEVEL PMENT DUNTON Type If 4-hr 10-YR Pain fallm3-60" Prepared by The Environmental Design Partnership, LLP Printed 9/1412017 H5 d ro CADO 8.513 sIn 000476 0 2007 H ydroCAD Software Solutions LLC e 8 Summary for SubGatGhment A6: - Runoff = 0,04 cfs a 11.97 hrs, Volume= 0.002 af, Depth= 2,10" Runoff by SCS TR-2Q method, UH;--SCS, Time Spar= 5-00-80.00 hrs, dt= 0.05 hrs Type 11 24-hr 10- R Rainfall=3.64" Area {sf QN Description 040 98 Paved parking & roofs 95 39 RAIN GARDEN 435 85 Weighted Average 95 PGrvinus Area 340 Impervious Area Tc Length Slope Velocity Capacity Description min (feet) #t!f# (ff)sec) (cfs 6,0 Direct Entry, DIRECT urnmary for Subcatchment A7: - Runoff = 0,07 cfs @ 11-97 hrs, Volume= UO3 af, Depth= 2,36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-60,00 hrs, dt=:; 0.05 hrs Type 11 4-hr 10-YR Rainfall=3.6or, AFea (sn C IN De�Ui tion 635 98 Paved parking & roofs 135 39 >75% Grass cover, Goad, H O A 770 88 Weighted Average- 135 Pervious Area 635 1 mpervious Area Tc Length Slope Velocity Capacity Description min feet) (fuft) (fklsec cfs 6.0 Direct Entry, DIRECT Summary for Subcatchment A8: - Runoff = 1-01 cfs a 11.99 hrs, Volume= 0.080 of, Depth= 1,25" Runoff by SCS TR-20 method, Uhl=SCS, Time Span= 5,00-00.00 hrs, dt= 0-05 hrs Type 11 24-hr 10-YR Rainfall=3,60" AT-ea (sn CN Description 2,520 62 Woods/grass comb., fair, HSG D 4.000 98 Paved parking & roofs 14,380 65 Woods/grass comb-, Fair, HSG B 20,900 73 Weighted Average 16,900 Pervious Area 4,000 Impervious Area POSTDEVELOPMENT DUNTON Type 11 4-hr 10-YR Rainfall=3.60" Prepared by The Environmental Design Partnership, LLP Printed 9114/2017 H droCADD 8.50 stn 000476 0 2007 H dro AD Software SoWons LLC Page 9 Te Length Slope Velocity Capacity Description min feet #tiff ftlsec cfs 5.9 70 0.5000 0.20 Sheet Flow, Woods: Light underbrush n= 0,400 P2= 2.76„ 0.9 155 0.3000 2.74 Sha[low Concentrated Flow, Woodland Kv= 5.0 fps 6.8 225 Total Summary for Pond 1P, GRASS DEPRESSION #'I Inflow Area = 0.182 2s, 3&81% Impefv[ous, Inflow Depth = 1.37" for 10-YR event Inflow = 0.31 cfs @ 11.98 hrs, Volume- 0.015 of Outflow - 0.aI ofa Q 11.65 hrs, Volume= 0.015 af, Men= 95%, Lag= 0.0 rain Discarded = 0.01 cfs Q 11.65 hrs, Volume= 0.015 of Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Ston Ind method, Time Span;-- 5.00-60.00 hrs, dt= 0,05 hrs Peal< Elevr 337.00' 13.52 hrs Surl`.Ar+ea= 15 sf Storage= 300 cf PIu q-Plow detention time= 198.1 ruin calculated for 0.015 of{1 00% of inflow) Center-"ass det.time= 197.9 min ( 1,046.6 - 848.6 ) Volume Invert Avail Stora a Storage Description #1 335.00' 516 cf Custom Stage Data (Irregular)Listed beio {Recale) Elation SurfArea Perim. Voids Inc.Store Cum. tore Wet.Area Leet) -fl feet % cublo-fee!) cubic4i. t -ft 355.00 215 70.0 40.0 0 0 215 336.00 215 70.0 40.0 86 86 285 337.00 215 70.0 100.0 215 301 855 838.00 215 70.0 100.0 215 518 425 Device Routing Invert Outlet Devices 1 Primary 357.50' .0` long x 'l.0' breadth OVERFLOW Head (feet) 0.20 0.40 0.60 0.80 1.00 "1.20 1.40 "1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.24 3.28 5.31 8.90 3.31 8.52 #2 discarded 335,00' 3.000 in1hr Extiltratlon over Surface area, 91scarded OutFlow Ma =0.01 cfs @ 11.65 hrs HW--335.04' (Free Discharge) 2=Exfiltration (EAttration Controls 0.01 cfs) Primary Out:Flow Max-z0.00 ofs a 5.00 hrs HW--335.00' (Free Discharge) GDVERFLOW ( Controls 0.00 cfs) PO TDEVELOPMENT DUNTON Typo 11 4-hr 10-YR Ra rrfafi=3.80" Prepared by The Environmental Design Partnership, LLP Printed 9il41 017 Hydro AD0 8.50 stn 000 376 C)2007 Hydro AD ofrivare olutiortis LLC Page IQ Summary for Pond P: RAIN GARDEN #fit Inflow Area = 0.018 ac, 82.47% 1mpery€ous, Inflow Depth = 2.36" for 90-YR event Inflow - 0.07 cfs @ 11.97 hrs, Volume= 0.003 of Outrlow = 0.01 cfs @ 11.70 hrs, Volume= 0.003 af, Aden= 84%, Lag= 0,0 min Primary - 0.01 cfs @ 11.70 hrs, VoIurne= 0.003 of Flouting by ter--Ind rnethiDd, Time Spar= 5.00-60.00 hrs, dt= 0.08 hrs