Loading...
CC-0608-2018TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: CC-0608-2018 Date Issued: Wednesday, February 6, 2019 This is to certify that work requested to be done as shown by Permit Number has been completed. CC-0608-2018 Tax Map Number: Location: Owner: 302.8-1-7 309 BAY RD CR Bard The VMJR Companies LLCApplicant: This structure may be occupied as a: 7200 s.f. Commercial Alterations (office space/warehouse)By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Planning Board or Zoning Board of Appeals. Director of Building & Code Enforcement TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 BUILDING PERMIT The VMJR Companies LLC 302.8-1-7 CC-0608-2018 Permission is hereby granted to: Tax Map No: Permit Number: For property located at: In the Town of Queensbury, to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Owner Address: Business Office - Alteration Total Value Type of Construction $985,000.00 $985,000.00 309 BAY RD 289 Bay RD Queensbury, NY 12804 CR BardOwner Name: Contractor or Builder's Name / Address Electrical Inspection Agency The VMJR Companies LLC 73 Mohican ST Glens Falls, NY 12801 Plans & Specifications 7200 s.f. Commercial Alterations (office space/warehouse) PERMIT FEE PAID - THIS PERMIT EXPIRES:$2,160.00 Monday, October 21, 2019 (If a longer period is required, an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Queensbury;Friday, October 19, 2018 SIGNED BY:for the Town of Queensbury. Director of Building & Code Enforcement ________________________________ Office Use Only ADDITION/ALTERATION PERMIT Permit#: CC,—O look • ?A tPJ APPLICATION Permit Fee:$ ZA b o luou 01( uccu.but1 742 Bay Road,Queensbury,NY 12804 Invoice#: e)`1- P:518-761-8256 www.queensbury.net Project Location: 289 Bay Road �n Tax Map ID#: 302.8-1 1� Subdivision Name 1i1 C tS a ■ • CONTACT INFORMATION: SEP 21 2018 • Applicant: TOBUILpOF N G& CODES EENSBURY Name(s): VMJR Companies LLC Mailing Address, C/S/Z: 73 Mohican Street,Glens Falls, NY, 12801 Cell Phone: ( ) Land Line: (518 ) 792-1128 Email: mjhenzel@vmjrcompanies.com • Primary Owner(s): Name(s): CR Bard Mailing Address, C/S/Z: 289 Bay Road,Queensbury, NY, 12804 Cell Phone: ( ) Land Line: ( 518 ) 793-2351 Email: Joseph.Caricari@crbard.com • Contractor(s): Business Name: VMJR Companies LLC Contact Name(s): Micah Henzel Mailing Address, C/S/Z: 73 Mohican Street,Glens Falls, NY, 12801 Cell Phone: ( 518 ) 338-2612 Land Line: ( 518 ) 792-1128 Email: mjhenzel@vmjrcompanies.com • Architect(s)/Engineer(s): Business Name: Highlander Engineering Contact Name(s): Daniel Bruno Mailing Address, C/S/Z: 182 County Route 44,Argyle, NY, 12809 Cell Phone: (518 ) 321-8538 Land Line: ( ) Email: brunofe@hotmail.com Contact Person for Building & Code Compliance: Micah Henzel-VMJR Companies Cell Phone: ( 518 ) 338-2612 Land Line: ( ) Email: mjhenzel@vmjrcompanies.cdfn Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 PROJECT INFORMATION: TYPE: X Commercial _ Residential WORK CLASS: _Single-Family Two-Family _ Multi-Family (#of units Townhouse ` Business Office Retail X Industrial/Warehouse Garage (#of cars ) _Other (describe ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 7,200 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement (habitable space): Basement(habitable space): Total square feet: Total square feet: 7,200 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 985,000 2. If Commercial project, what is the proposed use: Office Space/Warehouse 3. Source of Heat(circle one): Gas Oil Propane Solar Other Fireplaces need a separate Fuel Burning Appliances &Chimney Application 4. Are there any structures not shown on the plot plan? YES ® Explain: 5. Are there any easements on the property? YES 6. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? N/A b. Is this a corner lot? YES NO c. Will the grade be changed as a result of the construction? YES NO d. What is the water source? 