Loading...
RC-0292-2018 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building& Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-0292-2018 Date Issued: Friday, December 14, 2018 This is to certify that work requested to be done as shown by Permit Number RC-0292-2018 has been completed. Tax Map Number: 301.17-3-57 Location: 42 CAITLIN DR Owner: Kelaco, LLC Applicant: Collette Construction Inc. This structure may be occupied as a: Single Family Dwelling w/gas FP 2560 s.f. Garage 484 s.f. By Order of Town Board Pointe West, lot 10 TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the CtivP 4 4t property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. { TOWN OF QUEENSBURY • T 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-0292-2018 Tax Map No: 301.17-3-57 Permission is hereby granted to: Kelaco,LLC For property located at: 42 CAITLIN DR In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Kelaco,LLC Single Family-New $350,000.00 Owner Address: 35 Front ST Total Value $350,000.00 Lake George,NY 12845 Contractor or Builder's Name/Address Electrical Inspection Agency Collette Construction Inc. 38 Collette LN Hudson Falls,NY 12839 Plans&Specifications Single Family Dwelling w/gas FP 2560 s.f. Garage 484 s.f. Pointe West,lot 10 $ 1,918.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Saturday,June 8,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town o ueens ; rid. u) .; :18 SIGNED BY: \ for the Town of Queensbury. Director of Building&Code Enforcement • ! Office Use Only 1.3;:41 PRINCIPLE SYRUCTURE PE MIS 4' '`` Permit Fee:$ 15)lo 6 AP PLICAYI ON *Rec. Fee:$ jSo 742 Bay Road,Queerisbury, NV V804 P: 518-761-8256 www .queen,bury.i net invoice;Y: Project Location: `( - ► ��v �- Tax WI: p #: 3 0 )' 1 - 3 S Subdivision Name: .PJt t-est_ - .. TOWN BD.RESOW t ION 86-2013:$850 recreation fee for new dwelling units: single family,duplexe /two-family, multiplefamily, apartments,condominiums, 'townhouses,and/or manufactured modular homes, but not mobile homes. This is in addition to the permit fee(s). C�3N ACT INFORMA�I®hl: . ° Applicant: - Name(s): /4 rn C 4 s tic )Oh) Mailing.Address, C/S/Z: 3e Ca(I J /'f U.&c A5 1 /is ) ,V> 75' Cell Ph.: ( S1 ) 6.S` 2a- Land Line: ( ;/- ) ) Y6 - 11 a-c) Email: /4 1-bum r'i oro Af C//e7 must o PrilaFv Owrerr( Name(s): KQ%cO d- «jar, L// 149 Mailing Address, C/S/Z: ,�R.carr_ L freaup 1u 1, 1 V iSJ Cell Ph.: ( 5's- ) 3615 Land Line: _( '1�' ) tit(r- c2--/�� Email: o _C®it»1tractoP oy Name(s): ( // 60 Sf&Fe Mailing Address, C/S/Z: 3P 6 r'/4 ?IP L.J Cell Ph.: ( ) 3 4‹.5` S-2 2- Land Line: _( ) U . � Email:. I li l [HIMAY 23 2,018o Architect /Enclirneer�(s)o TOWN OF QUEENSBURY Name(s): ucQsC ctik P .. r, III rNir.irr' 9 r•ne)=e • Mailing Address, C/S/Z: 4 /,'cam (O ` 6A/L.s. Fit; Cell Ph.: (PP ) 2 2 2 /a3 C, Land Line: ( ) Email: Contact Person for Building & Code Compliance: (Tit) ea/'Wf Cell Ph.: ( 5„0 ) 3(3 6-1-2?-- Land Line: ( ) Email: a0 Building&Code Enforcement ---- Prinrinle Stnvtnre Raviced_March-9(ri R i'_RQJEc _iNFORMATLOly. TYPE: ��31Am-1;e1 Commercial I Residential WORK CLASS: /Single-Family Two-Family Multi-Family(#of ) Townhouse Business Office Retail Hotel/Motel industrial/Warehouse t Garage(#ofcars .. ) Other(describe FOOIAG : GARAGE jnit 1ST floor: r•`-(4. _ .5' floor: 2nd floor: 3 /41 2nd floor: 3rd floor: Total square feet: .. Basement(habitable space): Total square feet: as C ADDITIONAL PROiECi INFORMATION: 1. Estimated Cost of Construction: $ 3 3-0) art, Pl tis Lot 2. Proposed use of the building: S/i%fi' I v 3. If Commercial or Industrial, indicate the name of the business: 4.. Source of Heat (circle one): et, Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances - Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? YES Explain: 6. Are there any easements on the property? YES NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? I' b. Is this a corner lot? YES 4 c. Will the grade be changed as a result of the construction? YES NO 9.24/ s jap d. What is the water source? 'UBL._ PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? PP-Puf f sq7c nO Ruildine Re Coda Fnfnrrr ment fir: r:.lu err..�r..ro�n.d� Ann .rL onao DECLARATION acknowledge that no construction ,hall ,-;ommen 'e prior to Issuance ut 8 vajiCi k3iii C ftr and wort':will be completed within a `12 month period. - . . _ .. . , .. 2. lithe work is not completed by the lyeer e; piration date the permit may be renewed, subject t0 fees and department approval. 3. I certify that the application, plans and supporting materials are a t rue and complete statement and/or description of the work proposed, that ail work will be performed in accordance with the • NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge.that prior to occupying the' facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. • • • have read and agree to the above: PRINT NAME: , k Av //€ SIGNATURE: DATA; 19-�7/ --. cal RI iidina R Cnda Fnfnrramant • f Yf Office use Only ° ``� i+ L;,sf: FUEL BURIN APP IAN E Permit it: tee, 0291 2 • 22I%8 ! {;A „ y CHIMNEY APPLICATION $ I3EYii'iit Fee-: , 7 I I _ '`" I invoice tt: ,;,or Q4Ie805.1-)c, 742 Bay Road, Queensbury, NY 17804 F: 518-761-8256 ,vvvw,quell,sb Iry net Project Location: CA L OA Tax MAp ID: 3 6)). 