Peak E€ev= 359.49' a 12.20 hrs Surf. ea= 95 sf Storage= 47 cf Plug-Flow detention time= 25.E min calculated for 0,003 of(900% of InfloW) Center-of-Mass dot, time 25.3 min ( 832.5 - 807.2 ) Volume Invert Avall. torage Storage Description #1 359,00' 95e Custom Stage Data (Irre9uIar)Listed €aeIow (Recalc) - Elevation Surf.Area Per€r'r'k, Inc.Store Cum. tore Wet.Area feet (sq-ft) feet cubic-feet cubic-feet s -ft 359.00 95 45.0 0 0 95 350,00 95 45.0 95 95 140 Device Routing Invert Outlet Devices _ #1 Device 2 359,00' 0.000 inft FILTER TO UNDERDRAIN over Surface area above invert Excluded Surface area = 0 sf 2 Pr[mary+ 355,50' 6.0" x 8.0` long Culvert OPP, square edge headwall, 1 e= 0.500 Outlet Invert= 352.00' S= 0.4375 °r Cc= 0,900 n= 0.013 Corrugated PE, smooth interior #3 Device 2 359,50' 6.0" Horiz. " STAN DPIPE Limited to weir flow 0= 0.600 rirrYary OutFlow Max=0.01 cfs @ 11.70 fora HVV=359,01' (f=ree Discharge) ^Cu lvert (Passes CLOT cfs of 1.71 cfs potential flow) 1=FILTERTO UNDERDRAIN (E xfiltration Controls 0.01 ds) 3=6'° STANDP1RE { Oontro€s 0,00 cfs} Summary for Pond P: PERMEABLE PAVERS Inflow Area = 0.410 ac,f00,000A Impervious, Inflow Depth > 3.28" for 10-YR event Inflow = 0.05 ds @ 11.96 hrs, Volume= 0.003 of Outflow = 0.03 ds @ 11,90 hrs, Volurne= 0.803 af, Atten= 39%, Lag= 0,0 rein Discarded = 8.03 ds @ 11.90 hrs, Volume= € ,003 of Routing by Stor-€nd method, Time Span= 5.00-60,00 hrs, dt= 4.05 hrs Peak Elev= 338.97' @ 12.08 hrs Surf.Area= 435 sf Storage= 12 cf P€ug-FIow detention tirne= 3.3 m1n ca[cul ated far 0.003 of(100% of inflow) Center-af-Mass det. time= 3,0 rein ( 766.7 - 763,0 ) Volume Invert Avai],Storage Storage description #1 338,90' 438 cf Custom Stage Data (irregular)Listed below (Recalo) 1.096 cf Overal€ x 40.0% Voids PO TDEVEL PIVIENT DUNTON Type }f 4-hr 10-YR Rainfall= .60"r Prepared by The Environmental Design Partnership, LLP Printed 9114f2017 HydroCADO 8.50 stn 000476 0 2007 HydroCAD software Solutions LLC Pace 11 Elevation Surf,Area Perim. lnc.Store Cum.Store Wet.Ares feet N-ft)( feet cubic-feet tubi feet ft 308.90 435 85.0 0 0 435 340.90 485 85.0 870 870 605 341.42 435 85.0 226 1,096 649 Device Routing Invert Outlet Devices #1 Discarded 038.90' 3. 00 Whir Exffltraflon over Surface area ]iscarded OutFlow Ma =0.03 ds @ 11.90 hrs HW--338.9a Gree Discharge) T-1=Nr filtration (Exfiitration Controls 0.03 cfs) Summary for Pond 4P: RAID! GARDEN # Inflow Area = 0.019 ac, 9"1.57% impervious, Inflow Depth > 2.83° for 10- R event Inflow 0.49 cfs Q 11.96 hrs, Volume= 0.004 of Outflow - 0.10 ds @ '12.00 hrs, Volume= 0.004 af, Atten= 4%, Lag=2A rain Primary - 0.10 cfs Q 12.00 hrs, Volume= 0.004 of Routing by Star-1nd method, Time Span= 5.00 0.00 hrs, dt=; 0.05 hrs Peak Elev= 351.57' 12.01 hrs Sur€.Area= 70 sf Storage= 40 cf Plug-Flow detention time= 20.8 min calculated for 0.004 of(100% of inflow) Center-of-Mass det. time= 20.8 rain {807.3- 7861.5 Volume Invert Avail.Stora a Stora a Description 41 351,00' 70 cf Custom Stage Data (Irregular)Listed below {Recalc) Elevation Surf.Area Perim. Inc.Store Curn.Store Wet.Area feet s ft feet cubl -feet cubic feet s ft 851.00 70 35.0 0 0 70 352.00 70 35.0 70 70 105 Device Routing Invert Outlet Devices #1 Device 2 351.00' 5.000 iWhr FILTER TO UNDERDRAIN over Surface area above invert Excluded Surface area ^ 0 sf #2 Primary 347.50' 6.0" x 10.0' long Culvert CPP, square edge headwall, Ke-- 0.500 Outlet Invert= 347.00' S= 0.0500 7 CO-- 0.900 n= 0.010 Corrugated PE, smooth interior #3 Device 2 351.50' 6.0" Hartz. 