Loading...
Planning Board Staff Notes Packet for 2/27/18 PLANNING BOARD STAFF NOTES FEBRUARY' 2, 7, 2018 Site Plain rs -2018 @ 1,4, Ladd Lase James Schneider Public Hearing Schell, �l � S,EQR I I Draft resolution, —grant/deny site plan approval _.-........... Town of Queensbury Planning noaH, Community Development Department Staff Notes February 27,2018 Site Pla,n,6-201 8 JAMES SCHNEIDER 14 Ladd Lane/ WR—Waterfront Residential/ Ward I SEQR Type Il Material Review: application, survey, site plans, elevations,photos Parcel History- 2017septic att., RCA678-2017 addition, AV 7-2018 Reguested Action Planaing Board review and approval for renovation of a front entry and infill, porch. Resobtions 1. Planning Board decision P'Ea 'at!�Iscm trnrr Applicant proposes renovation of at front entry and in�fill porch. Project includes a 5,8 sq, ft. addition to develop kitchen area,,then as sq. ft. front entry porch with an 46 sq. ft. porch area. Pursuant to Chapter 179-3-040 . 19-6-0,50 of the Zoning Ordinance, expansion of a non-conforming structure shall be subject to Planning Board review and approval. Staff Comments * Location-The site is,located at 14 Ladd Lane of of Lockhart Loop and Route 9L * Arrangement-The existing 1,300 sq ft,home (footprint) is currently under interior renovations and the two exterior renovations will complete the total work on the home. The home:is located,41 ft from the shoreline. o Site Design- There is no changes proposed to the site:only changes are to the building. @ Ruilding—The additions are to be located on the:road side of the home where:the home is an exist�ing non- conforining structure,. The additions as,shown on the drawing do not meet the shoreline setback requirements. On the first floor of the home there is a preexisting enclosed washer/drytr area and a covered porch area that is to be an expanded kitchen area. Adjacent to this area would be the addition of a mechanical room area. On the second floor over the mechanical room area would be a new entry room,area with the addition of an open porch 46 sq ft connected to the existing walkway. Site cond�itions-The applicant received a septic permit in September 2017. * Elevations—Elevations show the exterior renovated areas and new constmiction. * Floor plans—Floor plans, show the first and second floor interior arrangement, Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The application form identified as "'Requirements"' outlines the items to appear on th,e site plan or included as attachments,. At the time of application the applicant has either requested waivers, indicated the item not applicable or has, not addressed the item/ left check box hlank. This includes the follow items listed under Requirements of the applicant's application g. site lighting, h,. signage, J. storni.water, k. topography, 1. landscaping, n traffic, o. commercial alterations/construction details, P floor plans, q, soil logs, r. construction/demolition disposal s. snow removal. Nature f Varia=e: Applicant proposes,the additions to be 69,16 ft from the shoreline as the:existing hoine does:not rneet the shoreline setbacks were a,75 ft setback is required. Relief requested fo�r permeability where '3.6 % is proposed ,and 75% is required. Relief is also expansion of a non-conforming structure. SUMMa The applicant has completed a site plan application,for the expansion, of a nonconforming structure—with additions to expandthe kitchen area, redo an entryway and utility space. Section 179-13-010 Continuation —Expansion of a non-conforming structure within a critical environmental area Meeting j.jis!qa- PB. 2113/18 PBR; ZBA: 2/21/18; Town of Queensbuty Planning Bayard RESOLUTION—Grant/Mny Site:Plan Approval SITE PLAN 6-2018 JAMT HF'lDBlE TAX MAP ITS; 239.18-1-1 /PROPERTY ADDRESS: 14 L DD LANE f,?ON : WR The applicant has submitted an application to the Planning Board for Site Plan approval pursuant to Article of the Town zoning, Ordinance fonApplicant proposes renovation of a int entry and infrl.l poor h. Project. includes,a q. fr. addition to develop kitchen.area, then a 59 sq., ft. front entry porch with a46 sal. fl. porch area. Pursuant to Chapter 179-3-040 19-6-050 of the Zoning Ordinance, expansion of a non-c nfon in structure shall be subject to Planning Board review and approval. Pursuant to relevant sections of the, Town of Queensbury Zoning Curie-Chapter 179-:9- 