RC-0478-2018 �^ TOWN OF QUEENSBURY
a
y
� 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
--__ Community Development - Building & Codes (518) 761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-0478-2018 Date Issued: Thursday, May 30, 2019
This is to certify that work requested to be done as shown by Permit Number RC-0478-2018
has been completed.
Tax Map Number: 295.15-2-15
Location: 47 JOHN CLENDON RD
Owner: FOOTHILLS BUILDERS, LLC
Applicant: FOOTHILLS BUILDERS, LLC
This structure may be occupied as a: Single Famly Dwelling w/gas FP 1605 s.f.
Garage 528 s.f. By Order of Town Board
John Glendon Road Subdivision Lot 18 TOWN of QuEENssuxY
Issuance of this Certificate of Occupancy DOES NOT relieve theproperty owner owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
_ TOWN OF QUEENSBURY
�,.- - t 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
_ ,f .
a Community Development-Building& Codes (518) 761-8256
BUILDING PERMIT
Permit Number: RC-0478-2018
Tax Map No: 295.15-2-15
Permission is hereby granted to: FOOTHILLS BUILDERS,LLC
For property located at: 47 JOHN CLENDON RD
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance -
. Type of Construction
Owner Name: FOOTHILLS BUILDERS,LLC Single Family-New $175,000.00
Owner Address: 9 Mountainside DR Total Value $175,000.00
Queensbury,NY 12804 V
Contractor or Builder's Name/Address Electrical Inspection Agency
FOOTHILLS BUILDERS,LLC
9 Mountainside DR
Queensbury,NY 12804
Plans&Specifications
Single Famly Dwelling w/gas FP 1605 s.f.
Garage 528 s.f.
John Clendon Road Subdivision Lot 18
$ 781.50 PERMIT FEE PAID -THIS PERMIT EXPIRES: Tuesday,August 13,2019
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before t e expiration••.te.
Dated at the To of.Que bury- 4 M��i i,e, - gust 13,2018
SIGNED BY: \- for the Town of Queensbury.
Director of Building&Code Enforcement
Office Use Only
PRINCIPLE EflmV E • 't#: cc
AP it Fee:$ 7 ,
P I N 9u, 4 20 L 2 18 IAA-Nov) Ut.
742 Bay Road Queensbury, NV 12804
P 518-761-8256 --- • TOWN OF cjEEfiURFnvcIicem 0 to7
BUiLDUJG 84 CODES
Project Location: Li -) J11t CA-ENDO p RD
Tax Map #: 2-9 I 2 - Subdivision Name: 36 HP CIANDoi- 6.51Ara
TOWN BD.RESOLUTION 86-2013 $850 recreation fee for new dwelling un,is single family.dup'e:,e two-family,
multiplefamily. apartments condominiums tok,vnhouses.and or manufactured tv modular homes but not mobile
homes. This is in addition to the permit fee(s).
CONTACT INFORMATION:
• Applicant:
Name(s): THtLU t.k.(Li) ERS
Mailing Address, C/S/Z: ctmot, TReJcicE.- bRive auce-f-iss,tizi ig-ro
Cell Ph.: I ( t ) -74/ 1- t.ci 33 Land LiRe: (St ) (C.cc.i..)
Email: FO CIO I %At Nv g co
• Primary Owner(s):
Name(s): SP‘rY)6- S 11 PP/- CAN-1`
Mailing Address, CIS/Z:
Cell Ph.: Land Line: (
Email:
• Coritractor(s);
Name(s): S A rn e". AS A P put c AN-r
Mailing Address, CIS/Z:
Cell Ph.: ( Land Line: (
Email:
• Architect(s)/Engineer(s):
Name(s): Pip) PE ( riotJ
Mailing Address, C/S/Z: 2-0 0 5-j Sucre 5(o C-11..-Et.) FAL-0 to i 2-8-0 1
Cell Ph.: ( Land Line: I ( ) 79 Z 612-0
Email: 1)R4AN(& ENC- , eMA
Contact Person for Building & Code Compliance: 5°E-
Cell Ph.: I (5-IV ) "OH {133 band Line: t (cl? ) - 3 S-2..0 (Le 1-1-..)
Email: FoyFOOTt tLokA LO rvt
Ton finikling&Corti>Fnforrempnt Priorinip Strurturp RPviSPCi March 701R
PROJECT INFORMATION:
TYPE: Commercial i)( Residential
WORK CLASS:
b( Single-Family Two-Family (#of
Townhouse Business Office Retail Hotel/Motel
IndustriaINVarehouse Garage(*ofcars )• Other(describe
STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE:
lsr floor: ° 1ST floor: SI—2.
2nd floor: 2nd floor:
3rd floor:
Total square feet: C2-8'
Basement(habitable space):
Total square feet: I 0 S
ADDITIONAL PROJECT INFORMATION:
1. Estimated Cost of Construction: $
2. Proposed use of the building: ((ES- E--1-11' A L
3. If Commercial or Industrial, indicate the name of the business:
4. Source of Heat(circle one).41 Oil Propane . Solar Other:11. •
(Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance)
S. Are there any structures not shown on the plot plan? YES NO . plain:
6. Are there any easements on the property? YES NO
7. SITE INFORMATION:
a.What is the dimensions or acreag- .e parcel? 4CieeS
b. Is this a corner lot? YES NO
c. Will the grade be changed as a r- • the construction? YES NO
d.What is the water source? PUBL PRIVATE LL
e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Pg_i v•A T
ToO autIrline&Code ErtfnrcerruAnt PrinrinIP Strisrta Ina igpvicpri Mirrh 7111 R
DECLARATION:
I. I acknowledge that no construction shall commence priorto issuance of a valid building
perm and work will be completed within a 12 month period.
2. If the work is not completed by the 1year expiration date the permit may be renewed,
subject to fees anckiepartment approval
3. I certify that the application, plans and supporting materials are a t rue and complete statement
and/or description of the work proposed, that all work will be performed in accordance with the
NYS Building Codes, local building laws and ordinances, and in conformance with local zoning
regulations.
4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a
certificate of occupancy.
5. I understand that I/we are required to provide an as-built survey by a licensed land surveyor of
all newly constructed facilities priorto issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: -To SEPH Le (A CI
SIGNATURE. I . , _
q t. .vu.f DATE: -7 11---g / /
•
ToO Building&Code Enforcement Prinrinip Stn grhirp RPVICPCI Marrh 7f11R
. ,
Office Use Only
FUEL BURNING APPLIANCE & Permit 4:
CHIMNEY APPLICATION Permit Fee:$
Invoice. :
74 By Road, Queensbu N 2804 P.
5-L-761-8256
Project Location: 14.7
[IN C-LE-P"-) Tax Map ID: 2-9
Room of Install: G-'g-e-Al KA 0 in Planned Install Date: IIk
**ONE APPLICATION PER APPLIANCE**
CONTACT INFORMATION:
* Applicant:
Name(s): FO OTHI LLS p,t.ku„DERS L-Lc (1:ro 6- Leu
Mailing Address, C/S/Z: qento-‘N>liAiNs/pc:- DIL QueeNs (42-1 )itc
Cell Ph.: r (YI ) -19 1- t9 33 i ( Cig ) 1We 3S-ac
Email: Fa c.-4.1-1/4 1(.1;3 p)tAt LD cgs Cd ern n L, C PA
* Primary Owner(s):
Name(s): S'Arrvi- 6-s ArrLic
Mailing Address, C/S/Z:
Cell Ph.: ( Land Line: (
Email:
• Installer/Builder:
Name(s): rim As cn
Mailing Address, C/S/Z:
Cell Ph.: ( Land Line: (
Email:
Contact Person for Building & Code Compliance: -3t)E 1-Ekk-c-
Cell Ph.: t (C-t ) 1c1 - 1403 tat,e1 Line: L(5-1 g' 1(9 -
Email: oc IL-Ls 13IAIL-bE(23 GITt iL, tr.
T.ivirfQuesbury Buitc.tn- Fnforc4-:.rrellt
FUEL BURNING APPLIANCE INFORMATION:
TYPE OF DEVICE:
Stove X Fireplace Insert Fireplace
(>-) rY) r-3-TA Mob Dvb 36; P 3o tsi TAHOE'
_Fuel Fired Equipment(Garage Only,13"clearance per IMC 304.3)
Fireplace, factory built**
**Manufacturers Name: Model#:
SOURCE OF HEAT:
Wood Coal Pellet
CHIMNEY ItIFORMATIQN;
Masonry:
block brick stone
Flue:
tie size,-s!; ri inches
Material*:
double-wall triple-wa lljnsulated
(*Manufacturer's rr-1 m Model#:
ADDITIONAL INFORMATION:
et Two inspections are required. A rough-in rispection,prior to installation and a final inspection,after
installation.
