Loading...
SOLAR-0490-2018 TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF COMPLIANCE Permit Number: SOLAR-0490-2018Date Issued: Monday, January 14, 2019 This is to certify that work requested to be done as shown by Permit Number SOLAR-0490-2018 has been completed. 296.12-1-8 Tax Map Number: 4 BAYBERRY CT Location: WILLIAM GEHRING Owner: Solar Liberty Energy Systems Inc Applicant: This structure may be occupied as a: Solar Panel Installation By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building & Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY t. q 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 '- —�'s Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: SOLAR-0490-2018 Tax Map No: 296.12-1-8 Permission is hereby granted to: Solar Liberty Energy Systems Inc For property located at: 4 BAYBERRY CT In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: WILLIAM GEHRING Solar Panel-Residential $14,000.00 Owner Address: 4 Bayberry TER Total Value $14,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency Solar Liberty Energy Systems Inc 6500 Sheridan DR, Suite 120 Buffalo,NY 14221 Plans&Specifications Solar Panel Installation $ 75.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Saturday,August 3,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before he expirati+ da .) Dated at the To of Qu sb 1 4 i i°,/August 3,2018 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement Office Use Only Permit#: 5 L,' a.—oe-00, - zcv5 _ : Fee:$ "4r." 742 Bay Road,Queensbury,NY 12804 invoice#: ' P:518-761-8256 www.queensbury.net . SOLAR PANEL PERMIT APPLICATION � • Property Owner(s): 911 Wiliam Gehring JUL 0 2018 Name(s): 1 DEW � b Mailing Address, C/S/Z: 4 Bayberry Court Queensbury, NY 12804 Cell Phone:_( ) 518 744 1 505 Land Line: _( �)� 7°ij - -436Ur { Email: wgehring@yahoo.com Project Address: 4 Bayberry Court Queensbury, NY 12804 Section Block Lot: Existing Use: ® Single Family ❑ 2-4 Family 0 Commercial 0 Other: • Solar Contractor: Business Name: Solar Liberty Energy Systems, Inc. Contact Name: Kelli Wilson Mailing Address, C/S/Z: 6500 Sheridan Drive Suite 120 Buffalo, NY 14221 Cell Phone: ( ) 716 634 3780 Land Line:_( Email: kelli.wilson@solarliberty.com • Electrical Contractor: Business Name: Contact Name: Mailing Address, C/S/Z: Cell Phone: _( ) Land Line: ( ) . Email: Contact Person for Building & Code Compliance: Cell Phone: ( ) Land Line: ( Email: • Solar Panel Application Revised December 2017 Estimated cost of construction: $ 14,000 Total System Capacity Rating (sum of all panels): Solar PV System: 5.232 kW DC Select System Configuration: ►,! Supply side connection with micro inverters ❑ Supply side connection with DC optimizers ❑ Supply side connection with string inverter ❑ Load side connection with DC optimizers ❑ Load side connection with micro inverters ❑ Load side connection with string inverter Please sign below to affirm that all answers are correct and that you have met all the conditions and requirements to submit a unified solar permit. William Gehring 23,2018)" Jul 23,2018 (Ju Homeowner's Signature Date (--)f 7/2.3 ( Solar Co. Representative Signature Date Solar Panel Application Revised December 2017 Finger Lakes Engineering, PC LL< jan1.14ES\; 2536 State Route 21 ` .. 4 � � . ` -- Canandaigua, NY 14424 hen* phone (585) 396-3438 Anthony Yannotti, PE fax (585) 394-3867 July 20, 2018 Sheet 1 of 1 R1057 Mr. Michael Prinzi Senior Project Manager, Solar Liberty 6500 Sheridan Drive Suite 120 Buffalo,NY 14221 RE: William Gehring, 4 Bayberry Court, Queensbury,NY 12804 Dear Mike, Per your request we conducted a Preliminary Structural Condition Assessment that included an on-site visit on 7/12/18, an observational examination of the existing roof structure, and a review of any drawings, blueprints, or sketches that were available. PV solar panels are proposed