17 3 - .3-S Room of Install: L,l v;►`i ,' Planned Install Date: PiC /P **ONE APPLICATION PER APPLIANCE * CONTACT INFORMATION - o Applicant:, Name(s): /le Mailing Address, C/S/Z: 3-4 Cell Ph.: ___( S i 6/) ,3 6 S .2- Land Line; (SIP ) `7 VC // Email: o Primary Ownsr(a): Name(s): Ke Ia K,plu $ L.A1.44.4 Cedier Mailing Address, C/S/Z: 31— Fgo,r fit= L• 6. l ae-ygi Cell Ph.: ( ) :i)4.,N2 Land Line: r( ) Email: * Installer/Builder:, Name(s): Co // 7l C -rive. Mailing Address, C/S/Z: 3S C�1/e$ Li ' ,If /ap3 9 Cell Ph.: _( ) Land Line: (sip' ) 7z/6 // Email: Contact Person for Building & Code Compliance: Ke') 63Arh Cell Ph.: (5 ) 9(cc 5-2 Land Line: ( ) Email: Town of Queensbury Building&Code Enforcement r • e FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: Stove _ _ Fireplace Insert Fireplace Fuel Fired Equipment(Garage Only,13"clearance per IMC 304.3) Fireplace, factory built'--. Manufacturer's Name: gm]ec L Model 0: V__36 SOURCE OF HEAT: • Wood Coal Pellet Gay CHIMNEY INFORMATION: Masonry: block brick stone Flue: tie steel size in inches Material*: double-wall triple-wa Il_insulated (*Manufacturer's r _ Model#: _36 DV ADDITIONAL INFORMATION: 1. Two inspections are required. A rough-in inspection,prior to installation and a final inspection,after installation. 2 Manufacturer's installation manual must be available at the time of inspection. 3 Masonry fireplaces & chimneys require plans to be submitted. 4 Twenty-four (24) hour notification is required for nspections. Declaration:Construction/installation must conform to NYS Fire Prevention&Building Code and/or manufacturer requirements.The applicant or owner agrees to comply with all applicable laws,ordinances,regulations and all conditions that are part ofthese requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: �e21J 6/4-to SIGNATURE : ' (F fiATE: 01(1Yr Fuel Burning Appliance&Chimney Application • r -..•F •f,-' SEPTIC DISPOSAL PERMIT APPLJCATI ON Office Use Oni -"4- dry 7 2Q Queensbury,NY LSO .7 _Bay Road,�• y "'' Perm : '�C..ob Z q d2. Zo(b_ Tax Map ID#: Of v Permit Fee; iri�is%t;E?i . P of ct c Ci®[z__�4-Of L-Of J D CA :I t i iv' OK, Septic Variance? Yay _N o / Primary Owner(s) �A�� Mailing Address z? �/,1J. _ .,. u_-Phone Email • — n • {�sta9{�r,Bui{d�r r/E'p�10; I t . ...1.1*— _ .M ..,a= ,. ., _ _--_ -Mailing Address Phone & Email _ - Engineer �.... .__ .---- Mailing Address _.T. �m.�.-.� Phone& Email - Contact Person for Building&Code,Cwirvmpl.iiatri:, - - _ Phori - 78 365~ � 22 RESIDENCE INfFORMATION: - - _---_ _ , �� Year Built # of bedrooms X gallons per bedroom = totaldaily flow Garbage Grinder Yes l'"% 1980 or older Installed? {circle once Spa or Hot Tub Yes l�o 1951-1991 Installed? {circle one) uY -Nrese nt -3 — I V 3 3 c� PARCEL INFORMATION: Topography L, Flat Rolling Steep Slope %Slope Soil Nature _Sanc1 Loam Clay _Other Groundwater At what depth? ,g"-t __ Bedrockllmperviousmaterial [At what depth? -. . Domestic Water Supply L Municipal _Well{if well,wate r supply from any septic system absorption is ft.) Percolation Test 3 htew, Rate: per minute per inch{test to be completed by licensed enieerfarcltect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: - _ ___ __ Tank size1 /6-13-t) ga llons{min.slze 1,000 ga lions,add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field with#2 stone Total length ) ft.;Each Trench 5L ft. Seepage Pit with#3 stone IHow many:, , •Size: Alternative System Bed or other type: _ • HoldingT'ankSystem Total required capacity?. lank size ;# of tanks NOTES:1.Alarm system&associated electrica Iworkmust be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file-no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void.1 have read the regulations and agree to abide by these and all requirements oftheTown of Queensbury Sanitary Sewage Disposal Ordinance. //// - PRINT NAME: 1P tU G/l�1l.' DATE: .57f a/i SIGNATURE: DATE: �� , Town of Queensbury Building&Code Enforcement Revised February 2017 Town of Qkieerisbuiry Thomas R.Van Ne.,s Highway Department Highway Superintendent 742 Bay Road,queensbury, NY 12804 Home:518-745-0 29 Phone:518-761-8211 Fax:518-74-5-4•466 David Duell Deputy Highway Superintendent Home: 518-745-0 38 DRIVEWAY PERMIT Date: Applicant Name: Ceik,0 65qu3Avh� Telephone No,: 5-1 gv 3 3 .313 Address to be Inspected: La7 (0 4 7 -» P&.; Return Address: �,� III ten'' l ;f; )9?3? Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes at the specified location, The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action has been taken: STEP 1: ( ) Preliminary approval NEED ( ) - Slight Swale ( .) Deep Swale ( ) Level with the road ( ) Level with the top of the paved wing Size culvert pipe to be used (if necessary) ( ) 12" ( ) 15" ( ) 18" ( ) 24" ( ) 36" Preliminary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please resubmit this approval permit for a final approval. STEP 2: ( ) Final Approval ( ) Rejected Date: Thomas R.Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent Town of Queensbury Building&Code Enforcement Principal Structure Application Revised February 2017 _.. L , . REScheck Software Version 4e6.4 ./ijk coin . Hance Certificate Project Lot 10, Caitlin Drive, Queensbury, NY "_�^�1,.. , Energy Code: 2015 IECC • CO )-; N-v.! ��°'`, Location: Glens Falls, New"�k (� 0 '* /� 1�,.�''_- ;=�i��`; '`(�" �� ` Construction Type: Single-family ECIEIJ �1 Il=, .',; `'.'f a Project Type: "ate .. j>i j yp New Constructio D 1 _ Conditioned Floor Area: !Z2HDD, ``a, �'ra.'