2 Manufacturer's installation manual must be available at the time of inspection.
3 Masonry fireplaces & chimneys require plans to be submitted.
4 Twenty-four (24) hour notification is required for hspections.
Declaration:Construction/installation must conform to NYS Fire Prevention&Building Code and/or manufacturer
requirements,The applicant or owner agrees to comply with all applicable laws,ordinances,regulations and all
conditions that are,part ofthese requirements and also will allow the inspector to enter the premises to perform the
required inspections.
I have read and agree to the above:
PRINT NAME: S P ti LE - ---
SIGNATURE: )4\-- DTE: /
Fuel Burning Appliance&&iimney Application
. ..
yfirittift," .-,1 • -----
\z,-c,,,,,*,,.,, SEPTIC DISPOSAL PERMIT APPLICATION
,
-----,r 7 Bay Road Qun3bury,Vi" ` %04
Perm ,
— —
Ta, Map ID4;
Project Location: -T1 -To H i•-) CLeav6ti..) kiD -..-• .,.' i='.:-ta 7____ .
. :•
, --- --
Primary Owner(s) i
i To 0-1-1-1 1-t-S Au-I I-beg LZ.X. Csoc Le t4 <-1)
..„,„........._ . .,_.......,,,,...- ._,
Mailing Address
ri
1 frit;tA.iv-TA li--iS}De -6R. Clue tz- p...,\ 1,-,\J agoli
.....______..., ...,... ,
Phone & Email 1(. -rit-Mg3 if
foo-TR t z_i___s 6 t.),,t LDeg41,),-/ 616-mAIL.,or,
Installer/Bui Icier i
1 SO f`rke- As A2PLIc po.,--c- ,
Mailing Address
Phone & Email
.. -----
Engineer
-- - e
Mailing Address I 0 1-Ifivi I-A N.r Rb allk_isel-t•J S(.3 IA,gl 1,./-1
— .
Phone& Email i C
(SI g''')-19(D-2-- .1 S' -1-C,c->i-1014,36, @ Y/4 Ho 0, t,Orv\
e-
Contact Person for Building&Code coo nil pi 11-1 ,-:a Le kkciF)t-tc>r) : ( 1 )'1'.1 I - 11 33
(cif) 19(
RESIDENCE NFORMATION: I
4-3.S-2 0
A
Year Built 4 of bedrooms X gallons per bedroom ---- totaldaily flow 1 Garbage Grinder Yes
— 4171S
- -
'980 or older i Installed? {circle one)
Spa or Hot Tub Yes -10I
Installed? {circle one)
PARCEL NFORMATlON:
.,. _________ _, _ _. _ ., . A, a .- -3 , A--.. ., -- ,. 4.- C. - .. . - — ' . ,. :,. ,...,1•• . _,,,,-,-A.M1.-^ •.1,-- - l, — "',--,
Topography t< Flat Rolling Steep Slope %Slope
..._._ ..
Soil Nature eeind _Loam Clay Other
Groundwater :At What depth?- - e•-ijA _ _ _..._ .. _ _ _....._ _
Bedrock/Impervious material At what depth? w TA ,
._.. _.,..........._ _. .
Domestic Water Supply Oc Municipal Well{if well.Water supply from any septic system absorption is It.)
- - .
,_._— _
I Percolation Test Rate; V'c per minute per inch{test to be completed by licensed engneertarchect)
PROPOSED SYSTEM FOR NEW CONSTRUCTION;
Tank size 1 ty-o-o gallons{min.size 1000 ga Ilonsadd 250 ga lions for each garbage cylinder or spathortaT-----
...
System . _
Absorption field with#2 stone Total ngth 1..,S- 0 ft.:Eachlrench \c"--6 ' ft.
_
Seepage Pit with 43 stone How many: •Size:
_ :..._____—...,........---.
Alternative System Bed or other type:
I HoldingTank System Total required capacity? -tank size :# of tanks
— —
NOTES: 1,Alarrn system&associated electrical work must be inspected by a Town approved electrical inspection
agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved.
The installed system must match the septic layout on file-no exceptions.
Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material
representation or failure to make a material fact or circumstance known by or on behalf of an applicant. shall be void.l
have read the regulations and agree to abide by these and all requirements ofthe Town ofQueensbury Sanitary Sewage
Disposal Ordinance,
PRINT NAME: 505 IF 9 uk L€ u (.. ( DATE: 1 (24 ir
...: ,
SIGNATURE(- - DATE: ' I if
L-... i coos,5-forcer1ent
_.
Town of Queensbury Thomas R.Van Ness
Highway Department Highway Superintendent
742 Bay Road,Queensbury, NV 12804 Home:518-745-0929
Phone:518-761-8211
Fax:518-745-4466 David Duel!
Deputy Highway Superintendent
Home:518-745-0938
DRIVEWAY PERMIT
Date: / 1g
Applicant Name: roe 7[41u,S p,uki tze-P-s C-S-0
Telephone No.: Cs-10-79 - 'n /( c/g)-796-3s-zo
Address to be Inspected: CL o k) RD
Return Address: 1 t• )DE
Q . ctz1
Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes
at the specified location.
The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following
action has been taken:
STEP 1: ( Preliminary approval
NEED ) Slight Swale
) Deep Swale
( ) Level with the road
) Level with the top of the paved wing
Size culvert pipe to be used (if necessary)
) 12" ) 15" ) 18" )24" )36"
Preliminary inspection completed by: Date:
Approval by Highway Supt.: or Deputy Supt.:
Upon completion please resubmit this approval permit for a final approval.
STEP 2: ) Final Approval ) Rejected
Date:
Thomas R. Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent
Town of Queensbury Building 5 Code Enforcement Principal Structure Application Revised February 2017
EXHAUST SYSTEMS
2 TABLE M1507.3.3(1)
.,0:' CONTINUOUS WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM AIRFLOW RATE REQUIREMENTS
a NUMBER OF BEDROOMS -
T:5;iV DWELLING UNIT —
j i FLOOR AREA 0-1 2-3 4-5 I 6-7 >7
445. (square feet) Airflow in CFM
'' ,;_
'Il <1,500 30 45 60 75 90
.I+a,"irk'=.
.,4.,::!. 1,501—3,000 45 . 60 75 90 105
-1F, f_;�.. 3,001—4,500 60 75 - 90 105 120
h`ti-g:i,. 4,501—6,000 75 90 -. • 105 120 135
•L `'4; 6,001-7,500 90 105 120 135 150
_� ; >7,500 105 120 135 150 165
;111&1t;; <<' For SI: 1 square foot=0.0929 m2,1 cubic foot per minute=0.0004719 m3fs.
" t-ftt TABLE M1507.3.3(2)
= »y` A'i INTERMITTENT WHOLE-HOUSE MECHANICAL VENTILATION RATE FACTORSa,b
- _ 214, +,_ RUN-TIME PERCENTAGE IN EACH 4-HOUR 25% 33% 50% 66% 75% j
.,, ;, SEGMENT
1 ,:: Factora 4 3 2 1.5 1.3
'!:_' '-;'� '?. a.For ventilation system run time values between those given,the factors are permitted to be determined by interpolation. .
`;'At' b.Extrapolation beyond the table is prohibited.
ist.
•F I; TABLE M1507.4 '
„; -46 M1507.4 Local exhaust rates. Local exhaust systems shall MINIMUM REQUIRED LOCAL EXHAUST RATES F
ii ::: be designed to have the capacity to exhaust the minimum air ONE-AND TWO-FAMILY DWELLINGS-:;'.
- 1,'" `. flow rate determined in accordance with Table M1507.4. AREA TO BE
EXHAUST RATES- `
r` EXHAUSTED _,,
"e:1`�^' Kitchens 100 cfm intermittent or 25 cfm co
b,,4,y,, . Bathrooms-Toilet Mechanical exhaust capacity;o 5(
lti:: Rooms intermittent or 20 cfm continyoti+
t;3, YY" For SI: I cubic foot per minute=0.0004719 m3/s. 1,
-.''z,(ggif.• ,?.JWt:i
.fi t-t1V _ ({fi - .:
'h'.
2015 INTERNATIONp4.:-x i
SJ
3
I,
155 MAX- vs..
HEAT RECOVERY VENTILATOR
N.
ENGINEERING DATA LIFEBRERTH'
THERMALLY CONDUCTIVE,PATENTED DEFROST
ALUMINUM CORE Recirculating damper defrost system.
The counter-flow heat recovery care transfers heat between the two airstreams.It is
easily removed for cleaning or service. CASE -
Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to
MOTORS AND BLOWERS prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)OD.Balancing ports
Each airstream has one centrifugal blower driven by a common PSC motor,with multiple are located on door.
fan speed operations.
ELECTRONICS
FILTERS The DXPL02 control included with the unit can be wall mounted in a central location of
Washable air filters in exhaust and supply air streams. the home.3 wire 20 gauge(min.)100 ft length(max.).
