STORMWATER SUMMARY REPORT REV 1-16-18 PRELIMINARY STORMWATER MANAGEMENT SUMMARY FOR HARBOR FREIGHT TOOLS 871 US Route 9 Town of Queensbury Warren County,New York Prepared For: Queensburywood, LLC 1529 Western Avenue Albany,NY 12203 November 15, 2017 Revised January 16, 2018 Project No. 4917A Prepared By: Joseph J. Bianchine, P.E. ABD Engineers, LLP 411 Union Street Schenectady,NY 12305 (518) 377-0315 PRELIMINARY STORMWATER MANAGEMENT SUMMARY HARBOR FREIGHT TOOLS 871 US Route 9 Town of Queensbury Warren County, New York TABLE OF CONTENTS ITEM PAGE PROJECT LOCATION............................................................................................1 GENERAL SITE DEVELOPMENT.......................................................................1 SOIL TYPES, GROUNDWATER &TOPOGRAPHY..........................................1 STORMWATER MANAGEMENT PLAN............................................................1 SUMMARY.............................................................................................................2 EXHIBIT 1: SITE LOCATION MAP ........................................................Attached PRELIMINARY STORMWATER MANAGEMENT SUMMARY HARBOR FREIGHT TOOLS 871 US Route 9 Town of Queensbury Warren County,New York PROJECT LOCATION The proposed Harbor Freight Tools is located at 871 US Route 9 in the Town of Queensbury, Warren County,New York (see Exhibit 1). The site is bordered on the north by Walmart, on the south by Pizza Hut, on the east by Route 9, and on the west by residential homes and Wahnart. GENERAL SITE DEVELOPMENT The applicant is proposing to develop 2.14±acres in order to construct a 16,000- square foot retail building, associated pavement, utilities, and stormwater management area for water quality treatment utilizing Green Infrastructure Techniques. Access to the site will be provided from Route 9. SOIL TYPES, GROUNDWATER& TOPOGRAPHY According to the Warren County NRCS, the primary hydrologic soil group is Type A loam fine sand. A geotechnical report was prepared by Dente Group which contains three soil borings performed on October 4, 2017 and two infiltration tests performed on December 20, 2017. The borings confirined predominantly sandy soils with trace silt and gravel. Infiltration rates stabilized at 7 and 10 inches per hour. Groundwater was not encountered down to a depth of 50 feet. The existing site drains east towards Route 9 and enters the existing storm system. STORMWATER MANAGEMENT PLAN The stormwater management plan for the proposed project will utilize surface sheet flow across pavement to catch basins and ultimately into subsurface infiltrator chambers. The building rooftop runoff will be conveyed to the catch basin system and ABD Engineers,LLP Harbor Freight Tools 4917A-SW Summary I then to the infiltration area. Stormwater runoff in the southern portion of the parcel will continue to drain towards Route 9 as in the pre-development condition. A design infiltration rate of 1"in 15 minutes was used for the stormwater calculations. The subsurface stormwater infiltrators will be utilized to achieve water quality volume(WQv) and minimum runoff reduction volume (RRv)per NYSDEC Phase 2 Stormwater Regulations including Green Infrastructure Teelmiques. The total water quality treatment volume(WQv)required is 5,574± cubic feet and the minimum Runoff Reduction Volume (RRv)required is 2,970± cubic feet. The provided RRv is 5,574± cubic feet which meets or exceeds the required WQv. Refer to the WQv and RRv calculations in Appendix A. Pretreatment within the system will be achieved utilizing an isolator row prior to infiltration. SUMMARY P.,,e.ak-RMff.,..- atwCfs) Peak O. . Di S cat r s -v;ar 100-Y_ar ..�._-.. 1- "ear 10-YeaSfl-Velar 1 -ye r Pre-Atea 1 0.17 1.81 4.22 5.68 0.17 1.81 4.22 5.68 Pre.Area 2 0.03 0.44 1.10 1.51 O.03 0.44 1,10 1.51 Pre Area 3 0.00 0.01 0.130.23 0.00 0.00 0.00 0.00 Tota1Pre 0 2.261 5A . 7.42 H 0.20 215 5,32. W 7.19 Sub t a Pak Ruwff'C-eratM(cf) Peak Oft Di ( 1-"Fear 10-Year 50-Year 100-Ym 1-Year 10-Year 50-Yez 1410-Year Posi Aria I A 0.22 0.96 189 2:43 0.22 0.96 1.89 2.43 Post Area 1B 1.41 4.48 8.07 10.08 0.00 0.00 I S2 3.38 Post A rea 2 0.05 0.14 025 031 0.05 1 0.14 025 031 Total Post 1.68 5.58 10..21 1 12,82 0.27 1.10 3 b 632 The peak discharge rates for the post-development condition are at or below the pre-development rates. The stormwater management plan will meet the NYSDEC Stormwater Design Manual standards, the needs of the project, and the Town of Queensbury. The stormwater management plan will function ade uately and will not adversely affect adjacent or downstream properties. of NEW y A , x o m W C� w 226 ABD Engineers,LLP Harbor Freight Tools 4917A-SW Summary 2 EXHIBIT l: SITE LOCATION MAP � 1� =flul6.,7c Stedknouoe� oBtRJ ' m { � -Walmay Strpersenter _ � r p�pi }tom P .s E y � n Not loll NEW 17W _ Ful t s 6fead . d = a 1 � Igxti&. queen3iwryt7nan` s � ��4�r alsRest uant -. - F/caor�rolct-_ ' Ree Schoa!DrsUeer - �. &Gift 6rtAA - c5 � tai � C17 Rwsn n t.4t_ 5 `� k8 rrt� i t talon Rd Lam.. . z z � ZzatrcnA Ct�r L�of ih - Ann�nciadon Roman.-- _ I d