Loading...
inspectionsINSPECTION WORKSHEET (MULT-006061-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: Inspection Date: Inspector: Case Module: Inspection Status: Inspection Type: CC-000480-2017 08/21/2018 John O'Brien Permit Partial Pass Multi-Dwelling, Hotel, Motel Fin- al Job Address:Parcel Number:524 AVIATION RD Queensbury, NY 12804 302.5-1-96.1 Contact Type Company Name Name Primary Owner Aviation Hospitality, LLC Jariwala, Bhavik Applicant Bast Hatfield Construction LLC Fretto, John Granted Permission Aviation Hospitality, LLC Jariwala, Bhavik Contractor Bast Hatfield Construction LLC Fretto, John Architect AIA Architect , Checklist Item Passed Comments Aug 21, 2018 Page (1) INSPECTION WORKSHEET (MULT-006061-2018) Checklist Item Passed Comments Building Inspector Notes YES 6/21/18 Preliminary Final Inspection Not Approved -Install all interior signage and room numbers -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits and miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Need to inspect elevator shaft to verify all penetrations have been sealed. -Final Electrical Inspection -Blower Door Test -HVAC Air Balancing Report -Final approval letters from Architect, Engineer and the Special Inspections Agency (Construction Technologies). -Submit all special inspections reports for soil compaction, concrete testing, structural steel and structural wood framing. These can be submitted on a thumb drive. -Submit a letter certifying that the building envelope. Electrical and Mechanicals were installed in accordance with the approved 2015 IECC COMcheck. -Submit the Final Survey. -Complete all site items. Separate inspection! -Complete all fire marshal's items. Separate inspection! -Complete parking lot striping and handicapped parking and no parking signage. 6/26/18 Final Inspection 3rd & 4th Floors Not Approved -Miscellaneous corridor and room doors need final adjustments 6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! 7/5/18 Final Inspection Partial Approval TEMPORARY CO APPROVED -OK TO OCCUPY Conditions: -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. -Complete all exterior caulking -Submit As-Built Construction Plans -Complete remaining Fire Marshal's Items. Aug 21, 2018 Page (2) INSPECTION WORKSHEET (MULT-006061-2018) Checklist Item Passed Comments Chimney Height / B Vent / Direct Vent Location YES Plumb Vent Thru Roof Minimum 6 YES Outside Spigots have Air Gap YES Roof Complete YES Ext Finish /Grade Complete/6 in 10ft or Equivalent YES Interior/Exterior Railings 34 into 38 inch YES Interior Handrails Stairs 1 or More Risers YES Guardrails 42", Balusters 4 Minimum Spacing YES Vestibules for Exit doors greater than 3000 sq. ft YES Doors 36 Lever Handles YES -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. Headroom 6ft 8 on Stairs YES Bathroom / Kitchen Watertight YES Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet YES Safety glazing: w/in 5' of tub/shower - stairwell win/adj to drs YES Smoke Detectors 3' from Kitchens & Baths R314 YES Dryer Duct Max Length 35', Labeled Over 35'YES Bathroom Fans Plumbing Fixtures Complete YES -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. 6/27/18 complete plumbing issues on second floor Foundation Insulation YES Bollard Protection: 15" footings & 3' below grade YES Bollard Protection:4' on ctr/3' abv grd, gas meter YES Aug 21, 2018 Page (3) INSPECTION WORKSHEET (MULT-006061-2018) Checklist Item Passed Comments Fire Separation, ¾, 1, 2 hr.YES -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits, miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Seal electrical conduit sleeves at ceilings of each electrical room Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 Hour YES Elevator Chase 20 Minute Fire Door/Self-Closing Hardware YES -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. H/C Accessibility Parking Signage YES -Stripe handicapped parking spaces at south end exit. Universal Symbol of Access displayed - on all H/C signs YES Hydraulic Elevators: Non-comb. Plumbing REQUIRED YES Elevator Operation and Signage Shaft Sealed YES -Need to inspect elevator shaft to verify all penetrations have been sealed. Gas Shut-off Exposed & Regulator (18) Above Grade YES Furnace Hot Water Heater operating YES Low Water Shut-Off for Boiler YES Blower Door Test Certification YES Test failed needs to be redone. BLOWER DOOR TEST RECEIVED