MOUNTING
Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and WARRANTY
hanging straps supplied with the unit. Units carry a lifetime warranty on the HRV core and a 5 year
replacement parts warranty.
OPTIONAL ACCESSORIES:
TechGrille
Weather Hood
99-EAG4 Terminator Wireless 20/40/60
99-185
99-186 99-EAGS Fitting Min Timer
99-TM4 99-187 t`i 99-EAG6 CH—..lei'\
99 TM5 99 DETDZ �'r 7!i 99-EAGS r- „ 99-TM6lei' ir r
LIFEBREATH CONTROL OPTIONS TIMER OPTIONS
FEATURES 99-DXPLO2 99-BCO2 99-BC03 99-BCO4
99 OETOl Lifebreath 20/40/60 Minute Timer
Initiates high speed Ventilation for 20,40 or 60
5 speed fan operation on each mode
✓ minutes.3 wire connection.
99-DETO2
2 speed fan operation(Low/High) ✓ ✓ Wireless Lifebreath 20/40/60 Minute Timer
Continuous low speed fan operation ✓ Initiates high speed Ventilation for 20,40 or 60
minutes.Wirelessly connects to main control for
Humidity control through adjustable Dehumidistat ✓ ✓ ✓ ease of installation.40'approximate range.
Excusive to Lifebreath.
Large digital LCD screen ✓
99-RX02-Wireless Lifebreath Repeater
LED status indicator lights ✓ ✓ ✓ Extends range of 99-DET02 Wireless Timers.Plugs
into 120V power outlet.Wirelessly connects to
Continuous Ventilation ✓ ✓ main control and 99-DET02.Install at halfway
V ✓ point between timer and main wall control if timer
Continuous Recirculationis out of range.
20 ON/40 OFF V
x.
10 0N/50 OFF ✓ -.S ' ."
20 ON/40 Recirculation
20/40/60 min.High speed override button ✓ 99-DXPL02 f 99-DET02
Compatible with 99-DET02 Wireless Timer ✓ ✓ ✓ ✓
to/
3 wire connection V ✓ '/ V L IFEBREFI TH"
Di Indoor Air systems
155MAX(01-01-18) www.lifebreath.com
fry 1
3 1
Is
E 5 5 MAX E `.;
I ,EAT RECOVERY VENTILATOR
PERFORMANCE (HVI CERTIFIED) L/FEBRERTH°
J
0.1(25) 0.2(50) 0.3(75) O.4(100) 0.5(125) 0.6(150) 0.7(175) ELECTRICAL SPECIFICATIONS
IN.W.G.(PA) CFM(Us) CFM(Us) CFM(Us) CFM(Lis) CFM(Us) CFM(Us) CFM(Us)
VAC @ 60Hz 115
Net Supply Airflow 184(87) 163(77) 146(69) 132(62) 115(54) 92(43) 60(28) Watts/Low Speed 66
Gross Supply Airflow 188(81) 166(78) 149(70) 134(63) 117(55) 94(44) 61(29) Watts/High Speed 118
Gross Exhaust Airflow 239(113) 228(101) 212(100) 193(91) 172(81) 150(71) 126(60) Amp Rating 1.4
Sensible Effectiveness(ASE) 32,E(0°C) 84% 180 WEIGHT:
@ 59 CFM(28 Us) 71 LBS(32 KG)
Sensible Efficiency(SRE) 0 160 SHIPPING WEIGHT:
@ 59 CFM(28 Us) 32°F(0°C) 15/o 140 73 LBS(33 KG)
\ .
Sensible Efficiency(SRE) 32°F(0°C) 75% Li
64 CFM(30 Us) 3 120 NOTE:
Sensible Efficiency(SRE) -13°F(-25°C) 72% i 100
@ 64 CFM(30 Us) a Front clearance of 25 in.(635 mm)is
80 recommended for servicing unit.All ducts
use 6 in.(152 mm)round collars.Balancing
15 eI- 90 g-. r 60 dampers are located in all air streams.
„,,,,,ws5 NV! 01 `,
CERTIFIED REGISTERED III I III I
0.1 0.2 0.3 0.4 0.5 0.6 D.7 0.8
• Static Pressure(in w.g.)
DIMENSIONS
FRONT VIEW TOP VIEW
Filter If i 143/4 in.(375 mm),
Recirculating MM. 1 I
Defrost !� —° —1 I
Damper .11\MIN
lA • •
Removable 1Blower
II�j Stale air to outside
RecoveryHeat ihi _ Motor
Core RN t. i. v Fresh air from outside
";�__ '11.ll lik ,i1II+
• Stale air from inside
M Fresh air to inside
V
SRounIn.(152d Co llars I mm) I, 1— 33 5/8In.(854 mm) — v v
Date: WARRANTY
Contractor: Units carry a lifetime warranty
Tag: on the HRV core and a S year
replacement parts warranty.
CityE Supplier:
Project
Quote#: All units conform to C5A and ULstandards
Engineer: RI Control: Submitted By: LIFEBRE//a
TH°
II Indoor Air Systems
Timer: Timer City:
155MAX(01-01-18) • wvwv.lifebreath.com
..%
` r of ‘e9a6,-‘
Manual S CompliAlce Report Job: LOT18
Date: Jul 30,2018
Entire House By:
FOOTHLL BUILDERS Plan: 1351
r\L, /4 - ,?Ole
zr�
',�,�,}.'�-2 �-�y �itY __: �➢t,t'��'�°.y` <�� _ �# � ..
s .f _ ojeolnfor do _� # � w .
it'. �t�
it
For: JOE LUCIA, FOOTHILL BUILDERS ;',1 � - �'�' 11
QUEENSBURY NY 12804 t` `'1 (((?( 11SI ,7 I .! ±.± iJ
t ,i �-�,
FAT .�. " .te$' rfP3'€ "Ors x_.Y_� §e3H; Lam{ k`M �.i '' 711
� � ,C�ooli.ng Equiplmenl" h
�.c
Design Conditions
Outdoor design DB: 85.0°F Sensible gain: 20459 Btuh Entering coil DB: 75.3°F
Outdoor design WB: 71.0°F Latent gain: 5259 Btuh Entering coil WB: 62.6°F
Indoor design DB: 75.0°F Total gain: 25718 Btuh
Indoor RH: 50% Estimated airflow: 886 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split AC -
Manufacturer: York Model: TCHD30S41S3+HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1
Actual airflow: 933 cfm
Sensible capacity: 0 Btuh 0% of load
Latent capacity: 0 Btuh 0% of load
Total capacity: 0 Btuh 0% of load SHR: 0%
tr
a., �u� s S k�'�""" ,� "�s.`� .. {'.. ' d * ra�q k
-..� '�
Design Conditions
Outdoor design DB: -4.0°F Heat loss: 92331 Btuh Entering coil DB: 65.1°F
Indoor design DB: 68.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas furnace
Manufacturer: York Model: TM9X080B12MP11
Actual airflow: 933 -cfm
Output capacity: 76000 Btuh 82% of load Temp. rise: 50 °F
Meets are all requirements of ACCA Manual S.
2018-Jul-30 08:56:37
wrightsoft° Right-Suites Universal 2017 17.0.16 RSU25116 Page 1
ACCA ...ers\scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N -
Residential=PIa s Examiner F�eview.Fofrn
Form
r ,-� Z r x,,, k ry r ,. 4 RISER 1
(✓Ck pr hiVACSystemIDesrgni(Uoads(jEquipment, Ducts)' 15mar09
NrecxftiarigCon}sclasofAtrerea w+., ir,,e ` `r :' e��. ."-r.. sa-."t1 >.:G g ,' 6; _.t '• ,' 'ix ka2l.uc k
QUEENSBURY NY
Header Information
Contractor: FOOTHILL BUILDERS REQUIRED ATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes D No D
Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes 0 No D
OEM performance data(heating,cooling,blower): Yes D No 0
Building plan#: 1351 Manual D Friction Rate Worksheet: Yes 0 No
Duct distribution sketch: Yes 0 No 0
Home address(Street or Lot#,Block,Subdivision): , Entire House
'l ', / '-1 1 Y °F+ •,Y-Y YTia �'T `y YF'•` A ry
AC�LOAD CALCUL,ATVONIIRC MT 401. 3) 1: 11 `1' y - Ems '' �`` .