80➢, the Planning. Beard has deter nined that this proposal satisfies the requirements as stated in the Zoning Lunde, As required by General Municipal Lair Section 9-rn the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Burd opened a public 'hearing, on the Site plan application on /27/201.8 and continued the public hearing to 02/27/2018,when it was closed, The Planning Beard has reviewed the application materials submitted by the applicant and all comments made at the public hearing,and submitted in.Ming through and including 02/27 18x The Planning, Board determines that the application complies with the review co siderations aortal standards set forth in Article 9 of the Zoning Ordinance for Site Fly approval,, MOTION TO APPROVE / DISAPPROVE ITE PLAN -2018 JAMES ' CHI' TT ER, I.ntrodnuced by who moved for its adoption;; Per the draft provided by staff conditioned upon the followhig conditions: 1 'waivers request granted/denied: 2 Adherence to the items oudined in the follow-urP letter sent with this resolution. a, If application, was referred to engineering, then engineering sign-off required prior to signature of Zoning Administrator ofthe approved plans b) Finial approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing roo ns and proposed rooms in the building and.site improvements, c) Final approved plans,, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; d) The applicant must meet with 'Staff` after approval and prior to issuance of Building Permit and/or the beginning of any site work; t'ue t of Phone, 518,761.8Far. 51 ,745.4437 '742 Bay R,o , u iuuee nsbury,NY 1 804 A w.uluae nsbu,ury.flet e) Subsequent iss,uancof furtherpermits, including building peinfitsis dependentoncompliance with this and all othr conditions of this resolution; As-built plans to certify that.the site plan is devclops td according to the approved plansto be provided prior to issuance of the certi(i cate of occupancy; g) Resolution to be placed on final plans in its entirety and legible. Duly adoted this 27'h day offtbr-uary, 2018 by the following voW- AYES: NO Page 2 of�2 Phone,,. 518361,8220 " Fac 518,345.4437' 742 Bay Road, Qunsbury. NY 12504 1 www,qw?ensbuiry.net Site, l 2 � 235 Corinth Road RAN Entertainment,, LLC Public Hearing Scheduled SEQR Unlisted Draft resolution ,grant/deny site plan approval Town of Queensbury Planning Board Community Development.Department Staff Notes February 27, 18 Site:Plan 8-2018 RAN ENTERTAINMENT, LLC 235 Corinth Road/CIA— Commercial Light Industrial / Ward 4 SEQR Unlisted Material Review: application, narrative, site plan drawings, star mwater management. Parcel History: SP 149-2016 Reauested Action Planning Board review and approval to add 34 new parking spaces (7,513 sq. ft), new pavement and a 375 sq. ft. accessory structure to an existing,trampoline recreation facility. Resolutions 1. SEQR 2. Planning Board,decision Pro ied Description Applicant proposes to add 34 new parking spaces (7,513 sq. ft,.), new pavement and a 375 sq. ft., accessory structure to an existing trampoline recreation facility. Project includes update to grading,and stornawater, Pursuant to Chapter 179-3-040 of the Zoning Ordinance, new construction shall be subject to Planning Board review and approval. Staff Comments 0 Location-The project site is at 235 Corinth Rd an existing trampoline recreation facility. * Arrangement- The existing site currently has a 22,2060 sq ft building with 34 parking spaces. 0 Site Design;-The applicant,proposes to add 34 additional parking spaces and, a 375 sq ft shed to the property. T he plans show the:new parking,spaces to be located on the east sid of the property'. The area contains, existing trees to be removed for the length of the new parking—about 306 ft. The location is,directly opposite:the trwnpofine building., The storage shed is to be 375 sq, ft and placed, adjacent to the dump,ster enclosure. The shed is to be used for storage of site maintenance equipment—shovels, salt, snow removal, lawn tools. 