6" STANDPIPE Limited to weir flow C=0.600 Primary OutFlow Max=0,10 cfs @ '12.00 hrs H =35'1.57' (Free Discharge) t-2=culvert (Passes 0.10 cfs of 1.85 cfs potentlal flow) FILTER TO UN13ERDRAIN (EAltrafion Controls 0.01 ds) 3-6" STANDPIPE (Weir Controls 0.09 cfs @ 0.85 fps) PO TIDEVELOPMENT DUNTON Type U 4-hr 10-YR Rainfal1=3.60' Prepared by The Environmental Design Partnership, LLP Printed 9114/2017 H ydroCADO 8.50 sIn 000476 0 2007 H ydro AD Software Solutions LLD POge 1 ummary for Pond 5P: RAI GARDEN Inflow Area = 0.076 ac, 77.29°x6 Ira pervious, Inflow Depth > 2.10" for I0-YR event Inflow - 0.22 cfs @ 12.00 hrs, Volume 0.013 of 0WIDw = 0.05 cfs @ 11,85 hrs, Volume= 0.013 af, Atten= 77%, Lag= 0.0 min Primary - 0.05 cfs a 11.85 errs, Volurne^ 0.013 of Flouting by Stor-Ind method, Time Span= 5,00-60,00 hrs, dt= 0.05 hrs Peak Elev= 350.19' c 12.16 hrs urf.Area= 445 sf Storage= 35 cf Plug-Flow detention time= 7.7 rain calculated for 0.013 of(100% of inflow) Center-of-Klass det. time= 7.7 rain ( 833.4 - 825.7 ) Volume Invert Avail. tora a Storage Descrf tion #1 350.00' 445 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf-Area Perim. Inc.Store CUM.Store Wei.Area (feet) (sq-ft) feet cubio-feet pubic-feet (Sq-ft) 350.00 445 95.0 0 0 445 351.00 445 95.0 445 445 540 Device Routing Invert Outlet Devices 41 Devi 2 350.00' 5.000 inlhr 1=[LTER TO UNDERDRAIN over Surface area above invert Excluded Surface area 0 sf #2 Pdmary 347.00' 6.0" x 35.0' long Oulvart DPP, Square edge headviall, Ke= 0.800 Outlet Invert= 345.50' S= 0_01437 tic= 0,900 rr= 0.01 3 Corrugated PE, smooth interior #3 Device 2 350.50' 8.0" Horiz. 6" STANDPIPF Lirniited to air flow C= 0.800 Primary OutFlow Max=0.05 cfs @ 11.85 hrs HVV�350.01' (Free Discharge) "L-2;--C uIvert: (Passes 0.08 cfs of 1,32 cfs potential flour) FILTER TO t.IhfDERDKAIN (Exfiitra#ion Controls 0.05 cfs) 3^6" STANDPIPE ( ContralS 0,00 cfs) ummary for Pond 61P; RA OAF DEN #4 Inflow Area = 0.010 ac, 76.16% Impervious, Inflow Depth � 2.10" for 10-YR event Inflow - 0.04 cfs @ 11.97 hrs, Volume= 0.002 of Outflow = 0.01 cfs a 11.75 hrs, Volume= 0.002 af, Atten= 85%, Lag= Q.0 fain Discarded = 0.01 cfs @ 11.78 hrs, Volume= 0.002 of Primary = 0.00 cfs a 5.00 hrs, VoWne= 0.000 of Routing by tor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Peale Elev= 338.82' 12.22 [yrs urf.Area= 75 sf Storage= 4 Cf Plug-Flow detention time= 3[x.0 min calculated for 0,002 of (100% of inflow) Center-of-[bass det. time= 30.0 min ( 847,8 - 817.8 ) POSTDEVEL PMENT DUNTON Type 8 4-hr 10-YR Rainfaf1= .60'+ Prepared by The Environmental Design Partnership, LLP Printed 911412017 HydroCA06 8.50 s!n 000476 0 2007 HydroCAD Software Solutions LLC Page 13 Volume Invert Avail.Stora a Storage Description #1 338.00' 180 cf Cetstom Stage Data (Irregular)Usted below (Recalc) Elevation Surf.Area Perim_ Voids Inc.Store Curn. tare vvet.kea feet (sq-ft) feet tubi feet cubio-feet s -ft 338.00 75 35.4 40.0 4 0 75 337.00 75 36.0 40.4 30 30 114 338,00 75 35.0 100.0 75 105 145 339.00 75 35.0 100.0 75 180 184 Device Roufinn Invert Outlet Devices #1 PKmary 338.50' 3.0' long x 1.0' breadth OVERFLOW Head (feet) 0.24 0.40 4.60 0.84 1.00 1.24 1.40 1,60 1,80 2,00 2."'50 3.40 Coef. (English) 2.89 2.72 2.75 2.85 2.98 3.48 3.20 3.28 3.31 3.30 8,31 3.32 #2 Discarded 336.00' 3.000 in1hr EAItratiion over Surface area 1piscarded OutFlow Max-4.41 efs @ 11.75 hrs H =335.05' (Free Discharge) =E filtration (E fi'iltrat€on Controls 4.41 cfs) rlmary OutFlowMax--0.00 cfs @ 5.40 hrs H1 =338.00' (Free Discharge) =OVERFLOW (Controls 0.00 cfs) Summary for Pond 7P: RAIN GARDEN #5 Inflow Area = 0.414 ac, 78.189 impervlousT Inflow Depth = 2,10" for 10-Vii event inflow = 0.44 cfs @ 11.97 hrs, Volume= 0.042 of Outflow - 0M cfs iM 11.75 hrs, Volume= 0.002 af, At[en= 85%, Lag= 0.0 min Discarded = 0.01 cfs @ 11.75 hrs, Volume= 4.042 of Primary - 0.00 cfs 1§ 5.00 hrs, Vofume= 0.000 of Routing by for-Ind method, Time Span= 5.0"00 hrs, dt= 0.05 hrs Peak Elev= 338.82' 12.22 hrs SurfArea= 75 sf Storage- 24 Cf Plug-Flow detention time= 30.0 min calculated for 0.002 of(100% of inflow) Center-of-Mass det. time= 30.0'min ( 847.8- 817.8) Volume Invert Avail. torn a Storage DescCi 'on #1 336.00' 180 cf Custom Stage Data (Irregular)LTsted Wow (Recalc) Elevation Surf-Area Perim. Voids Inc.Stnre Cum.Store Wet.Area (feet) (Sq-ft) feet % cubf c4eet tubi feet -ft 336.04 75 35.0 40.0 0 0 75 337.00 75 35.0 40.0 30 30 110 338.00 75 35.4 100.0 75 105 145 339.00 75 35.0 100.4 75 180 180 Device Roubn_q Invert Outlet Devices #1 Primary 338.50` 3.0' long x 1.4' breadth OVEW-LOW !