._..s.. _ .y...s:.,....�....�.a_........,....�. ,�.,.......i i _..:';r rsr.&vw
Design Conditions Building Construction Information
Winter Design Conditions Building
Outdoor temperature: -4 °F Orientation: Front Door faces North
Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 92331 Btuh Number of bedrooms: 3
Conditioned floor area: 4776 ft2
Summer Design Conditions Number of occupants: 0
Outdoor temperature: 85 °F
Indoor temperature: 75. °F Windows Roof
. Grains difference: 27 grub @50% RH Eave overhang depth: 0 ft
Sensible heat gain: 22732 Btuh Internal shade: none Eave
Latent heat gain: 5844 Btuh Blinds,drapes,etc. Depth window
Total heat gain: 28576 Btuh Number of skylights: 0 -
,
HVAC EQUIPMENT SELECTION�(IRC M-1401.3) •. _
Heating Equipment Data Cooling Equipment Data Blower Data
Equipment type: Gas furnace Equipment type: Split AC Heating cfm: 933
umace,Hea pump,Boiler,etc. it onditioner,Heat pump,etc. Cooling cfm: 933
Model: York Model: York Static pressure: 0 in H2O
TM9X080B12MP11 TCHD30S41S3 Fan's rated extemal static pressure for
design airflow
Heating output capacity:. 76000 Btuh Total cooling capacity: 0 Btuh
Heat pumps-capacity at winter design ou doorconditions Sensible cooling capacity: 0 Btuh
Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh
f_ ,,,� ' ) ' i _ IY Y ..f ?"' '4 } R YTa, 'rt7 3'"i`l $
ICI
HVAC DUCT DfSTF�IBl1Tl0!NL,SSTEMQESIGN„n(IRC,M1601 1) , t.
Design airflow: 933 cfm Longest supply duct: 0 ft Duct Materials Used
Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct:
Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft
Available static pressure(ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal
Friction Rate=ASP>(TELx10 ) 1
r--s-£':.r --4—:,-;-:?.., - „- Ct Tl '. f}t :£:'.. Yl A_1 .ttG Y t"v' i .ri '.
l declare the load calculatlon,egwpiiitent;,equipment selection and ductdesignl were rigorously/performed'loased;oni the bmuilding
plan fisted above f undermt ndl the claims made on these forms will be subpectto revrew aindl verification_
Contractor's printed name:
Contractor's signature: Date:
rved for County Town Munucipalay orAufhori ,having;furlsdlciion use.,
nom,s qualifies for MJ1AE Form based on Abridged Edition Checklist
41-wrightsofr Right-Suitee Universal 2017 17.0.16 RSU25116
Project SummaryJob: LOT18
.Date: Jul 30,2018
Entire House By:
FOOTHILL BUILDERS Plan: 1351
•
�� �yy-- - -X» . SL,,T, ^+-t � cF, A",Mr 'f;• 3r' ■y�,,I,-, {t+' .{' . tfic7z etox:`,^.kn] ��F .wr ,rs7 ` Ys`F. s �..`t
I i.L:Fd)Sb. _ztrs...k.,-..,u. PY 'xwv..uJwwr�'xM--."a.,:j+4+�'3 ^il>a wtt rO.,—-AIL ALL LI:- 4{i "fib--'4 l'. 3fnw?. lxsti
For: JOE LUCIA, FOOTHILL BUILDERS
QUEENSBURY, NY 12804
Notes:
. . N V _® _a ~ ® A WWII A ® A . .-
Weather: Glens Falls AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db -4 °F Outside db 85 °F
Inside db 68 °F Inside db 75 °F
Design TD 72 °F Design TD 10 °F
Daily range M
Relative humidity 50 %
Moisture difference 27 gr/Ib
Heating Summary - Sensible Cooling Equipment Load Sizing
Structure 86861 Btuh Structure 19505 Btuh
Ducts 5471 Btuh Ducts - 954 Btuh
Central vent(0 cfm) V 0 Btuh Central vent(0 cfm) 0 Btuh
(none)
(none)
Humidification 0 Btuh Blower V 0 Btuh
Piping 0 Btuh
Equipment load 92331 Btuh Use manufacturer's data n
Rate/swing multiplier 0.90
Infiltration Equipment sensible load 18413 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0 Structure 5259 Btuh
Ducts 0 Btuh
Central vent(0 cfm) 0 Btuh
Heating Cooling (none)
Area(ftZ) 4776 4776 Equipment latent load 5259 Btuh
Volume(ft3) 42984 42984
Air changes/hour 0.70 0.40 Equipment total load 23672 Btuh
Equiv.AVF (cfm) 501 287 Req. total capacity at 0.70 SHR 2.2 ton
Heating Equipment Summary _ . Cooling Equipment Summary
Make York Make York
Trade YORK Trade HORIZONTAL DISCHARGE
Model TM9X080B12MP11 V Cond TCHD30S41S3
AHRI ref 2008691 Coil HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1
AHRI ref 3743063
Efficiency 95.5 AFUE Efficiency 12.5 EER, 14 SEER
Heating input 80000 Btuh Sensible cooling 19600 Btuh
Heating output 76000 Btuh Latent cooling 8400 Btuh
Temperature rise 74 °F Total cooling 28000 Btuh
Actual air flow 933 cfm Actual air flow 933 cfm
Air flow factor 0.010 cfm/Btuh Air flow factor 0.046 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.80
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
WC- IItSOf�m 2018-Jut-30 08:56:37
Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
" ' ...ers\scott.IangeworthytDocuments\York\LOT 18.rup Cale=MJ7 Front Door faces: N
Right-J®Worksheet Job: LOT18
Entire House Date: Jul 30,20l8
• By:
FOOTHILL BUILDERS Plan: 1351
MANUAL J:7th Ed.
1 Name of room Entire House Room2 Room3 Room4
2 Length of exposed wall 558.0 ft 186.0 ft 32.0 ft 5.0 ft
3 Room dimensions 1.0 x 1590 ft 1.0 x 161.0 ft 9.0 x 5.0 ft .
4 Ceilings Condit. Option 9.0 ft d 9.0 ftl heat/cool 9.0 ft heat/cool 9.0 ft i heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg
5 Gross a 12E3 5.4 1.0 5022 **** **** 1674 **** **** 288 **** **** 45 **** ****
Exposed b 0 0 III **** **** 111111 **** **** HIM **** **** 11111 **** ****
po 1.1.1 l....I !
walls and c 0 0 1111I1 **** **** !III II **** **** 111111 **** **** IIIIII **** ****
partitions d 0 0 IIIIII **** **** IIIIII **** **** IIIIII **** **** III III **** ****
e 0 0 IIIIII **** **** IIIIII **** **** mill **** **** HMI **** ****
f 0 0 IIIIII **** **** IIIIII **** **** win **** **** III III **** ****
6 Windows and a 3A0 39.7 ** 215 8529 **** 0 0 **** 30 1190 **** 10 397 ****
glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** .
f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
7 Windows and North 19.0 105 **** 1995 0 **** 0 0 **** 0 0 **** 0
glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
Cooling E/W 68.0 50 **** 3400 0 **** 0 0 **** 0 10 **** 680
SE/SW 0 - 0 **** 0 0 **** 0 0 **** 0 0 **** 0
South 34.0 60 **** 2040 0 **** 0 30 **** 1020 0 **** 0
Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
8 Other doors a 10D0 33.1 6.3 84 2782 526 0 0 0 0 0 0 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 0 0 0 0 -0 0 0 0
9 Net a 12E3 '5.4 1.0 4723 25504 4817 1674 9040 1707 258 1393 263 35 189 36
exposed b 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0
walls and c .0 0 IIIII! 0 0 111111 0 0 111111 0 0 111111 0 0
partitions d 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0
e 0 0 Will 0 0 111111 0 0 111111 0 0 111111 0 0 '
f 0 0 1H111 0 0 111111 0 0 111111 0 0 ill!!! 0 0
10 Ceilings a 16G0 2.4 1.1 3186 7570 3575 1590 3778 1784 161 383 181 45 107 50
b 0 0 111111 0 0 11111! 0 0 111111 0 0 111111 0 0
c 0 0 111111 0 0 1!!H!! 0 0 IIIIII 0 0 l!1i11 0 0
e 0 0 111111 0 0 !1i1!! 0 0 HMI 0 0 111111 0 0 '
e 0 0 !!1111 0 0 IIIIII 0 0 111111 0 0 111111 0 0
f 0 0 will 0 0 !!!!ll 0 0 IIIIII 0 0 111111 0 0
11 Floors a 1910 1.7 0 1596 2758 0 0 0 0 0 0 0 0 0 0
(Note:room b 0 0 111111 0 0 111111 0 0 111111 0 0 !I!!!! 0 0
perimeter c 0 0 mill 0 0 111111 0 0 !1H11 0 0 111111 0 0
is displ. d 0 0 !1!!11 0 0 !!!!I! 0 0 111111 0 0 111111 0 0
for slab e 0 0 111111 0 0 !l!!11 0 0 111111 0 0 111111 0 0
floors) f 0 0 111111 0 0 111111 0 0 HIM 0 0 111111 0 0
12 Infiltration a 133 10.5 299 39717 3152 0 0 0 30 3985 316 10 1328 105
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 **** 86861 **** **** 12817 **** **** 6951 **** **** 2021 ****
Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 ****
Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 ****
Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 ****
14 Duct loss • 6% 5471 **** 6% 807 **** 6% 438 **** 6% 127 ****
15 Total loss=13+14 **** 92331 **** **** 13625 **** **** 7389 **** **** 2148 ****
16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0
Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0
17 Subtot RSH gain=7+8..+12+16 **** **** 19505 **** **** 3491 **** **** 1780 **** **** 872
Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0
Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0
Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0
18 Duct gain 5% **** 954 5% **** 171 5% **** 87 5% **** 43
19 Total RSH gain=(17+18)*PLF 1.00 **** 20459 1.00 **** 3662 1.00 **** 1867 1.00 **** 914
20 Air required(cfm) 933 933 138 167 75 85 22 42
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
Wr- htso. 2018-Jul-3008:56:37
9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
ACCN ...ers\Scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N
t
Right-J®Worksheet Job: LOTIS
Entire House Date: Jul 30,2018
•
• FOOTHILL BUILDERS Plan: 1351
MANUAL J:7th Ed.
