Loading...
RC-0478-2018 �^ TOWN OF QUEENSBURY a y � 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 --__ Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-0478-2018 Date Issued: Thursday, May 30, 2019 This is to certify that work requested to be done as shown by Permit Number RC-0478-2018 has been completed. Tax Map Number: 295.15-2-15 Location: 47 JOHN CLENDON RD Owner: FOOTHILLS BUILDERS, LLC Applicant: FOOTHILLS BUILDERS, LLC This structure may be occupied as a: Single Famly Dwelling w/gas FP 1605 s.f. Garage 528 s.f. By Order of Town Board John Glendon Road Subdivision Lot 18 TOWN of QuEENssuxY Issuance of this Certificate of Occupancy DOES NOT relieve theproperty owner owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. _ TOWN OF QUEENSBURY �,.- - t 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 _ ,f . a Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-0478-2018 Tax Map No: 295.15-2-15 Permission is hereby granted to: FOOTHILLS BUILDERS,LLC For property located at: 47 JOHN CLENDON RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance - . Type of Construction Owner Name: FOOTHILLS BUILDERS,LLC Single Family-New $175,000.00 Owner Address: 9 Mountainside DR Total Value $175,000.00 Queensbury,NY 12804 V Contractor or Builder's Name/Address Electrical Inspection Agency FOOTHILLS BUILDERS,LLC 9 Mountainside DR Queensbury,NY 12804 Plans&Specifications Single Famly Dwelling w/gas FP 1605 s.f. Garage 528 s.f. John Clendon Road Subdivision Lot 18 $ 781.50 PERMIT FEE PAID -THIS PERMIT EXPIRES: Tuesday,August 13,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before t e expiration••.te. Dated at the To of.Que bury- 4 M��i i,e, - gust 13,2018 SIGNED BY: \- for the Town of Queensbury. Director of Building&Code Enforcement Office Use Only PRINCIPLE EflmV E • 't#: cc AP it Fee:$ 7 , P I N 9u, 4 20 L 2 18 IAA-Nov) Ut. 742 Bay Road Queensbury, NV 12804 P 518-761-8256 --- • TOWN OF cjEEfiURFnvcIicem 0 to7 BUiLDUJG 84 CODES Project Location: Li -) J11t CA-ENDO p RD Tax Map #: 2-9 I 2 - Subdivision Name: 36 HP CIANDoi- 6.51Ara TOWN BD.RESOLUTION 86-2013 $850 recreation fee for new dwelling un,is single family.dup'e:,e two-family, multiplefamily. apartments condominiums tok,vnhouses.and or manufactured tv modular homes but not mobile homes. This is in addition to the permit fee(s). CONTACT INFORMATION: • Applicant: Name(s): THtLU t.k.(Li) ERS Mailing Address, C/S/Z: ctmot, TReJcicE.- bRive auce-f-iss,tizi ig-ro Cell Ph.: I ( t ) -74/ 1- t.ci 33 Land LiRe: (St ) (C.cc.i..) Email: FO CIO I %At Nv g co • Primary Owner(s): Name(s): SP‘rY)6- S 11 PP/- CAN-1` Mailing Address, CIS/Z: Cell Ph.: Land Line: ( Email: • Coritractor(s); Name(s): S A rn e". AS A P put c AN-r Mailing Address, CIS/Z: Cell Ph.: ( Land Line: ( Email: • Architect(s)/Engineer(s): Name(s): Pip) PE ( riotJ Mailing Address, C/S/Z: 2-0 0 5-j Sucre 5(o C-11..-Et.) FAL-0 to i 2-8-0 1 Cell Ph.: ( Land Line: I ( ) 79 Z 612-0 Email: 1)R4AN(& ENC- , eMA Contact Person for Building & Code Compliance: 5°E- Cell Ph.: I (5-IV ) "OH {133 band Line: t (cl? ) - 3 S-2..0 (Le 1-1-..) Email: FoyFOOTt tLokA LO rvt Ton finikling&Corti>Fnforrempnt Priorinip Strurturp RPviSPCi March 701R PROJECT INFORMATION: TYPE: Commercial i)( Residential WORK CLASS: b( Single-Family Two-Family (#of Townhouse Business Office Retail Hotel/Motel IndustriaINVarehouse Garage(*ofcars )• Other(describe STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: lsr floor: ° 1ST floor: SI—2. 2nd floor: 2nd floor: 3rd floor: Total square feet: C2-8' Basement(habitable space): Total square feet: I 0 S ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 2. Proposed use of the building: ((ES- E--1-11' A L 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat(circle one).41 Oil Propane . Solar Other:11. • (Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance) S. Are there any structures not shown on the plot plan? YES NO . plain: 6. Are there any easements on the property? YES NO 7. SITE INFORMATION: a.What is the dimensions or acreag- .e parcel? 4CieeS b. Is this a corner lot? YES NO c. Will the grade be changed as a r- • the construction? YES NO d.What is the water source? PUBL PRIVATE LL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Pg_i v•A T ToO autIrline&Code ErtfnrcerruAnt PrinrinIP Strisrta Ina igpvicpri Mirrh 7111 R DECLARATION: I. I acknowledge that no construction shall commence priorto issuance of a valid building perm and work will be completed within a 12 month period. 2. If the work is not completed by the 1year expiration date the permit may be renewed, subject to fees anckiepartment approval 3. I certify that the application, plans and supporting materials are a t rue and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities priorto issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: -To SEPH Le (A CI SIGNATURE. I . , _ q t. .vu.f DATE: -7 11---g / / • ToO Building&Code Enforcement Prinrinip Stn grhirp RPVICPCI Marrh 7f11R . , Office Use Only FUEL BURNING APPLIANCE & Permit 4: CHIMNEY APPLICATION Permit Fee:$ Invoice. : 74 By Road, Queensbu N 2804 P. 5-L-761-8256 Project Location: 14.7 [IN C-LE-P"-) Tax Map ID: 2-9 Room of Install: G-'g-e-Al KA 0 in Planned Install Date: IIk **ONE APPLICATION PER APPLIANCE** CONTACT INFORMATION: * Applicant: Name(s): FO OTHI LLS p,t.ku„DERS L-Lc (1:ro 6- Leu Mailing Address, C/S/Z: qento-‘N>liAiNs/pc:- DIL QueeNs (42-1 )itc Cell Ph.: r (YI ) -19 1- t9 33 i ( Cig ) 1We 3S-ac Email: Fa c.-4.1-1/4 1(.1;3 p)tAt LD cgs Cd ern n L, C PA * Primary Owner(s): Name(s): S'Arrvi- 6-s ArrLic Mailing Address, C/S/Z: Cell Ph.: ( Land Line: ( Email: • Installer/Builder: Name(s): rim As cn Mailing Address, C/S/Z: Cell Ph.: ( Land Line: ( Email: Contact Person for Building & Code Compliance: -3t)E 1-Ekk-c- Cell Ph.: t (C-t ) 1c1 - 1403 tat,e1 Line: L(5-1 g' 1(9 - Email: oc IL-Ls 13IAIL-bE(23 GITt iL, tr. T.ivirfQuesbury Buitc.tn- Fnforc4-:.rrellt FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: Stove X Fireplace Insert Fireplace (>-) rY) r-3-TA Mob Dvb 36; P 3o tsi TAHOE' _Fuel Fired Equipment(Garage Only,13"clearance per IMC 304.3) Fireplace, factory built** **Manufacturers Name: Model#: SOURCE OF HEAT: Wood Coal Pellet CHIMNEY ItIFORMATIQN; Masonry: block brick stone Flue: tie size,-s!; ri inches Material*: double-wall triple-wa lljnsulated (*Manufacturer's rr-1 m Model#: ADDITIONAL INFORMATION: et Two inspections are required. A rough-in rispection,prior to installation and a final inspection,after installation. 2 Manufacturer's installation manual must be available at the time of inspection. 