'UBLI PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Sewer Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 DECLARATION: 1. I acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: 44/Ltli4. I :n,t, SIGNATURE: f�, DATE: /l Zr 6tY i Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 INSPECTION WORKSHEET (BINS-000686-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0608-2018 Case Module:Permit Inspection Date:Wed Feb 6, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Commercial Final Inspection Job Address:Parcel Number:289 BAY RD Queensbury, NY 12804 302.8-1-3 Contact Type Company Name Name Engineer Highlander Engineering Bruno, Dan Contractor The VMJR Companies LLC Applicant The VMJR Companies LLC Granted Permission The VMJR Companies LLC Primary Owner CR Bard Checklist Item Passed Comments Engineer or Architect Approval YES Received Dan Bruno's and Ethan Hall's Final Approvals. Special Inspections YES RECEIVED HVAC AIR BALANCING REPORT OK to Issue Temporary C/O YES 12/20/18 Final Inspection Partial Approval - Ok to occupy New Controlled Storage Area Only! Remaining Items: - Install and Test sink pump at cooler not installed yet. - Complete Balance of miscellaneous work - Schedule a Final Inspection once everything is complete. OK to Issue C/O YES 2/6/19 Final Inspection Approved - Ok to Issue CO! Feb 06, 2019 Page (1) O'Brien, John (Inspector) Jan. 4 1U19 1 45NIVI•,..-"� MUiH .,,, . �� -- .• to. 0��4 r, 3/ ° c„ MIDDLE DEPARTMENT 1 INSPECTION AGENCY, INC. I that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date l (, noted below and is issued subject to the following conditions. ty Owner CR Bard bate: 12/17/2018 � � ,�. Occupant: Locetio 289 BayRd. 0 tpf) Warehouse/1 St Floor z Occupancy. Queensbury, Warren Co. NY l A. t.., Non-Residential t• (qj Applicants �a ).- Prediletto Electric `i 36 Beechwood Drive •� � ffi { Clifton Park, NY 12065 y7 .a N it L C J �� Joseph A.Holmesei (`2 No. ��' (� 14028510.6284EL_ ... .- ._ ___ • ,-. Equipment: a .�•1 ' `yF -r j 1 - 100 Amp Panel; 4- Power Poles; 1 - 75 KVA Transformer; 2 -200 Amp Panels; 1 -Time Clock; 34- Receptacles; Nk m 26 Fixtures; 1 - Burner,Wiring & Control For Gas-, 5 - Emergency Lights; 3 - Exit Lights; 5.- Exit/Emergency Combo.; M ��1 -Time Clock rA a C l „}s t v. rod tl LC This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. This certificate applies only to the use.occupancy and �? `; above and the Installation inspected as of the above noted date based on a visual ownership as indicated herein. Upon a change in the use,occupancy or ownership IfV ( Inspection. No warranty is expressed or Implied as to the mechanical safety,etli- of the property Indicated above,this certificate shall be immediately null and void. Ir:')� �s ciency or fitness of the equipment for any particular purpose. This certificate shall In the event that this certificate becomes Invalid based upon the above conditions, y . be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon reinspection by Middle Department \`,,.., era'' system to which this Certificate applies be altered in any way,including but not limit- Inspection Agency, Inc. An application for inspection must be submitted to Middle (1�, ad to.the introduction of additional electrical equipment and/or the replacement of Department Inspection Agency, Inc. to initiate the inspection and revalidation 4) � any of the components installed as of the above noted date,this certificate shall be process. A fee will be charged for this service. 5 9 � ^r� laS�•` �s. ,rw1;�5%i"�.� 1,, .a � •1• 1,`N,:,qzw:k,, 4 4,, �:1'1,� . ,1:•t:, z�� frma`c�. :�:e r.;�F�,,n, . S:~,G'bvr:r��t `r�j4}���V:J <��L��-� �',����s��:,�:1{��'�'�✓=��; ei,�} �j`/.\✓�y�✓,✓C��4,... ,��✓ .�:n :�,t'.:, :.i , L`is' ,"5 E C k liAti E --.'. ' Fli 1---.J.AN 0 4 21 TOWN OF QUEENSBURY BU t nE ^n CC.- - OIQOt, • 2A- -5 RUCINSKI HALL ARCHITECTURE ITECTURE Ronald Richard Rucinski =� Ethan Peter Hall 134 Dix Avenue Glens Fails NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall a@nycap.rr.com CR Bard—Phase II Building Alteration 17 December 2018 John O'Brien—Town of Queensbury—Code Enforcement 742 Bay Road Queensbury NY 12804 Re: Phase II acceptance letter John, At the above referenced project location our office has made periodic site observations during the course of construction. The new laboratory space and reconfigured warehouse space is nearly complete and BARD is looking for an occupancy by the end of the year. I believe that the new canopy at the exterior is meant to be installed this week and that exterior work is still weather permitting and may be pushed off until the spring. It is our belief that all other items have been completed and are acceptable to this office. If there are any questions please contact this office to discuss. Regards; Ethan Peter Hall Architect Y:\CR Bard\Warehouse RcnovationsiPaperwork\BARD Phase 11 Letter- 17 Dec 201$_doc 1 STRENKOWSIO ASSOCIATES, P.C. Consulting Engineers 620q)--2_c-.)