0 Site conditions- The only changes are to the parking area on the east side of the property all other existing site conditions are to remain as is. * Traffic- The plans show the location of the new parking and the distance between the parking spaces is 24 ft to accommodate two way traffic, The service area and bus turn-am and are to remain in the current location at the rear of the building. Grading and drainage plan and Sediment and erosion control—the plans show the:new parking area storrnwater will be handled by swales on the east side. * Landscape plan—no additional landscaping is proposed. * Site lighting plan,—seven new pole lights are to be installed. e plans indicate 20 ft poles with cutoff fixtures. The plans,also show wall inounted fixtures -3 ofthern on the east side of the building —a detail will need to be provided for the plans. Pursuant to Section 1.79-9-0,50 the Planning, Board may grant waivers on its own hiftiative or at the written request of an applicant. The application f6rm identified as "Requirements" outlines the item, s to appear on the ,site plan or included as attachments. At the time of application the applicant has either requested waivers,, indicated the itern not applicable orr has not addressed the itm,/ left ch,ecl< box blank.. This includes the follow iterns listed under Requirements of the applicant's application: g. site lighting, h. signage, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details,, p floor plans,, q. soil logs, r. constructipan /dernolition dip osal s. snou removal, Summary The applicant has,completed as site plan application for the addition of 34 parking spaces,and a 375 sq ft storage shed. Lighting details will need to be shown on the plans. Section 179-3-040 new con ArUdiron. Section 1791-9-1 0 Amendments—Site Plan,amendments Meeting History: F'irst Meeting THE North Cour try Office Cha qt 375 Bay Road, Queensbury, INY 12804 P: (518) 812-0513 F., (518) 8,12-2205 COMPAN I ES www.chazencompanles,com fi),o)ph'u lie,t�owoed Hudson Valley Office ('845)454-3980 Enoneerypital District Office 519) 273-0055 Land SMOVOCS Planners Environmefftal ProfesslonaN Landscaloe Architects February 15,2019 Mr.Craig Brown Zoni ng Adm Inistrator and Code Comp lia n ce OffIceir Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only:Cra1gB@qupgnLb_u_ .net Re." AN Entertainment—Additional Parking Town of Queensbury, Warren County, New York Chazen Projea#91800.05 Queensbury Ref#SP8,-2018, Dear Mr. Brown*, The, Chazen CDrnpanfes (Chazen) has received a submission package from your office for the above referenced project. The applicant Intends to construct 34 additional parking spaces for the existing Sky- Zone trampoline park/recreation center.Submitted information linclud8s the following: • Site Plans and Details, prepared by Nace Engineering, PC,dated January 10, 20,18,; • Short Environmental Assessment Form, dated January 10, 2018; • Stormwater Management Calculations and Project Narrative, prepared by Dace Engineering, PC, dated January 15,2018,and; 91 Site Plan Application,dated January'10,2018. Your office has requested that we limit our review to the design of stormwater system as it relates to compliance to local, state or relevant codes and regulations. Based upon our review, Chazen does not, have any technical comments. Chazen Engineefing, LandSurveying&Landscape ArchilecturaCm, 0,F C. Champ Envirenmenfaiservices. Inc. 7he Chown Compw;es, Inc, TQwn 6f Qwenlbftjiry PAN Entertainment—Addlt�pnial Plarkiiig February 15.,2018 Page 2 in the event the Planning Board or Town staff have any qluestions or require addition,ail information, please do, not hesitate.to contact me,at(518,)824-1926. Sincerely, S,ean NI. Doty, P,E,,, LEE P,, CM54S Principal Director, MunicIpal Engineering Services cc: Sunny Sweet,Town, Planning Off ice Administrator(via email) Laura Moore,Town Land Use Planner(via e-mad) Fiile -T.Qu"nsbury-SPO,2018 RAN cvoI-� 9fl 4 NBJK:a Id J nB,W,tis aD�paF,��i�GGh�1A �',Mu tii"fl➢;'D�"Balirw`gll@. � 4tl�n.;.' s° B " 1 14j,I',L�1. �.4d1 . 1 ,q, ➢ v,. �'4u 4';ha,u..y. Tovai of Queensbury Planning Board SEAR RESOLUTION—Reaffirm Previous SEQR Site Plan -2018 RAN ENTERTAINMENT, LLC Tax Map Ili: 30 .13-2-28/ Property ,address. 