-'lead {feet) 0,20 0,44 4.60 0.80 1.00 1.20 1A0 1.80 1.80 2.00 PO TDEVELOPMENT DUN` ON Type 11 4-fir 10-YR Rain FaIN 3.60" Prepared by The Environmental Design Partnership, LLP Printed 9!1412017 dro AD& B.50 sin 000476 0 2007 H dro AD Software Solutions LLC Page 14 2.00 3.00 Coef, (English) 2,09 2,72 2.75 2.85 2.98 3.08 3.20 8,28 3.31 3.30 3.31 3.32 #2 Discarded 330,00' 3.000 Irslhr Fxfiltration over Surface area MiscardedOutFlowMax-0,01cfs, 11.75firs H =336,05' (Free Discharge) Wiltration (Exfiltration Controls 0.01 cfs) Primary OutFlo Max=0.00 cfs a 5.00 hrs HVV=336.00' (Fres Discharge) -1=OVERFLOW ( C ontre[s 0.00 cfs) Summary for Link A: LAKE GEORGE Inflow Area = 0.708 ac, 30.37% Irnpery€cus, Inflow Depth > 1.07" for I0-YR event How = 1.00 cf� @ 11E 913 hrs, VoILrme= 0.003 of Primary - 1.06 cfs a 11.99 hrs, Volurne- 0.063 af, Atten� 0%, Lag= 0,0 rain Primary outflow = Inflow, T[rne Sparta 5.00-60.00 hrs, dt= 0,05 hrs PO TDEVELOPMENT DUNTON Type 11 4-hr 25 YR Rainfafi=4. 0" Prepared by The Environmental Design Partnership, LLP Hinted 9114/2017 H dmCAD(&8.50 stn 000475 2007 Fit droCAD o%vare Solutions LLC Pa e 15 Time span=5.00-60.00 hrs, dt=0,45 hrs, 1101 points Runoff by SCS TR-2r] method, UH=SCS Reach routing by tordnd+Trans method - Pond routing by for-Ind method SubcatchmentA1: - Runoff Area=6745 sf 36.81% ImporvIous Runoff Depth=1,82" Flow Length=179 Tc=6_0 min C N=75 Runoff--0.42 cfs 0.028 of SubcatchmieMA2: - Runoff Area=438 sf 100.00% Irnpervious Runoff Depth>3.86' Tc=0.0 ruin CN=98 Runoff=0.06 ofs 0.003 of SuboatchmentA3: - Runoff Area=830 sf 91.5716 Impervious Runoff Depth53.40" To=6.0 ruin C N=93 Runoff--O.10 cfs 0.005 of �r'uhcatchrnentM. - Runoff Area=1,725 sf 68.12% Imper0ous Runoff Depth=2.13" Tc=8,0 rain CN=79 Runoff--0.14 cfs 0.007 8f ubcatchment A5: - Runoff Area--435 sf 78.16% Impervious Runoff Depot=2,64" Tc;=6.0 mIn C N=85 Runoff=0.04 ofs 0.002 of SubcatchrnentM: - Runoff Area=438 sf 78.16% Impervious Runoff Depth=2.64" TG--6,0 rain ON=85 Runof--0.04 cfs 0.002 of ubcatchmentA7: - Runoff Area=770 sf 82.47% Impervious Runoff Depth=2,92" Tc=:6.0 min CN=88 Runoff=0.09 cfs 0.004 of SubcatchmentA$: - Runoff Area=20.900 sf 19,14% Impervious Runoff Depth=1.07" Flow Length=225' Mope=U.30M T Tc=5,8 min CN=73 Runoff`1.37 cfs 0.067 of Pond IP: GRASS DEPRESSIOM Peak Elev=337.51' torage^411 cf Inflow=0,42 cfs 0.020 of Discarded=0.01 cfs 0.019 of Primary:=0.01 cfs 0.001 of Outflow=0.03 cfs 0.020 of Pond 2P: RAIM GARDEN#1 Peale EIev=359.54' Storage=52 cf Inflow=0.09 cfs 0.004 of Outflotiw=0.05 cfs 0.004 of Pond 3P: PERM EASLEPAVE RS Peak EIev=339.00' Storaga=17 cf Inflow=0,06 cfs 0.003 of OlJtflow=0.03 cfs 0.003 of Pond 4p. RAIN GAR DEN#2 Peak EIev=351.58' Storage--41 cf Inflow=0.10 cfs 0.005 of Outflow=0.11 cfs 0,005 of Pond SP: RAID GARDEN#3 Peak EIev=350,32' Storage--14-4 cf lnflow�0.27 cfs 0,017 of Outfiaw=0,05 cfs 0.017 of Pond SP: RAIN GARDEN44 Peak EIev=337,05' Storage=33 cf Inflow=0,04 cfs 0,402 of Discarded=0,41 cfs 0,002 of Primary=0.40 cfs 0,000 of Outflow=0.01 cfs 0.002 8f Pond 7P: RAIN GARDEN#5 Pear Elev=337.05' Storage=33 cf 1n lour=0.04 cfs 0.002 of 0iscarded=0-01 cfs 0.002 of Prirnary=4_{l0 cfs 0.000 of 0utflow=0.01 cfs 0_002 of Link A: LAKE 0 EORGE Inflovj=1.42 cfs 0.084 of Primary=1,42 cfs 0.084 of PO TDEVELOPMENT DUNTON Type 11 4-hr 25 YR Rai'nfal1=4.20" Prepared by The Environmental Design Partnership, LLP Printed 911412017 H MCAD 8.50 sin 000476 02007 H droCAD Software Solutions LLC Pae 96 Total Runoff Area= 0.718 ac Runoff Volume = 0.111 of Average Runoff Depth = 1.86" 68.67% Pervious = 0.493 ac 31.33° Impervious = 0.225 ac PO TDEVELOPMENT_DUNTON 7 pe all 4-hr 25 YR Rai}7faf1=4,20" Prepared by The Envii ronmerstaI Design Partnersh1p, LLP Printed 911412017 H dro ADO18,50 stn 000+76 9 2007 Fl droCAD Software Solutions LX Page 17 Summary for Subcatchment Al .