\c't Town of Queensbury December 17, 2018 745 Bay Road Highlander Project No. M-154-17 Queensbury,NY 12804 ATTN: Mr. David Hatin—Warehouse Renovation& Code Enforcement RE: CR Bard—Warehouse Renovation—Phase 2 30 Collins Drive, Queensbury,NY 12804—HVAC and Plumbing Dear Mr. Hatin: This letter will certify that Strenkowski Associates PC, as subcontract Engineer to Highlander Engineering Services PLLC,has designed and monitored this project periodically throughout the construction process. We find that,to the best of our knowledge,that the Heating,Ventilating and Air Conditioning work as well as the Plumbing installation meets the intent of the applicable design documents and satisfies the requirements of applicable codes. Please contact me if you have questions. . Very Truly Yours, � JJ Raymo d N. Strenkowski P.E. 'de t CC: Patrick Sullivan—Highlander Engineering Dan Bruno—Highlander Engineering Joe Caricari—CR Bard • 118.Z94_o'7.4 .Box 719 • Glens Falk,New York 12801 R OO SK1 HALL ARCHFIECTURE �A � Ronald Richard Rucinski Ethan Peter Hall I lyG 134 Dix Avenue Glens Falls NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com 60(6---7--9Va CR Bard—Phase II Building Alteration 17 December 2018 John O'Brien—Town of Queensbury—Code Enforcement 742 Bay Road Queensbury NY 12804 Re: Phase II acceptance letter John, At the above referenced project location our office has made periodic site observations during the course of construction. The new laboratory space and reconfigured warehouse space is nearly complete and BARD is looking for an occupancy by the end of the year. I believe that the new canopy at the exterior is meant to be installed this week and that exterior work is still weather permitting and may be pushed off until the spring. It is our belief that all other items have been completed and are acceptable to this office. If there are any questions please contact this office to discuss. Regards, aff Ethan Peter Hall Architect Y:\CR Bard\Warehouse Renovation\Paoerworlc\BARD Phase 11 Letter-17 Dec 2018.doc 1 &R)-72_0€, Submittal Cover Sheet EC K E RI' MECHANICAL, LLC Date: 12/19/2018 Job No: 574 Attention: Micah Henzel,VMJR Companies RE: TAB Report Submittal C.R. Bard,Inc.Warehouse Renovation Phase 2 1062 Central Avenue,Albany,New York 12205 Mechanical Submittals Truck Deliveries,Warehouse:1064 Central Avenue From: Brian Martin,Project Manager Phone:518.459.4116 Fax:518.459.1208 To: The VMJR Companies 73 Mohican Street Glens Falls,NY 12801 (518)792-1128 Submittal Type: ❑ Product Data ❑ Re-Submittal ❑ Information ❑ Shop Drawings ❑ Certificate ® Quality Control ® Test Reports ❑ Samples ❑ Other Date Spec Section Par Description 12/19/18 N/A N/A Final TAB Report Contractors Stamp Architect's Use 21, At ❑ Approved ❑ Approved as Noted Project Manager ❑ Revise and Resubmit Eckert Mechanical, LLC ❑ Rejected ❑ No Action Required Comments ElReturned Without Review By: Date: Eckert Mechanical,LLC 1062 Central Ave,Albany NY 12205 T 518.459.4116 F 518.459.1208 MTI Mechanical Testing Inc. ac Testis Services For Indoor Environments - AABC Commissioning— CR Bard Warehouse Renovation Phase 2 FIRM: CUSTOMER: MTI- Mechanical Testing, Inc. Eckert Mechanical Service Corp PROJECT#: 70 Lake Avenue 18-430 mTi Saratoga Springs NY 12866 PROJECT ADDRESS: PHONE: 289 Bay Road (518)450-7292 Queensbury NY 12804 FAX: DATE: (518)450-7295 2018-12-19 Y,I CONTACT: Chris Hart Sustainable Solutions for Efficient Environments ( T6S, aI fi 1 Y MENTM � \FBAL :4 1 c, • am/sic AT • + OWNED • 15 oa-5 CERTIFIED BY NAOT ONALOO N C ENTERPRISE 'Lice elJ.O This is to certify that Mechanical Testing, Inc. has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements of the Associated Air Balance Council and the results of these tests are herein recorded. ATI MOB Sustainable Solutions for Efficient Environments 70 Lake Ave,Saratoga Springs,NY 12866 Phone:518-450-7292 Fax:518-450-7295 Design Review-Commissioning-Fire Life Safety-Test And Balance-ASHRAE 110 To: Brian Martin Contractor: Eckert Mechanical Service From: Mike Morwin EIC:W Project Name: CR Bard Warehouse PH2 Disposition: Final TAB Report MTI#: 18-430 Date: 12-19-18 The following is a summary of any of the HVAC Equipment tested for the CR Bard Warehouse Renovation Phase 2 Project. Included in the summary are any details regarding any open issues or deficiencies witnessed during the Testing and Balancing of this project. 