AND PASSED. Relief Valve ,Heat Trap/Water Temp 110 deg or less YES -Relief Valve downspouts not installed on two heating units in 1st floor mechanical room as discussed. Light Ventilation per Room Safety Glazing YES Attic Access 30 x 20 x 30 (h)YES Roof Access Aug 21, 2018 Page (4) INSPECTION WORKSHEET (MULT-006061-2018) Checklist Item Passed Comments Final Electrical YES Site Plan / Variance required NO -Complete all site items and submit engineer's site certification. Final Survey Plot Plan NO -Submit the Final Survey Public Sewer Sign-Off YES November 2017 Building/Apartment Num on Bldg or Driveway YES -Address at road Bldg Access All Sides 20ft Drivable Surface YES Handicapped Ramps YES Handicapped Units YES Engineer or Architect Approval YES -Submit final approval letter from Tom Joslin at Construction Technologies RECEIVED! Aug 21, 2018 Page (5) INSPECTION WORKSHEET (MULT-006061-2018) Checklist Item Passed Comments Okay To Issue Temp CO or Permanent CO YES 6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! 6/30/18 Final Inspection Approved - Temporary CO Conditions: -Complete All Open Items -Complete All Outstanding Fire Marshal's Items -Complete All Outstanding Site Items NOTE: ALL LIFE SAFETY ITEMS HAVE BEEN ADDRESSED! 7/3/18 Final inspection Partial Approval ! -Address at road -Complete all site items. -Submit the Final Survey -Stripe handicapped parking spaces at south end exit. -Complete all fire marshal's items. 7/5/18 Final Inspection Partial Approval TEMPORARY CO APPROVED -OK TO OCCUPY Conditions: -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. -Complete all exterior caulking -Submit As-Built Construction Plans -Complete all remaining Fire Marshal's Items. 8/21/18 Final Inspection Not Approved Temp CO is still active. Remaining Items: -Submit As-Built Construction Plans -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. Aug 21, 2018 Page (6) O'Brien, John (Inspector) INSPECTION WORKSHEET (MULT-004730-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000480-2017Case Module:Permit Inspection Date:06/29/2018Inspection Status:Partial Pass Inspector:John O'BrienInspection Type:Multi-Dwelling, Hotel, Motel Fin- al Job Address:524 AVIATION RDParcel Number:302.5-1-96.1 Queensbury, NY 12804 Contact TypeCompany NameName Granted Permission\[Aviation Hospitality, LLC\]Jariwala, Bhavik Primary Owner\[Aviation Hospitality, LLC\]Jariwala, Bhavik Applicant\[Bast Hatfield Construction LLC\]Fretto, John Contractor\[Bast Hatfield Construction LLC\]Fretto, John Architect\[AIA Architect\], Checklist ItemPassedComments Jun 29, 2018Page (1) INSPECTION WORKSHEET (MULT-004730-2018) Checklist ItemPassedComments Building Inspector NotesNO6/21/18 Preliminary Final Inspection Not Approved -Install all interior signage and room numbers -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits and miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Need to inspect elevator shaft to verify all penetrations have been sealed. -Final Electrical Inspection -Blower Door Test -HVAC Air Balancing Report -Final approval letters from Architect, Engineer and the Special Inspections Agency (Construction Technologies). -Submit all special inspections reports for soil compaction, concrete testing, structural steel and structural wood framing. These can be submitted on a thumb drive. -Submit a letter certifying that the building envelope. Electrical and Mechanicals were installed in accordance with the approved 2015 IECC COMcheck. -Submit the Final Survey. -Complete all site items. Separate inspection! -Complete all fire marshal's items. Separate inspection! -Complete parking lot striping and handicapped parking and no parking signage. 6/26/18 Final Inspection 3rd & 4th Floors Not Approved -Miscellaneous corridor and room doors need final adjustments 6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! Chimney Height / B Vent / Direct Vent LocationYES Plumb Vent Thru Roof Minimum 6YES Outside Spigots have Air GapYES Roof CompleteYES Ext Finish /Grade Complete/6 in 10ft or EquivalentYES Jun 29, 2018Page (2) INSPECTION WORKSHEET (MULT-004730-2018) Checklist ItemPassedComments Interior/Exterior Railings 34 into 38 inchYES Interior Handrails Stairs 1 or More RisersYES Guardrails 42", Balusters 4 Minimum SpacingYES Vestibules for Exit doors greater than 3000 sq. ftYES Doors 36 Lever HandlesYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. Headroom 6ft 8 on StairsYES Bathroom / Kitchen WatertightYES Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Safety glazing: w/in 5' of tub/shower - stairwell win/adj toYES drs Smoke Detectors 3' from Kitchens & Baths R314YES Dryer Duct Max Length 35', Labeled Over 35'YES Bathroom Fans Plumbing Fixtures CompleteNO-Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. 