3 Masonry fireplaces & chimneys require plans to be submitted. 4 Twenty-four (24) hour notification is required for hspections. Declaration:Construction/installation must conform to NYS Fire Prevention&Building Code and/or manufacturer requirements,The applicant or owner agrees to comply with all applicable laws,ordinances,regulations and all conditions that are,part ofthese requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: S P ti LE - --- SIGNATURE: )4\-- DTE: / Fuel Burning Appliance&&iimney Application . .. yfirittift," .-,1 • ----- \z,-c,,,,,*,,.,, SEPTIC DISPOSAL PERMIT APPLICATION , -----,r 7 Bay Road Qun3bury,Vi" ` %04 Perm , — — Ta, Map ID4; Project Location: -T1 -To H i•-) CLeav6ti..) kiD -..-• .,.' i='.:-ta 7____ . . :• , --- -- Primary Owner(s) i i To 0-1-1-1 1-t-S Au-I I-beg LZ.X. Csoc Le t4 <-1) ..„,„........._ . .,_.......,,,,...- ._, Mailing Address ri 1 frit;tA.iv-TA li--iS}De -6R. Clue tz- p...,\ 1,-,\J agoli .....______..., ...,... , Phone & Email 1(. -rit-Mg3 if foo-TR t z_i___s 6 t.),,t LDeg41,),-/ 616-mAIL.,or, Installer/Bui Icier i 1 SO f`rke- As A2PLIc po.,--c- , Mailing Address Phone & Email .. ----- Engineer -- - e Mailing Address I 0 1-Ifivi I-A N.r Rb allk_isel-t•J S(.3 IA,gl 1,./-1 — . Phone& Email i C (SI g''')-19(D-2-- .1 S' -1-C,c->i-1014,36, @ Y/4 Ho 0, t,Orv\ e- Contact Person for Building&Code coo nil pi 11-1 ,-:a Le kkciF)t-tc>r) : ( 1 )'1'.1 I - 11 33 (cif) 19( RESIDENCE NFORMATION: I 4-3.S-2 0 A Year Built 4 of bedrooms X gallons per bedroom ---- totaldaily flow 1 Garbage Grinder Yes — 4171S - - '980 or older i Installed? {circle one) Spa or Hot Tub Yes -10I Installed? {circle one) PARCEL NFORMATlON: .,. _________ _, _ _. _ ., . A, a .- -3 , A--.. ., -- ,. 4.- C. - .. . - — ' . ,. :,. ,...,1•• . _,,,,-,-A.M1.-^ •.1,-- - l, — "',--, Topography t< Flat Rolling Steep Slope %Slope ..._._ .. Soil Nature eeind _Loam Clay Other Groundwater :At What depth?- - e•-ijA _ _ _..._ .. _ _ _....._ _ Bedrock/Impervious material At what depth? w TA , ._.. _.,..........._ _. . Domestic Water Supply Oc Municipal Well{if well.Water supply from any septic system absorption is It.) - - . ,_._— _ I Percolation Test Rate; V'c per minute per inch{test to be completed by licensed engneertarchect) PROPOSED SYSTEM FOR NEW CONSTRUCTION; Tank size 1 ty-o-o gallons{min.size 1000 ga Ilonsadd 250 ga lions for each garbage cylinder or spathortaT----- ... System . _ Absorption field with#2 stone Total ngth 1..,S- 0 ft.:Eachlrench \c"--6 ' ft. _ Seepage Pit with 43 stone How many: •Size: _ :..._____—...,........---. Alternative System Bed or other type: I HoldingTank System Total required capacity? -tank size :# of tanks — — NOTES: 1,Alarrn system&associated electrical work must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file-no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant. shall be void.l have read the regulations and agree to abide by these and all requirements ofthe Town ofQueensbury Sanitary Sewage Disposal Ordinance, PRINT NAME: 505 IF 9 uk L€ u (.. ( DATE: 1 (24 ir ...: , SIGNATURE(- - DATE: ' I if L-... i coos,5-forcer1ent _. Town of Queensbury Thomas R.Van Ness Highway Department Highway Superintendent 742 Bay Road,Queensbury, NV 12804 Home:518-745-0929 Phone:518-761-8211 Fax:518-745-4466 David Duel! Deputy Highway Superintendent Home:518-745-0938 DRIVEWAY PERMIT Date: / 1g Applicant Name: roe 7[41u,S p,uki tze-P-s C-S-0 Telephone No.: Cs-10-79 - 'n /( c/g)-796-3s-zo Address to be Inspected: CL o k) RD Return Address: 1 t• )DE Q . ctz1 Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes at the specified location. The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action has been taken: STEP 1: ( Preliminary approval NEED ) Slight Swale ) Deep Swale ( ) Level with the road ) Level with the top of the paved wing Size culvert pipe to be used (if necessary) ) 12" ) 15" ) 18" )24" )36" Preliminary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please resubmit this approval permit for a final approval. STEP 2: ) Final Approval ) Rejected Date: Thomas R. Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent Town of Queensbury Building 5 Code Enforcement Principal Structure Application Revised February 2017 EXHAUST SYSTEMS 2 TABLE M1507.3.3(1) .,0:' CONTINUOUS WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM AIRFLOW RATE REQUIREMENTS a NUMBER OF BEDROOMS - T:5;iV DWELLING UNIT — j i FLOOR AREA 0-1 2-3 4-5 I 6-7 >7 445. (square feet) Airflow in CFM '' ,;_ 'Il <1,500 30 45 60 75 90 .I+a,"irk'=. .,4.,::!. 1,501—3,000 45 . 60 75 90 105 -1F, f_;�.. 3,001—4,500 60 75 - 90 105 120 h`ti-g:i,. 4,501—6,000 75 90 -. • 105 120 135 •L `'4; 6,001-7,500 90 105 120 135 150 _� ; >7,500 105 120 135 150 165 ;111&1t;; <<' For SI: 1 square foot=0.0929 m2,1 cubic foot per minute=0.0004719 m3fs. " t-ftt TABLE M1507.3.3(2) = »y` A'i INTERMITTENT WHOLE-HOUSE MECHANICAL VENTILATION RATE FACTORSa,b - _ 214, +,_ RUN-TIME PERCENTAGE IN EACH 4-HOUR 25% 33% 50% 66% 75% j .,, ;, SEGMENT 1 ,:: Factora 4 3 2 1.5 1.3 '!:_' '-;'� '?. a.For ventilation system run time values between those given,the factors are permitted to be determined by interpolation. . `;'At' b.Extrapolation beyond the table is prohibited. ist. •F I; TABLE M1507.4 ' „; -46 M1507.4 Local exhaust rates. Local exhaust systems shall MINIMUM REQUIRED LOCAL EXHAUST RATES F ii ::: be designed to have the capacity to exhaust the minimum air ONE-AND TWO-FAMILY DWELLINGS-:;'. - 1,'" `. flow rate determined in accordance with Table M1507.4. AREA TO BE EXHAUST RATES- ` r` EXHAUSTED _,, "e:1`�^' Kitchens 100 cfm intermittent or 25 cfm co b,,4,y,, . Bathrooms-Toilet Mechanical exhaust capacity;o 5( lti:: Rooms intermittent or 20 cfm continyoti+ t;3, YY" For SI: I cubic foot per minute=0.0004719 m3/s. 1, -.''z,(ggif.• ,?.JWt:i .fi t-t1V _ ({fi - .: 'h'. 2015 INTERNATIONp4.:-x i SJ 3 I, 155 MAX- vs.. HEAT RECOVERY VENTILATOR N. ENGINEERING DATA LIFEBRERTH' THERMALLY CONDUCTIVE,PATENTED DEFROST ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery care transfers heat between the two airstreams.It is easily removed for cleaning or service. CASE - Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to MOTORS AND BLOWERS prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)OD.Balancing ports Each airstream has one centrifugal blower driven by a common PSC motor,with multiple are located on door. fan speed operations. ELECTRONICS FILTERS The DXPL02 control included with the unit can be wall mounted in a central location of Washable air filters in exhaust and supply air streams. the home.3 wire 20 gauge(min.)100 ft length(max.). MOUNTING Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and WARRANTY hanging straps supplied with the unit. Units carry a lifetime warranty on the HRV core and a 5 year replacement parts warranty. OPTIONAL ACCESSORIES: TechGrille Weather Hood 99-EAG4 Terminator Wireless 20/40/60 99-185 99-186 99-EAGS Fitting Min Timer 99-TM4 99-187 t`i 99-EAG6 CH—..lei'\ 99 TM5 99 DETDZ �'r 7!i 99-EAGS r- „ 99-TM6lei' ir r LIFEBREATH CONTROL OPTIONS TIMER OPTIONS FEATURES 99-DXPLO2 99-BCO2 99-BC03 99-BCO4 99 OETOl Lifebreath 20/40/60 Minute Timer Initiates high speed Ventilation for 20,40 or 60 5 speed fan operation on each mode ✓ minutes.3 wire connection. 