_, ^e MAY 2 3 201$ 4 �� f,a�_ 1,' �>:� = TO;:T O% Permit Date: Li._ TOWN OF QUEE iSSORY Permit Number: 3P ilLnI G&€nD r'S Construction Site: Owner/Agent: Designer/Contractor: Lot 10, Caitlin Drive Kenneth Collette Collette Construction queensbury, NY 12804 Collette Construction 35 Front Street Lake George,NY 12845 518.365.5822 information@colletteconstruction.c om Compliance:Passes using UA trade-off Compliance: 0.3%Better Than Code Maximum UA: 395 Your UA: 394 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies ''',.1 ...gyp.- ,.3 r 5. ,z '' yr ry , a',7,-. y ` "" i" ' '� Z- �"m T' rT "'x '-', c,' z - a M e ,.; w5 "5_ ,mo 5 ^A ,jx. �� s.. :. z 1 <� .- x�, ` � � 7 ? ,d S ,� `n,*a .**1 s'Ssi.-s, .-.. < x..,,S 4A embi y4 • • F •„i ',.. s. o .4y.,, ; Y '*�u' U Fa t >et`,,t ��i„ r - ,,1`" . I , WA ` K , ` X „»?.,z:ra,v3�:ay.'u�0'W.� .2,5�.�n��,.+�. .,.._....z"�.+*�,; <u e_ .iR y ,n '�:.:2, v,..aa�:.....;5"rl `A`�4T.�S,a _;2.�. 4s N�"..,"�,>'_�`tiX;2u. 3S2�r.+.S4 ., :ik"�'£,su,'ez .�'1 A��" •' Ceiling 1: Cathedral Ceiling 347 30.0 0.0 0.034 11 Skylight 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 20 0.370 7 Ceiling 2: Flat Ceiling or Scissor Truss 1,899 38.0 0.0 0.030 57 Wall 1:Wood Frame, 16" o.c. 2,200 21.0 0.0 0.057 97 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 327 0.270 88 Door 1: Solid 63 0.100 6 Door 2: Glass 109 0.270 29 Basement Wall 1: Solid Concrete or Masonry 1,645 15.0 0.0 0.056 91 Wall height: 8.0' Depth below grade: 7.0' Insulation depth: 8.0' • Window 2:Vinyl/Fiberglass Frame:Double Pane 26 0.300 8 301.17-3-57 RC-0292-2018 ' Kelaco, LLC 42 Caitlin Drive SFD w/gas FP 2560 s.f.' Gar. 484 s.f. Project Title: Lot 10, Caitlin Drive, Queensbury, NY. : 05/17/18 Data filename: C:\Users\Public\Documents\judson\REScheck\Collette 4-27-18 Lot 10.rck -Page 1 of10 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.4 and to comply with the mandatory requirements I' to • fie REScheck Inspection Checklist. Z\&� -Z — - ,Z.l 532—• —. q at to Name-Title Signature Date I t.• . E". R .'.�` _..� fl (` �' •! PESSIC do Project Title: Lot 10, Caitlin Drive, Queensbury, NY Report date: 05/17/18 Data filename: C:\Users\Public\Documents\Judson\REScheck\Collette 4-27-18 Lot 10,rck Page 2 of10, r T d\ x REScheck Software e Version 4.6M4 w ci Inspection Checklist Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 5eetican i ' Plans Verified Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions I& Regal) I Valle i Value i i 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the :Location on plans/spec: building envelope.Thermal ❑Not Observable Throughout plan envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable „ , Systems serving multiple ❑Not Applicable dwelling units must demonstrate I compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: OComplies Requirement will be met. 1403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Location on plans/spec: to Manual] or other methods Btu/hr Btu/hr ENot Observable Sized per F.W.Webb approved by the code official. ❑Not Applicable I Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Lot 10, Caitlin Drive, Queensbury, NY Report date: 05/17/18 Data filename: C:\Users\Public\Documents\Judson\REScheck\Collette 4-27-18 Lot 10.rck Page 3 of10 • -3 Section l ' . # I Foundation Ins ection i Plans Verified ; Field Verified fte(i iC7 p I Value I Value Complies. I Comments/Assumptions 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R- R- ❑Does Not table for values. y insulation is used,verification may need to occur during ENot Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall EComplies Requirement will be met. [FO5]1 insulation installed per ODoes Not manufacturer's instructions. ❑Not Observable Location on plans/spec: Page 8, Cross-section C-C . ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [FO6]1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies Exception: Requirement is [FO11]2 to protect exposed exterior ❑Does Not not applicable. insulation and extends a minimum of 6 in. below grade. ❑Not Observable :Not Applicable 403.9 Snow-and ice-melting system ❑Complies Exception: Requirement is I[FO12]z controls installed. ❑Does Not not applicable. , 'A' ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Lot 10, Caitlin Drive, Queensbury, NY Report date: 05/17/18 Data filename: C:\Users\Public\Documents\Judson\REScheck\Collette 4-27-18 Lot 10.rck Page 4 of10 [ . ) ' Plans Verified ' Field Ver�hed ' Ir Section pra�bmg/mmogh-m �ms�e���n/� walue ��|u� � Complies? | � -- � 402.1.1' oourU-facto: U' U' OCompUes See the Envelope Assemblies |402.3.4 []onesNnt �mem'vome� /[pn�]� ' L]NotObsemab|e °" '[]Nut*mp|icab|e '402.1.1' Glazing U~fagor(areo-weighteU U- U' LJComplies See the Envelope xssemoxes 402.3.1. average). []DnesNot table for values, | 402.3.3' � | 4023.6' LJNotObsemab|e ' 402.5 []NotApp|icable � [PRz]3. ( lcol � } ------- ------- 3O3.z.9 U-facu000f fenestration products. LJCnmplies Requirement will bemet, [pR4]1 are determined inaccordance []Doesmct with the wFnc test procedure ur ONotobservab|e Location mmp|ams/spec: taken from the default table. []NotAppUcab|e Page 9' notes section 5ky|ightU-faUor. U_ __. U' []Complies See the Envelope Assemblies []Does Not table for values. O0ot0bsemab|e402.5 . UNoLApp|icab|e � - ------ -- 402.4.l.l Air banierand thermal barrier LJCom�ies Requirement will be met. [FR23]z installed per manufacturer's []DnesNot instructions, []mctubsemab|e Location ompVans$pac: Throughout house | []NotApp|icab|e | --- - ' 402.4.3 Fenestration that|s not site built []Complies Requirement will bemet, [FR20]1 }s listed and labeled asmeeting []Dues Nut AAMAfWDwA/CSAlOz/|S2/A440 nr has in�|tetinnrates '—e-NFRC []Not0bsemable 4OO that do not exceed code ' ONo«App|icab|e limits. 