1 Name of room Room5 Room6 Room7 RoomB
2 Length of exposed wall 0 ft 24.0 ft 64.0 ft 14.0 ft
3 Room dimensions 4.0 x 2.0 ft 1.0 x 142.0 ft 1.0 x 774.0 ft 14.0 x 15.0 ft
4 Ceilings Condit.Option 9.0 ft heat/cool _ 9.0 ft heat/cool 9.0 ftl heat/cool 9.0 ft l heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Cig
5 Gross a 12E3 5.4 1.0 0 **** **** 216 **** **** . 576 **** **** 126 **** ****
Exposed b 0 0 111111 **** **** I I I I I I **** **** IIIIII **** **** 111111 **** ****
walls and c 0 0 [If III **** **** 1 I I I I I **** **** I I I I I I **** **** I I I I I I **** ****
partitions d 0 0 null **** **** III III **** **** !1!!!! **** **** Hill **** ****
e 0 0 IIIIII **** **** 111111 **** **** 111111 **** **** III III **** ****
f 0 0 IIIIII **** **** IIIIII **** **** III III **** **** IIIIII **** ****
6 Windows and a 3A0 39.7 ** 0 0 **** 30 1190 **** 45 1785 **** 30 1190 ****
glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
d 0 ** 0 ' 0 **** 0 0 **** 0 0 **** 0 0 ****
e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
7 Windows and North 19.0 0 **** 0 0 **** 0 45 **** 855 30 **** 570
glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
Cooling E/W 68.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
South 34.0 0 **** 0 30 **** 1020 0 **** 0 0 **** 0
Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 84 2782 526 0 0 0
b 0 0 0 -0 0 0 0 0 0 0 0 0 0 0 .
c 0 . 0 0 0 0 0 0 0 .0 0 0 0 0 0
9 Net a 12E3 5.4 1.0 0 '0 0 186 1004 190 447 2414 456 96 518 98
exposed b 0 0 llllll 0 0 111111 0 0 IIIIII 0 0 i!!1!1 0 0
• walls and c 0 0 !IIIII 0 0 !!!!!! 0 0 Inn! 0 0
111111 0 0 •
partitions d 0 0 iliili 0 0 .11111I 0 0 !Hill 0 0 WI!! 0 0 .
e 0 0 Will 0 0 inn 0 0 HUH 0 0 111111 0 0
f 0 0 Will 0 0 !!Ill1 0 0 IIIII! 0 0 !!!1!I 0 0
10 Ceilings a 16G0 2.4 1.1 8 19 9 142 337 159 774 1839 868 210 499 236
b 0 0 111111 0 0 IIIIII 0 0 IIIIII 0 0 111111 0 0
c 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0
e 0 0 131111 0 0 111111 0 0 111111 0 0 111111 0 0
e 0 0 111111 0 0 !IIIII 0 0 !II!!! 0 0 !III!! 0 0
f 0 0 1!!!il 0 0 !!!!!! 0 0 111111 0 0 11i11 0 0
11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note:room b 0 0 IIIIII 0 0 i ii 0 • 0 !1!!I! 0 0 111111 0 0
perimeter c 0 0 111111 0 0 II!!II 0 0 111111 0 0 !!II!! 0 0
is displ. d 0 0 fill!! 0 0 !!I!I! 0 0 IIIIII 0 0 Will 0 0
for slab e 0 0 n11n 0 0 111111 0 0 IIIIII 0 0 I1111! 0 0
floors) f 0 0 Wlill 0 0 111111 0 0 111111 0 0 !!Ill! 0 0
12 Infiltration a 133 10.5 0 0 0 30 3985 316 129 17136 1360 30 3985 316
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 **** 19 **** **** 6517 **** **** 25956 **** **** 6193 ****
**** **** **** 0 **** **** 0 **** :*** 0 ****
Less external heating 0 Less transfer **** 0 **** **** 0 **** **** 0 **** *** 0 ****
Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 ****
14 Duct loss 6% 1 6% 410 **** 6% 1635 **** 6% 390 ****
15 Total loss=13+14 **** 20 **** **** 6927 **** **** 27590 **** ' **** 6583 ****
16 Int.gains: People@ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0
Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0
17 Subtot RSH gain=7+8..+12+16 **** **** 9 **** **** 1685 **** '"` 4065 **** **** 1220
Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0
Less transfer • **** **** 0 **** **** 0 **** **** 0 **** **** 0
Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0
18 Duct gain 5% **Vic
0 5% **** 82 5% **** 199 5% *"*' 60
19 Total RSH gain=(17+18)*PLF 1.00 **** 9 1.00 **** 1768 1.00 **** 4264 1.00 **** 1279
20 Air required(cfm) 0 0 70 81 279 195 67 58
•
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
81Vi'9 A 1tri®#t". 2018-Jul-30 08:56:37
Right-Suite®Universal 2017 17.0.16 RSU25116 Page 2
/ Ck ...ers\scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N
a
Right-J®Worksheet Job: LOT18
Entire House Date: Jul 30,2018
FOOTHILL BUILDERS Plan: 1351
MANUAL J:7th Ed.
1 Name of room Room9 Room10 Room11 Room12
2 Length of exposed wall 17.0 ft 19.0 ft 11,0 ft 0 ft
3 Room dimensions 6.0 x 11.0 ft 1.0 x 92.0 ft 11.0 x 4.0 ft 8.0 x 6.0 ft
4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool
. TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
EXPOSURE NO. Htg (Clg (ft2) Htg Clg (ft2) Htg I Clg (ft2) Htg Clg (ft2) Htg Clg
5 Gross a 12E3 5.4 1.0 153 **** **** 171 **** **** 99 **** **** 0 **** ****
Exposed b 0 0 !urn **** **** I I I I I I **** **** I I I I I I
**** **** I I I I I I **** ****
walls and c 0 0 IIIIII **** **** IIIIII **** **** I I I I I I **** **** IIIIII **** ****
partitions d 0 0 mill **** **** IIIIII **** **** !III
II **** **** 1111I! ** ****
1 III **** **** 111l11 **** **** !Inn **** **** mill **** ****
e 0 0 f.l... !.. 1....
f 0 0 Jill II **** **** I I I I I I **** **** II III I **** **** II!III **** ****
6 Windows and a 3A0 39.7 ** 20 793 **** 0 0 **** 0 0 **** 0 0 ****
glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ****
7 Windows and North 19.0 10 **** 190 0 **** 0 0 **** 0 0 **** 0
glass doors NE/NW 0 0 0 0 0 0 0 0 0
Cooling E/W 68.0 10 **** 680 0 **** 0 0 **** 0 0 **** 0
SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
South 34.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0
-
8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 0 0 0 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .
c 0 0 0 0 0 0 0 0 0 _ 0 • 0 0 0 0
9 Net a 12E3 5.4 1.0 133 718 136 171 923 174 99 535 101 0 0 0
exposed b 0 0 111111 0 0 I I I II! 0 0 111111 0 0 111111 0 0 .