- - Runoff = 0,42 cfs a. 11.98 hrs, Volume= 0,020 af, Depth= 1.82" Runoff by SCS TR-2 0 method, U H;::S CS, Time Span= 5,00-60.00 hrs, dt= 0.05 hrs Type 11 24-hr 25 YR Rai nfall=4.20° Area (sfl ON Description 2,115 98 Paved parking & roofs 1,155 65 Woods/grass comb., Pair, H G B 2,475 61 >75% Gross cover, Goad HSG 13 5,745 75 Weighted Average 3,630 Pervious Area 2,115 1mpervious Area Tc Length Slope Velocity Capacity Descrip#ion rain feet 2 D kLs-ec cfs 4,5 50 0.3000 0.19 Sheet Plow, Woods- Light underbrush rx^ 0A0O P2= 2.75" 0.3 120 0.1500 7.86 ha[[ow Concentrated Flow, Paved [ v- 20.3 fps 4.8 170 Total', Increased to minimum Tc = 6.0 min Summary for Subcatchment A2: Runoff - 0.06 cfs @ 11,96 hrs, Volume= 0.003 of, Depth> 3.85" Runoff by SCS TFC-20 method, UH-SCS, Time Span= 5.00-60.00 hrs, dt= 0,05 hrs Type 11 24-lir 26 YR Rainfall=4,20" Ares s N Deseri tion 435 96 _ paved parking & roofs 435 Impervious Area Tc Length Slope Wocity Capacity Descriptions min feet fYftl (ftlsec) (cfs 6.0 Direct Entry, DIRECT Summary for Subeatchment X13: Runoff = 0.10 efs a 11.96 hrs, Volume= 0.005 af, Depth> 3.40„ Runoff by SGS TR- 0 method, UH=SGS, Trne Span= 5.00-60.00 hrs, dt= 0.05 hrs Type 11 24-hr 25 YID Rainfall=4.20" PO TDEVELOPMENT DUNTON Type 11 4-hr 25 YR Rainfall=4.20" Prepared by The Environmental Design Partnership, LLP Printed 9194/2017 N dro ADV 8.50 sly 0.30475 0 2007 HydraCAD Software Solutions LLC Page 18 Area (sf) Cid Description 760 98R Laved parking & roofs 70 39 >75% Grass cover, Good, HSG A 860 93 Weighted Average 70 Pervious Area 760 Impervious Area Tc Length Slope VelocRy Capacity Description ruin feet (ft/ft) (ft/sec) cfs 6_0 Direct Entry, DIRECT Summary for Subcatchment A4: - Runoff = 0,14 cfs c 11.97 ]yrs, Volume= 0.007 af, Depth= 2.93„ Runoff by SCS TR-20 method, UH=SCS, Time Span= 5,00-60.00 hrs, d#= 0,05 hrs Type II 24-hr 25 YR Rainfa€1=4.20" Area (sf) CN Description _ 1,175 98 Paved parking & roofs 550 39 >75% Grass cover, Good HSG A 1,725 79 Weighted Average 550 Pervious Area 1,175 1 rnpervioas Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftfsec) (cfs) 6.0 Direct Entry, DIRECT Summary for Suboatchment AS: Runoff - 0.04 cfs @ 19.97 hrS, Volume;-- 0.002 af, Depth= 2,64" Runoff by SCS TR-20 method, UH=SGS, Time Span= 5,00-50,00 hrs, dt= 0,05 hrs Type 1124-hr 25 YR RaInfn11=4,2 0" Areas s Ch! Description 340 98 Paved parking & roofs * 95 39 RAIN GARDEN 435 85 Weighted Average 95 Pervious Area 340 Impervious Area Tc Length Slope Velocity Capacity Description rrri feet ftJf€) (fuser') Ws) 6.0 Direct Entry, DIRECT PO TDEVELI PMENT_DUNTON Type 11 4-fir 25 YR Rarr7faff--4. 0" Prepared by The Environmental Design Partnership, LLP Printed 9/1312017 H V droCADO 8 50 sin 000476 E]2007 HydroCAD Software SoIu;ions LLC Pape 19 Summary for Subcatchment A6: - Runoff = 9.04 ds a 11.97 hrs, Volume= 0-002 af. Depth 2-64" Runoff by SCS TR-20 method, UH=SCS, T[me Span= 3.00-60.00 hrs, dt� 4-05 hrs Type I1 4-hr 25 YR Rainfall=4. 01e Area sf GN Description 340 98 Paved parking & roofs 95 39 RAIN GARDEN 435 85 Weighted Average 95 Pervious Area 340 Impervious Area Tc Length Slope Ve[ocity Capacity Description (min) feet) (fUft) (ftfsec cfs 6-0 Direct Entry, DIRE=CT Summary for Subcatchment A7: - Runoff - 9.09 ds @ 11-97 hrs, Volume= 0.004 af, Depth= 2.92° Runoff by SGS TR-20 method, UH= C , Time Span= 5.00-60.90 hrs, dt= 0.05 hrs Type 1124-hr 25 YR Ralnfa11=4.20" Areas CN Descri #ion 635 98 Laved parking & roofs _ 135 39 >75% Grass cover, Good, HSG A 770 88 Weighted Average 135 PerVrious Area 635 Impervious Area Tc Length Slope Ve[ocity Capacity Descrlp icn min feet ftffk) (Ns@g) cfs 6.0 Direct Entry, DIRECT Summary for Subcatchment A8: - Runoff 1.37 cfs @ 11,89 hrs, Volume= 0.067 af, Depth= 1,67" [runoff by SGS TFC-20 method, UH=SCS, TimeSpan;-- 5-00-60.00 hrs, dt= 0.05 hrs Type 11 24-hr 25 YR Rainfall=4.20" Area {sf) CN Description _ 2,520 82 Woods/grass comb., [-air, HSG D 4,000 96 paved parking & roofs 14,380 65 Woods/grass cprnb.