99-DETO2 2 speed fan operation(Low/High) ✓ ✓ Wireless Lifebreath 20/40/60 Minute Timer Continuous low speed fan operation ✓ Initiates high speed Ventilation for 20,40 or 60 minutes.Wirelessly connects to main control for Humidity control through adjustable Dehumidistat ✓ ✓ ✓ ease of installation.40'approximate range. Excusive to Lifebreath. Large digital LCD screen ✓ 99-RX02-Wireless Lifebreath Repeater LED status indicator lights ✓ ✓ ✓ Extends range of 99-DET02 Wireless Timers.Plugs into 120V power outlet.Wirelessly connects to Continuous Ventilation ✓ ✓ main control and 99-DET02.Install at halfway V ✓ point between timer and main wall control if timer Continuous Recirculationis out of range. 20 ON/40 OFF V x. 10 0N/50 OFF ✓ -.S ' ." 20 ON/40 Recirculation 20/40/60 min.High speed override button ✓ 99-DXPL02 f 99-DET02 Compatible with 99-DET02 Wireless Timer ✓ ✓ ✓ ✓ to/ 3 wire connection V ✓ '/ V L IFEBREFI TH" Di Indoor Air systems 155MAX(01-01-18) www.lifebreath.com fry 1 3 1 Is E 5 5 MAX E `.; I ,EAT RECOVERY VENTILATOR PERFORMANCE (HVI CERTIFIED) L/FEBRERTH° J 0.1(25) 0.2(50) 0.3(75) O.4(100) 0.5(125) 0.6(150) 0.7(175) ELECTRICAL SPECIFICATIONS IN.W.G.(PA) CFM(Us) CFM(Us) CFM(Us) CFM(Lis) CFM(Us) CFM(Us) CFM(Us) VAC @ 60Hz 115 Net Supply Airflow 184(87) 163(77) 146(69) 132(62) 115(54) 92(43) 60(28) Watts/Low Speed 66 Gross Supply Airflow 188(81) 166(78) 149(70) 134(63) 117(55) 94(44) 61(29) Watts/High Speed 118 Gross Exhaust Airflow 239(113) 228(101) 212(100) 193(91) 172(81) 150(71) 126(60) Amp Rating 1.4 Sensible Effectiveness(ASE) 32,E(0°C) 84% 180 WEIGHT: @ 59 CFM(28 Us) 71 LBS(32 KG) Sensible Efficiency(SRE) 0 160 SHIPPING WEIGHT: @ 59 CFM(28 Us) 32°F(0°C) 15/o 140 73 LBS(33 KG) \ . Sensible Efficiency(SRE) 32°F(0°C) 75% Li 64 CFM(30 Us) 3 120 NOTE: Sensible Efficiency(SRE) -13°F(-25°C) 72% i 100 @ 64 CFM(30 Us) a Front clearance of 25 in.(635 mm)is 80 recommended for servicing unit.All ducts use 6 in.(152 mm)round collars.Balancing 15 eI- 90 g-. r 60 dampers are located in all air streams. „,,,,,ws5 NV! 01 `, CERTIFIED REGISTERED III I III I 0.1 0.2 0.3 0.4 0.5 0.6 D.7 0.8 • Static Pressure(in w.g.) DIMENSIONS FRONT VIEW TOP VIEW Filter If i 143/4 in.(375 mm), Recirculating MM. 1 I Defrost !� —° —1 I Damper .11\MIN lA • • Removable 1Blower II�j Stale air to outside RecoveryHeat ihi _ Motor Core RN t. i. v Fresh air from outside ";�__ '11.ll lik ,i1II+ • Stale air from inside M Fresh air to inside V SRounIn.(152d Co llars I mm) I, 1— 33 5/8In.(854 mm) — v v Date: WARRANTY Contractor: Units carry a lifetime warranty Tag: on the HRV core and a S year replacement parts warranty. CityE Supplier: Project Quote#: All units conform to C5A and ULstandards Engineer: RI Control: Submitted By: LIFEBRE//a TH° II Indoor Air Systems Timer: Timer City: 155MAX(01-01-18) • wvwv.lifebreath.com ..% ` r of ‘e9a6,-‘ Manual S CompliAlce Report Job: LOT18 Date: Jul 30,2018 Entire House By: FOOTHLL BUILDERS Plan: 1351 r\L, /4 - ,?Ole zr� ',�,�,}.'�-2 �-�y �itY __: �➢t,t'��'�°.y` <�� _ �# � .. s .f _ ojeolnfor do _� # � w . it'. �t� it For: JOE LUCIA, FOOTHILL BUILDERS ;',1 � - �'�' 11 QUEENSBURY NY 12804 t` `'1 (((?( 11SI ,7 I .! ±.± iJ t ,i �-�, FAT .�. " .te$' rfP3'€ "Ors x_.Y_� §e3H; Lam{ k`M �.i '' 711 � � ,C�ooli.ng Equiplmenl" h �.c Design Conditions Outdoor design DB: 85.0°F Sensible gain: 20459 Btuh Entering coil DB: 75.3°F Outdoor design WB: 71.0°F Latent gain: 5259 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 25718 Btuh Indoor RH: 50% Estimated airflow: 886 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC - Manufacturer: York Model: TCHD30S41S3+HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1 Actual airflow: 933 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% tr a., �u� s S k�'�""" ,� "�s.`� .. {'.. ' d * ra�q k -..� '� Design Conditions Outdoor design DB: -4.0°F Heat loss: 92331 Btuh Entering coil DB: 65.1°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X080B12MP11 Actual airflow: 933 -cfm Output capacity: 76000 Btuh 82% of load Temp. rise: 50 °F Meets are all requirements of ACCA Manual S. 2018-Jul-30 08:56:37 wrightsoft° Right-Suites Universal 2017 17.0.16 RSU25116 Page 1 ACCA ...ers\scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N - Residential=PIa s Examiner F�eview.Fofrn Form r ,-� Z r x,,, k ry r ,. 4 RISER 1 (✓Ck pr hiVACSystemIDesrgni(Uoads(jEquipment, Ducts)' 15mar09 NrecxftiarigCon}sclasofAtrerea w+., ir,,e ` `r :' e��. ."-r.. sa-."t1 >.:G g ,' 6; _.t '• ,' 'ix ka2l.uc k QUEENSBURY NY Header Information Contractor: FOOTHILL BUILDERS REQUIRED ATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes D No D Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes 0 No D OEM performance data(heating,cooling,blower): Yes D No 0 Building plan#: 1351 Manual D Friction Rate Worksheet: Yes 0 No Duct distribution sketch: Yes 0 No 0 Home address(Street or Lot#,Block,Subdivision): , Entire House 'l ', / '-1 1 Y °F+ •,Y-Y YTia �'T `y YF'•` A ry AC�LOAD CALCUL,ATVONIIRC MT 401. 3) 1: 11 `1' y - Ems '' �`` . ._..s.. _ .y...s:.,....�....�.a_........,....�. ,�.,.......i i _..:';r rsr.&vw Design Conditions Building Construction Information Winter Design Conditions Building Outdoor temperature: -4 °F Orientation: Front Door faces North Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 92331 Btuh Number of bedrooms: 3 Conditioned floor area: 4776 ft2 Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75. °F Windows Roof . Grains difference: 27 grub @50% RH Eave overhang depth: 0 ft Sensible heat gain: 22732 Btuh Internal shade: none Eave Latent heat gain: 5844 Btuh Blinds,drapes,etc. Depth window Total heat gain: 28576 Btuh Number of skylights: 0 - , HVAC EQUIPMENT SELECTION�(IRC M-1401.3) •. _ Heating Equipment Data Cooling Equipment Data Blower Data Equipment type: Gas furnace Equipment type: Split AC Heating cfm: 933 umace,Hea pump,Boiler,etc. it onditioner,Heat pump,etc. Cooling cfm: 933 Model: York Model: York Static pressure: 0 in H2O TM9X080B12MP11 TCHD30S41S3 Fan's rated extemal static pressure for design airflow Heating output capacity:. 