482.4.5 ---IC-rated recessed lighting fixtures -- []Complies Requirement will bemet, [FKl§]z �sealed at housing/interior finish []DoesNct � and labeled tu indicate<z o�m Location on plans/spec: � []mo�obsemab|e |eakageat75Pa. Kitchen/living room area []NotApp|icab|e 4O].- Supply and return ducts in attics --- -- -- []Complies ---'Exception: Ducts located [FRla]z insulated >= R'8 where duct is []DoesNnL completely inside the >=] inches in diameter and ~= bui)dingenve|ope []NntObsemab|e ' | R'h where^] inches.Supply and / return ducts inother portionsof []NotAppUcab|e the building insulated >= n'0for diameter>~3 inches and n4.Z � for< 3 inches in diameter. 403.3.3.5 Building�—cavities are not used as --' ----- --------[]Comp|ies --quinementwill be met. ducts urplenums. []Does Not � Location omm|am$spec: []NotObservab|e Throughout house []NotApp|icab|e |403.4 HVAC piping conveying fluids R- R- []Complies Exception: Requirement ia | [FR17 above lO5uFor chilled fluids []Does Not not applicable. below 55»F are insulated to;�n- ' 3. []NotObsemab|e []motAppUcab|e 1403.4.1 Protection of insulation on HVAC []Comp|/es Requirement will be m��� [FR2411 piping. []Does Not []No«Obsemab|o . LJmnt Applicable l High Impact(Tier l> 2 Medium Impact(Tier 2) ' 3 Low Impact(Tier 3) -- Project Title: Lot 10' Caitlin Dhve, Queensbury' NY Report date: 05/I7/I8 Data filename: C:\Users\Pub||c\OncumenLs�udson\REScheck\Co||ette4'Z7'lO Lot l0.rck Page 5oflO A - ' Section ( 1 Plans Verified Field Verified Sc Req.tf)IFraming/i ough-in Inspection Value Value Complies? Comments/Assumptions " 403.5.3 Hot water pipes are insulated to R- R- ❑Complies Requirement will be met. [FR18]2 >_R-3. ❑Does Not I ate' ONot Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies Requirement will be met. [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable Location on plans/spec: In proximity to furnace ❑Not Applicable (basement) Additional Comments/Assumptions: 1 High Impact(Tier 1) j 2 Medium Impact(Tier 2) ' 3 Low Impact(Tier 3) Project Title: Lot 10, Caitlin Drive, Queensbury, NY Report date: 05/17/18 Data filename: C:\Users\Public\Documents\Judson\REScheck\Collette 4-27-18 Lot 10.rck Page 6 of10 ^ , Section — p�nsVe�fba� ~ # Insulation Inspection Verified �a�� vmmmo ~~^^°~'~~ *^~=~ � Re' L�- ==— ' -- �---- 3o,.l All installed insulation blabeled []complies Requirement will bemet. [|N1312 or the installed R+a|ues []onesmct v pn� ded ' d� provided. []NotobsemaU|e ||. — []mot Applicable 4Oz.z.l' Wall insulation R-value,|Y this isa R, R- []Complies See m^Envelope Assemu�s 480.2.5' mass w��at [� Wood �� Wood .[]Doesmo« 'table for values. 402Z � wall 'z' F] Mass [] mass []NotObsemob|e ' UN3] eterior,theextehorinsu|ation � requirement applies(FRlO). F� Stee| .[] Stee| []NotAppUcab|e . 1303.2 Wall insulation is installed per LlCnmplies Requirement will bemet. [|N411 manufacturer's instructions. ODnesNct Location ~ plans/spec: []NotObsemaNe Thmughu ^^—the hou se []NctAppUcab|e Additional Cmmnmmewta/Assmmmptioss: � l High Impact(Tierl) ' 2 Medium Impact(Tier2) | 3 Low Impact(Tier 3) Project Title: Lot IU. Caitlin Drive, Oueensbury. NY Report date: 05/17/I8 Data filename: C:\Users\Pub|ic\Oocuments�udson\REScheck\CuUet&e4'27-l8 Lot l0.rck Page 7ofI0 . . ` Section # FY�I�� �� ����� Field Verified Complies? Comments/Assumptions6^�eq�o /� Value { Value i . � ^ � |402.l.1, Ceiling insulation R'va|ue. n- n- Ocomplies See the Envelope Assemblies |402.2.1' [] Wood [� Wood []Does Not table for values' 402.2.2, 4Oz.o.O L� Steel �� Steel []Notobsemab|e [F|111 .[]Notxpplicable 303.1.1.1' Ceiling insulation installed per Requirement will �--met. 303.2 manufs�urersins�ucd ----instructions. [] �Not lies [nz]:L Blown insulation marked every Location omp/ams/spec: 300*t2. []Not Observable Throughout the house LJNctApp|icab!e 402.2.3 Vented attics with air permeable []complies —nequinementwU| bemet. [F122]2 insulation include baffle adjacent []DoeoNot to soffit and eave vents that Location mmmlams/spec: extends over insulation. []Not Observable Rear soffits inhnuse []NotAppKcab|e ' 40224 Attic access hatch and door R' --- []rummes Requirement will Uemet. insulation -K-va|uenfthe []Does mot adjacent assembly. Location on plans/spec: � []motousemab|e With vveatherstriiping on . []woLAppUcab!o edges. .3 Blower door test @5O Pa. <=5 ACH50 = ACH5U= []Complies Requirement will bemet. achin Climate Zones l'2' and []DoesNct <=] ach in Climate Zones 3'a. []motobsenmb|e Location on plans/spec: Not specified onp|an but will []NotAppUcab|e be completed. ' 408.2.3 Duct Ughtoesstest result of<=4 cfn/zUD chn/lUO []Complies Exception:AUducts and air [R4]1 cfm/I00ft2 across the system or �� � ft2 []Dues Not handlers are located within <=3cfm/lV0ft2 without air :cond|tionedspace handier(�Z5 Pa. For rough-in � []Notobsemab|e � ' tA tes�'veh�cabonm []Noc Applicable ca e occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfn/100 cfm/zOO -- omp|ies Exception:All ducts and air [F|27]1 determine air leakage with ft2 ft2 []DoesNot handlers are located within either: Rough-in test:Total conditioned space leakage measured with o []NotObsemable � pressure differential ofO.l inch []NctApp|icab}e | vv.g. across the em including the manufacturer's air handier enclosure if installed at time of test.pnstconstmcUon test:Total leakage measured with a pressure differential ofO.l inch � wg. across the entire system including the manufacturer's air � handler enclosure. 