- Fair HSG B 20,900 73 Weighted Average 16,900 Pervious Area 4,000 Impervious Area PO TDEVELOPMENT DUNTON Type if 24-hr 25 YR Rainfaf1=420" Prepared by The Environmental Design Partnership, LLP Printed 911412017 H ydro AM 8.50 sfn 000476 0 2007 H draCAD Scftware S ol utions LLC Pa a 20 To Length dope Velocity Capacity Description rain feet) (fVft) (ftlsec cfs 5.9 70 0.3000 0.20 Sheet Flow, Woods. Light underbrush n= 0.400 P2= 2.75" 0.9 155 0.3000 2.74 Shadow Concentrated Flow, Woodland Kv= 5.0 fps 6.8 225 Total Summary for Pond 1P: GLASS DEPRESSION #1 Inflow Area = 0.132 ac, 36.81% IrnpeMeus, Inflow Depth = 1.82" for 25 YR event Inflow = 0.42 cfs @ 11,98 hrs, Valurne= 0.020 of outflow CM cfs @ 12.85 hrs, Volurr ie= 0.020 af, Attain= 93%, Lag= 52.3 min Discarded 0.01 cfs @ 11,55 hrs, Volume= 4.019 of Primary = CAll cfs @ 12.85 hrs, Vp[urne= 0.001 of Routing by Star-1nd method, Time Span 5,00-60.00 hrs, cit- 0.05 hrs Peak EIev= 337,51' @ 12,85 hrs Surf.Area= 215 sf Stcrag8= 411 d Plug-Flaw detention time= 277.2 min calculated for 0.020 of(900% cf inflow) Center-of-Mass det. tlrne= 277.9 mitt ( 1,197.4 - 840.6 ) Volurne Invert Avail.Stora e Storage Description #1 335.00' 516 cf ustaom Stage Data (Irregular)Listed below {Recalc} Elevation Surf.Area Perim. Voids Inc,Store Curn.Stare Wet-Area feet (Sq-ft) feet cubic-feet cubic-feet -ft 365.00 215 70.0 40.0 0 0 215 336M 215 70.0 40.0 86 66 285 337.00 215 70.0 100.0 215 301 355 338.00 215 70.0 100.0 215 516 425 Device Routing Invert Outlet Devices #1 Primary 337.50' 3.0' long x 1.0' breadth OVERFLOW Head (feet) 0,20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Ooef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #2 Dlsc2arded 336.00' 3.000 infhr ExfiItration over Surface area Discarded OutFlovv fvlax=0.09 cfs a 11.55 hrs HUV=335.03' (Free Discharge) 't--2=Exf1ltrat1on (Exfiltration Controls 0.01 cfs) rimary 0 utF I ow IVlax=0.01 cfs @ 12.85 }yrs IOW=337.6V (Free Discharge) 9=OVERFLOW Melr Controls 0.01 cfs @ 0.29 fps} PO TMVELOPMENT ]UNTON Type It 24-hr 25 YR Rainfafl=4.20" Prepared by The E nvi ro n.m e n ta I Design Partnership, LLP printed 9/1412017 H dro ADO 8.50 sin 000476 0 2007 H draCAD Software Solutions LLC Pa e 21 Summary for Pond 2P, RAW GARDEN 41 Inflow Area 0,018 ac, 82,47% Impervious, Inflow Depth � 2,92" for 25 YR event Inflow 0.09 cfs 11.97 hrs. Volume^ 0.004 of Outflow = 0.05 cfs 12.46 hrs, Volume= 0,004 af, Atten= 38"10, Lag= 5.7 min Primary - 0.05 cfs ig 12.06 hrs, Volume= O.004 of Routing by for-Ind method, Time Span= 5.O MO.00 hrs, dt= 0.05 hrs Peak Bev= 359.54' @ 12.07 hrs urf.Area= 95 sf Stnrage= 52 cf Plug-Flow detention time= 24.2 mfn calculated for 0.004 of(100% of Inflow) Center-cf Mass det. time= 24.2 rain (825.4 - 801.2 ) Volume Invert Avail. tars a Storage Description #1 359,00, 95 cf Dustorn Stage Data (Irregulsr)LIsted below ( ecalc) Elevations Surf.Area Perim. Inc. tore Durn3tore Wet-Area feet (Sq-ft feet cubic-feet cubic-feet (Sq-ft) 859.00 95 45.0 0 0 95 360.00 95 45.0 95 95 140 Device Routing Invert Outlet [devices #1 Device 2 359.00' 5.000 inlhr FILTER TO UKDERDRAI N over Surface area above Invert Excluded Surface area = 0 sf #2 Primary 355.5G' 6.0" x 8.0' long Culvert CPP, square 6d:9e headwa11r Ke= 0.500 Outlet Invert 352,00' S= 0.43757 c^ O.900 n= 0.013 Corrugated PE, smooth interior #3 Device 2 359.50' &0" Horiz. fl" STANDPIPE Limited to weir flaw C= 0.600 Primary OutFlow Max�0.05 cfs @ 12,06 hg's H =359.54' (Free Discharge) t--2=Cv[vert (Passes 0.05 cfs of 1.84 cfs potentiaf flow) LI=FILTER TO UNDERDRAI N (E fi[tration Controls 0.01 cfs) 3 STANDPIPE (Weir Controls 0.04 cfs a 0,63 fps) Summary for Pond 3P: PERMEABLE PAVERS Inflow Area = 0.010 ac,100.O0% Impervfous, Inflow Depth > 3.85" for 25 YR event Inflow - 0.06 cfs @ 