walls and c 0 0 IIIIII 0 0 I!ll!! 0 0 nun 0 0 mini 0 0
partitions d 0 0 IIIIII 0 0 HIM 0 0 MI 0 0 111111 0 0
e 0 0 I!!!!! 0 0 lll!1! 0 0 Illlll 0 0 111111 0 0
f 0 0 IIIIII 0 0 !!fill 0 0 IIIIII 0 0 IIIIII 0 0
10 Ceilings a 16G0 2.4 1.1 66 157 74 92 219 103 44 105 49 48 114 54
b 0 0 I111!! 0 0 I!!In! 0 0 limn 0 0 IIIII! 0 0
c 0 0 I111!I 0 0 pun 0 0 IIIIII 0 0 Illlll 0 0
d 0 0 nnn 0 0 111111 0 0 inn! 0 0 !Il!fl 0 0
e 0 0 !IIIII 0 0 IIIII! 0 0 inn! 0 0 nun 0 0
f 0 0 111111 0 0 IIII! 0 0 Mill 0 0 mu! 0 0
11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note:room b 0 0 rum 0 0 mu! 0 0 inn! 0 0 IIIII 0 0
perimeter c 0 0 111111 0 0 IIIIII 0 . 0 111111 0 0 mill 0 0
is displ. d 0 0 111111 0 0 MI 0 0 111111 0 0 111111 0 0
for slab e 0 0 !!I!!1 0 0 111111 0 0
111111 0 0 Mill 0 0
floors) f 0 0 HI111 0 0 111111 0 0 111111 0 0 111111 0 0
12 infiltration a 133 10.5 20 2657 211 0 0 0 0 0 0 0 0 0
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8.+11+12 **** 4325 **** **** 1142 **** **** 539 **** **** 114 ****
Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 ****
0 'c'
Less transfer
**** **it* * * 0 **i,* **it* 0 **** ***lc 0 **:tk
Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 ****
14 Duct loss 6% 272 **** 6% 72 **** 6% 40 **** 6% 7 ****
15 Total loss=13+14 **** ' 4598 **** **** 1214 **** **** 679 **** **** 121 ****
16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** . 0
Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0
17 Subtot RSH gain=7+8..+12+16 **** **** 1291 **** **** 278 **** **** 150 **** **** 54
Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0
Less transfer **** **** 0 **** **** 0 **** **** 0 **** *'*** 0
Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0
18 Duct gain 5% **** 63 5% **** 14 5% **** 7 5% **** 3
19 Total RSH gain=(17+18)*PLF 1.00 **** 1354 1.00 **** 291 1.00 **** 158 1.00 **** 56
20 Air required(cfm) 46 62 12 13 7 7 1 3
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
�!. 2018-Jul-30 08:56:37
A" �r�9� 0ft® Right-Suite®Universal 2017 17.0.16 RSU25116 Page 3
ACCA .„ers\scott.langeworthy\Documents\York\LOT18.rup Calc=MJ7 Front Door faces: N
Right-J®Worksheet Job: LOT18
•
• Entire House Date: Jul 30,2018
FOOTHILL BUILDERS Plan: ' 1351
MANUAL J:7th Ed.
1 Name of room Room13
2 Length of exposed wall 186.0 ft
3 Room dimensions 1.0 x 1596 ft
4 Ceilings Condit.Option 9.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Area Area
EXPOSURE NO. Htg Clg (ft2) Htg Clg Htg Clg Htg Clg Htg Clg
5 Gross a 12E3 5.4 1.0 1674 **** **** **** **** **** **** **** ****
Exposed b 0 0 IIIIII **** **** **W* **** **** **** *"..** ****
walls and c 0 0 IIIIII **** **** **** **** **** **** **** ****
partitions d 0 0 ill!!! **** **** **** **** **** **** **** ****
e 0 0 nun **** **** **** **** **** **** **** ****
f 0 0 ll!III **** **** **** **** **** **** **** ****
6 Windows and a 3A0 39.7 ** 50 1984 **** **** **** ****
glass doors b 0 ** 0 0 **** **** **** ****
Heating c 0 ** 0 0 **** **** **** ****
d 0 ** 0 0 **** **** **** ****
e 0 ** 0 0 **** **** **** ****
f 0 ** 0 0 **** **** **** ****
7 Windows and North 19.0 20 **** 380 **** **** ****
glass doors NE/NW 0 0 **** 0 **** **** ****
Cooling E/W 68.0 30 **** 2040 **** **** ****
SE/SW 0 0 **** 0 **** **** ****
South 34.0 0 **** 0 **** **** ****
Holz 0 0 **** 0 **** **** ****
8 Other doors a 10D0 33.1 6.3 0 0 0
b 0 0 0 0 0
c 0 0 . 0 0 0 •
9 Net a 12E3 5.4 1.0 1624 8770 1656
exposed . b •0 0 HMI 0 0
walls and c 0 0 win 0 0
partitions d 0 0 !lllll 0 0
e 0 0 !!!I!! 0 0
f 0 0 win 0 0
10 Ceilings a 16G0 2.4 1.1 6 14 7
b 0 0 nun 0 0 •
c 0 0 MI 0 0
d 0 0 111111 0 0
• e 0 0 111111 0 0
f 0 0 111111 0 0
11 Floors a 1910 1.7 0 1596 2758 0
(Note:room b 0 0 nun 0 0
perimeter c 0 0 nun 0 0
is displ. d 0 0 Will 0 0
for slab e 0 0 !11111 0 0
floors) f 0 0 hull 0 0
12 Infiltration a 133 10.5 50 6642 527
Ventilation 0 0
13 Subtotal loss=6+8..+11+12 **** 20167 **** **** **** **** **** **** ****
Less external heating **** 0 **** **** **** **** **** **** ****
Less transfer **** 0 **** **** **** **** **** **** ****
Heating redistribution **** 0 **** **** **** **** **** **** ****
14 Duct loss 6% 1270 **** **** **** ****
15 Total loss=13+14 **** - 21437 **** **** **** _ **** **** ****
16 Int.gains: People @ 300 0 **** 0 **** **** ****
Appl. @ 1200 0 **** 0 **** **** ****
17 Subtot RSH gain=7+8..+12+16 **** **** 4610 **** **** **** **** **** ****
Less external cooling **** **** 0 **** **** **** **** **** ****
Less transfer **** **** 0 **** **** **** **** **** ****
Cooling redistribution **** **** 0 **** **** **** **** **** ****
18 Duct gain 5% **** 226 **** **** ****
19 Total RSH gain=(17+18)*PLF 1.00 **** 4836 **** **** ****
20 Air required(cfm) 217 221
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
ft- 2018-Jul-30 08:56:37
- wrightso
Right-Suitee Universal 2017 17.0.16 RSU25116 Page 4
ACC ...ers\scott.langeworthy\Documents\York\LOT 18.rup Cale=MJ7 Front Door faces: N
Software i4.6.4
Compliance Certificate_
•
. E E C Ei.Y., _,1 r,,\, , I
Project Foothills Builders VI �l�L � � $ L
Energy Code: 2015 IECC TOWco
N .,::1-',..,':''.''.. `,--, ,:..%s ( v-
Location: Glens Falls, New York r3"lj s .—< - - w °� Uj
Construction Type: Single-family �""" V
ProjectType: New Construction 15
d b
Conditioned Floor Area: 1,605 ft2 'U V,
Glazing Area 12% o 1
Climate Zone: 6 (7635 HDD) p
Permit Date: • o
Permit Number:
C
Construction Site: Owner/Agent: Designer/Contractor: O�
John Clendon Drive Vision Engineering LLC GilN..
Lot 18 206 Glen Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801 --
Compliance: 0.0%Better Than Code Maximum UA: 255 Your UA: 255
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home,
Envelope Assemblies
k z tF ,f l� -� F•,a i .{ O rtee t s c ter - *I�
It-,-4...' • el- .c•f Se b §� a s R Ma 4 ��cfid� t
Wall 1:Wood Frame, 16" o.c. 1,674 21.0 0.0 0.057 83
Window 1:Vinyl Frame:Double Pane with Low-E 141 0.290 41
Door 1: Glass 40 0.290 12
Door 2: Solid 18 0.140 3
Door 3: Solid 20 0.240 5
Ceiling 1: Raised or Energy Truss 1,605 42.0 0.0 0.023 37
Basement Wall 1: Solid Concrete or Masonry 1,450 0.0 15.0 0.046 66
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5
Window 3:Vinyl/Fiberglass Frame:Double Pane 7 0.400 3
Floor 1:All-Wood Joist/Truss:Over Outside Air 12 30.0 0.0 0.033 0
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 1 of10
Lot 18 JCD\1351 Rescheck.rck
•t
J
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the IECC requirements in
REScheck Version 4.6.4 and to -crmply,with the mandatory re • ents listed in the RESchec • ection Checkli t.
Version
S - __../ .
��
Name-Title " — Signature Date
il
.e,
fr
\\\,,,,,,,,,,, .‘--( tz...0-r, , ..,:::
¼th '
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 2 of10
Lot 18 JCD\1351 Rescheck.rck
VersionREScheck Software
4.6.4
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software •
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Settlers .
Plans VFerth ed' " Field V.ei if ecd •.. # ' Fred sp,;tda t/Plaii•Revie Cornplies? ,Corn'''a sts/Assa�c tptl.ens
4E egJD " f:;. ' Value 1t" lu ..
