Loading...
CC-000482-2016TOWN OF QUEENSBURYIOW 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: CC-000482-2016 Tax Map No: 308.15-1-34 Permission is hereby granted to: Thomas Barber,Rod Cornelins For property located at: 462 CORINTH RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Rod Cornelins Business Office-New 15,000.00 Owner Address: 8 Lockhart Mountain RD Total Value 15,000.00 Lake George,NY 12845 Contractor or Builder's Name/Address Electrical Inspection Agency NE Storage Construction,LLC 12 Courtland ST Pawcatuck,CT 06379 Plans&Specifications Business Office 300 sq.ft.connected to Storage Unit/Bldg.A. Included is installation of a new septic system 144.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Wednesday,August 16,2017 If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the ex 'ration date.) Dated at the Town o Queensb ; Frid y •„`;ust 19,2016 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement PRINCIPAL STRUCTURE APPLICATION 308.15-1-34 CC-482-2016 Thomas Barber/ Rod CornelinsDate: 42/ '/ t9 462 Corinth Road Tax Map ID 3 V cgo- Office with new Septic System Zone T- Historic? Yes r Self-Storage Bldg A, Unit 0 (for Office) Subdivision Name V Lot# / S Subdivision# Project Location 12 64..'J1 0.4 i,.S 12i' Z t TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family,multiple family, apartments,condominiums,townhouses,and/or manufactured&modular homes,but not mobile homes. This is in addition to the permit fee(s). Primary Owner(s) 4)4,1/7- ed 6R/Viiiii Address k Am) g/ /414alLt Al `2/Y 1 Phone/Email 3o 7 - 3 SiApplicant5-m 6,14-&12.. 104.A111/4S Address F him)6Zy c-ni'• ill. Phone/Email i ) 3o 1 ' k f1 ,r a G i i !4 .0 04},9, cc/' Contractor Ai( 5-l.e-4ASL 6,444 clic„-v Address 2- t.P P4 k f A t t C r el C i a 4 Phone/Email 6;b0) 551 t. LZ i/ ) Contact Person for Building&Codes Compliance: Oifi;avy avii Phone 37k" 3 4i 34 3 P. TYPE OF CONSTRUCTION Check all that apply New Addition Alteration 1'floor sf 2nd floor sf Total sf Height Single Family Two-Family Multi-Family of units, ) Townhouse 004') usiness Office x ANAttitt IC( 11.1,41- n 5®o 5 G Retail-Mercantile Factory-Industrial Attached Garage 1, 2, 3, 4+) Other Town of Queensbury Building&Codes Principal Structure Application revised January 2016 If commercial or industrial please indicate name of business z.,,4 5 ffoyL if Proposed use of building or addition Source of Heat(circle one) Gas Oil Propane Solar thenAd/24_ Fireplace: Complete a separate application for Fuel Burning Appliances&Chimneys hnr Are there structures not shown on plot plan? N4 Are there easements on the property?a i/`i Site Information: a. Dimensions or acreage of lot j. 46ICS b. Is this a corner lot? Yes v#No c. Will the grade be changed as a result of construction Yes i/ No d. Public water or Private well(circle one) uYTic, Private e. Sewer or Private Septic System(circle one) Sewer Private Value of all work to be performed(labor or materials) DECLARATION: 1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement / description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: i41) 4.94/42-- DATE: 7 '2 __ile SIGNATURE: DATE: `7 /2 -1 ZC/t For office use only Operating Permit Issued:Yes No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised January 2016 SEPTIC DISPOSAL APPLICATION 308.15-1-34 CC-482-2016 Thomas Barber/ Rod Cornelins DATE: Z V20/1, 462 Corinth Road J L ,t Office with new Septic System TAX MAP ID: Self-Storage Bldg A, Unit 0 (for Office) ZONE: e L r i APPLICANT "-fix f), 3 4; Q.,/./LA;li, HONE/E-MAIL (ii ) 3C 9. 3L 3 k ADDRESS k Lit 4 Al.vi /h/,t, , 4 C /Z jV kis e `.,!'c)1s1,[:S`o 2 o,,f aL2 cry INSTALLER/ t < P PHONE/E-MAIL BUILDER VC/l/14n5T (J/4n ,, (L15/4L izt 8& 5 5 - 34z2_ OWNER i, 1n i&iia eo, „i/iti3 ADDRESS 12- a:m 14.,vc 5/ R'j146 4 " ,44 / C % 0G 339 CONTACT PERSON FOR BUILDING&CODE COMPLIANCE:2") , PHONE/E-MAIL If-3c ) - 31-3 ' le", g ‘„,c_c 44.0 .i.tii,jj, Ce,,/' ) RESIDENCE INFORMATION Year Built of bedrooms X gallons per bedroom =total Daily flow 1980 or older Garbage grinder installed r Yes No 1981-1991 Spa or Hot Tub installed Yes No 1992-Present SCE t„y i,j i S Z 3 j E. Of-S; ,`t PARCEL INFORMATION Topography i Flat rolling Steep slope Slope Soil Nature Sand Loam Clay Other Groundwater At what depth: Aidi I1 fi ico444& D .491 (r i Bedrock/Impervious material At what