76000 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design ou doorconditions Sensible cooling capacity: 0 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh f_ ,,,� ' ) ' i _ IY Y ..f ?"' '4 } R YTa, 'rt7 3'"i`l $ ICI HVAC DUCT DfSTF�IBl1Tl0!NL,SSTEMQESIGN„n(IRC,M1601 1) , t. Design airflow: 933 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure(ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal Friction Rate=ASP>(TELx10 ) 1 r--s-£':.r --4—:,-;-:?.., - „- Ct Tl '. f}t :£:'.. Yl A_1 .ttG Y t"v' i .ri '. l declare the load calculatlon,egwpiiitent;,equipment selection and ductdesignl were rigorously/performed'loased;oni the bmuilding plan fisted above f undermt ndl the claims made on these forms will be subpectto revrew aindl verification_ Contractor's printed name: Contractor's signature: Date: rved for County Town Munucipalay orAufhori ,having;furlsdlciion use., nom,s qualifies for MJ1AE Form based on Abridged Edition Checklist 41-wrightsofr Right-Suitee Universal 2017 17.0.16 RSU25116 Project SummaryJob: LOT18 .Date: Jul 30,2018 Entire House By: FOOTHILL BUILDERS Plan: 1351 • �� �yy-- - -X» . SL,,T, ^+-t � cF, A",Mr 'f;• 3r' ■y�,,I,-, {t+' .{' . tfic7z etox:`,^.kn] ��F .wr ,rs7 ` Ys`F. s �..`t I i.L:Fd)Sb. _ztrs...k.,-..,u. PY 'xwv..uJwwr�'xM--."a.,:j+4+�'3 ^il>a wtt rO.,—-AIL ALL LI:- 4{i "fib--'4 l'. 3fnw?. lxsti For: JOE LUCIA, FOOTHILL BUILDERS QUEENSBURY, NY 12804 Notes: . . N V _® _a ~ ® A WWII A ® A . .- Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 68 °F Inside db 75 °F Design TD 72 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/Ib Heating Summary - Sensible Cooling Equipment Load Sizing Structure 86861 Btuh Structure 19505 Btuh Ducts 5471 Btuh Ducts - 954 Btuh Central vent(0 cfm) V 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower V 0 Btuh Piping 0 Btuh Equipment load 92331 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 18413 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 5259 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ftZ) 4776 4776 Equipment latent load 5259 Btuh Volume(ft3) 42984 42984 Air changes/hour 0.70 0.40 Equipment total load 23672 Btuh Equiv.AVF (cfm) 501 287 Req. total capacity at 0.70 SHR 2.2 ton Heating Equipment Summary _ . Cooling Equipment Summary Make York Make York Trade YORK Trade HORIZONTAL DISCHARGE Model TM9X080B12MP11 V Cond TCHD30S41S3 AHRI ref 2008691 Coil HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1 AHRI ref 3743063 Efficiency 95.5 AFUE Efficiency 12.5 EER, 14 SEER Heating input 80000 Btuh Sensible cooling 19600 Btuh Heating output 76000 Btuh Latent cooling 8400 Btuh Temperature rise 74 °F Total cooling 28000 Btuh Actual air flow 933 cfm Actual air flow 933 cfm Air flow factor 0.010 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.80 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. WC- IItSOf�m 2018-Jut-30 08:56:37 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 " ' ...ers\scott.IangeworthytDocuments\York\LOT 18.rup Cale=MJ7 Front Door faces: N Right-J®Worksheet Job: LOT18 Entire House Date: Jul 30,20l8 • By: FOOTHILL BUILDERS Plan: 1351 MANUAL J:7th Ed. 1 Name of room Entire House Room2 Room3 Room4 2 Length of exposed wall 558.0 ft 186.0 ft 32.0 ft 5.0 ft 3 Room dimensions 1.0 x 1590 ft 1.0 x 161.0 ft 9.0 x 5.0 ft . 4 Ceilings Condit. Option 9.0 ft d 9.0 ftl heat/cool 9.0 ft heat/cool 9.0 ft i heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 5022 **** **** 1674 **** **** 288 **** **** 45 **** **** Exposed b 0 0 III **** **** 111111 **** **** HIM **** **** 11111 **** **** po 1.1.1 l....I ! walls and c 0 0 1111I1 **** **** !III II **** **** 111111 **** **** IIIIII **** **** partitions d 0 0 IIIIII **** **** IIIIII **** **** IIIIII **** **** III III **** **** e 0 0 IIIIII **** **** IIIIII **** **** mill **** **** HMI **** **** f 0 0 IIIIII **** **** IIIIII **** **** win **** **** III III **** **** 6 Windows and a 3A0 39.7 ** 215 8529 **** 0 0 **** 30 1190 **** 10 397 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** . f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 105 **** 1995 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 50 **** 3400 0 **** 0 0 **** 0 10 **** 680 SE/SW 0 - 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 60 **** 2040 0 **** 0 30 **** 1020 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 33.1 6.3 84 2782 526 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 -0 0 0 0 9 Net a 12E3 '5.4 1.0 4723 25504 4817 1674 9040 1707 258 1393 263 35 189 36 exposed b 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 walls and c .0 0 IIIII! 0 0 111111 0 0 111111 0 0 111111 0 0 partitions d 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 Will 0 0 111111 0 0 111111 0 0 111111 0 0 ' f 0 0 1H111 0 0 111111 0 0 111111 0 0 ill!!! 0 0 10 Ceilings a 16G0 2.4 1.1 3186 7570 3575 1590 3778 1784 161 383 181 45 107 50 b 0 0 111111 0 0 11111! 0 0 111111 0 0 111111 0 0 c 0 0 111111 0 0 1!!H!! 0 0 IIIIII 0 0 l!1i11 0 0 e 0 0 111111 0 0 !1i1!! 0 0 HMI 0 0 111111 0 0 ' e 0 0 !!1111 0 0 IIIIII 0 0 111111 0 0 111111 0 0 f 0 0 will 0 0 !!!!ll 0 0 IIIIII 0 0 111111 0 0 11 Floors a 1910 1.7 0 1596 2758 0 0 0 0 0 0 0 0 0 0 (Note:room b 0 0 111111 0 0 111111 0 0 111111 0 0 !I!!!! 0 0 perimeter c 0 0 mill 0 0 111111 0 0 !1H11 0 0 111111 0 0 is displ. d 0 0 !1!!11 0 0 !!!!I! 0 0 111111 0 0 111111 0 0 for slab e 0 0 111111 0 0 !l!!11 0 0 111111 0 0 111111 0 0 floors) f 0 0 111111 0 0 111111 0 0 HIM 0 0 111111 0 0 12 Infiltration a 133 10.5 299 39717 3152 0 0 0 30 3985 316 10 1328 105 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 86861 **** **** 12817 **** **** 6951 **** **** 2021 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss • 6% 5471 **** 6% 807 **** 6% 438 **** 6% 127 **** 15 Total loss=13+14 **** 92331 **** **** 13625 **** **** 7389 **** **** 2148 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 19505 **** **** 3491 **** **** 1780 **** **** 872 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 954 5% **** 171 5% **** 87 5% **** 43 19 Total RSH gain=(17+18)*PLF 1.00 **** 20459 1.00 **** 3662 1.00 **** 1867 1.00 **** 914 20 Air required(cfm) 933 933 138 167 75 85 22 42 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. Wr- htso. 2018-Jul-3008:56:37 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCN ...ers\Scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N t Right-J®Worksheet Job: LOTIS Entire House Date: Jul 30,2018 • • FOOTHILL BUILDERS Plan: 1351 MANUAL J:7th Ed. 1 Name of room Room5 Room6 Room7 RoomB 2 Length of exposed wall 0 ft 24.0 ft 64.0 ft 14.0 ft 3 Room dimensions 4.0 x 2.0 ft 1.0 x 142.0 ft 1.0 x 774.0 ft 14.0 x 15.