1-MTI did not find any deficiencies or issues during the balancing of this equipment. The Testing and Balancing has been performed in accordance with the standard requirements of the Associated Air Balance Council (AABC). The results of these tests are herein recorded. MTI has noted all other pertinent information in regards to the testing and balancing of this project within the TAB Report. If you have any questions or concerns, please contact us. MTI Sustainable Solutions for Efficient Environments 70 Lake Ave,Saratoga Springs,NY 12866 694 Colesville Rd,Binghamton,NY 13904 Phone:518-450-7292 Fax:518-450-7295 Design Review-Commissioning-Fire Life Safety-Test And Balance-ASHRAE 110 Terms and Abbreviations ACH-Air Changes per Hour In.- Inches AHU-Air Handling Unit In. w.g.- Inches of Water Gauge AK-Free Area of Duct ISDFT-Insufficient Straight Duct for Traverse AVG-Average Kfactor-Correction factor to the free area BHP-Brake Horsepower needed to calculate CFM. BV-Ball Valve(Shut Off Valve) LAT-leaving Air Temperature CB-Circuit Breaker LWT-Leaving Water Temperature CBV-Calibrated Balance Valve MAU-Make Up Air Handling Unit CD-Ceiling Diffuser MAX-Maximum set point/flow CFM-Cubic Feet per Minute MIN-Minimum set point/flow CHWS-Chilled Water System NI-Not Installed CRAC-Computer Room Air Conditioner NIS-Not in Scope CS-Circuit Setter 0/A-Outside Air CUH-Cabinet Unit Heater OBD-Opposed Blade Damper DAT-Discharge Air Temperature OD-Outside Diameter Measurement of Sheave DD-Direct Drive(motor) PH-Phase Des.-Design PSI-Pounds per Square Inch Disch.-Discharge RA-Return Air DNE-Does Not Exist RAT-Return Air Temperature DP-Discharge Pressure of Pump/Pressure Drop RF-Return Fan EA-Exhaust Air RHC-Reheat Coil EAV-Exhaust Air Valve RPM-Revolutions per Minute EAT-Entering Air Temperature RTU-Roof Top Unit EF-Exhaust Fan SA- Supply Air EG-Exhaust Grille SAV- Supply Air Valve ERU-Energy Recovery Unit SAT- Supply Air Temperature E.S.P.-External Static Pressure S.F.- Service Factor EWT-Entering Water Temperature SF- Supply Fan FCU-Fan Coil Unit SP- Suction Pressure of Pump/Static Pressure FD-Fire Damper Sq. ft.- Square Feet FLA-Full Load Amperage TAB-Test,Adjust and Balance Flow Coeff.—Correction Factor for Flow to VAV TDV-Triple Duty Valve Flow Hood- Instrument that measure airflow TP-Thermally Protected FPM-Feet per Minute TSP-Total Static Pressure GPM-Gallons Per Minute UH-Unit Heater HEPA-High Efficiency Particulate Arrestance V-Volts HP-Horsepower VAV-Variable Air Volume Box HVAC-Heating Ventilation and Air Conditioning VD-Volume Damper HWS-Hot Water System VFD-Variable Frequency Drive HX-Heat Exchanger VVT-Variable Volume Terminal Hz-Hertz WC-Water Column MTIMechanical Testing Inc. _ a.C-Testing Services For Indoor Environments AA BC `Omm - LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Table of Contents Instruments Used 3 Instruments Used 3 AME (3Ph) AHU-2 4 AHU-2 4 Supply Outlet VT-1 8 Supply Outlet Summary 8 Supply Outlet VT-2 9 Supply Outlet Summary 9 Supply Outlet VT-3 10 Supply Outlet Summary 10 Supply Outlet VT-4 11 Supply Outlet Summary 11 Supply Outlet VT-5 12 Supply Outlet Summary 12 Return Inlets AHU-2 13 Return Inlet Summary 13 Page 2 of 13 2018-12-19 Mechanical Testing In . `TestingServices For Indoor Environments AABC ac g AABC Comm' - Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Instruments Used Instruments Used AIR Manufacturer Evergreen Telemetry Calibration Date 08/17/18 Model No. PVF Tech Name Christopher Hart Serial No. 1500192 WATER Manufacturer Not Applicable Calibration Date Not Applicable Model No. Not Applicable Tech Name Not Applicable Serial No. Not Applicable IMAGES: Air P c.1,21.."4C yi Calibration Certificate 2..00..0 EVEnoREEM TELEMETRY 222211011: M.d.:..i..r..12. a.ura..90a,02 22.1. 2..E..r..Y,a. PP*.1.12 0.11.......122 Maw.ms.a ere..0...222 2 stsw mme.mwma ....2,m TM .