6/27/18 complete plumbing issues on second floor Foundation InsulationYES Bollard Protection: 15" footings & 3' below gradeYES Bollard Protection:4' on ctr/3' abv grd, gas meterYES Fire Separation, ¾, 1, 2 hr.NO-Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits, miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Seal electrical conduit sleeves at ceilings of each electrical room Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 HourYESElevator Chase 20 Minute Fire Door/Self-Closing HardwareYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. H/C Accessibility Parking SignageNO-Stripe handicapped parking spaces at south end exit. Universal Symbol of Access displayed - on all H/CYES signs Hydraulic Elevators: Non-comb. Plumbing REQUIREDYES Jun 29, 2018Page (3) INSPECTION WORKSHEET (MULT-004730-2018) Checklist ItemPassedComments Elevator Operation and Signage Shaft SealedYES-Need to inspect elevator shaft to verify all penetrations have been sealed. Gas Shut-off Exposed & Regulator (18) Above GradeYES Furnace Hot Water Heater operatingYES Low Water Shut-Off for BoilerYES Blower Door Test CertificationNOTest failed needs to be redone. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES-Relief Valve downspouts not installed on two heating units in 1st floor mechanical room as discussed. Light Ventilation per Room Safety GlazingYES Attic Access 30 x 20 x 30 (h)YESRoof Access Final ElectricalYES Site Plan / Variance requiredNO-Complete all site items. Separate inspection! Final Survey Plot PlanNO-Submit the Final Survey.qq Public Sewer Sign-OffYESNovember 2017 Building/Apartment Num on Bldg or DrivewayNOAddress at road Bldg Access All Sides 20ft Drivable SurfaceYES Handicapped RampsYES Handicapped UnitsYES Engineer or Architect ApprovalYES-Submit final approval letter from Tom Joslin at Construction Technologies Okay To Issue Temp CO or Permanent COYES6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! 6/30/18 Final Inspection Approved - Temporary CO Conditions: -Complete All Open Items -Complete All Outstanding Fire Marshal's Items -Complete All Outstanding Site Items NOTE: ALL LIFE SAFETY ITEMS HAVE BEEN ADDRESSED! O'Brien, John (Inspector) Jun 29, 2018Page (4) INSPECTION WORKSHEET (MULT-004689-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000480-2017Case Module:Permit Inspection Date:06/28/2018Inspection Status:Partial Pass Inspector:John O'BrienInspection Type:Multi-Dwelling, Hotel, Motel Fin- al Job Address:524 AVIATION RDParcel Number:302.5-1-96.1 Queensbury, NY 12804 Contact TypeCompany NameName Granted Permission\[Aviation Hospitality, LLC\]Jariwala, Bhavik Primary Owner\[Aviation Hospitality, LLC\]Jariwala, Bhavik Applicant\[Bast Hatfield Construction LLC\]Fretto, John Architect\[AIA Architect\], Contractor\[Bast Hatfield Construction LLC\]Fretto, John Checklist ItemPassedComments Jun 28, 2018Page (2) INSPECTION WORKSHEET (MULT-004689-2018) Checklist ItemPassedComments Building Inspector NotesNO6/21/18 Preliminary Final Inspection Not Approved -Install all interior signage and room numbers -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits and miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Need to inspect elevator shaft to verify all penetrations have been sealed. -Final Electrical Inspection -Blower Door Test -HVAC Air Balancing Report -Final approval letters from Architect, Engineer and the Special Inspections Agency (Construction Technologies). -Submit all special inspections reports for soil compaction, concrete testing, structural steel and structural wood framing. These can be submitted on a thumb drive. -Submit a letter certifying that the building envelope. Electrical and Mechanicals were installed in accordance with the approved 2015 IECC COMcheck. -Submit the Final Survey. -Complete all site items. Separate inspection! -Complete all fire marshal's items. Separate inspection! -Complete parking lot striping and handicapped parking and no parking signage. 