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool _ 9.0 ft heat/cool 9.0 ftl heat/cool 9.0 ft l heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Cig 5 Gross a 12E3 5.4 1.0 0 **** **** 216 **** **** . 576 **** **** 126 **** **** Exposed b 0 0 111111 **** **** I I I I I I **** **** IIIIII **** **** 111111 **** **** walls and c 0 0 [If III **** **** 1 I I I I I **** **** I I I I I I **** **** I I I I I I **** **** partitions d 0 0 null **** **** III III **** **** !1!!!! **** **** Hill **** **** e 0 0 IIIIII **** **** 111111 **** **** 111111 **** **** III III **** **** f 0 0 IIIIII **** **** IIIIII **** **** III III **** **** IIIIII **** **** 6 Windows and a 3A0 39.7 ** 0 0 **** 30 1190 **** 45 1785 **** 30 1190 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 ' 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 0 **** 0 0 **** 0 45 **** 855 30 **** 570 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 30 **** 1020 0 **** 0 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 84 2782 526 0 0 0 b 0 0 0 -0 0 0 0 0 0 0 0 0 0 0 . c 0 . 0 0 0 0 0 0 0 .0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 0 '0 0 186 1004 190 447 2414 456 96 518 98 exposed b 0 0 llllll 0 0 111111 0 0 IIIIII 0 0 i!!1!1 0 0 • walls and c 0 0 !IIIII 0 0 !!!!!! 0 0 Inn! 0 0 111111 0 0 • partitions d 0 0 iliili 0 0 .11111I 0 0 !Hill 0 0 WI!! 0 0 . e 0 0 Will 0 0 inn 0 0 HUH 0 0 111111 0 0 f 0 0 Will 0 0 !!Ill1 0 0 IIIII! 0 0 !!!1!I 0 0 10 Ceilings a 16G0 2.4 1.1 8 19 9 142 337 159 774 1839 868 210 499 236 b 0 0 111111 0 0 IIIIII 0 0 IIIIII 0 0 111111 0 0 c 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 131111 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 111111 0 0 !IIIII 0 0 !II!!! 0 0 !III!! 0 0 f 0 0 1!!!il 0 0 !!!!!! 0 0 111111 0 0 11i11 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 0 0 IIIIII 0 0 i ii 0 • 0 !1!!I! 0 0 111111 0 0 perimeter c 0 0 111111 0 0 II!!II 0 0 111111 0 0 !!II!! 0 0 is displ. d 0 0 fill!! 0 0 !!I!I! 0 0 IIIIII 0 0 Will 0 0 for slab e 0 0 n11n 0 0 111111 0 0 IIIIII 0 0 I1111! 0 0 floors) f 0 0 Wlill 0 0 111111 0 0 111111 0 0 !!Ill! 0 0 12 Infiltration a 133 10.5 0 0 0 30 3985 316 129 17136 1360 30 3985 316 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 19 **** **** 6517 **** **** 25956 **** **** 6193 **** **** **** **** 0 **** **** 0 **** :*** 0 **** Less external heating 0 Less transfer **** 0 **** **** 0 **** **** 0 **** *** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 1 6% 410 **** 6% 1635 **** 6% 390 **** 15 Total loss=13+14 **** 20 **** **** 6927 **** **** 27590 **** ' **** 6583 **** 16 Int.gains: People@ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 9 **** **** 1685 **** '"` 4065 **** **** 1220 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer • **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **Vic 0 5% **** 82 5% **** 199 5% *"*' 60 19 Total RSH gain=(17+18)*PLF 1.00 **** 9 1.00 **** 1768 1.00 **** 4264 1.00 **** 1279 20 Air required(cfm) 0 0 70 81 279 195 67 58 • Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 81Vi'9 A 1tri®#t". 2018-Jul-30 08:56:37 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 2 / Ck ...ers\scott.langeworthy\Documents\York\LOT 18.rup Calc=MJ7 Front Door faces: N a Right-J®Worksheet Job: LOT18 Entire House Date: Jul 30,2018 FOOTHILL BUILDERS Plan: 1351 MANUAL J:7th Ed. 1 Name of room Room9 Room10 Room11 Room12 2 Length of exposed wall 17.0 ft 19.0 ft 11,0 ft 0 ft 3 Room dimensions 6.0 x 11.0 ft 1.0 x 92.0 ft 11.0 x 4.0 ft 8.0 x 6.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool . TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg (Clg (ft2) Htg Clg (ft2) Htg I Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 153 **** **** 171 **** **** 99 **** **** 0 **** **** Exposed b 0 0 !urn **** **** I I I I I I **** **** I I I I I I **** **** I I I I I I **** **** walls and c 0 0 IIIIII **** **** IIIIII **** **** I I I I I I **** **** IIIIII **** **** partitions d 0 0 mill **** **** IIIIII **** **** !III II **** **** 1111I! ** **** 1 III **** **** 111l11 **** **** !Inn **** **** mill **** **** e 0 0 f.l... !.. 1.... f 0 0 Jill II **** **** I I I I I I **** **** II III I **** **** II!III **** **** 6 Windows and a 3A0 39.7 ** 20 793 **** 0 0 **** 0 0 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 10 **** 190 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 68.0 10 **** 680 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 - 8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . c 0 0 0 0 0 0 0 0 0 _ 0 • 0 0 0 0 9 Net a 12E3 5.4 1.0 133 718 136 171 923 174 99 535 101 0 0 0 exposed b 0 0 111111 0 0 I I I II! 0 0 111111 0 0 111111 0 0 . walls and c 0 0 IIIIII 0 0 I!ll!! 0 0 nun 0 0 mini 0 0 partitions d 0 0 IIIIII 0 0 HIM 0 0 MI 0 0 111111 0 0 e 0 0 I!!!!! 0 0 lll!1! 0 0 Illlll 0 0 111111 0 0 f 0 0 IIIIII 0 0 !!fill 0 0 IIIIII 0 0 IIIIII 0 0 10 Ceilings a 16G0 2.4 1.1 66 157 74 92 219 103 44 105 49 48 114 54 b 0 0 I111!! 0 0 I!!In! 0 0 limn 0 0 IIIII! 0 0 c 0 0 I111!I 0 0 pun 0 0 IIIIII 0 0 Illlll 0 0 d 0 0 nnn 0 0 111111 0 0 inn! 0 0 !Il!fl 0 0 e 0 0 !IIIII 0 0 IIIII! 0 0 inn! 0 0 nun 0 0 f 0 0 111111 0 0 IIII! 0 0 Mill 0 0 mu! 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 0 0 rum 0 0 mu! 0 0 inn! 0 0 IIIII 0 0 perimeter c 0 0 111111 0 0 IIIIII 0 . 0 111111 0 0 mill 0 0 is displ. d 0 0 111111 0 0 MI 0 0 111111 0 0 111111 0 0 for slab e 0 0 !!I!!1 0 0 111111 0 0 111111 0 0 Mill 0 0 floors) f 0 0 HI111 0 0 111111 0 0 111111 0 0 111111 0 0 12 infiltration a 133 10.5 20 2657 211 0 0 0 0 0 0 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8.+11+12 **** 4325 **** **** 1142 **** **** 539 **** **** 114 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** 0 'c' Less transfer **** **it* * * 0 **i,* **it* 0 **** ***lc 0 **:tk Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 272 **** 6% 72 **** 6% 40 **** 6% 7 **** 15 Total loss=13+14 **** ' 4598 **** **** 1214 **** **** 679 **** **** 121 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** . 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 1291 **** **** 278 **** **** 150 **** **** 54 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** *'*** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 63 5% **** 14 5% **** 7 5% **** 3 19 Total RSH gain=(17+18)*PLF 1.00 **** 1354 1.00 **** 291 1.00 **** 158 1.00 **** 56 20 Air required(cfm) 46 62 12 13 7 7 1 3 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. �!. 