° m n.os.Iio "aa.a�,.,� (T..0 We".,,., li ';—C__ I d2.m2... Instruments Used Page 3 of 13 2018-12-19 TI �ehani Ttinc Inc. acg AABC T� I~iric 5ervice� Fear Indoor Environments AA BC `Omm - LOCAT ION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 AME (3Ph) AHU-2 AHU-2 UNIT DATA Equipment Location Outside Pad Filter Type Fiber Area Served Warehouse Filter Quantity 4 Unit Manufacturer Carrier Filter Size 20x20x2 in Unit Model No. 48HCRD Performed By CH Unit Serial No. 4418P85728 Pass/Fail Pass TEST DATA Design Actual % Design Actual % Total Unit CFM 2425 CFM 2469 CFM 102 Fan RPM 942 RPM 884 RPM 94 Outlet CFM 2425 CFM 2465 CFM 102 O1A Damper Position 5% Outside Air CFM 300 CFM 314 CFM 105 RIA Damper Position 95% Return Air CFM 2125 CFM 2155 CFM 101 Hertz at Design CFM 60 Hz MOTOR DATA Motor Manufacturer Marathon Volts T1 461 Volts Motor Frame 56HZ Volts T2 461 Volts Motor RPM 1725 RPM Volts T3 458 Volts Motor Horsepower Not Listed HP Plate Amps 5.8 Amps Motor Phase 3 Amps T1 3.57 Amps Motor Hertz 60 Hz Amps T2 3.64 Amps Service Factor 1.15 Amps T3 3.71 Amps Efficiency 0.850 Starter Heater TP Power Factor 0.850 Brake Horsepower 2.757 Plate Volts 460 Volts DRIVE DATA Motor Sheave/OD Size VM50 Fan Bore 1 in AHU-2 Page 4 of 13 2018-12-19 ..: Mechanical Testing Inc. ac Teti rvi _ ForIndoorAABc- st c_ n AABC Commissioning- Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 DRIVE DATA Motor Bore 7/8 in No.of Belts 1 Motor Sheave%Closed 0% Belt Size AX49 Fan Sheave/OD Size AFD74 Center Distance 16 13/16 in TEST PRESSURES Design Actual % Design Actual % Total Static Pressure 1.45 in.H2O 1.58 in.H2O 109 Pre-Filter DP Not Specified 0.09 in.H2O in.H2O Not Specified See Note in. External Static Pressure 1.35 in.H2O 1.49 in.H2O 110 Pre-Heat Coil DP in.H2O H2O Not Specified See Note in. Discharge Static 0.65 in.H2O Cooling Coil DP in.H2O H2O Suction Static 0.93 in.H2O Static at Furthest VAV Not Applicable in.H2O Mix BoxlPre-Filter SP Not Specified 0.84 in.H2O Sys.Operational Static 0.60 in.H2O in.H2O IMAGES: Unit Data Motor Data AHU=2 AH -2 AHU-2 ., on X I I � v„��fi' °+swi'xam+ r-are0ws�'�:� `' C n7 t Krr ATM Wee1 r marathon �--o ... mudefsH. q u rr< �� °i y .r " t rdth5aa t r srvstF J a e .- ' d1 zib - -_" "i2I a ms au 3 o i6E 1unc,a '3 gyp.. . v... " Ni. :ntsill tisans-:, .,.,w,,,:! m doec°mu�se 1 � 111�e,.,�d� �� 9514/BE ner AHU-2 Page 5 of 13 2018-12-19 MT Mechanical Testin g Inc. aC ... g Testing Cervices For Indoor Envrrrf7aer7ts AABC Comm. — Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbuty NY 12804 . it #-AHU=2 stat, itic Profile .,,t 31_14 ' ,..„,...„1,,,,,,,,,,,,.:14:4;., 411.„.:11 ...,, ' 1 ,-' ''' ' -,-,',3'..(i"..„r' ' ''''- , ;:: ' 0 i4M B/PF F i _. .�_ �„Q.84 we Sucton j • 0,93"wc 1 1 *MB on far side, Fan - and coils between MB Discharge fan_ , d 0.65 "WC y x Y # ya + yip+ NOTES: Motor Data Efficiency AHU-2:Efficiency and power factor not listed on motor data tag.MTl utilized standard 0.85 and 0.85 respectively to approximate BHP. Test Pressures Pre-Heat Coil DP AHU-2:Coils and filters are adjacent.MTI recorded DP across both. AHU-21 Traverse Summary AHU-2 Page 6 of 13 2018-12-19 MTIMechanical Testing Inc. = aC Testing Services For Indoor Environments g Commissioning ommis - Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 TRAVERSE SUMMARY Name System Location Size Area Design FPM Design CFM Average FPM Actual CFM Static Pressure Main Traverse AHU-2 South Wall 31x16 3.444 704 2425 717 2469 0.730 Outside Air AHU-2 South Wall 20.5x29 4.128 73 300 76 314 0.000 Totals 2725 2783 AHU-2 Page 7 of 13 2018-12-19 TIMechanicalTesting Inc. =TestingServices For Indoor Environments ac AABC g AABC Group Comm' - LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbuty NY 12804 Supply Outlet VT-1 Supply Outlet Summary SUPPLY OUTLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim CFM FPMICFM Final CFM %of Design Min CFM SO-001 Zone 1 CD-A 24x24 1.000 150 150 187 143 143 95 Not Applicable SO-002 Zone 1 CD-A 24x24 1.000 150 150 136 164 164 109 Not Applicable Totals 300 323 307 307 0 Supply Outlet Summary Page 8 of 13 2018-12-19 MTI Mechanical Testing Inc. acg 9 Services For Indoor Environments - A A B C CommisssP— LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Supply Outlet VT-2 Supply Outlet Summary SUPPLY OUTLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim CFM FPM/CFM Final CFM %of Design Min CFM SO-003 Zone 2 CD-A 24x24 1.000 325 325 174 321 321 99 Not Applicable SO-004 Zone 2 CD-A 24x24 1.000 325 325 354 322 322 99 Not Applicable