4O5.3.2�l Air handier leakage des�nated []complies �Exception: Requirement)s [F124]1 by manufacturer at<=2Y6of []DoesNoL not applicable. design air flow. []Not0bsemob|e ONotApplicable '4O3.I.l Programmable thermostats ----'— --------[]Comp|ies Requirement miUbemet. [R9]z installed for control oYprimary []Does0ot � heating and cooling systems and []Nut0bsemab|e initially set by manufacturer to code specifications. []NntApp|icab|e 403.1.2 Heat pump thermostat installed OCnmpUes Exception: Requirement is [p|zO]z un heat pumps. []DnesNct not applicable. � L]No«Obsemab|e � LJNotxppUcab|e �403.5.1 —Oncu|atingsenvicehctwater -- ---- ----[]Comp|iey Requirement will be met. �[F|11]2 systems have automatic or []Doeswnt .accessible manual controls, []Nut0bsemob|e � []WotApp|icab|e I High Impact(Tier l) 2 Medium Impact(Tier2) 3 Low Impact(Tier3) Project Title: Lot IO. Caitlin Drive, Uueansbury. NY Report date: 05/17/18 Data filename: C:\Usee\Pub|ic\Documents\judson\RE3check\Co||ette4'Z7'l8 Lot lO.nck Page8oflO - . ` ~ 'Me F—section p�no�e�fbe� Field Verified � Inspection�pectmn Provisions / �Value Complies? | �aYoe | �e � � ~ ' i403.6.1 All mechanical ventilation system []Complies; �equirementmiUbcme� ��� fans not of tested and listed Oo�sN� ' | HVAC equipment meet cy and air flow|imds. effica` LJNctobsenable LJNotAppUcab|e 403.2 Hot water boilers supplying heat -- -------- ---- []Complies Exception: Requirement is LF[26]2 throughone-urtwu-pipeheating []Does Not not applicable. systems have outdoor setback � cuntm|to|owerboi|erwater []Not Observable | ' ' temperature based onoutdoor LJNotApp|icab|e temperature. |403.5.12 Heated water circulation systems — -- []Complies Requirement is |[F128]2 :have a circulation pump.The []Does Not not applicable. system ret m pipe - []wotObsen�b|e return pipe |d tsupply pipe. Gravity and thermos- []Not Applicable � � syphon circulation | not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump / when water isin circulation loop [ isat set-point temperature and no demand for hot water exists. ------- ecthc heat trace s yt ' --[]CompUes Exception: Requirement is [F[29]2 Electric ywith|EEE5l5.l orUL []Does Not not applicable, 515. Controls automatically []NutObsemab|e adjust the energy input to the heat tracing to maintain the []NotApp}icab|e desired water temperature in the piping. 403.5.2 Water distribution systems that --- --' []Complies Exception: Requirement is [F130]2 have recirculation pumps that []ooesNnt not applicable. pump t from - heated �-he � d tar supply pipe back to the heated []NotObsemab|e water source through acold []wutAppUcab|e water supply pipe have a � demand recirculation water system, Pumps have controls that manage operation ofthe pump and limit the temperature of the water entering the cold water piping»o 1040F. . Drain water heat ecove d units — - []Comp|ies ��oce� mu: Requirement is �[�|3l]e tested in accordance with C5A []onesNo« not applicable. ! B55.1. Potable water-side pressure loss u[drain water Heat []motObsemab|e recovery units<5 psi for []Not Applicable individual units connected toone ' nr two showers. Potable water- side pessure|ossoYdrainwater � heat recovery units <z psi for individual units connected to theeor more showers. 404.1 -75Y6of|ampampermanent -- []Complies Requirement will be met, fixtures nr75Y6ofpermanent []ones Not fixtures have high efficacy lamps. Does not apply tn|ow�n|tage []mc�Obsemab|e lighting. []NotApp|icaUie � [i6 4.1.z Fuel gas lighting have []Complies Exception: Requirement is [F/23]' no continuous pilot light. []ooeswo« not applicable. []NotObservab|e | []NoLApp|icab|e l High Impact(Tier I) 2 Medium Impact(Tier 2) ] Low Impact(Tier 3) Project Title: Lot lO. Caitlin Drive, Queensbury. NY Report date: 05/17/I8 Data filename: C:\Users\Pub|ic\DucumentsVudson\REScheck\Cu||ette4-27'I8 Lot lU.rck Page 9ofl0 9 Section ? Plans Verified I Field Verified Final inspection ProvisionsComplies? Comments/Assumptions Value Value & RetIiI 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [Fl7]Z ❑Does Not [Not Observable ❑Not Applicable 303.3 Manufacturer manuals for EComplies Requirement will be met. [FI18]3 mechanical and water heating ❑Does Not systems have been provided. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1} 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) J Project Title: Lot 10, Caitlin Drive, Queensbury, NY Report date: 05/17/18 Data filename: C:\Users\Public\Documents\Judson\REScheck\Collette 4-27-18 Lot 10.rck Page 10 of10 • • .1 i 114 2015 IECC Energy Efficiency Certificate [art 'c:VRT,',/liZit4kiii;:a,4124-iieV:V*77- Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): V1Ittcar:,1"45YAFt,:MV:AW5,rF-TJ ' ;Qfr Window 0.27 Door 0.27 Skylight 0.37 .1ye 0)4 c eg. 0, A f;:: FIFJ9. e Heating System: Cooling System: Water Heater: • ‘40i' --wea-n4L, Name: Date: Comments Manual S Compliance Report Job: 062310 Date: May 21,2018 Entire House By: COLLETTE CONSTR Plan: 062310 Project Information For: KEN COLLETTE, COLLETTE CONSTR. LOT 10 CAITLIN DR, QUEENSBURY, NY 12804 Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 28513 Btuh Entering coil DB: 75.3°F Outdoor design WB: 71.0°F Latent gain: 7087 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 35601 Btuh Indoor RH: 50% Estimated airflow: 1364 cfm Manufacturer's Performance Data at Actual Design Conditions E C f 11 V E [ily Equipment type: Split AC Manufacturer: Model: Actual airflow: 1364 cfm MAY 2 3 2018 II:JJ Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load TOWN OF QUEENSBURY Total capacity: 0 Btuh 0% of load SHR: 0% BUILDING&CEDES Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 138729 Btuh Entering coil DB: 67.0°F Indoor design DB: 70.0°F • Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: Model: Actual airflow: 1364 cfm Output capacity: 0 Btuh 0% of load Temp. rise: 0 °F 301.17-3-57 RC-0292-2018 Kelaco, LLC 42 Caitlin Drive Meets are all requirements of ACCA Manual S. SFD w/gas FP 2560 s.f., Gar. 484 s.f. ® 2018-May-21 10:01:52 wrightsoft Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCA ...rs\scott.langeworthy\Documents\York\BECRAFT.rup Caic=MJ7 Front Door faces: N , Residential Plans Examiner Review Form Form RPER 1 ACCk. or HVAC System Design (Loads, Equipment, Ducts) 15Mar09 QUEENSBURY NY Header Information Contractor: COLLETTE CONSTR REQUIREDATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes Ej No 0 Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes 0 No 0 OEM performance data(heating,cooling,blower): Yes 0 No Building plan#: 062310 Manual D Friction Rate Worksheet: Yes 0 No 0 Duct distribution sketch: Yes D No 0 Home address(Street or Lot#,Block,Subdivision): LOT 10 CAITLIN DR, Entire House HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Building Construction Information Winter Design Conditions Building Outdoor temperature: -4 °F Orientation: Front Door faces North Indoor temperature: • 70 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 138729 Btuh Number of bedrooms: 4 Conditioned floor area: 6436 ft' Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows Roof Grains difference: 27 grub a50% RH Eave overhang depth: 0 ft Sensible heat gain: 31682 Btuh Internal shade: none Blinds,drapes,etc. Eave Latent heat gain: 7875 Btuh Depth window Total heat gain: 39556 Btuh Number of skylights: 0 ' HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Cooling Equipment Data Blower Data Equipment type: Gas furnace Equipment type: SplitAC Heating cfm: 1364 Furnace,Heat pump,Boiler,etc. Air Conditioner,Hest pump,etc. Cooling cfm: 1364 Model: Model: Static pressure: 0 in H2O + Fan's rated external static pressure for design airflow Heating output capacity: 0 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design outdoor conditions Sensible cooling capacity: 0 Btuh - Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 1364 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure(ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal . Friction Rate=ASP=(TEL x 10 ) lare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County,Town Municipality orAuthority having jurisdiction use. *Home qualifies for MJ1AE Form based on Abridged Edition Checklist -f1- wrightsoft® Right-Suite®Universal 2017 17.0.16 RSU25116 Project Summary Job: 062310 Date: May 21,2018 Entire House By: COLLETTE CONSTR • Plan: 062310 Pro'ect Information For: KEN COLLETTE, COLLETTE CONSTR. LOT 10 CAITLIN DR, QUEENSBURY, NY 12804 Notes: Desi• n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 70 °F Inside db 75 °F Design TD 74 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr./lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 130509 Btuh Structure 27184 Btuh Ducts 8220 Btuh Ducts 1330 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) Humidification 0 Btuh Bloer(none) 0 Btuh Piping 0 Btuh Equipment load 138729 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 25662 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 7087 Btuh . Ducts 0 Btuh Central vent (0 cfm) 0 Btuh • Heating Cooling (none) Area(ft?) 6436 6436 Equipment latent load 7087 Btuh Volume(ft') 57924 57924 Air changes/hour 0.90 0.40 Equipment total load 32749 Btuh Equiv.AVF (cfm) 869 386 Req. total capacity at 0.70 SHR 3.1 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1364 cfm Actual air flow 1364 cfm Air flow factor 0.010 cfm/Btuh Air flow factor 0.048 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.80 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2018-May-21 10:01:52 wrightsoft® Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCK ...rs\scott.langeworthy\Documents\York\BECRAFT.rup Cale=MJ7 Front Door faces: N Right-J®Worksheet Job: 062310 Entire House Date: May 21,2018 COLLETTE CONSTR Plan: 062310 MANUAL J:7th Ed. . 