depth: NA, c.,reoc.),v/d /51 c I Domestic Water Supply Cle Municipal Well(if well,water supply from any septic system absorption is ft.) Percolation Test Rate: 5/1.115 per minute per inch(test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION Tank size /060 gallons(min.size 1,000 gallons,add 250 gallons to size for each garbage cylinder or spa or hot tub System Absorption field with#2 stone Total length So ft.;Each Trench 25 i fir). Seepage Pit with#3 stone How many: AM ;Size A,14 Alternative System Bed or other type:AM Holding Tank System Total required capacity? //'9 Tank size A14 #of tanks Notes: I)Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency;2)We will no longer allow systems to be covered until such time as an As-Built plan is received&approved. The installed system must match the septic system layout on file—no exceptions. Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: 1. 4/hA1 641-h4^--DATE: G/Z P//6 SIGNATURE: DATE:Z,12 Pi h Town of Queensbury Building&Codes Principal Structure Application Revised January 2016 INSPECTION WORKSHEET (BINS-005366-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: Inspection Date: Inspector: Case Module: Inspection Status: Inspection Type: CC-000482-2016 07/24/2018 John O'Brien Permit Failed Commercial Final Inspection Job Address:Parcel Number:462 CORINTH RD Queensbury, NY 12804 308.15-1-34 Contact Type Company Name Name Applicant Barber, Thomas Contractor NE Storage Construction, LLC [NE Storage Construction, LLC] Primary Owner Barber, Thomas Applicant Cornelins, Rod Granted Permission Barber, Thomas Granted Permission Cornelins, Rod Primary Owner Cornelins, Rod Checklist Item Passed Comments Plumbing Vent Through Roof/Roof complete NO Complete bathroom plumbing. Ext Finish /Grade Complete/6 in 10ft or Equivalent YES Doors 36 inch wLever Hand Panic Hardware, if req YES Exits At Grade Or Platform 36 (w) x 44 (l)YES Floor Bathroom Watertight Other Floors Okay YES Relief Valve ,Heat Trap/Water Temp 110 deg or less NO Complete bathroom plumbing. H/C Bathroom Grab Bars /Sinks/Toilets/Mirrors NO Complete bathroom plumbing. Handicapped Bath/Parking Lot Signage NO Install Handicapped Parking Sign at designated parking spot. The bottom of the sign needs to be 66" from finished pavement. Install No Parking Sign at designated handicapped hashed access area. The bottom of sign needs to be 66" from finished pavement. Public Toilet Room Handicapped Accessible YES Complete bathroom. Final Electrical / Flex Gas Piping Bonded YES Provide Final Electrical Inspection. Site Plan Variance required NO Complete all outstanding site items. Final Survey NO Submit Final Survey. As-built Septic System Layout Required YES Jul 24, 2018 Page (5) INSPECTION WORKSHEET (BINS-005366-2018) Checklist Item Passed Comments Bldg Num or Tenant Address on Bld or Drive NO Install building number or letter on building facing Corinth Road. 4" high or larger. Bldg Access All Sides 20ft Drivable Surface YES Engineer or Architect Approval YES OK to Issue Temporary C/O YES 1/22/18 Final Inspection Partial Approval-Ok to issue a temporary CO for the following conditions Submit Final Survey Complete All Site Work Complete Office Submit Septic System Final Report & As-Built OK to Issue C/O NO Final Inspection Not Approved. Your building permit has expired. Also the ceiling insulation for the office has not been inspected. 1/22/18 Final Inspection Partial Approval-Ok to issue a temporary CO for the following conditions Submit Final Survey Complete All Site Work Complete Office Submit Septic System Final Report & As-Built 7/24/18 Final Inspection Not Approved Vent Stack needs to be 18" above roof Bottom of Handicapped & No Parking Signs need to be 66" from grade. Install building numbers or letters on each building on side facing road. Install mirror over sink. Bottom edge of mirror 40" max from finished floor. Utility closet remove kraft paper from exposed insulation and install Poly on wall. Install Utility closet door. Finish ceiling tile. Unisex Handicapped Bathroom Sign Submit Final Survey Complete All Site Items Submit Septic System Final Report & As-Built Jul 24, 2018 Page (6) O'Brien, John (Inspector) 4 COMcheck Software Version 4.0.4.1 inA Envelope Compliance Certificate Project Information Energy Code:2014 New York Energy Conservation Construction