103.1, :Construction drawings and x� ❑Complies
.103.2 :documentation demonstrate •
: '�°�.;�;;.:. �I❑Does Not
[PR1]i i energy code compliance for the . _ ::`?w u„
;building envelope.Thermal "3 , ',, "'-. ,. ❑Not Observable
envelope represented on ❑Not Applicable
construction documents. - .•
103.1, :Construction drawings and "❑Complies
103.2, :documentation demonstrate `
''}❑Does Not
403.7 energy code compliance for ,_ '`-_
[PR3]1 :lighting and mechanical systems. `:;, ,❑Not Observable
• i `, :Systems serving multiple _' •;- ❑Not Applicable
dwelling units must demonstrate r''
:compliance with the IECC xf
:Commercial Provisions. , • '"3
302 L; .';;»: Heating and cooling equipment is: Heating: ; Heating: ❑Complies
403:7>`".;;<=sized per ACCA Manual 5 based Btu/hr Btu/hr EDoes Not
[Pft212,-;--"%. on loads calculated per ACCA ; Cooling: Cooling:
; , Manual J or other methods Btu/hr ; Btu/hr ❑Not Observable
approved by the code official. :❑Not Applicable
Additional Comments/Assumptions:
•
1 1High Impact(Tier 1) :2 Medium Impact(Tier 2) k 3; Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 3 of10
Lot 18 JCD\1351 Rescheck.rck
I
Sectjpre Pla Verified :Freicl verified
# Foundationins ecti Complies?., emmesnts/Assuaevmpt¢afls,
Req.i% . '�7lue Value
402.1.1 Conditioned basement wall i R- R- i❑Complies ;See the Envelope Assemblies
[F04]1 insulation R-value.Where interior; R_ R- ❑Does Not table for values.
insulation is used,verification 3❑Not Observable
may need to occur during
Insulation Inspection, Not -❑Not Applicable
required in warm-humid locations
,
-
in Climate Zone 3. 3
303.2 Conditioned basement wall = r '<❑Complies
[F05]i insulation installed per ❑Does Not
:manufacturer's instructions.
i. `.❑Not Observable
...;r.> ❑Not Applicable
402.2.9 :Conditioned basement wall ft ft ;❑Complies See the Envelope Assemblies
[F0611 'insulation depth of burial or i0Does Not table for values.
' 1 distance from top of wall. j❑Not Observable
•
❑Not Applicable
303.2:1`" .A protective covering is installed i;- ❑Complies
[F011;]? ::to protect exposed exterior ❑Does Not
'L.= insulation and extends a
''' minimum of 6 in. below grade. ❑Not Observable
; i;; <❑Not Applicable
403.9 :•".• .;Snow-and ice-melting system ' ❑Complies
[F01212 {controls installed. ]❑Does Not
: ;; ,❑Not Observable
? ..- _;. ,2,< . . ,_, ;❑Not Applicable
Additional Comments/Assumptions:
•
1 !High Impact(Tier 1) .:2"IMedium Impact(Tier 2) I:3.; Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 4 of10
Lot 18 JCD\1351 Rescheck.rck
Section
Plans Verified Fled yerrfa d
# Framingf Re u n Insnest9�.i Lern lies? C rnmen'tslAssa niptinns
Op.� value •Value
402.1.1, Door U-factor. U- U- '❑Complies See the Envelope Assemblies
402.3.4 ;❑Does Not table for values.
[FR1]
;ems •
❑Not Observable
•
❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- i❑Complies See the Envelope Assemblies
•402.3.1, average). _ DDoes Not table for values.
402.3.3,
402.3.6, DNot Observable
•
402.5 i it]Not Applicable
[FR2]'
F. 3
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 :are determined in accordance ='. ❑Does Not
with the NFRC test procedure or .ti j,-
:taken from the default table. Not Observable
❑Not Applicable
402.4.1.1 :Air barrier and thermal barrier ,,,, .;EComplies
[FR23]1 installed per manufacturer's '❑Does Not
CO i instructions.
lENot Observable
$- ;❑Not Applicable
402.4.3 :Fenestration that is not site built ='' " • EComplies
[FR20]'- is listed and labeled as meeting .. ❑Does Not
=AAMA/WDMA/CSA 101/I.S.2/A440 ; ;::D `.: : -.-•a❑Not Observable
or has infiltration rates per NFRC :
:400 that do not exceed code • ❑Not Applicable
limits.
402":4;5 . IC-rated recessed lighting fixtures '';❑Complies
[FR'16]? sealed at housing/interior finish '° _❑Does Not
land labeled to indicate <_2.0 cfm '°~
leakage at 75 Pa. ❑Not Observable
❑Not Applicable
403.2.1 :Supply and return ducts in attics ' =` :' �;❑Complies
[FR12 1 'insulated >= R-8 where duct is ,.. ' :❑,z:•a:-,;n" Does Not
( , ;>= 3 inches in diameter and >= ', -`-_;; ,. •�;:-. '',['Not Observable
:R-6 where < 3 inches.Supply and :.❑Not Applicable =
:return ducts in other portions of `; I
the building insulated >= R-6 for : ` 'z?, - ;
`diameter>= 3 inches and R-4.2 ;s= �,•'
:for<3 inches in diameter.
403.3;3i5.: Building cavities are not used as ;;-, - ❑Complies
[FR15]3 =ducts or plenums. ;.: " ;❑Does Not:"-: [:]Not Observable
:r e.,... ❑Not Applicable
403.4 ,_``.-,HVAC piping conveying fluids R- I R- ;❑Complies
CFRI7;] t'` 'above 105 °F or chilled fluids :❑Does Not
`below 55 °F are insulated to>_R-
❑Not Observable
"..=3. •
•
❑Not Applicable
403.4.1 :Protection of insulation on HVAC ,, ••; ;; ",.., `t ❑Complies
[FR24] piping. i t ,' ❑Does
Not
u •
rz„: ❑Not Observable
❑Not Applicable
'403:•5`3 ,, 'Hot water pipes are insulated to : R- R- ;❑Complies
[FRIB12 _R-3. ❑Does Not
;;y,r , • ❑Not Observable
•
• ❑Not Applicable
44)3:6- ',- FAutomatic or gravity dampers are;-°. "', : F>,..;•.!s'.‘ • • :❑Complies
[FR19.]?;-, installed on all outdoor air __ `'' <' ❑Does Not
`intakes and exhausts. l' f° "''`
i' ❑Not Observable
' :•.. .... . . ❑Not Applicable
1 1 JHigh Impact(Tier 1) I,.2]Medium Impact(Tier 2) 3 ' Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 5 of10
Lot 18 JCD\1351 Rescheck.rck
Additional Comments/Assumptions:
1 IHigh Impact(Tier 1) `2 Medium Impact(Tier 2) I 3'.,Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 -'DES - FHB Page 6 of10
Lot 18 JCD\1351 Rescheck.rck
c
-_- , ; . Plans Verified r ::F ld Vertflesi.
if: ,g hisi laden Cn4*trion : Cpmpiies?., Y'='•Coia manta/Assi T'' ptl9ns .
jtSi-Req,!ID„I Vdal ' lue
303 1 =„''.AAII installed insulation is labeled .' ❑Complies
[INi3i2 or the installed R-values 'f :; ''- i❑Does Not
provided.
y` ❑Not Observable
T`<•,• . ❑Not Applicable
402.1.1, ;Floor insulation R-value. . R- R- ❑Complies See the Envelope Assemblies
402.2.E i i❑ Wood ID Wood '❑Does Not table for values.
[IN1]i i ❑ Steel i❑ Steel :❑Not Observable
❑Not Applicable
'303.2, :Floor insulation installed per : $❑Complies
402.2.7 :manufacturer's instructions and is #❑Does Not
[IN2]1 in substantial contact with the ..
1 :underside of the subfloor, or floor i"::',••.., .;`v;;;-= ''','`:' > ❑Not Observable
:framing cavity insulation is in r:; ::::- 4=` r>_ ;;°-.: ;. .❑Not Applicable
contact with the top side of ,, F . -,.>;: " '
:sheathing, or continuous `;:>>=.:;_ •.,�;;:;;s==,
insulation is installed on the
underside of floor framing and '
extends from the bottom to the
top of all perimeter floor framing ' - •i
members.
402.1.1, :Wall insulation R-value. If this is a R- ; R- ❑Complies See the Envelope Assemblies
402,2.5, mass wall with at least 1/2 of the i❑ Wood :❑ Wood ;DDoes Not table for values.
402.2.E wall insulation on the wall ❑ Mass ❑ Mass ;❑Not Observable
['NW :exterior,the exterior insulation
requirement applies (FR10). :❑ Steel ',❑ Steel ❑Not Applicable
303.2 :Wall insulation is installed per i . ❑Complies
[IN4]i manufacturer's instructions. ;:= : . °:`; _ `❑Does Not
WV., " . ,;, ❑Not Observable
•
•
• i'l'... - ❑Not Applicable
Additional Comments/Assumptions:
•
1;High Impact(Tier 1) 2;, Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders . Report date: 07/22/18
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES- FHB Page 7 of10
Lot 18 JCD\1351 Rescheck.rck
•
`Sectisn ,�len �fetif'ec Fie€ Vraee CQrislies/ ' " omina.ntstak4girptions
. inei inspectran P> Vis@errs r aiue S 6te. i
& Fie A
402.1.1, :Ceiling insulation R-value. R- ; R- ❑Complies See the Envelope Assemblies.