2018-Jul-30 08:56:37 A" �r�9� 0ft® Right-Suite®Universal 2017 17.0.16 RSU25116 Page 3 ACCA .„ers\scott.langeworthy\Documents\York\LOT18.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: LOT18 • • Entire House Date: Jul 30,2018 FOOTHILL BUILDERS Plan: ' 1351 MANUAL J:7th Ed. 1 Name of room Room13 2 Length of exposed wall 186.0 ft 3 Room dimensions 1.0 x 1596 ft 4 Ceilings Condit.Option 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Area Area EXPOSURE NO. Htg Clg (ft2) Htg Clg Htg Clg Htg Clg Htg Clg 5 Gross a 12E3 5.4 1.0 1674 **** **** **** **** **** **** **** **** Exposed b 0 0 IIIIII **** **** **W* **** **** **** *"..** **** walls and c 0 0 IIIIII **** **** **** **** **** **** **** **** partitions d 0 0 ill!!! **** **** **** **** **** **** **** **** e 0 0 nun **** **** **** **** **** **** **** **** f 0 0 ll!III **** **** **** **** **** **** **** **** 6 Windows and a 3A0 39.7 ** 50 1984 **** **** **** **** glass doors b 0 ** 0 0 **** **** **** **** Heating c 0 ** 0 0 **** **** **** **** d 0 ** 0 0 **** **** **** **** e 0 ** 0 0 **** **** **** **** f 0 ** 0 0 **** **** **** **** 7 Windows and North 19.0 20 **** 380 **** **** **** glass doors NE/NW 0 0 **** 0 **** **** **** Cooling E/W 68.0 30 **** 2040 **** **** **** SE/SW 0 0 **** 0 **** **** **** South 34.0 0 **** 0 **** **** **** Holz 0 0 **** 0 **** **** **** 8 Other doors a 10D0 33.1 6.3 0 0 0 b 0 0 0 0 0 c 0 0 . 0 0 0 • 9 Net a 12E3 5.4 1.0 1624 8770 1656 exposed . b •0 0 HMI 0 0 walls and c 0 0 win 0 0 partitions d 0 0 !lllll 0 0 e 0 0 !!!I!! 0 0 f 0 0 win 0 0 10 Ceilings a 16G0 2.4 1.1 6 14 7 b 0 0 nun 0 0 • c 0 0 MI 0 0 d 0 0 111111 0 0 • e 0 0 111111 0 0 f 0 0 111111 0 0 11 Floors a 1910 1.7 0 1596 2758 0 (Note:room b 0 0 nun 0 0 perimeter c 0 0 nun 0 0 is displ. d 0 0 Will 0 0 for slab e 0 0 !11111 0 0 floors) f 0 0 hull 0 0 12 Infiltration a 133 10.5 50 6642 527 Ventilation 0 0 13 Subtotal loss=6+8..+11+12 **** 20167 **** **** **** **** **** **** **** Less external heating **** 0 **** **** **** **** **** **** **** Less transfer **** 0 **** **** **** **** **** **** **** Heating redistribution **** 0 **** **** **** **** **** **** **** 14 Duct loss 6% 1270 **** **** **** **** 15 Total loss=13+14 **** - 21437 **** **** **** _ **** **** **** 16 Int.gains: People @ 300 0 **** 0 **** **** **** Appl. @ 1200 0 **** 0 **** **** **** 17 Subtot RSH gain=7+8..+12+16 **** **** 4610 **** **** **** **** **** **** Less external cooling **** **** 0 **** **** **** **** **** **** Less transfer **** **** 0 **** **** **** **** **** **** Cooling redistribution **** **** 0 **** **** **** **** **** **** 18 Duct gain 5% **** 226 **** **** **** 19 Total RSH gain=(17+18)*PLF 1.00 **** 4836 **** **** **** 20 Air required(cfm) 217 221 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. ft- 2018-Jul-30 08:56:37 - wrightso Right-Suitee Universal 2017 17.0.16 RSU25116 Page 4 ACC ...ers\scott.langeworthy\Documents\York\LOT 18.rup Cale=MJ7 Front Door faces: N Software i4.6.4 Compliance Certificate_ • . E E C Ei.Y., _,1 r,,\, , I Project Foothills Builders VI �l�L � � $ L Energy Code: 2015 IECC TOWco N .,::1-',..,':''.''.. `,--, ,:..%s ( v- Location: Glens Falls, New York r3"lj s .—< - - w °� Uj Construction Type: Single-family �""" V ProjectType: New Construction 15 d b Conditioned Floor Area: 1,605 ft2 'U V, Glazing Area 12% o 1 Climate Zone: 6 (7635 HDD) p Permit Date: • o Permit Number: C Construction Site: Owner/Agent: Designer/Contractor: O� John Clendon Drive Vision Engineering LLC GilN.. Lot 18 206 Glen Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 -- Compliance: 0.0%Better Than Code Maximum UA: 255 Your UA: 255 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home, Envelope Assemblies k z tF ,f l� -� F•,a i .{ O rtee t s c ter - *I� It-,-4...' • el- .c•f Se b §� a s R Ma 4 ��cfid� t Wall 1:Wood Frame, 16" o.c. 1,674 21.0 0.0 0.057 83 Window 1:Vinyl Frame:Double Pane with Low-E 141 0.290 41 Door 1: Glass 40 0.290 12 Door 2: Solid 18 0.140 3 Door 3: Solid 20 0.240 5 Ceiling 1: Raised or Energy Truss 1,605 42.0 0.0 0.023 37 Basement Wall 1: Solid Concrete or Masonry 1,450 0.0 15.0 0.046 66 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Window 3:Vinyl/Fiberglass Frame:Double Pane 7 0.400 3 Floor 1:All-Wood Joist/Truss:Over Outside Air 12 30.0 0.0 0.033 0 Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 1 of10 Lot 18 JCD\1351 Rescheck.rck •t J Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the IECC requirements in REScheck Version 4.6.4 and to -crmply,with the mandatory re • ents listed in the RESchec • ection Checkli t. Version S - __../ . �� Name-Title " — Signature Date il .e, fr \\\,,,,,,,,,,, .‘--( tz...0-r, , ..,::: ¼th ' Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 2 of10 Lot 18 JCD\1351 Rescheck.rck VersionREScheck Software 4.6.4 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software • Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Settlers . Plans VFerth ed' " Field V.ei if ecd •.. # ' Fred sp,;tda t/Plaii•Revie Cornplies? ,Corn'''a sts/Assa�c tptl.ens 4E egJD " f:;. ' Value 1t" lu .. 103.1, :Construction drawings and x� ❑Complies .103.2 :documentation demonstrate • : '�°�.;�;;.:. �I❑Does Not [PR1]i i energy code compliance for the . _ ::`?w u„ ;building envelope.Thermal "3 , ',, "'-. ,. ❑Not Observable envelope represented on ❑Not Applicable construction documents. - .• 103.1, :Construction drawings and "❑Complies 103.2, :documentation demonstrate ` ''}❑Does Not 403.7 energy code compliance for ,_ '`-_ [PR3]1 :lighting and mechanical systems. `:;, ,❑Not Observable • i `, :Systems serving multiple _' •;- ❑Not Applicable dwelling units must demonstrate r'' :compliance with the IECC xf :Commercial Provisions. , • '"3 302 L; .';;»: Heating and cooling equipment is: Heating: ; Heating: ❑Complies 403:7>`".;;<=sized per ACCA Manual 5 based Btu/hr Btu/hr EDoes Not [Pft212,-;--"%. on loads calculated per ACCA ; Cooling: Cooling: ; , Manual J or other methods Btu/hr ; Btu/hr ❑Not Observable approved by the code official. :❑Not Applicable Additional Comments/Assumptions: • 1 1High Impact(Tier 1) :2 Medium Impact(Tier 2) k 3; Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 3 of10 Lot 18 JCD\1351 Rescheck.rck I Sectjpre Pla Verified :Freicl verified # Foundationins ecti Complies?., emmesnts/Assuaevmpt¢afls, Req.i% . '�7lue Value 402.1.1 Conditioned basement wall i R- R- i❑Complies ;See the Envelope Assemblies [F04]1 insulation R-value.Where interior; R_ R- ❑Does Not table for values. insulation is used,verification 3❑Not Observable may need to occur during Insulation Inspection, Not -❑Not Applicable required in warm-humid locations , - in Climate Zone 3. 