Code Project Title: New Self Storage Office Location: Warren County, New York Climate Zone:6a Project Type:New Construction C'L Vertical Glazing/Wall Area: 4% Construction Site:Owner/Agent: Designer/Contractor: 462 Corinth Road Tom Barber Ethan P. Hall Queensbury, NY 12804 8 Lockhart Mountain Road Rucinski Hall Architecture Queensbury,NY 12804 134 Dix Ave 518-307-3638 Glens Falls, NY 12801 FILE O PY tom@bouncearound.com 518-741-0268 ephall@nycap.rr.com Building Area Floor Area 1-Office: Nonresidential 298 Additional Efficiency Package Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(a> Perimeter Roof 1:Metal Building,Standing Seam,Filled Cavity with Thermal 298 38.0 0.0 0.041 0.031 Blocks(d),[Bldg.Use 1 -Office] Floor 1:Slab-On-Grade:Unheated,Vertical 2 ft.,[Bldg.Use 1 - 80 14.0 0.524 0.540 Office](c) NORTH Exterior Wall 3:Steel-Framed,24"o.c.,[Bldg.Use 1-Office] 267 19.0 7.0 0.057 0.064 EAST Exterior Wall 2:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 80 19.0 7.0 0.057 0.064 SOUTH Exterior Wall 1:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 267 19.0 7.0 0.057 0.064 Window 1:Vinyl/Fiberglass Frame:Operable,Perf.Specs.:Product ID 24 0.290 0.430 product label,SHGC 0.33,[Bldg.Use 1-Office](b) Door 1:Insulated Metal,Swinging,[Bldg.Use 1-Office] 20 0.300 0.370 WEST Exterior Wall 4:Steel-Framed,24"o.c.,[Bldg.Use 1-Office] 80 19.0 7.0 0.057 0.064 a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 1 of 14 d)Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt,and the roof deck secured to the purlins. Envelope PASSES: Design 2% better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2014 New York Energy Conservation Construction Code requirements in COMcheck Version 4.0.4.1 and to comply with any applicable mandatory requirements listed if- Ins*, ti sal h= ist. Ethan P. Hall-Architect 40-ZOat Name-Title Signature Date Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 2 of 14 pit COMcheck Software Version 4.0.4.1 II Interior LightingCompliance Certificate Project Information Energy Code:2014 New York Energy Conservation Construction Code Project Title: New Self Storage Office Project Type:New Construction Construction Site:Owner/Agent: Designer/Contractor: 462 Corinth Road Tom Barber Ethan P. Hall Queensbury, NY 12804 8 Lockhart Mountain Road Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave 518-307-3638 Glens Falls,NY 12801 tom@bouncearound.com 518-741-0268 ephall@nycap.rr.com Additional Efficiency Package Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts ft2) Watts/ft2 B X C) 1-Office 298 0.85 253 Total Allowed Watts= 253 Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Office LED 1:LED Linear 20W: 3 3 64 192 LED 2:LED A Lamp 13W: 1 1 34 34 Total Proposed Watts= 226 Interior Lighting PASSES: Design 11% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2014 New York Energy Conservation Construction Code requirements in COMcheck Version 4.0.4.1 and to comply with any applicable mandatory requirements listed-• ''- Insp- •nAf, Ethan P. Hall-Architect 8 Ate,24o/6 Name-Title S •- ure Date Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 3 of 14 COMcheck Software Version 4.0.4.Z Exterior Lighting Compliance Certificate Project Information Energy Code:2014 New York Energy Conservation Construction Code Project Title: New Self Storage Office Project Type:New Construction Exterior Lighting Zone 2(Light industrial area with limited nighttime use) Construction Site:Owner/Agent: Designer/Contractor: 462 Corinth Road Tom Barber Ethan P. Hall Queensbury, NY 12804 8 Lockhart Mountain Road Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave 518-307-3638 Glens Falls, NY 12801 tom@bouncearound.com 518-741-0268 ephall@nycap.rr.