235 Corinth Road,1 Zoning:: CLI The applicant proposes to add 34 new parking spaces (7,513 sq. ft,.), new pavement and a.375 sub. ft. accessory structure to an existing trampoline recreation facility'. P"roject includes update to grading and storm grater. Pursuant to Chapter 179-3-04O oftheZoning Ordinance, new construction shall be subject to Pla ni,ng Board review and approval. The Planning, Board Inas determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review fact The proposed action considered by this Beard is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality t Review ,a,et and the regulations of the Tewin of Queensbury; No Federal or other agencies are involved- Part I of the Short EAF has been completed by the appliearnt, Whereas, the Planning Board adopted Resolution SP PZ 149-2016, on 07/191/2016 adopting, SEQRA. determination ofnon-significance, and Upon review of the information recorded on the 'p,a.P', it is the conclusion of the Town of Queensbury Planning Board as lead agency reaffirms that this project will result in, e significant adverse impacts on the environment, and, therefore, an.environmental impact statement meed not be prepared., Accordingly,this negative declaration is issued. MOTIONTO, REAFFIRM NEGATIVE DECLARATION FOR THE PROPOSED,ID 1TL PLAN 8-2018 RAN ENTERTAINMENT, LLC. Introduced b who moved for its adoption, seconded.b Duly adopted this 27n4' day of February, 2018 by the following vote: AYES: NOES: 434waae: 5 48.764,8220,� F uv 5 18.74;+A,137' � 742 Bay Road,()twe agbury,NY 12904 p wmv.tj Lice Lisbury,nei fl + u'9�V°tiV�k±GV� r" � �r° ti:°Qu,tib,➢Nllu`.u`� B 'VN�u.:a.` Town of Queensbury Planning Board RESOLUTION -- Grant/Deny Site Plan Approval Site Plan 8-2018 RAN ENTERTAINMENT, LL Tax Map ID: 309.:13- - f Property Address: 23.5 Corinth Road/Zoning: CLI The applicant Inas submitted an application, to tire Planning Board. applicant proposes to add 34 new parking spaces (7,513 sq. .), new,pavement and a 375 sq. ft. accessory structure to an existing trampoline recreation facility, Project includes update to grading and, storm water., Pursuant to Chapter 179-3-040 of the Zoning,Ordinance,new onstruction shall be subjiect to Planning board review and approval, Pursuant to relevant sections of the Town of Queensbury Zoning Code-chapter 179-9-080, the Planning: Board has determined that this proposal satisfies the requirements as stated in.the Zoning Code; As re urired by General Municipal,ipal Law 'Section 239-rn the site plan application was :referred to the Warren County Planning Department fuer its recommendation The Planning Board has reviewed the potential environmental impacts of the project, pursuant to the 'State Environmental uail:it review Act S and adopted a SEQRA Negative Declaration— Determination of bion-Significance The Planning :board opened a public hearing on the Fite plan application on 02/27/2018 and continued the public hearing to 02/27/20,18, when it was closed, The Planning board has reviewed the application materials siibmitted by the applicant and all, connments made at the public hearing and submitted inwriting through and including 02/27/201,8, The Planning board determines that the application, complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE, SITE PLAN 8-2018 RAN ENTERTAINMENT,T LLC; Introduced y who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied 2. Adherence to the items outlined in the follow-up letter sent with,this resolution. a) The limits of clearing, will constitute a no-curt bruflbr zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff'; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater (Department for its review, approval, perannitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the:approved driveway permit has,been provided to the Planning free; d) If application was referred to engineering then Engineering sigh-ofl'required prior to signature of ,'Zoning;Administrator of the approved plans; Rage 1 of Phone 518,761,4220 n Fax;: 51&745.44371742 Say Road. C uee nsbuJry, NY 12804j www.qu oe nsburr'y,rnet e) Final approved plans, should have dimensions and setbacks noted on the site plan/survey, floor plans, and elevation for the existing rooms,and proposed rooms, in the building and site improvements;- f) if required, the applicant must submit a copy of the following to tine 'down: a, The project N01 (Notice of Intent), for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start f'any site work. b. The project NOT(Notice of Termination) upqn completion of the prqjett� c. The applicant must.maintain on their projectsite, for review by staff, i. The approved final plans that have been stamped by the TownZErni ng Administrator. These plans inust include the project WPPP (Storm Water Pollution Prevention Plan) when.such a plan was prepared, and approved;, ii. The project NOT and proof of coverage under the current NYSDEC SPD ES General