3 303.2 Conditioned basement wall = r '<❑Complies [F05]i insulation installed per ❑Does Not :manufacturer's instructions. i. `.❑Not Observable ...;r.> ❑Not Applicable 402.2.9 :Conditioned basement wall ft ft ;❑Complies See the Envelope Assemblies [F0611 'insulation depth of burial or i0Does Not table for values. ' 1 distance from top of wall. j❑Not Observable • ❑Not Applicable 303.2:1`" .A protective covering is installed i;- ❑Complies [F011;]? ::to protect exposed exterior ❑Does Not 'L.= insulation and extends a ''' minimum of 6 in. below grade. ❑Not Observable ; i;; <❑Not Applicable 403.9 :•".• .;Snow-and ice-melting system ' ❑Complies [F01212 {controls installed. ]❑Does Not : ;; ,❑Not Observable ? ..- _;. ,2,< . . ,_, ;❑Not Applicable Additional Comments/Assumptions: • 1 !High Impact(Tier 1) .:2"IMedium Impact(Tier 2) I:3.; Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 4 of10 Lot 18 JCD\1351 Rescheck.rck Section Plans Verified Fled yerrfa d # Framingf Re u n Insnest9�.i Lern lies? C rnmen'tslAssa niptinns Op.� value •Value 402.1.1, Door U-factor. U- U- '❑Complies See the Envelope Assemblies 402.3.4 ;❑Does Not table for values. [FR1] ;ems • ❑Not Observable • ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- i❑Complies See the Envelope Assemblies •402.3.1, average). _ DDoes Not table for values. 402.3.3, 402.3.6, DNot Observable • 402.5 i it]Not Applicable [FR2]' F. 3 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 :are determined in accordance ='. ❑Does Not with the NFRC test procedure or .ti j,- :taken from the default table. Not Observable ❑Not Applicable 402.4.1.1 :Air barrier and thermal barrier ,,,, .;EComplies [FR23]1 installed per manufacturer's '❑Does Not CO i instructions. lENot Observable $- ;❑Not Applicable 402.4.3 :Fenestration that is not site built ='' " • EComplies [FR20]'- is listed and labeled as meeting .. ❑Does Not =AAMA/WDMA/CSA 101/I.S.2/A440 ; ;::D `.: : -.-•a❑Not Observable or has infiltration rates per NFRC : :400 that do not exceed code • ❑Not Applicable limits. 402":4;5 . IC-rated recessed lighting fixtures '';❑Complies [FR'16]? sealed at housing/interior finish '° _❑Does Not land labeled to indicate <_2.0 cfm '°~ leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.2.1 :Supply and return ducts in attics ' =` :' �;❑Complies [FR12 1 'insulated >= R-8 where duct is ,.. ' :❑,z:•a:-,;n" Does Not ( , ;>= 3 inches in diameter and >= ', -`-_;; ,. •�;:-. '',['Not Observable :R-6 where < 3 inches.Supply and :.❑Not Applicable = :return ducts in other portions of `; I the building insulated >= R-6 for : ` 'z?, - ; `diameter>= 3 inches and R-4.2 ;s= �,•' :for<3 inches in diameter. 403.3;3i5.: Building cavities are not used as ;;-, - ❑Complies [FR15]3 =ducts or plenums. ;.: " ;❑Does Not:"-: [:]Not Observable :r e.,... ❑Not Applicable 403.4 ,_``.-,HVAC piping conveying fluids R- I R- ;❑Complies CFRI7;] t'` 'above 105 °F or chilled fluids :❑Does Not `below 55 °F are insulated to>_R- ❑Not Observable "..=3. • • ❑Not Applicable 403.4.1 :Protection of insulation on HVAC ,, ••; ;; ",.., `t ❑Complies [FR24] piping. i t ,' ❑Does Not u • rz„: ❑Not Observable ❑Not Applicable '403:•5`3 ,, 'Hot water pipes are insulated to : R- R- ;❑Complies [FRIB12 _R-3. ❑Does Not ;;y,r , • ❑Not Observable • • ❑Not Applicable 44)3:6- ',- FAutomatic or gravity dampers are;-°. "', : F>,..;•.!s'.‘ • • :❑Complies [FR19.]?;-, installed on all outdoor air __ `'' <' ❑Does Not `intakes and exhausts. l' f° "''` i' ❑Not Observable ' :•.. .... . . ❑Not Applicable 1 1 JHigh Impact(Tier 1) I,.2]Medium Impact(Tier 2) 3 ' Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 5 of10 Lot 18 JCD\1351 Rescheck.rck Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) `2 Medium Impact(Tier 2) I 3'.,Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 -'DES - FHB Page 6 of10 Lot 18 JCD\1351 Rescheck.rck c -_- , ; . Plans Verified r ::F ld Vertflesi. if: ,g hisi laden Cn4*trion : Cpmpiies?., Y'='•Coia manta/Assi T'' ptl9ns . jtSi-Req,!ID„I Vdal ' lue 303 1 =„''.AAII installed insulation is labeled .' ❑Complies [INi3i2 or the installed R-values 'f :; ''- i❑Does Not provided. y` ❑Not Observable T`<•,• . ❑Not Applicable 402.1.1, ;Floor insulation R-value. . R- R- ❑Complies See the Envelope Assemblies 402.2.E i i❑ Wood ID Wood '❑Does Not table for values. [IN1]i i ❑ Steel i❑ Steel :❑Not Observable ❑Not Applicable '303.2, :Floor insulation installed per : $❑Complies 402.2.7 :manufacturer's instructions and is #❑Does Not [IN2]1 in substantial contact with the .. 1 :underside of the subfloor, or floor i"::',••.., .;`v;;;-= ''','`:' > ❑Not Observable :framing cavity insulation is in r:; ::::- 4=` r>_ ;;°-.: ;. .❑Not Applicable contact with the top side of ,, F . -,.>;: " ' :sheathing, or continuous `;:>>=.:;_ •.,�;;:;;s==, insulation is installed on the underside of floor framing and ' extends from the bottom to the top of all perimeter floor framing ' - •i members. 402.1.1, :Wall insulation R-value. If this is a R- ; R- ❑Complies See the Envelope Assemblies 402,2.5, mass wall with at least 1/2 of the i❑ Wood :❑ Wood ;DDoes Not table for values. 402.2.E wall insulation on the wall ❑ Mass ❑ Mass ;❑Not Observable ['NW :exterior,the exterior insulation requirement applies (FR10). :❑ Steel ',❑ Steel ❑Not Applicable 303.2 :Wall insulation is installed per i . ❑Complies [IN4]i manufacturer's instructions. ;:= : . °:`; _ `❑Does Not WV., " . ,;, ❑Not Observable • • • i'l'... - ❑Not Applicable Additional Comments/Assumptions: • 1;High Impact(Tier 1) 2;, Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders . Report date: 07/22/18 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES- FHB Page 7 of10 Lot 18 JCD\1351 Rescheck.rck • `Sectisn ,�len �fetif'ec Fie€ Vraee CQrislies/ ' " omina.ntstak4girptions . inei inspectran P> Vis@errs r aiue S 6te. i & Fie A 402.1.1, :Ceiling insulation R-value. R- ; R- ❑Complies See the Envelope Assemblies. 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, i ❑ Steel ❑ Steel ;❑Not Observable 402.2.E [Fill' • 3❑Not Applicable 303.1.1.1, :Ceiling insulation installed per :❑Complies 303.2 manufacturer's instructions. ;❑Does Not [FI2]1 Blown insulation marked every 300 ft2. `'`;❑Not Observable .'j❑Not Applicable 40223_"::;,Vented attics with air permeable __ ❑Complies [Fi22]2 'insulation include baffle adjacent ..,;_ ,'.j • ❑Does Not ,;to soffit and eave vents that :. ,'extends over insulation. Not Observable 4" ❑Not Applicable 402.2.4 :Attic access hatch and door R- R- ;❑Complies [FI3]i :insulation >. R-value of the ;❑Does Not :adjacent assembly. • ❑Not Observable • ❑Not Applicable 402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ' ACH 50 = :❑Complies '[F117]1 :ach in Climate Zones 1-2, and i il=1Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable • ❑Not Applicable 403.2.3 :Duct tightness test result of<=4 : cfm/100 cfm/100 '❑Complies [FI4]1 ;cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ;❑Not Observable :tests,verification may need to i ;❑Not Applicable :occur during Framing Inspection. 