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage B X C) Entry canopy 1 ft2 0.25 Yes 0 Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 600 a)Wattage tradeoffs are only allowed between tradable areas/surfaces. b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry canopy(1 ft2):Tradable Wattage LED 1:LED A Lamp 13W: 1 1 34 34 Total Tradable Proposed Watts= 34 Exterior Lighting PASSES: Design 94% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2014 New York Energy Conservation Construction Cod- equirements in COMcheck Version 4.0.4.1 and to comply with any applicable mandatory requirements listed• e Ins. ti• e Ethan P. Hall-Architect 0l b Name-Title ature uate Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 4 of 14 COMcheck Software Version 4.0.4.14:4 Inspection Checklist Energy Code: 2014 New York Energy Conservation Construction Code Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions Req.ID C103.2 Plans and/or specifications provide all Complies Requirement will be met. PR1]1 information with which compliance Does Not can be determined for the building Not Observable Location on plans/spec:A-1 envelope and document where exceptions to the standard are Not Applicable claimed. C103.2 Plans, specifications, and/or Complies Requirement will be met. PRO calculations provide all information Does Not with which compliance can be Location on plans/spec:A-i determined for the interior lighting Not Observable and electrical systems and equipment Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C103.2 Plans, specifications, and/or Complies .Requirement will be met. PR8]1 calculations provide all information ODoes Not with which compliance can be Not Observable Location on plans/spec:A-i determined for the exterior lighting and electrical systems and equipment Not Applicable and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. C406 Plans, specifications, and/or OComplies Requirement will be met. PR9]1 calculations provide all information Does Not with which compliance can be Location on plans/spec:A-1 determined for the additional energy Not Observable efficiency package options. Not Applicable C402.3.1 The vertical fenestration area <= 30 OComplies Requirement will be met. PR10]1 percent of the gross above-grade wall Does Not area. Location on plans/spec:A-iNotObservable Not Applicable C402.3.1 The skylight area <=3 percent of the OComplies Requirement will be met. PRii]1 gross roof area. Does Not Not Observable Location on plans/spec:A-1 Not Applicable C402.3.2. Skylights in office, storage, OComplies Exception: Requirement does not apply. 2 automotive service, manufacturing, Does Not PR15]1 non-refrigerated warehouse, retail store,and distribution/sorting area Not Observable have a measured haze value>90 Not Applicable percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: i }High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 5 of 14 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 6 of 14 Section Footing/Foundation Inspection Complies? Comments/Assumptions Req.1© I C402.2.6 Slab edge insulation R-value. Complies See the Envelope Assemblies table for values. FO3]2 Does Not i Not Observable Not Applicable C303.2 Slab edge insulation installed per Complies Requirement will be met. FO4]2 manufacturer's instructions. Does Not Not Observable Location on plans/spec:A-1 Not Applicable C402.2.6 Slab edge insulation depth/length. Complies See the Envelope Assemblies table for values. FO5]2 Slab insulation extending away from Does Not building is covered by pavement or Not Observable10inchesofsoil. Not Applicable C403.2.8. Exterior insulation protected against Complies Requirement will be met. 1 damage,sunlight, moisture,wind, Does Not FO6)1 landscaping and equipment maintenance activities. Not Observable DNot Applicable C402.2,8 Bottom surface of floor structures Complies Exception: Requirement does not apply. FO12]3 incorporating radiant heating Does Not insulated to>=R-3.5. See the Envelope Assemblies table for values. Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 7 of 14 Section Framing/Rough-In Inspection Complies? Comments/Assumptions Req.IQ C402.4.1, The building envelope contains a Complies Requirement will be met. 1 C402.4.2 continuous air barrier that is sealed in Does Not FR16]1 an approved manner and either Location on plans/spec:A-i constructed or tested in an approved Not Observable manner.Air barrier penetrations are Not Applicable sealed in an approved manner. C402.4.3, Factory-built fenestration and doors Complies Requirement will be met. C402.4.4 are labeled as meeting air leakage Does Not FR18)3 requirements. Not Observable Not Applicable C402.4.7 Vestibules are installed on all building .Complies Exception: Doors that open directly from a space=3000 ft2. FR17]3 entrances. Doors have self-closing DDoes Not devices. Not Observable Not Applicable C402.3.3, Vertical fenestration U-Factor. Complies See the Envelope Assemblies