SO-005 Zone 2 CD-A 24x24 1.000 325 325 331 331 331 102 Not Applicable SO-006 Zone 2 CD-A 24x24 1.000 325 325 331 326 326 100 Not Applicable Totals 1300 1190 1300 1300 0 Supply Outlet Summary Page 9 of 13 2018-12-19 iMechanical Testng Inc. = Testing Services For Indoor EnvironmentsW ac- Commis -AABC LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Supply Outlet VT-3 Supply Outlet Summary SUPPLY OUTLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim CFM FPMICFM Final CFM %of Design Min CFM SO-007 Zone 3 CD-A 24x24 1.000 250 250 211 242 242 97 Not Applicable SO-008 Zone 3 CD-A 24x24 1.000 250 250 169 248 248 99 Not Applicable Totals 500 380 490 490 0 Supply Outlet Summary Page 10 of 13 2018-12-19 marl Mechanical Testing Inc. = ac- Testing Services For Indoor Environments WC AABC Comm't - LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Supply Outlet VT-4 Supply Outlet Summary SUPPLY OUTLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim CFM FPM/CFM Final CFM %of Design Min CFM SO-009 Zone 4 CD-A 24x24 1.000 175 175 348 180 180 103 Not Applicable Totals 175 348 180 180 0 Supply Outlet Summary Page 11 of 13 2018-12-19 Mechanical Testing Inc. Testing Services For Indoor Environments ac Arc g `Omm�—AABC LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Supply Outlet VT-5 Supply Outlet Summary SUPPLY OUTLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim CFM FPMICFM Final CFM %of Design Min CFM SO-010 Zone 5 CD-A 24x24 1.000 150 150 316 188 188 125 Not Applicable Totals 150 316 188 188 0 Supply Outlet Summary Page 12 of 13 2018-12-19 m mr 1 Mechanical Testing Inc. acg Testing Services For Indoor Environments AABC Commissioning AA� Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Warehouse Renovation Phase 2 18-430 Chris Hart 289 Bay Road Queensbury NY 12804 Return Inlets AHU-2 Return Inlet Summary RETURN INLET SUMMARY Name Room No. Type Size AK Factor Design FPM Design CFM Prelim FPM/CFM Final Reading Final CFM %of Design Min CFM RI-001 Zone 2 CR-B 12x24 1.150 1130 1300 480 1077 1239 95 Not Applicable RI-002 Zone 1 CR-B 12x12 1.150 261 300 107 276 317 106 Not Applicable RI-003 Zone 3 CR-B 12x12 1.150 435 500 463 456 524 105 Not Applicable RI-004 Zone 5 CR-B 12x12 1.150 130 150 189 141 162 108 Not Applicable RI-005 Zone 4 CR-B 12x12 1.150 152 175 169 156 179 102 Not Applicable Totals 2425 1408 2421 0 Return Inlet Summary Page 13 of 13 2018-12-19 xl . HIGHLANDER ENGINEERING SERVICES, PLLC 1 [E‘ CEOWEL) OCT 0 8 2018 TOWN OF QUEENSBU_RY BUILDING&CODTKAN MITTAL TO: VMJR Companies 73 Mohican Street DATE: 8-October-2018 Glens Falls, NY PROJECT NO.: M-154-17 12801 RE: CR Bard Warehouse Renov. — Phase 2 No.: TO-M-154-17-1 ATTN.: Micah Henzel CC: Joe Cricari WE ARE FORWARDING: [] UNDER SEPARATE COVER [X] HEREWITH [ ] VIA E-MAIL [ ] DRAWINGS [ ] SPECIFICATIONS [ ] SHOP DRAWINGS [ ] CATALOG DATA [] CD/DVD [ ] ADDENDUM(S) [] SUBMITTALS [] OTHER THE FOLLOWING: a.)Interior Lighting Compliance Certificate, b.) Mechanical Compliance Certificate. THESE ARE: [] FOR YOUR FILE [X] AS REQUESTED [] AS NOTED REMARKS: Very Truly Yours, .9aidet Sumo FILE COPY Daniel F.Bruno Sr. Project Manager lECEPVIEIHIGHLANDER Cd OCT - 8 2018 Highlander Engineering Services, PLLC 182 County Route 44,Argyle, NY 12809 Design and Construction Engineering Solutions p VMJR M AN{S ECKIEltI' MI ,IIANI(.AI LI(� 1062 Central Avenue Albany,NY 12205ECEEDIVE " Phone:518.459.4116 Fax: 518.459.1208 '1 I Date: October 1,2018 OCT U , 201 Attn: The VMJR Companies TOWN OF QUEENSBURY BUILDING 8 CODES Re: C.R.Bard,Inc.-Warehouse Renovation Project Phase 2 __4 From: Brian Martin,Project Manager at Eckert Mechanical,LLC To Whom It May Concern, For the abovementioned project, Eckert Mechanical, LLC will be utilizing the services of Mechanical Testing, Inc. to perform the testing and balancing (TAB) scope of work. Their qualifications and credentials are herein attached. Sincerely, Brian Martin Project Manager Eckert Mechanical,LLC FILE COPY Eckert Mechanical,LLC 1062 Central Ave,Albany NY 12205 T 518.459.4116 F 518.459.1208 ' Afii COMcheck Software Version 4.3.5.1 rft Mechanical Compliance Certificate Project Information � r--, E li-, --; �, ,. 