6/26/18 Final Inspection 3rd & 4th Floors Not Approved -Miscellaneous corridor and room doors need final adjustments 6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! Chimney Height / B Vent / Direct Vent LocationYES Plumb Vent Thru Roof Minimum 6YES Outside Spigots have Air GapYES Roof CompleteYES Ext Finish /Grade Complete/6 in 10ft or EquivalentYES Jun 28, 2018Page (3) INSPECTION WORKSHEET (MULT-004689-2018) Checklist ItemPassedComments Interior/Exterior Railings 34 into 38 inchYES Interior Handrails Stairs 1 or More RisersYES Guardrails 42", Balusters 4 Minimum SpacingYES Vestibules for Exit doors greater than 3000 sq. ftYES Doors 36 Lever HandlesYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. Headroom 6ft 8 on StairsYES Bathroom / Kitchen WatertightYES Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Safety glazing: w/in 5' of tub/shower - stairwell win/adj toYES drs Smoke Detectors 3' from Kitchens & Baths R314YES Dryer Duct Max Length 35', Labeled Over 35'YES Bathroom Fans Plumbing Fixtures CompleteNO-Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. 6/27/18 complete plumbing issues on second floor Foundation InsulationYES Bollard Protection: 15" footings & 3' below gradeYES Bollard Protection:4' on ctr/3' abv grd, gas meterYES Fire Separation, ¾, 1, 2 hr.NO-Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits, miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Seal electrical conduit sleeves at ceilings of each electrical room Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 HourYESElevator Chase 20 Minute Fire Door/Self-Closing HardwareYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. H/C Accessibility Parking SignageNO-Stripe handicapped parking spaces at south end exit. Universal Symbol of Access displayed - on all H/CYES signs Hydraulic Elevators: Non-comb. Plumbing REQUIREDYES Jun 28, 2018Page (4) INSPECTION WORKSHEET (MULT-004689-2018) Checklist ItemPassedComments Elevator Operation and Signage Shaft SealedYES-Need to inspect elevator shaft to verify all penetrations have been sealed. Gas Shut-off Exposed & Regulator (18) Above GradeYES Furnace Hot Water Heater operatingYES Low Water Shut-Off for BoilerYES Blower Door Test CertificationNOTest failed needs to be redone. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES-Relief Valve downspouts not installed on two heating units in 1st floor mechanical room as discussed. Light Ventilation per Room Safety GlazingYES Attic Access 30 x 20 x 30 (h)YESRoof Access Final ElectricalYES Site Plan / Variance requiredNO-Complete all site items. Separate inspection! Final Survey Plot PlanNO-Submit the Final Survey. Public Sewer Sign-OffYESNovember 2017 Building/Apartment Num on Bldg or DrivewayNOAddress at road Bldg Access All Sides 20ft Drivable SurfaceYES Handicapped RampsYES Handicapped UnitsYES Engineer or Architect ApprovalNO-Submit final approval letter from Tom Joslin at Construction Technologies Okay To Issue Temp CO or Permanent CONO6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! O'Brien, John (Inspector) Jun 28, 2018Page (5) INSPECTION WORKSHEET (MULT-004410-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000480-2017Case Module:Permit Inspection Date:06/21/2018Inspection Status:Failed Inspector:John O'BrienInspection Type:Multi-Dwelling, Hotel, Motel Fin- al Job Address:524 AVIATION RDParcel Number:302.5-1-96.1 Queensbury, NY 12804 Contact TypeCompany NameName Granted Permission\[Aviation Hospitality, LLC\]Jariwala, Bhavik Architect\[AIA Architect\], Applicant\[Bast Hatfield Construction LLC\]Fretto, John Primary Owner\[Aviation Hospitality, LLC\]Jariwala, Bhavik Contractor\[Bast Hatfield Construction LLC\]Fretto, John Checklist ItemPassedComments Jun 21, 2018Page (1) INSPECTION WORKSHEET (MULT-004410-2018) Checklist ItemPassedComments Building Inspector NotesNO6/21/18 Preliminary Final Inspection Not Approved -Install all interior signage and room numbers -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits and miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Need to inspect elevator shaft to verify all penetrations have been sealed. -Final Electrical Inspection -Blower Door Test -HVAC Air Balancing Report -Final approval letters from Architect, Engineer and the Special Inspections Agency (Construction Technologies). -Submit all special inspections reports for soil compaction, concrete testing, structural steel and