table for values. C402.3.4 Does Not FR8]1 Not Observable Not Applicable C402.3.3 Vertical fenestration SHGC value. Complies See the Envelope Assemblies table for values. FR10]1 Does Not Not Observable ONot Applicable C303.1.3 Fenestration products rated in Complies Requirement will be met. FR12]2 accordance with NFRC. Does Not Not Observable Location on plans/spec:A-i Not Applicable C303.1.3 Fenestration products are certified as Complies Requirement will be met. FR13]1 to performance labels or certificates Does Not provided. Location on plans/spec:A-1NotObservable Not Applicable C402.2.7 U-factor of opaque doors associated OComplies See the Envelope Assemblies table for values. FR14]2 with the building thermal envelope Does Not meets requirements. Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 8 of 14 Section I Mechanical Rough-ln Inspection Complies? Comments/Assumptions Req.JD C402.4.5. Stair and elevator shaft vents have Complies Exception: Requirement does not apply. 1 motorized dampers that automatically Does Not l[ME3]3 close. Not Observable Not Applicable 1C402.4.5. Outdoor air and exhaust systems have Complies Requirement will be met. 2 motorized dampers that automatically Does Not ME58]3 shut when not in use and meet Not Observable.Location on plans/spec:A-1 maximum leakage rates.Check gravity dampers where allowed.Not Applicable Additional Comments/Assumptions: 1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 9 of 14 I Section Rough-In Electrical Inspection Compiles? Comments/Assumptions Req.1D C405.2.2. Automatic controls to shut off all Complies Requirement will be met. 1 building lighting installed in all Does Not 1[EL22]2 buildings. Location on plans/spec:A-iNotObservable Not Applicable C405.2.1. Independent lighting controls installed Complies Exception: Lighting that is related to means of egress in 1 per approved lighting plans and all Does Not stairways or corridors. EL23]2 manual controls readily accessible and visible to occupants. Not Observable Not Applicable C405.2.1. Lighting controls installed to uniformly.Complies Requirement will be met. 2 reduce the lighting load by at least Does Not EL15]1 50%. Location on plans/spec:A-iNotObservable Not Applicable C405.2.2. Daylight zones provided with Complies Exception: Requirement does not apply. 3 individual controls that control the ODoes Not EL16]2 lights independent of general area lighting. Not Observable Not Applicable C405.2.3 Sleeping units have at least one Complies Exception: Requirement does not apply. ELi7]3 master switch at the main entry door Does Not that controls wired luminaires and switched receptacles. Not Observable Not Applicable C405.2.2. Occupancy sensors installed in Complies Requirement will be met. 2 required spaces. Does Not EL18]1 Location on plans/spec:A-iNotObservable Not Applicable C405.2.2. Primary sidelighted areas are Complies Exception: Requirement does not apply. 3 equipped with required lighting Does Not EL20]1 controls. Not Observable Not Applicable C405.2.2. Enclosed spaces with daylight area Complies Exception: Requirement does not apply. 3 under skylights and rooftop monitors Does Not EL21]1 are equipped with required lighting controls. Not Observable Not Applicable C405.2.4 Automatic lighting controls for exterior:Complies Requirement will be met. EL25]2 lighting installed. Does Not Not Observable Location on plans/spec:A-1 Not Applicable C405.2.3 Separate lighting control devices for Complies Requirement will be met. EL4]1 specific uses installed per approved Does Not lighting plans. Location on plans/spec:A-iNotObservable Not Applicable C405.3 Fluorescent luminaires with odd Complies Exception: Requirement does not apply. ELI9]3 numbered lamp configurations that Does Not are within 10 feet center to center(if recess mounted)or are within 1 foot Not Observable edge to edge(if pendant or surface Not Applicable mounted)shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per Complies Requirement will be met. EL6]1 face. Does Not Not Observable Location on plans/spec:A-1 Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 10 of 14 Section Rough-In Electrical Inspection Complies? Comments/Assumptions Req.ID 1 C405.6 Exterior grounds lighting over 100 W DComplies Requirement will be met. i[ EL24]1 provides>60 Im/W unless on motion DDoes Not 1 sensor or fixture is exempt from scope Location on plans/spec:A-1 of code or from external LPD. Not Observable Not Applicable C405.2.3 Additional interior lighting power Complies Requirement will be met. EL8]1 allowed for special functions per the Does Not approved lighting plans and is Not Observable Location on plans/spec:A-1 automatically controlled and separated from general lighting.Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 11 of 14 Section Insulation Inspection Complies? Comments/Assumptions Req.ID C402.4.1. All sources of air leakage in the Complies Requirement will be met. 1 building thermal envelope are sealed, Does Not IN1]1 caulked,gasketed,weather stripped Location on plans/spec:A-1 or wrapped with moisture vapor- Not Observable permeable wrapping material to Not Applicable minimize air leakage. C402.4.2. Roof R-value. For some ceiling Complies See the Envelope Assemblies table for values. 1 systems,verification may need to Does Not IN2]1 occur during Framing Inspection. Not Observable ONot Applicable C303.2 Roof insulation installed per Complies Requirement will be met. IN3]1 manufacturer's instructions.Blown or Does Not poured loose-fill insulation is installed Location on plans/spec:A-1 only where the roof slope is<=3 in Not Observable 12. Not Applicable C303.2 Above-grade wall insulation installed Complies Requirement will be met. IN7]1 per manufacturer's instructions.Does Not Not Observable Location on plans/spec:A-1 Not Applicable C402.2.5 Floor insulation R-value. Complies See the Envelope Assemblies table for values. IN8]2 Does Not Not Observable Not Applicable C303.1 Building envelope insulation is labeled Complies Requirement will be met. IN10]2 with R-value or insulation certificate Does Not providing R-value and other relevant data. Not Observable Not Applicable C303.2.1 Exterior insulation is protected from Complies Exception: Requirement does not apply. IN14]2 damage with a protective material. Does Not Verification for exposed foundation insulation may need to occur during [Not Observable Foundation Inspection. Not Applicable C402.2.1 Insulation intended to meet the roof :Complies .Requirement will be met. IN1713 insulation requirements cannot be Does Not installed on top of a suspended Location on plans/spec:A-1 ceiling. Mark this requirement Not Observable compliant if insulation is installed Not Applicable accordingly. C402.4.9 Vapor retarders on the interior side of Complies Requirement will be met. lN18]3 framed walls,floors and ceilings Does Not where the framed cavity is not Not Observable Location on plans/spec:A-1 ventilated to allow moisture to escape. Does not include below-grade Not Applicable assemblies. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 12 of 14 Section Final Inspection Compiles? Comments/Assumptions Req.ID IC402.4.6 Weatherseals installed on all loading Complies Exception: Requirement does not apply.IEF137]1 dock cargo doors.Does Not Not Observable Not Applicable C402.4.8 Recessed luminaires in thermal Complies Exception: Requirement does not apply. F126]3 envelope to limit infiltration and be IC Does Not rated and labeled.Seal between interior finish and luminaire housing. Not Observable Not Applicable C408.2.5. Furnished as-built drawings for Complies Requirement will be met. 1 electric power systems within 30 days Does Not F116]3 of system acceptance. Not Observable Not Applicable C303.3, Furnished O&M instructions for Complies Requirement will be met. C408.2.5. systems and equipment to the Does Not 2 building owner or designated F117]3 representative. Not Observable Not Applicable C405.5.2 Interior installed lamp and fixture Complies See the Interior Lighting fixture schedule for values. F118]1 lighting power is consistent with what Does Not is shown on the approved lighting plans, demonstrating proposed watts :Not Observable are less than or equal to allowed Not Applicable watts. C405.6.2 Exterior lighting power is consistent Complies See the Interior Lighting fixture schedule for values. F119]1 with what is shown on the approved Does Not lighting plans, demonstrating proposed watts are less than or equal Not Observable to allowed watts. Not Applicable C408.3 Lighting systems have been tested to Complies Requirement will be met. F133]1 ensure proper calibration,adjustment, Does Not programming, and operation. Not