1 Name of room Entire House Room1 Room2 Room3 2 Length of exposed wall 637.0 ft 216.0 ft 214.0 ft 82.0 ft 3 Room dimensions 1.0 x 2192 ft 1.0 x 2150 ft 1.0 x 962.0 ft 4 Ceilings Condit.Option 9.0 ft d 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.6 1.0 5733 **** **** 1944 **** **** 1926 **** **** 738 **** **** Exposed b 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** walls and c 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** partitions d 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** e 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** f 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** 6 Windows and a 3A0 40.8 ** 290 11824 **** 60 2446 **** 0 0 **** 125 5097 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 " 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 95 **** 1805 0 **** 0 0 **** 0 65 **** 1235 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 165 **** 11220 60 **** 4080 0 **** 0 30 **** 2040 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 30 **** 1020 0 **** 0 0 **** 0 30 **** 1020 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 34.0 6.3 168 5719 1051 63 2145 394 0 0 0 63 2145 394 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.6 1.0 5275 29276 5381 1821 10107 1857 1926 10689 1965 550 3053 561 exposed b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 walls and c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 partitions d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 Ceilings a 16G0 2.4 1.1 2192 5353 2459 2192 5353 2459 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 • 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Floors a 1910 1.8 0 4244 7537 0 0 0 0 2150 3818 0 962 1709 0 (Note:room b 1910 1.8 0 42 75 0 42 75 0 0 0 0 0 0 0 perimeter c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 is displ. d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 for slab e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 floors) f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 Infiltration a 154 9.3 458 70725 4248 123 18994 1141 0 0 0 188 29031 1744 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **" 130509 **** **** 39119 **** **** 14508 **** **** 41034 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 8220 **** 6% 2464 **** 6% 914 **** 6% 2584 **** 15 Total loss=13+14 **** 138729 **** **** 41583 **** **** 15421 **** **** 43618 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 27184 **** **** 9932 **** **** 1965 **** **** 6994 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 1330 5% **** 486 5% **** 96 5% **** 342 19 Total RSH gain=(17+18)*PLF 1.00 **** 28513 1.00 **** 10418 1.00 **** 2061 1.00 **** 7336 20 Air required(cfm) 1364 1364 409 498 152 99 429 351 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wr- htsoft* 2018-May-21 10:01:52 9 Right-Suitee Universal 2017 17.0.16 RSU25116 Page 1 AC LAN. Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 062310 1 Entire House Date: May 21,2018 COLLETTE CONSTR Plan: 062310 MANUAL J:7th Ed. 1 Name of room Room4 Room5 Room7 Room8 2 Length of exposed wall 30.0 ft 0 ft 21.0 ft 24.0 ft 3 Room dimensions 11.0 x 13.0 ft 7.0 x 3.0 ft 14.0 x 16.0 ft 8.0 x 16.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO., Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.6 1.0 270 **** **** 0 **** **** 189 **** **** 216 **** **** Exposed b 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** walls and c 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** partitions d 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** e 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** f 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** 6 Windows and a 3A0 40.8 ** 15 612 **** 0 0 **** 30 1223 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 0 **** 0 0 **** 0 30 **** 570 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 15 **** 1020 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 1OD0 34.0 6.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.6 . 1.0 255 1415 260 0 0 0 159 882 162 216 1199 220 exposed b 0 0 0 0 0 0 • 0 0 0 0 0 0 0 0 walls and c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 partitions d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 Ceilings a 16G0 2.4 1.1 0 0 0 0 0 0 0 0 0 0 0 0 • b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Floors a 1910 1.8 0 143 254 0 21 37 0 224 398 0 128 227 0 (Note:room b 1910 1.8 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 is displ. d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 for slab e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 floors) f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 Infiltration a 154 9.3 15 2316 139 0 0 0 30 4633 278 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 4597 **** **** 37 **** **** 7136 **** **** 1426 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 290 **** 6% 2 **** 6% 449 **** 6% 90 **** 15 Total loss=13+14 **** 4887 **** **** 40 **** **** 7586 **** **** 1516 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 1419 **** **** 0 **** **** 1010 **** **** 220 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 69 5% **** 0 5% **** 49 5% **** 11 19 Total RSH gain=(17+18)*PLF 1.00 **** 1489 1.00 **** 0 1.00 **** 1060 1.00 **** 231 20 Air required(cfm) 48 71 0 0 75 51 15 11 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 'Pid- wrightsOft°° Right-Suite®Universal 2017 17.0.16 RSU25116 2018-May-21 10:01:52 �� Page 2 ..rs1scott.langeworthy\Documents\York1BECRAFT.rup Calc=MJ7 Front Door faces: N • Right-J®Worksheet Job: 062310 Entire House Date: May 21,2018 COLLETTE CONSTR Plan: 062310 t. MANUAL J:7th Ed. 1 Name of room Room9 Room10 Room11 Room12 2 Length of exposed wall 12.0 ft 27.0 ft 7.0 ft 4.0 ft 3 Room dimensions 1.0 x 142.0 ft 1.0 x 166.0 ft 7.0 x 8.0 ft 4.0 x 8.