Loading...
Staff Notes SP 27-2017 & SUP 7-2017 Seaton_4 18 17 et Town of Queensbury Planning Board Community Development Department Staff Notes April 18, 2017 Site Plan 27-2017 SEATON PROPERTY HOLDINGS Special Use Permit 7-2017 308 & 310 Corinth Road/ CLI—Commercial Light Industrial/Ward 4 SEQR Unlisted Material Review: Application, Plan sets Cl-C6 and A-1 to A-3, machinery detail, stormwater report and stormwater pollution prevention plan. Parcel History: SP 27-2006 Self storage bldgs., SP 65-2013 A-1 Treeworks, DISC 1-2017; AV 28-2017 Requested Action Recommendation to the Zoning Board of Appeals for relief requested relief requested from minimum lot size requirements for the firewood processing facility in the CLI zoning district were 100 ac is required. Resolutions 1. Planning Board recommendation Prosect Description Applicant proposes operation of a wood processing facility with a new 15,000 sq. ft. enclosed pole barn for wood products and to install two 1,200 sq. ft. kiln units on the site. Project includes merger of lots 308.16-1-55, -56, -58 & 61. Project includes continued auto facility for C& J automotive and current use of expanded material storage area. Project includes maintaining 4 existing buildings on the merged properties, additional clearing, installation of a gravel parking area and material storage area(logs, woodchips etc.). Pursuant to Chapter 179-3-040 and 179-10-040 of the Zoning Ordinance, light manufacturing—wood products, logging company, and Special Use Permit for wood product facility shall be subject to Planning Board review and approval. Variance: Relief requested from minimum lot size requirements for the firewood processing facility in the CLI zoning district were 100 ac is required. Planning Board shall provide a recommendation to the Zoning Board of Appeals. Staff Comments • Location-The project location is at 308 and 310 Corinth Rd where there is an existing wood products activity occurring at 308 Corinth Rd. • Arrangement- The project area contains four parcels that are to be merged. The existing buildings on the site are two homes, a residential garage, an operating auto repair building and a future building to be constructed for equipment storage for A-1 Treeworks. The new building is to be located on the current parcel 308.16-1-58. • Site Design- The existing buildings are to remain with no changes to access or associated area. The applicant has indicated the equipment storage building 5,000 sq ft is to be built in the future. The previous site plan included the clearing of property for storage of wood material. The applicant proposes to expand the log storage area—an approximate area should be included on the plans. Additional storage areas noted on the plans are a wood chip and vehicle storage pad area note approximate area should be noted on the plans. • Building—the project is for a 15,000 sq ft building. The plans show overhead doors on the east side of the building and on the north-side of the building. • Signage-the applicant should clarify signage as there was no information provided on Cl. • Site conditions-The existing site has buildings and lawn area to the road side and the applicant has cleared additional area for the log storage where the current project includes more site clearing. The plans shows some vegetation to remain on the east border and north border about 30 ft. The west bard appears to be cleared to the property line. The applicant should provide a clearing plan to confirm the vegetative buffer distance that is o remain. • Traffic- The applicant has indicated the site would accommodate 30 vehicle spaces—the plans do not delineate parking areas for the wood processing operation, the existing homes, and the existing auto repair. The plans should be updated showing parking. • Utility plan—the applicant has indicated the new building will be connect to a septic system plans should be updated to show septic. • Grading and drainage plan and Sediment and erosion control- The applicant has submitted a stormwater report and a stormwater pollution prevention plan for engineering review and comment. The project includes site work of 4.82 ac and about 153, 202 sq ft of storage area, driveway, and building footprints. • Landscape plan no site landscaping is proposed. • Site lighting plan light poles area shown on Sheet Cl and building lights on A2. Additional information on fixtures will need to be provided. • Elevations —Elevations show the building at 29 ft and the application indicates a 40 ft building information should clarify height. • Floor plans —The floor plans show a 240+/- sq ft office area and 108 sq ft restroom area—the remainder of the building is an open floor plan. Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The applicant proposes no waivers. The board should clarify if landscaping will be requested. Special Use Permit Criteria: A special use permit is required as outlined in section 179-10-010 general criteria: Harmony with the Comprehensive Plan—The project is located in a commercial light industrial zone where the applicant has provided supporting materials about the size and operations of the wood processing use. The new use is consistent with a lighting industrial use Compatibility —the project site is in a predominately mixed use area associated with commercial, health care, light industrial uses, and storage. Access, circulation and parking —the applicant proposes to maintain the existing access onto Corinth Rd. — parking for the uses should be clarified. The applicant has indicated employees pick up work trucks from the project site for tree service work. In addition, some employees will remain on site for the firewood processing. Infrastructure and services —the plans should show on-site septic and utility connections for electric/gas, water and communications. Environment and natural features —the applicant has indicated the new project activities will occur internal and will not cause odor or noise. Long-term effects —the proposed project brings a new processing operation to the area. Specific Criteria W. Sawmills, chipping mills, and pallet mills. Sawmill, chipping or pallet mills are allowed on lots of at least 100 acres in size. (Defined as SAWMILL, CHIPPING and PALLET MILL -Any building, site or place used for the cutting or milling of raw timber into dimensional lumber,pallets, chips or other wood products.) • Lot size -required 100 ac proposed 9.54 Nature of Variance The applicant requests variance lot size requirements of a logging operations processing wood where a 100 ac is required and the project area is 9.54 ac Summary The Planning Board is to provide a recommendation to the ZBA in regards to the request for relief from area variance lot area for usage. The Board should consider additional information for storage areas of materials size, landscaping, utilities —septic, signage, and parking. Also to include as a condition parcel merger 308.16-1- 55,56,58 &61. Meeting History Discussion 1/17/17, this is 1st meeting since