for the roof of an attached garage as summarized below. The panels are mounted on rails which are attached to the roof with an anchored deck base system installed per manufacturer's specifications and recommendations. I found that the roof structure, as noted on Site Plan PV-S1, can satisfactorily withstand the additional loads as proposed and will also meet the applicable standards included in the NYS 2017 Supplement, ASCE 7-10, and 2015 IRC. My analysis indicates that the areas of the existing roof, where the additional weight is to be located, and only as it applies to Solar Liberty specified equipment and their tributary areas, are capable of supporting a total load of at least 60 psf. In 2007 the roof was replaced, was a"tear off', and a single layer of asphalt shingle roofing was added to the existing plywood sheathing. The maximum existing total load on these areas of the roof is estimated to be 52 psf (DL=9, LL=43)leaving an available capacity of at least 8 psf. The average weight of the proposed solar panels and framework is less than 4 psf. Therefore, the roof framing in these areas will not be overstressed by the installation of the solar panels and framework. � ® NEg, p �.� . ,q 0 Thank you for the opportunity to be of service co�,�a 7/zo 18`l% '�.�c' cc Sincerely, n V0/W44A/g 9)4.W-et- rp f 0830 Anthony R Yannotti if?CfiE3StC311°' FingerLakesEngineering.com 1-800-255-8779 TOWN OF QUEENSBURY BUILDING DEPARTMENT Based on our limited examination,compliance FILE COPY with our comments shall lot be construed as tilt plans ana s ecitications; are in - compliance with the -Z N PV SYSTEM SUMMARY New York State, Building Codes at General Notes OF TOTAL STC DC SYSTEM SIZE 5.232 kW THE INSTALLATION SYSTEM SHALL BE I PV N ACCORDANCE WITH THE MOST RECENT NATIONAL ELECTRIC SOLAR MODULE MODEL SUNPOWER AC LEGEND AND BUILDING CODES AND STANDARDS,AS AMENDED BY SOLAR MODULE STC DC RATING 327 W JURISDICTION UNSHADED SOLAR MODULE SOLAR MODULE INFO 61.3"x 41.2"x 1.8",45.5lbs SHADED SOLAR MODULE MIXED ORIENTATION SOLAR MODULE COUNT 16 SOLAR MODULE ....................................... STRING SIZE 8Mx2S INV INVERTER RACKING SYSTEM SUNPOWER INVISIMOUNT EZM EASY TO READ METER *4 AC COMBINER BOX PITCH OF ARRAY 9:12 El UM UTILITY METER INVERTER MODEL INTEGRATED MICROINVERTERS MAIN MAIN BREAKER PANEL ELECTRICAL TRENCH ELECTRICAL STAMP AREA ARRAY AZIMUTH 180* VENTING AND PATHWAYS EAVE HEIGHT 8' V GROUND ACCESS AREA THIS INFORMATION IS CONFIDENTIAL AND PROPRIETARY TO SOLAR LIBERTY ENERGY S INTERCONNECTION VOLTAGE 240V/1(P ............ YSTEMS.INC PLEASE DO NOT SHARE THIS WITH ANYONE UNLESS THERE IS AWRITTEN APPROVAL N -I UVVN E E- I--I --- FROM SOLAR LIBERTY OF ittl PV SYSTEM OVERVIEW BUILDING & C P Scale:N.T.S. _r O Reviewed BY: 0 10 SrA Pba WIWI* No. R-W-A— Date SOLARLIBERTY'' THE FUTURE Of ENERGY INVERENDE- 6500 Sheridan Drive Suite 120 Buffalo,NY 14221 866-80-RENEW PV Installation Professional 296.12-1-8 SOLAR-0490-2018 Gehring, William ft*d NWo GN Ad*M 4 Bayberry Ct Gehring Residence 4 Bayberry Court Solar Panel Installation Queensbury,NY 12804 date 4 Choftd&I im CP 06/15/2018 06/15/2018 sd. Shd AS NOTM PV-Sl General Notes Array Details Panel Manufacturer: Sunpower E20-327-C-AC Panel Model:327W (2)#16 AWG TWISTED PAIR Panel Count: 16 (2)#8 AWG THHN Array Layout:8M x 2S (1)#8 AWG NEUT. (2)#10 AWG THWN-2, (1)#8 AWG CU GND (1)#10 AWG CU GND (1)3/4"EMT COND. 120/240V (1)3/4"EMT COND. 1�/3W SERVICE Inverter Details (TP) I SunPower EnergyLink ENTRANCE Monitoring System O JUNCTION BOX TO SPLICE SUNPOWER-- Inverter Model: Built In SUPPLIED WIRES TO FIELD WIRING. L _��� y� >< X Qty: 16 1 2 8 15AI Account#35914-33101 Peak Output Power: 320 W Nominal Output Current: 1.33 A I Meter#OH936470 Ira �— / O Line-to-Line Voltage:240V/1 v/ System Rating GFDI 1511 —` OUTLET o o-- Peak Output Power:5.12 kVA • • • Nominal Output Current:21.3A