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.6 1.0 108 **** **** 243 **** **** 63 **** **** 36 **** **** Exposed b 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** walls and c 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** partitions d 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** e 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** f 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** 6 Windows and a 3A0 40.8 ** 30 1223 **** 30 1223 **** 0 0 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f • 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 30 **** 2040 30 **** 2040 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 34.0 6.3 0 0 0 0 0 0 21 715 131 21 715 131 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.6 1.0 78 433 80 213 1182 217 42 233 43 15 83 15 exposed b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 walls and c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 partitions d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 Ceilings a 16G0 2.4 1.1 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 ' 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Floors a 1910 1.8 0 142 252 0 166 295 0 56 99 0 32 57 0 (Note:room b 1910 1.8 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 is displ. d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 for slab e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 floors) f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 Infiltration a 154 9.3 30 4633 278 30 4633 278 21 3243 195 21 3243 195 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 6541 **** **** 7333 **** **** 4290 **** **** 4098 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 412 **** 6% 462 **** 6% 270 **** 6% 258 **** 15 Total loss=13+14 **** 6953 **** **** 7795 **** **** 4560 **** **** 4356 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 *'** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 2398 **** **** 2535 **** **** 369 **** **** 341 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 117 5% **** 124 5% **** 18 5% **** 17 19 Total RSH gain=(17+18)*PLF 1.00 **** 2515 1.00 **** 2660 1.00 **** 387 1.00 **** 358 20 Air required(cfm) 68 120 77 127 45 19 43 17 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wr- htSOft® 2018-May-2110:01:52 �.-�A 9 Right-Suitee Universal 2017 17.0.16 RSU25116 Page 3 ..rs\scott.langeworthy\Documents\York\BECRAFT.rup Calc=MJ7 Front Door faces: N Rig ht-J®Worksheet Job: 062310 Entire House Date: May 21,2018 v. COLLETTE CONSTR By 062310 MANUAL J:7th Ed. 1 Name of room Room13 Room14 Room15 Room16 2 Length of exposed wall 0 ft 0 ft 0 ft 0 ft 3 Room dimensions 1.0 x 57.0 ft 1.0 x 57.0 ft 1.0 x 74.0 ft 4.0 x 8.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.6 1.0 0 **** **** 0 **** **** 0 **** **** 0 **** **** Exposed b 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** walls and c 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** partitions d 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** e 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** f 0 0 0 **** **** 0 **** **** 0 **** **** 0 **** **** 6 Windows and a 3A0 40.8 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 34.0 6.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.6 1.0 0 0 0 0 0 0 0 0 0 0 0 0 exposed b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 walls and c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 partitions d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 Ceilings a 16G0 2.4 1.1 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Floors a 1910 1.8 0 57 101 0 57 101 0 74 131 0 32 57 0 (Note:room b 1910 1.8 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 is displ. d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 for slab e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 floors) f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 Infiltration a 154 9.3 0 0 0 0 0 0 0 0 0 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8.,+11+12 **** 101 **** **** 101 **** **** 131 **** **** 57 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 6 **** 6% 6 **** 6% 8 **** 6% 4 **** 15 Total loss=13+14 **** 108 **** **** 108 **** **** 140 **** **** 60 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 0 5% **** 0 5% **** 0 5% **** 0 19 Total RSH gain=(17+18)*PLF 1.00 **** 0 1.00 **** 0 1.00 **** 0 1.00 **** 0 20 Air required(cfm) 1 0 1 0 1 0 1 0 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wrightsoft® 2018-May-21 10:01:52 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 4 AC ...rs\scott.langeworthy\Documents\York\BECRAFT.rup Calc=MJ7 Front Door faces: N JLT Building Services, LLC 700 Indian Road Fort Plain, NY 13339 518-925-7718 iltbuildingservices@gmail.com Blower Door Test Results Report Test Date: 1 2 i 1 d` -X /Client Name: C �E fly (./7-CAIS77eckC-- lOfi Client Address: f ml DEC1r1O1LI18 Test Site Address: A/ -y V1 /"l L-/N )I �QWN OF QUEENS$URY akikEE-IUSS&•,{2Yr i\)4, j BUILDING&CODES iLc,- 0212 LoleD Test Data Area Tested [cult]: "/ 1 / c? CC4 F- - Infiltration Rate Results[CFM@SOpaj: !! ( 7/ C,t ACH50#as tested at 50 Pascal: 8' 3 Z 4C!/ S.7) *2015 Code N1102.4.1.2 requires 5 3ach Based on our test results your building meets does not meet Air Infiltration in accordance with 2015 (ECC Residential Code Provisions section R402.4.1.2 1 I certify the above information as performed in accordance with IECC 2015,ANSI&ASTM protocols,and BPI standards using up to date calibrated Retrotec equipment models#5101 and#DM32 as required. Thank You for choosing JLT Building Services LLC. Jim Telfer BPI ID#5058106 Signed : i