structural wood framing. These can be submitted on a thumb drive. -Submit a letter certifying that the building envelope. Electrical and Mechanicals were installed in accordance with the approved 2015 IECC COMcheck. -Submit the Final Survey. -Complete all site items. Separate inspection! -Complete all fire marshal's items. Separate inspection! -Complete parking lot striping and handicapped parking and no parking signage. Chimney Height / B Vent / Direct Vent LocationNO Plumb Vent Thru Roof Minimum 6YES Outside Spigots have Air GapYES Roof CompleteYES Jun 21, 2018Page (2) INSPECTION WORKSHEET (MULT-004410-2018) Checklist ItemPassedComments Ext Finish /Grade Complete/6 in 10ft or EquivalentYES Interior/Exterior Railings 34 into 38 inchYES Interior Handrails Stairs 1 or More RisersYES Guardrails 42", Balusters 4 Minimum SpacingYES Vestibules for Exit doors greater than 3000 sq. ftNO Doors 36 Lever HandlesNO-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. Headroom 6ft 8 on StairsYES Bathroom / Kitchen WatertightYES Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Safety glazing: w/in 5' of tub/shower - stairwell win/adj toYES drs Smoke Detectors 3' from Kitchens & Baths R314NO Dryer Duct Max Length 35', Labeled Over 35'NO Bathroom Fans Plumbing Fixtures CompleteNO-Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. Foundation InsulationYES Bollard Protection: 15" footings & 3' below gradeNO Bollard Protection:4' on ctr/3' abv grd, gas meterNO Fire Separation, ¾, 1, 2 hr.NO-Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits, miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 HourNO 20 Minute Fire Door/Self-Closing HardwareNO-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. H/C Accessibility Parking SignageNO Universal Symbol of Access displayed - on all H/CNO signs Hydraulic Elevators: Non-comb. Plumbing REQUIREDNO Hydraulic Elevators: Oil Seperator REQUIREDNO Jun 21, 2018Page (3) INSPECTION WORKSHEET (MULT-004410-2018) Checklist ItemPassedComments Elevator Operation and Signage Shaft SealedNO-Need to inspect elevator shaft to verify all penetrations have been sealed. Elevator Hoistways PressurizedNO Gas Log In Sealed or Glass EnclosureNO Gas Furn Shut-Off W/in 30 ft. or W/in Line SiteNO Gas Shut-off Exposed & Regulator (18) Above GradeYES Furnace Hot Water Heater operatingNO Low Water Shut-Off for BoilerNO Blower Door Test CertificationNO Relief Valve ,Heat Trap/Water Temp 110 deg or lessNO-Relief Valve downspouts not installed on two heating units in 1st floor mechanical room as discussed. Light Ventilation per Room Safety GlazingYES Attic Access 30 x 20 x 30 (h)YESRoof Access Final ElectricalNO Site Plan / Variance requiredNO-Complete all site items. Separate inspection! Final Survey Plot PlanNO-Submit the Final Survey. Public Sewer Sign-OffNO Building/Apartment Num on Bldg or DrivewayNO Bldg Access All Sides 20ft Drivable SurfaceYES Handicapped RampsNO Handicapped UnitsNO Engineer or Architect ApprovalNO Okay To Issue Temp CO or Permanent CONO Okay To Issue CCNO O'Brien, John (Inspector) Jun 21, 2018Page (4) INSPECTION WORKSHEET (MULT-000148-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-000480-2017Permit Case Number:Case Module: Mon Jan 7, 2019Passed Inspection Date:Inspection Status: John O'BrienMulti-Dwelling, Hotel, Motel Final Inspector:Inspection Type: 524 AVIATION RD302.5-1-96.1 Job Address:Parcel Number: Queensbury, NY 12804 Contact TypeCompany NameName Granted PermissionAviation Hospitality, LLCJariwala, Bhavik ContractorBast Hatfield Construction LLCFretto, John ApplicantBast Hatfield Construction LLCFretto, John Primary OwnerAviation Hospitality, LLCJariwala, Bhavik ArchitectAIA Architect Checklist ItemPassedComments Jan 07, 2019Page (1) INSPECTION WORKSHEET (MULT-000148-2019) Checklist ItemPassedComments Building Inspector NotesYES6/21/18 Preliminary Final Inspection Not Approved -Install all interior signage and room numbers -Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. -Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. -Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits and miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Need to inspect elevator shaft to verify all penetrations have been sealed. -Final Electrical Inspection -Blower Door Test -HVAC Air Balancing Report -Final approval letters from Architect, Engineer and the Special Inspections Agency (Construction Technologies). -Submit all special inspections reports for soil compaction, concrete testing, structural steel and structural wood framing. These can be submitted on a thumb drive. -Submit a letter certifying that the building envelope. Electrical and Mechanicals were installed in accordance with the approved 2015 IECC COMcheck. -Submit the Final Survey. -Complete all site items. Separate inspection! -Complete all fire marshal's items. Separate inspection! -Complete parking lot striping and handicapped parking and no parking signage. 