Observable Location on plans/spec:A-1 Not Applicable C408.3 Lighting systems have been tested to Complies Requirement will be met. F148]1 ensure proper calibration, adjustment, Does Not programming, and operation. Not Observable Location on plans/spec:A-1 Not Applicable C406 Efficient HVAC performance, efficient Complies Requirement will be met. FI34]1 lighting system, or on-site supply of Does Not renewable energy consistent with Location on plans/spec:A-1 what is shown the approved plans. [ Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 13 of 14 Project Title: New Self Storage Office Report date: 08/08/16 Data filename: Y:\Barber\New Storage Building\Barber.cck Page 14 of 14 FIRE MARSHAL'S OFFICE i _ ___ _ Town of Queensbury AC'1, 742 Bay Road, Queensbury, NY 128044004 lb' Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Corinth Road U Store 462 Corinth Road Bldg A/ O CC-000482 - 2016 Plan review based on submittals: Verify function of exit/ emergency lighting Verify lock/ latches compliance Verify FE location ii\m,e ---s-S:L. Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net FILE COPY \ Fire Marshal's Office • Phone: 518-761-8206 • F a x: 518-745-4437 firemarshal@queensbury.net • www.queensbury.net C`D `-t -20t RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall 134 Dix Avenue 9GlensFallsNY12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com Office framing—Barber—Corinth Road Mini-Storage 11 January 2017 John O'Brien—Town of Queensbury Building Department 742 Bay Road Queensbury NY 12804 Re: Office framing At the above referenced project location we have reviewed the installation of the interior framing for the office area that mini-storage facility for Tom Barber. While the drawing did call for metal stud framing for the interior non-bearing partitions, Tom has substituted wood studs for these partitions. Since the partitions are merely for attachment of the insulation product and the interior wall finishes and are not part of the structural support system for the building this modification is acceptable to this office. All other items to this point appear to be installed in accordance with the construction documents and are acceptable to this office. If there are any additional items required please contact our office to discuss. Regards, ifoO!X212 Ethan Peter Hall Architect RHA-FS\acad\Barber\New Storage Building\Papenvork\Letter-Jan 11 2017.doc 1 RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski f`y Ethan Peter Hall cam' 134 Dix Avenue 0 °G Glens Falls NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com Barber-Corinth Road Mini-Storage 11 January 2017 CC,- 2fl 1 k, John O'Brien—Town of Queensbury Building Department cc - Z- 2,QA742BayRoad Queensbury NY 12804 cc-_ 2 -\ cc.-- o - At the above referenced project location this office has performed periodic site observations during the course of construction, all items appear to be installed in accordance with the construction documents and are acceptable to this office. If there are any additional items required please contact our office to discuss. Regards, eleiff Ethan Peter Hal Architect RHA-FS\acad\Barber\New Storage Building\Paperwork\Letter-Jan 12 2017.doc 1 T 1 KEVIN L. HASTINGS, P.E. TRANSMITTAL CONSULTING ENGINEER Mailing Address: 3 Jackson Avenue South Glens Falls,New York 12803 Tel: (518) 222-1338 Fax: (518) 747-2166 TO: Town of Queensbury 742 Bay Road DATE: September 21, 2016 Queensbury, New York 12804 JOB NO. ATTENTION: Bruce Frank RE: Barber Self-Storage WE ARE FORWARDING 0 UNDER SEPARATE COVER 17 HEREWITH Mr DRAWINGS 0 SPECIFICATIONS 0 SHOP DRAWINGS 0 CATALOG DATA SAMPLE(S) 0 ADDENDUM(S) 0 SUBMITTALS 0 OTHER THE FOLLOWING: One (1) Sewage Disposal "As-Built" Plan; One (1) set of field photographs . i t LIfc• B 'i,,..-7 - I, 4 , NOTE: Additional copies will be transmitted to the OWNER for their file . SEP 2 7 2016 THESE ARE: 0 FOR YOUR FILE 0 NO EXCEPTIONS TAKEN 0 REJECTED 0 AS NOTED REMARKS: VERY TRULY YOURS, cc : Tom Barber w/ enc .tott Kevin L. Hastings, PE 0 s` s ff/20/i (. 1.1111 imoOk Agef 4 n Y. if if 4' s IS t i J 3 it 4i. 4f v J mow.. i ,t" _ - ti F sky ai4 f h }3 r I N, 444 4-- s R mot 4 i ,,...,.,,+-,, 41 i1 1 1 ti:',,, .-; , i = ,,_ ..,.... - „.„ -.5_,.,„,,,-..,.,;.--,,_-_,-,,, - 14,!;-, 4,v-.7471.-..',0 ,i64.. 77. , . 3/41 -. s t' rs , iiiior.): a