Permit, or an, individual SRDES permit issued for the project if required. g), Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) 'The applicant must meet with Staff after approval and prior tissuance of Building Permit ,and/or the beginning of any s,itewo�rk.; i) Subsequent issuance of further nnits, including building,pei7,nits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to theappmved plans to be provided prior to, issuance:ofthe certificate of occupanc,y. k) This resolution is to be placed in its,entirety on the:final plans Duly adopted this 27b day of February, 2018 by the following vote: AYES: NOE& Page 2 of� Phoiie, 518,761, 20 Fax: 51'Z,745,4437 742 BaY Road, Queensbury, NY 121104 ! www.qu��nsbuiry.net Site Plan i i ion 8�-2 est Drive Luzerne Road Luzerne Holdings,, Inc. Public Hearing Scheduled ,SEQR Unlisted Draft resolution, —gr n y site pilan approval ........... Town of'Queensbury Planning Board et Community Development Department StaffNotes February 27, 2018 Site Plan (Mod.) 18-2018 LUZERNE HOLDINGS, INC. West Drive & Luzerne Road/ CLI—Commercial Light Industrial / Ward 4 SEQR Unlisted Material RevieWr: application, site drawing, star mwater Parcel History: SP PZ 93-2016 4800 sf'cold storage, ' UB,Mod. PZ I 10-2016;DKC SUB 4-2012 3 lots, LH SUB 18-;2 2 lots, SP 10-2004 Storage bIdgs., SP 5-2012 material storage area,; Disc. 2016; SP (M)35-2017, SP 26-2017, -2017 Reauested. Action Planning Board review and approval, to complete right of way 40 R. access road from Luzerne Road, on, -7.12 through, -7.2 to have access to -7.13. Project includes a storage building and parking area previously proposed with associated site work. Resolutions 1, SEQR 2. Planning Board decision, ft2ject Descrigtion Applicant proposes to complete right of way 40 fL access road from Luzerne Road on -7.12 through -7.,2 to have access to -7.13. Project includes storage building and parking area previously proposed with.associated site work. Right of way work includes grading and stormwAter management, 800 +/-ft, landscaping to be installed along property line of storage:building portion. Pursuant to Chapter 179-9-120 of the Zoning Ordinance, modification to an approved site plan shall be subject to,Planning Board review and approval. Staff Comments * Location-The project includes driveway work on parcel 7.12, currently vacant parcel and approved as a materials,storage lot and parcel 7.2 (240 Luzerne Rd)existing self storageand approved storage building. 0 Site Design- -The applicant has indicated the driveway work that had been started was not consistent with the approved plans. The applicant has proposed to correct the driveway access this includes installi'ng plantings along the property line between the two properties. e Grading and drainage plan Sediment and erosion control-The driveway is 832 ft and is,20 ft wide. The plans show the driveway disturbance is,42,,340 sq ft. The drainage plans has been designed for the drivewayr only and a 3.5 ft x 3 ft depth, store gravel trench is to be installed for the driveway storm water. Silt fence is shown along the length of the project area. The plans indicate a stockpile of materials on 7.2 will be removed. The project is associated with the SP 26-2017(1ot 3)for DDDJcontractor's yard and,an 8,,000 sq ft pole barn project. The applicant has indicated the grading on the self storage parcel '7.2 will match the grading needed for parcel 7.13 (lot 3 for DDDJ). The applicant is in the process,of updating the stormwater to include the storage building and associated site work (SP 93-2016/S P3 5-2017mod). Landscape pan—the plans shows 10 white spruce to he installed along the property line Pursuant to Section 179-9-050, t nye Planning oard may great waivers, on its own initiative or at the written request of an applicant. The application form identified as "Requirements,"' outlines the items toappear on the site plan or included as, attachments. At the time of application the applicant has either requested waivers, indicated the itern not applicable or has not addressed the item/ left check box blank. This includes the follow items listed undRequirements equirer ents of theapplicant's application . site li htin, h. signage, k. topography un traffic, . commercial alterations/ construction details, p floor plans, q. soil logs, r. canstr uction/demolitioru disposal s,. snow removal. Summa The applicant has completed a site plaza application for a driveway access development as part of the plans fbr a storage building already approved. MectiRg Histo First Meeting THE North Country Office Cba I re 375 Bay Road, Queenisbuiry NY 12804 P: (518) 812-0513 F, (518)X312- 05 COMPAN I ES, E-FRAILED www.chazencompanies.coirn PP-Oinl u13,bc-F-Ilq4ayu'r e::vll h,k Hudson Valley Off lice (945)454-3980 Enoneers, L@nd Surveyors Capital Dilstrkt Office X518,)'273-00 Planners Environmental Professionals Laindscaoie Ari February 15, 21018 Mr.Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay,Road Queensbury, New'York 12804 Delivered via emall only'.CE&.B@gueenisbury,net Re: Luzeme Holdings, Inc. Town of Queensibury, Warren ount]4 New York Chazen Project#91800»10 Queensibury Ref#SPfM)18-2018 Dear Mir. Brown: The Chazen Companies (Chazen), has received a submission package from your office for the above referenced project, The applicant intends to construct a new storage building, associated parking and new access drive of off West Drive. Submitted information includes the following: • Access Road Modification ptan sheet prepared by Van Dusen & Steves and Nate EngineerIng, dated last modified January 16, 2018; • Stormwater Management Report prepared by N�ace Engineering, P.C., last revised February 16, 2016; and, • Site Phan Appl"ucatiouw dated January 16, 2018. Your office ha s requested that we limit a u r review to the design of stormwater, system as it relates to compliance to, local, state or relevant codes and regulations. Based upon our review, Chazein offers the fo Illow ing comments for the,Town's consideration: Stiormwater Management&Erosion and Sediment Control- I The project appears to disturb an area over I acre (site plan application Indicates total area of land disturbance o472,848 square feet) and requires the preparation of a S,tormwateir Pollution Prevention Plan (SWPPP) in accordance with GP-G-15-002 that includes erosion and sedirri controls as well as post construction,stoirmwater management Ipraialcies.A Stormwater Pollution Prevention Plan(SWPPP)has been provided. Comments relating to the Stormwater Manageiment Report and SWPPP are offered below. Chazen Engineoring, Land SLoveying&Landscape Arciffifecture Ca, 0.P.C Chazen EnvironatenW Servkes, Inc, TheChazain Companies, lnc� Towyn ofQueenst wry Luierne HoHimn-gs Feldiruumry 15,2018, Rage 2. Section 179-6-0 80 of the Town Cade for u oirnrnercial projects, states that storumn;w anter drainage plans shall areal ?e the impacts of a project using at least a 50-year retuurrn interval storm with regards to both runoff rate and volume for commercial projects . It does not appear that suuffiiciient information and documents are provided to review the project for conformaruce to,the NYS S M DM and town crude storrnnavater standards. Cornrruents rel atiirug to this are offered belnvw: . The S PPP references drawings SP-1, SP-2 and RM-1. However only sheet -1 was provided. The Applicant shall submit all site plans and details Druce available. Please nate that sheet. R -1 does not appear to show all of theproposed improvements and details that are explained in the project narrative (Le. storage building and associated parking). 'Please note that the project: narrative states, The NYS DEC Notice of Went w i i befiled to include the;proposed storage building addition and the access drive in the assodated easemen L It appears that the proposed storage buuiildin , associated parking, and access to the storage building, were previously submitted to, the 'Town of Q ueensbuury as reference SP° - tl11b„ it: doesn't appear that thesel facilities were constructed as these facilities are shown,as proposedon this current submission. It appears that the access road modification and the#S1393-201151 project are being combined into,one project.The Applicant to dari'fy,. S: it due-es not appear that pre- and post-development su,ubcatchrnent reaps were provided, The Applicant.to provide once avaHable. b. It does net appear that a pre-development HydroCAD model was provided. The Applicant to provide once available. 7. It does not appear that erosion arnud sediment controls a,re depicted for the entire site arwd it does not appear that erosion and sediment control details were provided. The Applicant to provide once available. . it does not appear that a draft NOI1 was provided..The Applicant to provide once available. . The Applicant shall clarify the tonal area of proposed disturbance as the site plan,application(1.67 acres'), short EAF j9.7 acres), and sheet RM-1 (0.97 acres) all stag different areas of disturbance,. 