6/26/18 Final Inspection 3rd & 4th Floors Not Approved -Miscellaneous corridor and room doors need final adjustments 6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! 7/5/18 Final Inspection Partial Approval TEMPORARY CO APPROVED -OK TO OCCUPY Conditions: -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. -Complete all exterior caulking Jan 07, 2019Page (2) INSPECTION WORKSHEET (MULT-000148-2019) Checklist ItemPassedComments -Submit As-Built Construction Plans -Complete remaining Fire Marshal's Items. Doors 36 Lever HandlesYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. Bathroom Fans Plumbing Fixtures CompleteYES-Complete final connections of all plumbing fixtures. Also adjust drain stoppers for bathroom lavatories so they drain freely some are draining very slow. 6/27/18 complete plumbing issues on second floor Fire Separation, ¾, 1, 2 hr.YES-Electrical Rooms on each floor has firestopping that needs to be addressed. Specifically electrical conduits, miscellaneous wire chases from floor to floor. Seal all wall and ceiling penetrations as discussed. -Seal gaps at laundry chute doors at each floor as discussed. -Seal up holes in 1st floor corridor walls on both sides at south end of building. Need to verify before corridor ceiling is closed up. -Seal electrical conduit sleeves at ceilings of each electrical room Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 HourYESElevator Chase 20 Minute Fire Door/Self-Closing HardwareYES-Adjust all corridor doors to rooms, stair towers and bathroom doors. Corridor doors must self close and latch. H/C Accessibility Parking SignageYES-Stripe handicapped parking spaces at south end exit. Elevator Operation and Signage Shaft SealedYES-Need to inspect elevator shaft to verify all penetrations have been sealed. Jan 07, 2019Page (3) INSPECTION WORKSHEET (MULT-000148-2019) Checklist ItemPassedComments Blower Door Test CertificationYESTest failed needs to be redone. BLOWER DOOR TEST RECEIVED AND PASSED. Relief Valve ,Heat Trap/Water Temp 110 deg orYES-Relief Valve downspouts not installed on two heating units in less1st floor mechanical room as discussed. Attic Access 30 x 20 x 30 (h)YESRoof Access Site Plan / Variance requiredYES-Complete all site items and submit engineer's site certification. Final Survey Plot PlanYES-Submit the Final Survey Public Sewer Sign-OffYESNovember 2017 Building/Apartment Num on Bldg or DrivewayYES-Address at road Engineer or Architect ApprovalYES-Submit final approval letter from Tom Joslin at Construction Technologies RECEIVED! Jan 07, 2019Page (4) INSPECTION WORKSHEET (MULT-000148-2019) Checklist ItemPassedComments Okay To Issue Temp CO or Permanent COYES6/28/18 Final Inspection Not Approved-Temp Co -See Dave Hatin's remaining items on his inspection slip. Note: Final Inspection 9:00 AM Friday for Temp CO! 6/30/18 Final Inspection Approved - Temporary CO Conditions: -Complete All Open Items -Complete All Outstanding Fire Marshal's Items -Complete All Outstanding Site Items NOTE: ALL LIFE SAFETY ITEMS HAVE BEEN ADDRESSED! 7/3/18 Final inspection Partial Approval ! -Address at road -Complete all site items. -Submit the Final Survey -Stripe handicapped parking spaces at south end exit. -Complete all fire marshal's items. 7/5/18 Final Inspection Partial Approval TEMPORARY CO APPROVED -OK TO OCCUPY Conditions: -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. -Complete all exterior caulking -Submit As-Built Construction Plans -Complete all remaining Fire Marshal's Items. 8/21/18 Final Inspection Not Approved Temp CO is still active. Remaining Items: -Submit As-Built Construction Plans -Submit certified final survey -Complete all remaining site items and submit engineer's site certification. 1/7/19 Final Inspection Approved - Ok to Issue CO! O'Brien, John (Inspector) Jan 07, 2019Page (5)