1 Energy Code: 2012 IECC Project Title: BARD PH 2 Location: Glens Falls, New York OCT 0 9 2018 10 Climate Zone: 6a Project Type: Alteration TOWN OF QUEENSBURY BUILDING&CODES Construction Site: Owner/Agent: Designer/Contractor: CC - 0 ie• l� l `@! "'ZrJ Mechanical Systems List Quantity System Type&Description FILE COPY 1 HVAC System(Single Zone): Heating:1 each-Duct Furnace,Gas,Capacity=548 kBtu/h Proposed Efficiency=81.00%Ec,Required Efficiency=80.00%Ec Cooling: 1 each-Single Package DX Unit,Capacity=174 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.00 EER,Required Efficiency: 10.80 EER +11.0 LEER Fan System: FAN SYSTEM 1 -Compliance(Motor nameplate HP method):Passes Fans: ahu 1 Supply,Constant Volume,5150 CFM,5.0 motor nameplate hp Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. I . , ,` Q�CofNE .0� 1liicD ��• N• (4, I it ... .41 s;t�, t 0 463a P 4=� REVIEWED FOR t'FEsso. o l ENERGY CODE COMPLIANCE 1 I Project Title: BARD PH 2 Report date: 10/07/18 Data filename: t , II 11 I Page 1 of 8 OCT - 82018 I1 1 VM :.IR COMPANIES rill, COMcheck Software Version 4.0.8.0 ,a Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: CR Bard Phase II,Warehouse Renovation Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Glens Falls, NY 12801 CR Bard Highlander Engineering Services, Glens Falls, NY 12801 PLLC 182 CR 44 Additional Efficiency Package(s) Argyle, NY 12809 Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Oven Room(Common Space Types:Laboratory For Medical/Industrial/Research) 180 1.63 293 2-Main Inspection(Common Space Types:Laboratory For 850 1.63 1386 Medical/Industrial/Research) 3-File Storage(Common Space Types:Storage>=50-<=1000 sq.ft.) 350 0.57 200 4-Clean Room(Common Space Types:Office-Enclosed) 103 1.00 103 5-Office(Common Space Types:Office-Enclosed) 86 1.00 86 Total Allowed Watts= 2067 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Oven Room(Common Space Types:Laboratory For Medical/Industrial/Research) LED 1:LED Panel 44W: 1 4 46 184 2-Main Inspection(Common Space Types:Laboratory For Medical/Industrial/Research) LED 2:LED Panel 54W: 2 13 52 676 3-File Storage(Common Space Types:Storage>=50-<=1000 sq.ft.) LED 3:LED Panel 38W: 1 5 38 192 4-Clean Room(Common Space Types:Office-Enclosed) LED 2:B:LED Panel 54W: 1 2 52 104 5-Office(Common Space Types:Office-Enclosed) LED 2:B:LED Panel 54W: 1 2 52 104 �-,.� :ra Total Proposed Watts= 1260 rU..tri [ i 11J T - 820 1 f`v1 , C p z Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 1 of 9 COMcheck.cck . Interior Lighting PASSES: Design 39% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8. nd to com ly with any applicable mandatory requirements listed in the Inspection Checklist. poi r 7 fr�Gl- g/ Name Title c Sipat D ���� p.. �Ci NEW ma's E.SE f f-t,�/�._. � No.058843 ��� %PESSO\\ Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 2 of 9 COMcheck.cck COMcheck Software Version 4.0.8.0 ird,, Exterior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: CR Bard Phase II,Warehouse Renovation Project Type: New Construction Exterior Lighting Zone 2(Residential mixed use area) Construction Site: Owner/Agent: Designer/Contractor: Glens Falls, NY 12801 CR Bard Highlander Engineering Services, Glens Falls, NY 12801 PLLC 182 CR 44 Argyle, NY 12809 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts I Unit Wattage (B X C) Rear Parking(Parking area) 13940 ft2 0.06 Yes 836 Driveway(Driveway) 7630 ft2 0.06 Yes 458 Side Parking(Parking area) 93455 ft2 0.06 Yes 5607 Building Perimeter(Driveway) 28440 ft2 0.06 Yes 1706 Total Tradable Watts(a)= 8608 Total Allowed Watts= 8608 Total Allowed Supplemental Watts(b)= 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID :Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Rear Parking(Parking area 13940 ft2):Tradable Wattage LED 1:LED Other Fixture Unit 80W: 1 4 45 180 Driveway(Driveway 7630 ft2):Tradable Wattage LED 2:Other: 1 15 73 1098 Side Parking(Parking area 93455 ft2):Tradable Wattage LED 3:Other: 1 5 45 225 Building Perimeter(Driveway 28440 ft2):Tradable Wattage LED 4:Other: 1 5 45 225 Total Tradable Proposed Watts= 1728 Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 3 of 9 COMcheck.cck erior Lighting PASSES: Design 81%better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.0 an '4)corn with any applicable mandatory requirements listed in the Inspectionec Checklist. Nam -Title Sign re Dat ��pF NE4A r '�`I No.058843 C4, cif/* ` ,A9 / OFESSI9N\/ Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 4 of 9 COMcheck.cck COMcheck SoftwareChecklist Version 4.0.8.0 Inspection Energy Code: 2015 IECC Requirements: 88.