Loading...
Resolutions TOQ Planning Board 6/28/05: D. Farrar F1 C RESOLUTION APPROVING FINAL STAGE SUBDIVISI NO. 9-2004 FOR DORIS FARRAR RESOLUTION NO. SB 9-2004 RECREATION FEE INTRODUCED BY: Robert Vollaro WHO MOVED ITS ADOPTION: TO BE PAID AT THE TIME SECONDED BY: Thomas Seguljic A BUILDING PERMIT APPLICATION IS SUBMITTED WHEREAS, an application has been made to this board for the following: Subdivision No. 9-2004 Applicant: DORIS FARRAR. Preliminary & Final Stage Property Owner: Doris Farrar/ Rachael Allen SEQR Type: Unlisted Agent: VanDusen &Steves Zone: SR-1A Location: Ridge Road Applicant seeks approval to subdivide a 4.03 +/- acre property into two lots of 1 acre and 3.03 acres. Cross Reference: SB 1-03, AV 36-04, AV 66-02 Tax Map No. 290.6-1-70.1, 70.2 Lot size: 4.03 acres/ Section: Subdivision Regs Public Hearing: 6/22/04, 7/27/04, 9/21/04, 12/21/04 WHEREAS, the application was received in 4/15104, and WHEREAS, the above is supported with the following documentation, and inclusive of all newly received information, not included in this listing as of 6/24/04, and 6/24/05 Staff Notes 6/2/05 Meeting Notice 5/17/05 New info C.T. Male Associates engineering comments 4/18/05 Dave Hatin letter 3/7/05 Letter from DOH 9/21/04 PB resolution—Tabled 7/27/04 PB resolution—Tabled 6/22/04 PB resolution—Tabled 12/21/04 PB resolution-Tabled 12/21/04 Staff Notes 12/20/04 New map received: S-1 revised 12/17/04, (2) maps 29066-01 revised 12/17/04 12/14/04 CTM engineering comments 11/30/04 D. Farrar from PW: Copies 11/18/04 Maps: S-1 revised 11/16/04, 29065-01 —2 maps revised 11/5/04 11/8/04 Maps: S-1 revised 11/5/04, 29065-01 —2 maps revised 11/5/04 12/21/04 Staff Notes 11/30/04 Meeting Notice 9/21/04 PB from G. Hilton—staff notes 9/15/04 CTM engineering comments 8/20/04 Transmittal to CTM from GH: Map& Long EAF info 1 f TOQ Planning Board 06/28/05: D. Farrar 8/11/04 Map S-1 revised 8/10/04 8/11/04 Long Environmental Assessment Form 7/6/04 D. Farrar from CB: meeting notice 6/22/04 CONFIDENTIAL 6/22/04 Public Hearing comment: E. Miller to C. McNulty 6/15/04 Notice of Public Hearing WHEREAS, pursuant to Chapter A183, Subdivision of Land, Section A183-9J and A183-10C, D of the Code of the Town of Queensbury a public hearing was advertised and was held on 6/22/04, 7/27/04, 9/21/04 and 12/21/04; and WHEREAS, the Planning Board has determined that the proposal complies with the Subdivision application requirements of the Code of the Town Queensbury(Zoning); and WHEREAS, the Planning Board has considered the environmental factors found in the Code of the Town of Queensbury(Zoning); and WHEREAS, the requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative Declaration; and/or if application is a modification, the requirements of the State Environmental Quality Review Act have been considered; and the proposed modification(s)do not result in any new or significantly different environmental impacts, and, therefore, no further SEQRA review is necessary; and NOW, THEREFORE, BE IT RESOLVED, that We find the following: The application for Final Stage is hereby Approved in accordance with the resolution prepared by Staff and is subject to the following conditions which shall be listed on the final plat submitted for Planning Board Chairman's signature and filing: 1. C.T. Male Associates' statement on Drawing S-1 reference Schedule 40 versus Schedule 35. 2. That the letter of March 7, 2005 from the Dept. of Health should be attached or made part of the final plat 3. Recreation Fees in the amount of$500.00 per lot are applicable to this subdivision. 4. Waiver request(s)are granted: Sketch plan, Stormwater, Grading and Landscaping Plan 5. Applicant shall submit a copy of the required NOI prior to final signature by the Planning Board Chairman. 6. All necessary outside agency approvals have been received by the applicant, with a copy sent to and received by Planning Department Staff within 180 days. 7. The plat must be filed with the County Clerk within 60 days of receipt by Planning Department Staff of outside agency approvals noted. 8. Final approved plans in compliance with this subdivision must be submitted to the Community Development Dept. before any further review by the Zoning Administrator or Building & Codes personnel. Subsequent issuance of further permits; including building permits are dependent on receipt. 