403.3.2 :Ducts are pressure tested to cfm/100 cfm/100 il=IComplies [F127]1 :determine air leakage with : ft2 ft2 ;❑Does Not either: Rough-in test:Total :leakage measured with a Not Observable pressure differential of 0.1 inch i i❑Not Applicable :w.g. across the system including :the manufacturer's air handler :enclosure if installed at time of i test. Postconstruction test:Total • leakage measured with a :pressure differential of 0.1 inch w.g.across the entire system i :including the manufacturer's air handler enclosure. 403.3.2.1 :Air handler leakage designated : s Complies [F124]1 by manufacturer at<=2%of ""`" " '=::= ❑Does Not design air flow. 1 ':❑Not Observable . ''• =❑Not Applicable 403L1 Programmable thermostats ,❑Complies [F19]2.:` " installed for control of primary ❑Does Not . heating and cooling systems and " initially set by manufacturer to • Not Observable . ;codespecifications, • ❑Not Applicable 4031,2 Heat pump thermostat installed ,❑Complies [F•I10]? ,ion heat pumps. ```'• ` .'❑Does Not ❑Not Observable 1❑Not Applicable 403 5 1 Circulating; service hot water =g.� '❑Complies Fill a ,.,_.:i-,-; '[ ], -� °;;systems have automatic or `k =❑Does Not ,accessible manual controls. 311 "' :€,-N=; _ ❑, Not Observable : - . '" )❑Not Applicable 1 High Impact(Tier 1) 2;: Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES - FHB Page 8 of10 Lot 18 JCD\1351 Rescheck.rck ' ^ ~ 403,6,1 'All mechanical ventilation system. ElComplies fl�12512­ 'fans not part of teste HVAC equipment meet efficacy "'E]Not Observable and air flow limits. 'E]Not Applicable E]Does Not E]Not Observable water boilers supplying heat �systems have outdoor setback � control to lower boiler water e erature based on outdoor ,-.,,.E]Not Applicable mp 0 Heated water circulation systems � system return pipe is a dedicated pipe. Gravity and thermos- :.,[]Not Applicable E]Not Observable return pipe or a cold water supply � -,syphon circulation systems are . not present. --'---—circulating hot water system pumps start the pump , .� "for hot water demand within the .occupancy. Controls automatically turn off the pump ion loop when water is in circulat' is at set-point temperature and | no demand for hot water exists� .Electric heat trace systems Elcom plies � comply with IEEE 515.1 or UL ;E]Does Not -]Not Observable adJ ust the energy input to the ble heat tracing to maintain the JE]NotApplica desired water temperature in the Water distribution systems that .,,...:17!Com plies [F13QJ2 have recirculation pumps that Does Not �pump water from a heated water � ~~pp'xp'p=back"'the heated � � � ~ through cold water h cu � watersu [ � demand recirculation x g} system, Pumps have controls ` that pump and limit the temperature o/the water entering the cold water piping to 10*9F. ` "'o,an water eat recovery units i h ^ /�� EComplies [R� 12 'te�edin accordance with[5A � / � "ElDoes Not �1355.1. putab|ewatepside Not Obse able pessue loss of drain water heat --recovery units < ] psi for UNot Applicable individual units connected toone urtwushuwers. potab|ewatep � side pressure loss of drain water � ^^,� heat recovery units< 2 psi for `individual units connected to ' ' :theeormoeshowe� � 404.1 :75Y6of lamps in permanentElComplies [F1611 'fixtures or 75%of permanent """ElDoes Not :fixtures have high effica | ps� �ooesnutapp|yto|o -^ -- LJNotObsemab|e �lighting. �� LJmutApplicable | )Fuel gas lighting have ' .[1�123j3 i no_continuous pilot'light. �~ � Observable � Applicable - | | �] | . z'H�h |mpac (Tier Medium ��r]) Low Impact(Tier]) Project Title: Foothills Builders Report date: 07/22/18 Data fibname: C:\Usee\/robision\Dnopbox\V|S/ON Engineering, LLC\Active Projects VE\l35l ' DES ' FHB Page 9oflO Lot l8jCD\l35lRescheck.rck � � Plans Verified Field1'erified; { Final Inspection,P'revisions Ccarx'piaes� f [irnerit lAssaarrma@�t,�tis , Ei.tiecl:icz 4tali a el e 401.3='` " ,<Compliance certificate posted. ; ❑Complies [FI7lz' • " ❑Does Not ['Not Observable ;❑Not Applicable 303:3;'`` ;Manufacturer manuals for K❑Complies [F118e3 F mechanical and water heating ''!❑Does Not .;systems have been provided. ❑Not Observable ❑No t Applicable Additional Comments/Assumptions: 1'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 . Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/22/18 Data filename: C:\Users\Irobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1351 - DES- FHB Page 10 of10 Lot 18 JCD\1351 Rescheck.rck . ry 's 4 • ,cy ertific. ‘te 44iftier,;:,e; Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 30.00 Ceiling / Roof 42.00 Ductwork(unconditioned spaces): •. •, • , Geit < 4,4 • Al.4 „or < 'GLa 7*Du! cu 4 Window 0.29 Door 029 t-.4-.7ngn•fry="VilitirA'',11,40r540. - • 4 Effipx,., yaiu tipugA.D10111016142p841, „. . 440,1P Heating System: Cooling System: Water Heater: = Name: Date: Comments MAP REFERENCE: D [E O r "LEUCI - JOHN CLENDON ROAD SUBDIVISION" BY: VAN DUSEN & STEVES LAND SURVEYORS AND NACE ENGINNERING, P.G. DATE: MARCH 15, 2016 JUL L 4 2018 � LAST REVISED: JUNE 12, 2017 FILED:PLAT D 18 2017 �•S�, 1 g a o N. 11 "�i JULY Wj O TOWN OF E INSTRUMENT N0. 2017-3000063 Rib, 1 g BUILD] & CO®EC /:0• E N I w N N nowCOco I 4 � JJ vi J 1� L CC m CO q I H LL ry for la LOT 17 r, W _ m V co LOT le s4n7.2 Sq. Fest 0.80 Acne I c L6 0 � 0 NLL � LL (n I I I AREA / id 98nlvrl�s 14 JWNEI) 210(S)92jnionZd a] d d 3Hl Ol S3N1�1 Ail Ad3H1 0 30NVISIG 3H1 03dnS)V3W ATVNOS�3d 3AVH NVId 101d .11VI83d UcktetD c Scale July �U, �Uitf ( �7 y� ,." �e�tiwa,„, oa�w. Scale 1'=40' v a & ey[,1 rreuw.u��.�oae�cn.sw.s. Map of a Plot Plan made for •nanaui a aeenox rmx arw"ss a a x Steves �"a v�r mra nw�x a"a1r v ae:awrr �wno�a,x ww,Y.a x ixo nw�c+oa S- 1 uaea. aw' Foothills Builder s as ew�cr us reared r.�mwa ww x oosx cmc o naa ra wo sia�naia,osim Land Surveyors , 10 x ri1rW M YW x 8rtr a!I®KR rD SHEET 1 OF 1 O"Ml iMrli A x llllt eaiaar.Oprl""EIiK 149 Haviland Road Queensbur•y. New York 12804 a�,, tYD Town of Queeugbimy. Warren County, New York FOOTHILLS (518) 793-R474 New York Ne. No. "131) NO. DATE DESCRIPTION DWG. NO. 09094-18