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans,specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed.Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. C103.2 Plans, specifications, and/or ❑Complies ['DREW calculations provide all information ❑Does Not with which compliance can be determined for the exterior lighting ❑Not Observable and electrical systems and equipment ENot Applicable and document where exceptions to the standard are claimed.Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. C406 Plans,specifications, and/or ❑Complies Requirement will be met. [PR9]1 calculations provide all information ❑Does Not with which compliance can be determined for the additional energy :Not Observable efficiency package options. ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 I Low Impact(Tier 3) Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 5 of 9 COMcheck.cck Sectipn # Rough-In Electrical inspection Complies? Comments/Assumptions & Req.ID C405.2.1 Lighting controls installed to uniformly OComplies Requirement will be met. [EL15]1 reduce the lighting load by at least ❑Does Not 50%. :Not Observable ❑Not Applicable C405.2.1 Occupancy sensors installed in ElComplies Requirement will be met. [EL18]1 required spaces. ❑Does Not ONot Observable ONot Applicable C405.2.1, Independent lighting controls installed ❑Complies Requirement will be met. C405.2.2. per approved lighting plans and all ODoes Not 3 manual controls readily accessible and [EL23]2 visible to occupants. ONot Observable ONot Applicable C405.2.2. Automatic controls to shut off all ❑Complies Requirement will be met. 1 building lighting installed in all ODoes Not [EL22]2 buildings. :Not Observable ❑Not Applicable C405.2.3 Daylight zones provided with ElComplies Requirement will be met. [EL16]2 individual controls that control the ❑Does Not lights independent of general area lighting. ONot Observable ❑Not Applicable C405.2.3, Primary sidelighted areas are ❑Complies Requirement will be met. C405.2.3. equipped with required lighting ❑Does Not 1, controls. C405.2.3. [Not Observable 2 ❑Not Applicable [EL20]1 C405.2.3, Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply. C405.2.3. under skylights and rooftop monitors ODoes Not 1, are equipped with required lighting C405.2.3. controls. ONot Observable 3 ONot Applicable [EL21]1 C405.2.4 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ODoes Not lighting plans. ❑Not Observable ❑Not Applicable C405.2.4 Additional interior lighting power ElComplies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ONot Observable separated from general lighting. ❑Not Applicable C405.2.5 Automatic lighting controls for exterior ElComplies [EL25]na° lighting installed.Controls will be ❑Does Not daylight controlled, set based on business operation time-of-day, or ['Not Observable reduce connected lighting > 30%. ❑Not Applicable C405.3 Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 face. ODoes Not :Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 'Medium Impact(Tier 2) I 3 !Low Impact(Tier 3) Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 6 of 9 COMcheck.cck 1 High Impact(Tier 1) 2 M m Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 7 of 9 COMcheck.cck Sectign # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M instructions for ❑Complies Requirement will be met. C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [FI17]3 representative. ENot Observable ❑Not Applicable C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. C405.5.1 Exterior lighting power is consistent ❑Complies See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ❑Not Applicable C408.2.5. Furnished as-built drawings for ❑Complies Requirement will be met. 1 electric power systems within 90 days ❑Does Not [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [F133]1 ensure proper calibration,adjustment, ❑Does Not programming, and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: `1 !High Impact(Tier 1) 121Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: CR Bard Phase II,Warehouse Renovation Report date: 10/04/18 Data filename: Y:\UPSE Data Drive\17-0231 Highlander CR Bard Warehouse\Lighting Design\Phase II Page 8 of 9 COMcheck.cck