Loading...
PB Staff Notes SP 39-2018 CR Bard_6 19 18 Town of Queensbury Planning Board at Community Development Department Staff Notes June 19, 2018 Site Plan 39-2018 JOE CARICARI, CR BARD 30 Collins Drive/ CLI—Commercial Light Industrial/ Ward 2 SEQR Unlisted Material Review: application, elevations, floor plans, site drawings, stormwater report, facade details, parking area details. Parcel History: SP 65-2014 Crossfit Requested Action Planning Board review and approval for exterior work on an existing 35,400 sq. ft. warehouse building — painting, siding and other. Also included is new paved areas over existing gravel designating parking for employees of CR Bard facilities. Resolutions 1. SEQR 2. Planning Board decision Prosect Description Applicant proposes exterior work on an existing 35,400 sq. ft. warehouse building—painting, siding and other. Also included is new paved areas over existing gravel designating parking for employees of CR Bard facilities. Pursuant to Chapter 179-3-040 of the Zoning Ordinance, site and building alterations shall be subject to Planning Board review and approval. Staff Comments • Location-The project site is located at 31 Collins Drive and is primarily associated with the building and property area to the rear of the parcel. • Arrangement- The plans show there are several buildings on the at the front of the site and there is an existing undesignated access route to the rear of the property to the existing 35,400 sq ft warehouse building used by the tractor trailers for delivery and pick up there is also an unmarked parking area for CR Bard employees. • Site Design- The project site area to the rear of the property will include repaving and striping of the existing parking area east side of building, creating a new parking area on the south side of the building and to pave and stripe the parking area on the west side of the building. The east side parking will also include a pedestrian painted walkway area to direct employees to the gated entrance for CR Bard employees entrance area. The south side and west side parking areas will include grass infiltration trench areas, • Building—The building plans indicate the east side of the building there is to be a new canopy installed over an existing mandoor, one of the overhead loading doors is to be repaired; the south side of the building painting and siding are to be completed, the existing canopy to remain with no changes; the west side of the building two overhead door areas to be filled in one to be improved with a mandoor, and facade area to be painted; the north side to not change • Signage-There is directional signage to be installed on the building as shown on the left side elevation. • Traffic- The warehouse building use requires 63 spaces and the applicant proposes 134 spaces. The applicant has explained the parking is used for employees to the adjacent lot building complex for CR Bard. The existing buildings at the front of the property are not included in the parking calculation for their use— there appears to be adequate space for each building parking needs. • Grading and drainage plan and Sediment and erosion control—The applicant has provided a stormwater management report for the area to be worked on about 38,650 sq ft. The runoff is to be addressed with infiltration trenches and drywells. • Landscape plan—no addition landscaping for the site is proposed - the existing unpaved area is to remain current there are storage pods that are to remain • Site lighting plan- The lighting plan indicates there are 16 wall light fixtures,3 are canopy lighting, and 14 pole light fixtures • Elevations —The plans show the profile of each building side and note the areas that are changing. • Floor plans —The applicant has explained the interior of the building has an existing warehouse space and office area. No waivers have been requested. Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The application form identified as "Requirements" outlines the items to appear on the site plan or included as attachments. At the time of application the applicant has either requested waivers, indicated the item not applicable or has not addressed the item/ left check box blank. This includes the follow items listed under Requirements of the applicant's application: Summary The applicant has completed a site plan review for the redevelopment of the CR Bard employee parking area and warehouse building. The project includes paving the parking area on the east side of the building, adding additional parking on the south side of the building,and paving the parking area on the west side of the building for employees and truck traffic. In addition the project includes some door and paint changes on the facade. MeetingHistory: PB: lst meeting;