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, i ❑ Steel ❑ Steel ;❑Not Observable
402.2.E
[Fill' •
3❑Not Applicable
303.1.1.1, :Ceiling insulation installed per :❑Complies
303.2 manufacturer's instructions. ;❑Does Not
[FI2]1 Blown insulation marked every
300 ft2. `'`;❑Not Observable
.'j❑Not Applicable
40223_"::;,Vented attics with air permeable __ ❑Complies
[Fi22]2 'insulation include baffle adjacent ..,;_ ,'.j • ❑Does Not
,;to soffit and eave vents that
:. ,'extends over insulation. Not Observable
4" ❑Not Applicable
402.2.4 :Attic access hatch and door R- R- ;❑Complies
[FI3]i :insulation >. R-value of the ;❑Does Not
:adjacent assembly. •
❑Not Observable
• ❑Not Applicable
402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ' ACH 50 = :❑Complies
'[F117]1 :ach in Climate Zones 1-2, and i il=1Does Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
• ❑Not Applicable
403.2.3 :Duct tightness test result of<=4 : cfm/100 cfm/100 '❑Complies
[FI4]1 ;cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in ;❑Not Observable
:tests,verification may need to i ;❑Not Applicable
:occur during Framing Inspection.
403.3.2 :Ducts are pressure tested to cfm/100 cfm/100 il=IComplies
[F127]1 :determine air leakage with : ft2 ft2 ;❑Does Not
either: Rough-in test:Total
:leakage measured with a Not Observable
pressure differential of 0.1 inch i i❑Not Applicable
:w.g. across the system including
:the manufacturer's air handler
:enclosure if installed at time of i
test. Postconstruction test:Total •
leakage measured with a
:pressure differential of 0.1 inch
w.g.across the entire system i
:including the manufacturer's air
handler enclosure.
403.3.2.1 :Air handler leakage designated : s Complies
[F124]1 by manufacturer at<=2%of ""`" " '=::= ❑Does Not
design air flow. 1
':❑Not Observable
. ''• =❑Not Applicable
403L1 Programmable thermostats ,❑Complies
[F19]2.:` " installed for control of primary ❑Does Not
. heating and cooling systems and "
initially set by manufacturer to • Not Observable
. ;codespecifications, • ❑Not Applicable
4031,2 Heat pump thermostat installed ,❑Complies
[F•I10]? ,ion heat pumps. ```'• ` .'❑Does Not
❑Not Observable
1❑Not Applicable
403 5 1 Circulating; service hot water =g.� '❑Complies
Fill a ,.,_.:i-,-;
'[ ], -� °;;systems have automatic or `k =❑Does Not
,accessible manual controls. 311
"' :€,-N=; _ ❑, Not Observable
: - . '" )❑Not Applicable
1 High Impact(Tier 1) 2;: Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 8 of10
Lot 18 JCD\1351 Rescheck.rck
'
^
~
403,6,1 'All mechanical ventilation system. ElComplies
fl�12512 'fans not part of teste
HVAC equipment meet efficacy
"'E]Not Observable
and air flow limits. 'E]Not Applicable
E]Does Not
E]Not Observable
water boilers supplying heat
�systems have outdoor setback
�
control to lower boiler water
e erature based on outdoor ,-.,,.E]Not Applicable
mp
0 Heated water circulation systems
�
system return pipe is a dedicated
pipe. Gravity and thermos- :.,[]Not Applicable
E]Not Observable
return pipe or a cold water supply
�
-,syphon circulation systems are
. not present. --'---—circulating hot water system
pumps start the pump
, .� "for hot water demand within the
.occupancy. Controls
automatically turn off the pump
ion loop
when water is in circulat'
is at set-point temperature and
| no demand for hot water exists�
.Electric heat trace systems Elcom plies
�
comply with IEEE 515.1 or UL
;E]Does Not
-]Not Observable
adJ
ust the energy input to the
ble
heat tracing to maintain the JE]NotApplica
desired water temperature in the
Water distribution systems that .,,...:17!Com plies
[F13QJ2 have recirculation pumps that
Does Not
�pump water from a heated water
� ~~pp'xp'p=back"'the heated � � �
~ through
cold
water h cu �
watersu
[ � demand recirculation
x g}
system, Pumps have controls
` that
pump and limit the temperature
o/the water entering the cold
water piping to 10*9F.
` "'o,an water eat recovery units
i h ^
/�� EComplies
[R� 12 'te�edin accordance with[5A � / � "ElDoes Not
�1355.1. putab|ewatepside
Not Obse able
pessue loss of drain water heat
--recovery units < ] psi for
UNot Applicable
individual units connected toone
urtwushuwers. potab|ewatep
� side pressure loss of drain water �
^^,� heat recovery units< 2 psi for
`individual units connected to '
' :theeormoeshowe�
�
404.1 :75Y6of lamps in permanentElComplies
[F1611 'fixtures or 75%of permanent """ElDoes Not
:fixtures have high effica | ps�
�ooesnutapp|yto|o -^ -- LJNotObsemab|e
�lighting. �� LJmutApplicable |
)Fuel gas lighting have '
.[1�123j3 i no_continuous pilot'light. �~ �
Observable �
Applicable
-
| | �] |
. z'H�h |mpac (Tier Medium ��r]) Low Impact(Tier])
Project Title: Foothills Builders Report date: 07/22/18
Data fibname: C:\Usee\/robision\Dnopbox\V|S/ON Engineering, LLC\Active Projects VE\l35l ' DES ' FHB Page 9oflO
Lot l8jCD\l35lRescheck.rck �
�
Plans Verified Field1'erified;
{ Final Inspection,P'revisions Ccarx'piaes� f [irnerit lAssaarrma@�t,�tis ,
Ei.tiecl:icz 4tali a el e
401.3='` " ,<Compliance certificate posted. ;
❑Complies
[FI7lz' • " ❑Does Not
['Not Observable
;❑Not Applicable
303:3;'`` ;Manufacturer manuals for K❑Complies
[F118e3 F mechanical and water heating ''!❑Does Not
.;systems have been provided. ❑Not Observable
❑No t Applicable
Additional Comments/Assumptions:
1'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 . Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/22/18
Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES- FHB Page 10 of10
Lot 18 JCD\1351 Rescheck.rck
.
ry
's 4
•
,cy
ertific. ‘te
44iftier,;:,e;
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 30.00
Ceiling / Roof 42.00
Ductwork(unconditioned spaces):
•. •, • , Geit
< 4,4 • Al.4 „or <
'GLa 7*Du! cu 4
Window 0.29
Door 029
t-.4-.7ngn•fry="VilitirA'',11,40r540. - • 4 Effipx,., yaiu
tipugA.D10111016142p841, „. . 440,1P
Heating System:
Cooling System:
Water Heater:
=
Name: Date:
Comments
MAP REFERENCE: D [E O r
"LEUCI - JOHN CLENDON ROAD SUBDIVISION"
BY: VAN DUSEN & STEVES LAND SURVEYORS AND
NACE ENGINNERING, P.G.
DATE: MARCH 15, 2016 JUL L 4 2018 �
LAST REVISED: JUNE 12, 2017
FILED:PLAT D 18 2017 �•S�, 1 g a o N. 11 "�i
JULY Wj
O TOWN OF E
INSTRUMENT N0. 2017-3000063 Rib, 1 g BUILD] & CO®EC
/:0• E
N I w
N N
nowCOco
I 4 � JJ vi
J
1� L CC
m CO
q I H LL
ry for la LOT 17 r, W
_ m V co
LOT le s4n7.2 Sq. Fest
0.80 Acne I
c
L6 0 � 0
NLL � LL
(n
I
I
I
AREA
/ id 98nlvrl�s
14
JWNEI) 210(S)92jnionZd
a] d d
3Hl Ol S3N1�1 Ail Ad3H1 0
30NVISIG 3H1 03dnS)V3W ATVNOS�3d 3AVH
NVId 101d .11VI83d
UcktetD c Scale July �U, �Uitf
( �7 y� ,." �e�tiwa,„, oa�w. Scale 1'=40'
v a & ey[,1 rreuw.u��.�oae�cn.sw.s. Map of a Plot Plan made for
•nanaui a aeenox rmx arw"ss a a x
Steves �"a
v�r mra nw�x a"a1r v ae:awrr
�wno�a,x ww,Y.a x ixo nw�c+oa
S- 1
uaea. aw' Foothills Builder s
as ew�cr us reared r.�mwa ww x
oosx cmc o naa ra wo sia�naia,osim
Land Surveyors ,
10 x ri1rW M YW x 8rtr a!I®KR rD
SHEET 1 OF 1
O"Ml iMrli A x llllt eaiaar.Oprl""EIiK
149 Haviland Road Queensbur•y. New York 12804 a�,, tYD Town of Queeugbimy. Warren County, New York FOOTHILLS
(518) 793-R474 New York Ne. No. "131) NO. DATE DESCRIPTION DWG. NO. 09094-18