11.96 hrs, VeIurne= 0.003 of Outflow - 0.03 cfs @ 11.99 hrs, Volume 0.003 af, Atten= 45%, Lag;-- 0.0 ruin Discarded 0.03 cfs (c 11.90 hrs, Volume= 0.003 of Routing by for-Ind method, Time Span= 5.00-60.00 hrs, dt= 0,05 hrs Peak Elegy+= 339.00' 12.05 hrs Surf.Aren= 405 sf Storage= 17 cf Plug-Flow detention time;-- 3.9 min calculated for 0.003 of(100% of Inflow) Center-of Mass det. tirne= 3.6 min ( 756.0- 762.4 ) Volume Invert Avail. torn a Storage Descrf tion} #1 338.90' 438 cf Custom Stage Data (Irregular)Usted below (Recalc) 1,096 cf Overall x 40.U% Vcids PO TDEVELOPMENT DUNTON Type fl 4-hr 25 YR Rainfaff-4.20 Prepared by The Environmental Design Partnership, !_LP Printed 911412017 dro ADS 8.60 stri 000476 0 2007 Hydro CA0 Software SolLAoP. LLC Pace 22 Elevation Surf,Area Perim. lnc.Stom urn. tore l et,Area feet (sq-ft) feet cubic-feet cubic-feet (sq-ft) 338,90 435 85.0 0 0 435 340.90 435 85.8 870 870 505 341.42 435 55.0 226 1,095 649 Device Routing Invert Cutle# devices 1 Discarded 338.90' 3.000 i n I h r ExfItration over Surface area scarded OutFlow Max=0.03 cfs a 11.90 hrs H1 =338.94' (Free Discharge) '[=Exfiltration (.Exflltration Controls 0.03 cfs) Summary for Pond 4113: RAIN GARDEN ## Inflow Area 0.019 ac, 91,57% Impervious, Inflow Depth > 0,40" for 25 `E'R event Inflow = 0.10 cfs @ 11.96 hrs, VofumeT 4.005 of Outflow = 0.11 cfs @ 11.97 Ctrs, Volume= 0,005 af, Aden= 0%, Lag- 0,6 ruin Primary = 0.11 cfs @ 11.97 hrs, Volume 0.005 of Routing by Star-Ind method, Time Span= 5.00--50.00 hrs, dt= 0.05 hrs Peak Elev= 351.58' @ 11.97 hrs 8 urf_Area= 70 sf Storage= 41 cf PI ug-Row detentian.time= 19.5 min calculated far 0.005 of(100% of inflow) Center-of-Mass det. tune= 19.5 min ( 801,8 -782.3 ) Volume Invert Avail. torage Storage Description #1 301,001 70 cf Custom Stage Data (Irregular)List8d bal.o (Resale) Elevation urf,Area Perim, Inc-Store Oum. tore Wet,Area feet (Sq-ft) feet cubic-feet cubic-feet (Sq-ft) 351.00 70 35.0 0 0 70 352.40 70 35.0 70 70 105 Device Routing Invert Outlet Devices 91 Device 2 351.00` 5.000 in1hr FILTER TO UNDERDRAIN over uri'ace area above invert Excluded Surface area = 0 sf 42 Primary 347,50` 6.0" x 10.0' long Culvert CPP, square edge headwall, 1 e= 0.500 Outlet Invert= 347,00' S;-- 0.0500V Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #3 Device 2 351.50` 6.0" Heriz. 6" STANDPIPE Limited to weir flow C= 0.600 Primary 0utFIow Max=0,10 cfs @ 11.97 hrs H =351.57' (Free Discharge) 16-2;--C u I ve rt (Passes 0.10 cfs of 1.85 cfs potential flow) LFILTER TO UNDERDRAIN {Exfiltratian Controls 0,01 ofs) _13:8" STANDPIPE (Weir Controls 0,09 cfs @ 0.85 fps) PO TDEVELOPMENT_DUNTON Type If 4-hr 25 YR Rain fafi=4.20" Prepared by The Environmental Design Partnership, LLP POnted 911412017 HydroCADID8.50 sin 600476 C)2007 H droCAL) othvare olutions LLC Page 23 Summary for Pond 5P: RAIN CARDED] #3 Inflow Area = 0.076 ac, 77,29"/b Impervious, Inflow Depth > 2.63" for 25 YID event Inflow = 0.27 cfs @ 19,97 hrs, Volume= 0.617 of Outflow 0.05 cfs a 11,80 hrs, Volume= 0.017 af, Attert= S1%, Lag= 0.0 min Primary = 0.00 cfs @ 11.80 hrs, Volume= 0.097 of Flouting by Stor-Ind method, Time Span= 5,00-60,00 hrs, dt-- 0.05 hrs Peals Bev= 350.32' 92.22 hrs Surf.Area=445 sf torage=; 144 0f Plug-Flow detention time= 15.3 min calculated for 0.017 of(100% of inflow) Genter�of Mass de#_ time= 15.2 miry ( 834.8- 899.4) Volume Invert Avail,Stora a Storage Descri tion #1 350.00" 445 cf Cu.5tom Stage Data (irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc. fere Cum.Store Wet.Area feet (Sq-ft) feet cubic-feet cubic-fee# (sq-ft) 350.00 445 95.0 0 0 445 351.00 445 95.0 445 445 540 Devioe Routing _ _ Invert Outlet Devices *1 Device 2 350,00' 5.0001nlhr FILTER TO UNDERaRAI N over Surface area above invert Excluded Surface area = 0 sf #2 Pdmary 347.00' 6.D" x 35.0' long OuIvert DPP, square edge headwall, Ke= 0,500 Outlet Invert= 346.50' S= 0.0143 ' Dc= 0.900 n= 0.013 Corrugated PE, smooth interior #3 Device 2 350.50' 6.0" Horiz. 