910. It dines not appear that documentation was provided per part I1.i=.4 of the S,PDES General Permit concerning construction activities that may afffe t threatened and endangered species. The ;ppiicanat shall provide the Town with any docuarnentation regardiin;g the above determination and incorporate the same into the SWPPP pursuant to Part.I.P'.4 of the SIDES General Permit., 11. It does not appear that documentation was provided per part I.F.8 of the SPDES General Permit concerning construction activities that may affect ihistoldr. property. The Applicant shall provide the Town with any documentation mentation regarding the above determination and Incorporate the same Into the'S"tiiy'PPP'pursuant to part LRS oaf the SP I='S General Permit. T pr�aJ'este" E�Qi�-�PoS 9N'� I M4&- .�Cdl,u r Nh�A�a w'Nq Gh'4@a't',�9w�aYrrs�wocy�. ntati Y�- IS'k�flt�rneMad�`k' dmee,1lxXE'N%91'V9P, dlxx T4jwn of Queensbury luizeme HoWin&5 f e�rwaryl S,2018 Page 3 12. It. appears that infiltration practices will be propo,%ed for stormwateir management and the Applicant shafl provide soil test pit information and Infiltration test results in accordanice with Appendix D, 13, It dloes not appear that a diraftstormwater maintenance agreement wais provided.The Applicant shall coordinate with the Town regarding whether a stormwater maintenance agreement will be required. In the event the Planning Board or Town aaff have any questions or require addittoval information, please do not:hesitate to,contact me at(518) 8,24-1926. Sincerely, V1 —rjt�-- Sean, M. Doty, P.,E., LEED AP, CIMS4S Prinic:ipail Director, Municipal Engineering Services cc.: Sunny Sweet,Town Planning Off icdministrator(via ema,11) Laura Moore,Town Land Use Planner(via,e-mail) File T� d7 a [ko, N)" 11 '","10 I Town of Queensbury Planning Board SF,()R RFSOLUTION —Grant Positive or Negative Declaration. SITE PLAN MODIFICATION 18-2018 LUZERNE- HOLDINGS, INC. Tax Map ID: 30181.12-1-7.13, 308.12-1-7,.2, 308.12-1-7 12 /Property Address: West,Drive:& Luzerne Rd. Zoning: CLI The applicant proposes to complete right of way 40 ft., access, road from Luzerne Road on -7.12 through -7.2 to have: access to -7.13. Project includes storage building and parking area previously proposed with associated site work. Right of way work includes, grading and stonnwater management, 8,00 +/- ft, landscaping to be installed along property line of storage building portion.. Pursuant to Chapter 179-9-120 of the Zoning Ordinance,modification to an approved site plan shall be sural jest to Planning Board review and approval. The Planning Board has determined that the proposed project, and Planning Board action is subject to review under the State Environmental Quality Review Act; The: proposed action considered by this Board is Unlisted in, the Department of Environmental Conservation Regulations implementing, the State Environmental Quality Review Act and the regulations of the Town of Quee,nsbury; No Federal or other agencies are involved; Part I of the: Short EAF has been cornpleted by the, applicant; Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an, environmental impact statement need not be prepared. Accordingly, this, negative declaration is issued. MOTION TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SITE PLAN MODIFICATION 18-2018 L'UZERNE HOLDINGS, INC. introduced by who moved for its adoption. As per the resolution prepared by staff. L Part II of the Short EAF has been reviewed and completed by the:Planning Board. 2. Part III of the:Short EAF has 'been reviewed and completed, by the Planning Board. Or Part, III of the Short EAF is not necessary because the Planning Board did not identify potentially moderate to large impacts. Duly adopted this 27day of February, 2018 by the following vote: AYES: NOES: Phon,(�; 51&701�8�220 1 Fax. x,18.7 4.;5,=t437�742 13aRmeep id,Quisbury,NY 12804 �www.clueensbury.net y I' +. � �.aouw� ao:blv' �11�9��°, w, 1.� I b:;d V°� :.��I. � 1��n�.,��,.