I • • • Al r I Line-to-Line Voltage:240V/1� O1 2 8 2QA = I D o~ 2QA INSTALL PV BREAKER This document is proprietary to Solar Liberty Energy I � AT FARTHEST POSITION OPPOSITE Systems, Inc. Do not copy or I \ • • •I L1 L2 TO MAIN BREAKER redistribute without prior' I consent from Solar Liberty ` � • • •t LJ - � Energy Systems. d y CENTRAL JUNCTION BOX ) n (4)#10 AWG THWN-2 100A/240V oA (1)#10 AWG CU GND SUBPANEL. C (1)3/4"EMT COND. ) 1 2 Modules Added o�/o1J1s Notes I LABELED: ° C (� I 0 Array I - 16 x Sunpower AC 327W Solar Panels,Arranged in 2 "DO NOT o Preliminary Drawnng 0N13/18 Strings of 8 Modules, w/ Built-In Micro Inverter. ADD LOADS." No. Revision/Issue Date 0 Revenue grade EZ Read Meter for cumulative PV energy production. MBJ S®IAR�IBERTY` Current Transformer THE FUTURE OF ENERGY INDEPENDENCE O3 Utility owned and installed bi-directional energy meter. MDP SUPPLY-SIDE 6500 Sheridan Drive tY 9Y Suite 120 SUNPOWER AC PV MODULE SYSTEM DOES NOT REQUIRE A 200A/240V 89L TAP Buffalo, NY 14221 GEC PER THEIR INSTALLATION MANUAL. Generator Disconnect Project Nome and Address Switch Gehring Residence 4 Bayberry Court Queensbury, NY 12804 —A] CkSAW y Ty -T8/13/2018I t/13/20181 ter.l As Ha�o PV-S 1 � �;Sep. 17. 2018 1 :40PM MDIA No. P. 3/18 �.�lr _ `/•✓.�-/•✓.✓✓�/ -/•✓. •�•✓•✓�✓:✓:�%:•\.%:��1:\•.%:.\•.%i�`��i:✓:�:✓=:-�%`��1��:/:\• tel: `,`\,�`\�`:\••'•. •.�`.::`. ..... - _ `.: Al MIDDLEINSPECTION AGENCY INC. DEPARTMENT A.RTM NT ZN P CTI N •., ''�' <<{, ��that the electrical wiring to the electrical equipment listed below has been examined and is approved as V ; g\ being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date ?' noted below and is issued subject to the following conditions. �.� Owner: William Gehringr ' Date: 08/28/2018 ( Occupant Solar PV System Location- 0 4 Bayberry Court j Occupancy' Queensbury, Warren Single Family Dwg. a ran Co. NY ,t Applicant: ' ;; Solar Liberty Energy System (�) 6500 Sheridan Drive .- .".• . • • a Suite 120 . •• :.. .. . . _ . i j L Buffalo NY 14221 . • Joseph A.Holmes • ••• • - • -;) ?i• No. 141542105124EL •`'\ - • - - - - -• -- - • . . L< :<< Equipment: <<J� �;- 16-Solar Modules; 16-Micro Invertefs; 1 =`Summing Pane1;~"1 -Back Fed-Breaker' •- ? ;\ •->, :• j; ..._.._.._..-._ .. CCU .(`r1 C�) (a� %� This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. This certificate applies only to the use,occupancy and above and the installation inspected as of the above noted date based on a visual ownership as Indicated herein. Upon a change In the use,occupancy or ownership ?J\ '-j inspection. No warranty is expressed or implied as to the mechanical safety.effi- of the property indicated above,this certificate shall be immediately null and void. Y j ally p cieney Or fitness of the equipment for articular purpose. This certificate shall In the event that this certificate becomes invalid based upon the above conditions, .% \• be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon reinspection by Middle Department (C) system to which this certificate applies be altered In any way.Including but not limit. Inspection Agency,Inc. An application for Inspection must be submitted to Middle i)) (A ed to,the introduction of additional electrical equipment and/or the replacement of Department Inspection Agency, Inc.to initiate the inspection and revalidation ((• ;; any of the components installed as of the above noted date,this certificate shall be process. A fee will be charged for this service. <=. :v'--.4•;\r ,,,'/ '1. ;w,c ;;•r>,k ,c,r.-'4, \ •' �-.i ;=% r.• ',.• /; is . :. '..::.:4•".\:':',;-, ;;./ ; ri. G-its,_,: : :%:✓,: : : : :`!:' ,:*•,,Lv: '`✓=`i' ,:`1:k✓,:L✓,•:i-J:✓:,✓,• -�:• ar:\✓:\t�:iJ =::,-=!:•L,!�=!�2?: =:=::,'!i-,•••-`---tS=,-/i\E!-,--\-.:�:,-.L\-, ✓-•=7-' -&•42_.- o490 _ rLQ,Io s; .I i yLi i LET in 1 L mil/ ---•.-..w__. . i Ii I I 1 I I i SEP 18 2018 j(,�1 i