6_' STANDPIPE Limited to weir flow C= 0.600 rimary OutFlow Max=0.05 cfs @ 11.80 hes HW-350.01' (Free Discharge) =culvert (Passes 0.05 cfs of 1,32 cfs potential flow) 1=FILTER TO UNDERDRAIN (E filtraation Controls 4.05 cfs) 3=6" STANDl IPE (Ccntrols 4.00 cfs) Summary for Gond P: RAIN CARDED 44 tnflow Area = 0.010 ac, 78.16% Impervious, Inflow Depth = 2.64" for 25 YR event Inflow - 0.04 efs @ 11.97 hrs, Volume= 0.002 of Outflow 4.01 cfs @, 11.70 hrs, Volume 0.002 af, Man= BW Lag= 0.0 min Discarded = 0.01 cfs c 11.70 hrs, Volume= 0,002 of Primary = 4.00 ds @ 6.00 hrs, Volume= 0.000 of Routing by for-Ind method, Time Spann 5.00-60,00 hrs, dt^ 0.06 hrs Peak EIev= 337.05' @ 12,33 hrs Surf.Area= 75 sf Storage= 33 cf Plug-Flow€Ietiantion Iime-- 43.3 min calculated for 4,002 of (100% of inflow) Center-of-Mass det, bene= 43.3 min ( 854.7- 811.4 ) PO TDEVELOPMENT DUNTON Type P 4-hr 25 YR Rain faff--4. 0„ Prepared by The Environmental Design Partnership, LLP Printed M4/2017 H yd roCAD9 8.50 s!n 000 176 O 2007 HydrL-CAU Software Solutions LLC Paae 24, Volume Invert Avaii. tora a Storage Description #1 336.00' 180 cf Custom Stage Data (Irregu,lar)Lisled be]ow (Re calc) Elevation urf.Area Perim. Voids Inc_ tore Gum. tore VVst.Are2a feat 000 feet % cubic-feet cubic-feet s -ft 336.00 75 35.0 40.0 0 0 75 337.00 75 35.0 40.0 30 3l? 110 338,00 75 35.0 100.0 75 105 145 339.00 75 35.0 100.0 75 180 180 Device Routing Invert Outlet Devices _ ##1 Primary 338.50' 3.0' long x 1.0' breadth OVERFLOW Head (feet) 0.20 0.40 0,60 0.80 1.00 1,20 1.40 1.60 1 _s0 2.00 2.50 3.00 Oaef. (English) 2.69 2.72 2.75 2.85 2.98 3,08 3.20 3.28 3.31 3.30 3.31 3.32 ##2 Discarded 305,00' 3.000 inthr Wiltration over Surface area Discarded OutFlo Ma =0.01 cfs @ 11.70 hrs H1 =33 .04' (Free Discharge) "r--2=Exfiltrat1on (Exfiltrabon Controls 0.01 cfs) Primary outnow [fax=0,00 Cf5 1@ 5.00 hrs HHV=338.00` (Free Discharge) 't-1 mOVERFLO ( Controls 0.00 cfs) Summary for Pond 7P: RAIN GARDEN #5 Cnflow Area = 0.010 ac, 78.16% 1mpervlous, Inflow Depth = 2,64" for 25 YR event Inflow = 0.04 cfs a 91.97 hrs, Volume= 0.002 of Outflow = 0.01 cfs @ 11.70 hrs, Volume= 0.002 af, Atten= 88%, Lag= 0.0 rain Discarded = 0.01 cfs @ 11.70 hrs, Volume= 0.002 of Primary = 0.00 cfs @ 5.00 hrs, Volume- 0.400 of Routing by Ston-Ind rnethod, Tjme Span= 5.0060.00 hrs, dt= 0.05 hrs Peak Elev= 937.05' @ 12.33 hrsSurf-Area= 75 sf Storage= 33 cf Plug-Flow deterttiort time= 43.3 min cnIculated for 0.002 of(100% of inflow) Center-of-Mass det. time= 43.3 rain ( 854.7 - 811,4 ) Volume Invert Avail. tcrage Storage Description _ #1 336.00' 180 cf Custom Stage Data (Irregular)Listed below (Recalc) - Elevation Surf.Area Perim. Voids lnc.Store Cum-Store Wet.Area Leet) (sq-ft) feet "A) (cubic-feet) (cubic-feet s -ft) 336.00 75 35,0 40.0 0 0 75 337.00 75 35.0 40.0 30 30 110 338.00 75 35.0 100.0 75 105 145 339,00 75 35.0 100.0 75 180 180 Device Routing Invert Outlet Devices #1 Primary 338.50' 3.0' long x 1,0' breadth OVERFLOW Head (feet) 0.20 0.40 0,60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 PO TDEVELI PME T DUT TON Type I! 24-hr 25 YR Rainfall-4.20" Prepared by The Environmenta I Design Partnership, LLP Printed 9//412017 H droCAEG 8.50 sin 000476 0 2007 Fi dro AD Software Solutions LLQ Pago 25 2.50 100 oef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #2 Discarded 336.00' 3.000 in/hr Exflltration over Surface area Miscarded OutFlow MaxT0,01 cfs 11,70 hrs HW=336.04' (Free Discharge) E01tratior, {Exfiftration Controls 0.01 ofs) rlrnary Ou#Flow I ax=0.00 cfs @ 5.00 hrs HW--33 .00' (Free Discharge) =OVERFLOW ( Controls 0.00 cfs) Summary for Link A. LAME GEORGE Inflow Area 0.708 ac, 30.37% Impervious, Inflow Depth > 1.43" for 25 YR event Inflow - 1.42 cfs @ 11.99 hrs, Volume= 0.084 of Primary - 1.42 cfs @ 11.99 hrs, Volume= 0.084 af, Atten, 0%. Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-60.08 hrs, dt= 0.05 hrs