�n�til)n,.nn� ��, �_81,) Town of Queensbury Planning Board RESOLUTION—Grant /Tleray Site Plain,Approval SITEPLAN MODIFICATION 18-2018 LUZERNE HOLDINGS, I l . Tai Map Ili. 308,12-1-7.13, 308.12-1-7.2,, 308,.12-1-7.12 /Property Address: West Drive & Luazercne Rd. J Zoning- CLI The applicant has submitted an, application to the Planning Board. Applicant proposes to complete right of way 40 ft. access road from Lu eerrre load on -7.12 through %7.2 to have access to -7.13. Project includes storage building and, parking area previously proposed with associated site work. Right of way work, irnolnrdes grading and stormwater management, 8011 +/- fit_ landscaping, to be installed along property line of storage building portion. Pursuant to Chapter 179-9420 of the Zoning Ordinance, modification to as approved site plain shall be subject to Planning,Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board Inas determined that this proposal satisfies the requirements as stated in the Zoning Code, The Planning Board has reviewed the potential env rcrunental impacts of the project, pursuant to the State Environmental Quality Review ,pct R,A) and adopted a SEQRA Negative Declaration— Determination ofNon-Significance The Planning hoard opened a public hearing on the Site plan, application on 02/2712018 and continued the public hearing to 02/27'2018, when it was closed„ The Planning Board has reviewed the application materials submitted by the .applicant and all comments :made at the public hearing and submitted in writing,through gh and including t12/2'7'201;84 The Planning, Board determines that the application complies with the review considerations and standards set forth in Article 9 of the:Zoning Ordinance for Site Plan approval, MOTION ll' T0, APPROVE I IIS PPB:OV of SITE PLAN MODIFICATION 18-2018 LIIZ RNE H[I IITI I�T:I�l .4 Introduced by, who moved for its adoption. According to the draft resolution,prepared by Staff the following: 1) Waivers requested granted/denied; 2. Adherence to the items outlined in the follow-up letter seat with this resolution. The limits of clearing will constitute a no-cart buffer zone, orange construction fencing shall e installed around these areas and field verified by CommunityDevelopment staff-, In If applicable, the Sanitary Sewer connection plain must 'be sribmitted to the Wastewater Department for its review,,.approval.„permitting and inspection; c If curb cuts are being,added or,changed a driveway permit is required. A building perrrnit will not be issued until the approved driveway permit has been provided to the PlanminOffice;. d) If application was referred to engineering thein Engineering sign-off required prior to signature of Zoning, administrator of the approved pilans;, Page I d Phone,. 518,761,8220Fax: 518145,44a7 p 742 IBay Road, Queensbury, nwllY 12804 a ww,.queon banr .net c) Final approved plans should have dimensions and setbacks noted on thesite plain/survey, floor plans and elevation for the existing rooms and proposed roorns in the building and .site improvernents.;- 1) If recluired, the applicant must submit a copy of the following to the Town. a., The project 1 otice of Intent) for coverage under the current "NYSDEC SME' Gra Permit from Construction Activity"" prior to the start of any site wor�k. b. The project NOT(otice of Termination) 'upon completion of the project; c. The applicant must maintain on their project site; for review by stafl" il, The approved final plans,that, have been stamped by the Town Zoning-Administrator. These plans must include the project SWPPP, (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project 1 and proof of coverage under the current NYS,DEC SPDE,$ General Permit, or an individual SPDES permit issued for the project if required. g) Final approved.plans,, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review icy the Zoning Administrator or Building and Codes pe mnnel; h) The applicant m, ust meet with Staff aller approval and prior to issuance of Building Permit and/or the beginning of any site:work; �i) Subsequent issuance of further permits, including building permits, is;dependent on compliance with this,and, all other conditions of this,resolution.; j) As-built plans,to certify that the site plan is developed according to,the approved plans,to be provided prior to issuance of tbecertificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 27th day of February, 2018 by the following vote: .AYES: NOES: Page 2 of 2 Phone: 518,761,8220 F,ax518.745,4437� 742 Uy Road. Queensbury, NY 12804 �w wwqueensWry-net