Loading...
00731-2018 10102018 INSPECTION WORKSHEET (007231-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0380-2018Case Module:Permit Inspection Date:10/10/2018Inspection Status:Passed Inspector:Charles DyerInspection Type:Residential Final Inspection Job Address:51 JOHN CLENDON RDParcel Number:295.15-2-14 Queensbury, NY 12804 Contact TypeCompany NameName Granted PermissionFOOTHILLS BUILDERS, LLC\[FOOTHILLS BUILDERS, LLC\] ContractorFOOTHILLS BUILDERS, LLC\[FOOTHILLS BUILDERS, LLC\] ApplicantFOOTHILLS BUILDERS, LLC\[FOOTHILLS BUILDERS, LLC\] Primary OwnerFOOTHILLS BUILDERS, LLC\[FOOTHILLS BUILDERS, LLC\] Checklist ItemPassedComments General CommentsNO 4 inch Building Number Address visible from roadYES Chimney Height / B Vent / Direct Vent LocationYES Chimney Rain Cap InstalledNO Fresh Air IntakeYES Fresh air supply 3' from gradeYES 3" Plumbing Vent through roof minimum 18 inchYES Outside Spigots have Air GapYES Roof Complete / Exterior Finish CompleteYES Platform at all exterior doorsYES Handrail 4 or more risersYES Guards at stairs,decks,patios 30" + above gradeNO Guard at stairwell at 34" or moreNO Window guards req:<2' above floor/6' above grade -YES quick release installed Guard at deck, porches 36" or moreNO Handrail Termination at Newell Post or WallYES Interior/Exterior Railings 34 to 38YES Wood deck: 2'+ from grade dia bracing required - H/CYES ramp compliant Oct 10, 2018Page (4) INSPECTION WORKSHEET (007231-2018) Checklist ItemPassedComments 4+ Deck Joist Ledger Connections-24" From EndsYES Deck Ledger-Bolted per CodeYES Grade away from foundation 6 with 10 feetYES 6 clearance to sill plateYES Gas Shut-off Exposed & Regulator (18) Above GradeYES HVAC Vent Terminal 10' from Lot Line & OpeningsNO Dryer Duct Max Length 35', Labeled Over 35'NO Interior privacy/trim/doors/main entrance 36YES Bathroom / Kitchen WatertightYES Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Safety glazing: w/in 5' of tub/shower - stairwell win/adj toNO drs Smoke Detectors: Carbon MonoxideYES Smoke Detectors 3' from Kitchens & Baths R314YES Every level, Every bedroomYES Outside every bedroom areaYES Inter ConnectedYES Battery backup: _____YES Attic Access 22 x 30 minimumYES Attic Access Insulation = Attic R- ValueYES Attic Access GasketedYES Plumbing fixturesYES Backflow Preventors where requiredYES Foundation insulation to floorYES Energy Sticker on Elec. Panel:R-Val. & Heating SysYES All Hot Water Systems: R-3YES Duct work sealed properlyYES Intake OpeningsYES Blower Door Test CertificationYES Oct 10, 2018Page (5) INSPECTION WORKSHEET (007231-2018) Checklist ItemPassedComments HRV or ERV Installed per Bedroom RequirementsYES Emergency egress below gradeYES Furnace shut-off w/in 30 ft. or w/in line of siteYES Furnace Hot Water Heater operatingYES Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES 20 Minute Fire Door/Self-Closing HardwareYES Seals on Garage Doors, esp. WoodYES Basement stairs closed rise greater than 4 inchesYES Basement Egress: 5s.f. window w/sill or Bilco doorYES Garage Floor PitchedYES 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. TrussNO Gas Log In Sealed or Glass EnclosureYES Fin Elect; Energy Saving Light Bulbs 50 PercentYES Final Survey Plot PlanYES Arc Fault Breaker Habitable SpacesYES Flex Gas Pipe BondingYES As Built Septic SystemYES Site Plan / Variance requiredNO Flood Plain Certification, if requiredNO Truss ID Signage Installed at Electrical MeterYES OK to Issue Temporary C/ONO OK to Issue C/OYES Dyer, Charles (Inspector) Oct 10, 2018Page (6)