2 TOQ Planning Board 06/28/05: D. Farrar Duly adopted this 28th day of June 2005 by the following vote: AYES: Mr. Sanford, Mr. Goetz, Mr. Ford, Mrs. Steffan, Mr. Seguljic, Mr. Vollaro NOES: None ABSENT: Mr. Hunsinger Cc: Van Dusen &Steves 3 TOQ Planning Board 06/28/05: D. Farrar RESOLUTION APPROVING PRELIMINARY SUBDIVISION NO. 9-2004 FOR DORIS FARRAR RESOLUTION NO. SB 9-2004 INTRODUCED BY: Robert Vollaro WHO MOVED ITS ADOPTION: SECONDED BY: Thomas Ford WHEREAS, an application has been made to this board for the following: Subdivision No. 9-2004 Applicant: DORIS FARRAR Preliminary& Final Stage Property Owner: Doris Farrar/Rachael Allen SEQR Type: Unlisted Agent: VanDusen & Steves Zone: SR-1A Location: Ridge Road Applicant seeks approval to subdivide a 4.03 +/- acre property into two lots of 1 acre and 3.03 acres. Cross Reference: SB 1-03, AV 36-04, AV 66-02 Tax Map No. 290.6-1-70.1, 70.2 Lot size: 4.03 acres/Section: Subdivision Regs Public Hearing: 6/22/04, 7/27/04, 9/21/04, 12/21/04 WHEREAS, the application was received in 4/15/04, and WHEREAS, the above is supported with the following documentation, and inclusive of all newly received information, not included is this listing as of 6/24/05, and 6/24/05 Staff Notes 6/2/05 Meeting Notice 5/17/05 New info 9/21/04 PBresolution—Tabled 7/27/04 PB resolution—Tabled 6/22/04 PB resolution—Tabled 12/21/04 PB resolution -Tabled 12/21/04 Staff Notes 12/20/04 New map received: S-1 revised 12/17/04, (2) maps 29066-01 revised 12/17/04 12/14/04 CTM engineering comments 11/30/04 D. Farrar from PW: Copies 11/18/04 Maps: S-1 revised 11/16/04, 29065-01 —2 maps revised 11/5/04 11/8/04 Maps: S-1 revised 11/5/04, 29065-01 —2 maps revised 11/5/04 12/21/04 Staff Notes 11/30/04 Meeting Notice 9/21/04 PB from G. Hilton—staff notes 9/15/04 CTM engineering comments 8/20/04 Transmittal to CTM from GH: Map&Long EAF info 8/11/04 Map S-1 revised 8/10/04 8/11/04 Long Environmental Assessment Form 7/6/04 D. Farrar from CB: meeting notice 1 TOQ Planning Board 06/28/05: D. Farrar 6/22/04 CONFIDENTIAL , 6/22/04 Public Hearing comment: E. Miller to C. McNulty 6/15/04 Notice of Public Hearing WHEREAS, pursuant to Chapter A183, Subdivision of Land, Section A183-9J and A183-10C, D of the Code of the Town of Queensbury a public hearing was advertised and was held on 6/22/04, 7/27/04, 9/21/04 and 12/21/04; and WHEREAS, the Planning Board has determined that the proposal complies with the Subdivision application requirements of the Code of the Town Queensbury(Zoning); and WHEREAS, the Planning Board has considered the environmental factors found in the Code of the Town of Queensbury(Zoning); and WHEREAS, the requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative Declaration; and/or if application is a modification, the requirements of the State Environmental Quality Review Act have been considered; and the proposed modification(s)do not result in any new or significantly different environmental impacts, and,therefore, no further SEQRA review is necessary; and NOW, THEREFORE, BE IT RESOLVED, that We find the following: The application for Preliminary Stage is hereby Approved. Duly adopted this 28th day of June 2005 by the following vote: AYES: Mrs. Steffan, Mr. Goetz, Mr. Seguljic, Mr. Sanford, Mr. Ford, Mr. Vollaro NOES: None ABSENT: Mr. Hunsinger Cc: Van Dusen &Steves 2 r TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 Queensbury Planning Board Record of Resolution—June 30, 2005 RE: SUBDIVISION NO. 11-2005 RESOLUTION WHEN DETERMINATION OF NO SIGNIFICANCE IS MADE RESOLUTION NO. 11-2005 Introduced by Gretchen Steffan who moved for its adoption, seconded by Thomas Ford, WHEREAS, there is presently before the Planning Board an application for: RUTH KOUBA, WHEREAS, this Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act, NOW, THEREFORE, BE IT RESOLVED: 1. No Federal agency appears to be involved. 2. The following agencies are involved: 3. The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury. 4. An Environmental Assessment Form has been completed by the applicant. 5. Having considered and thoroughly analyzed the relevant areas of environmental concern and having considered the criteria for determining whether a project has a significant environmental impact as the same is set forth in Section 617.11 of the Official Compilation of Codes, Rules and Regulations for the State of New York, this Board finds that the action about to be undertaken by this Board will have no significant environmental effect and the Chairman of the Planning Board is hereby authorized to execute and sign and file as may be necessary a statement of non-significance or a negative declaration that may be required by law. Duly adopted this 30th day of July 2005, by the following vote: AYES: Mr. Seguljic, Mrs. Steffan, Mr. Ford, Mr. Sanford NOES: None ! ABSENT: Mr. Metivier, Mr. Vollaro, Mr. Goetz Cc: Van Dusen & Steves "Home of Natural Beauty ... A Good Place to Live " 1 r