PB Staff Notes SUB (P) 13-2018 & FWW 6-2018 Clear Brook_1 15 18 Town of Queensbury Planning Board Community Development Department Staff Notes January 15, 2019 SUB (P) Stage 13-2018 CLEAR BROOK, LLC FWW 6-2018 Big Boom Road / WR – Waterfront Residential / Ward 4 SEQR Type I Material Review: revised subdivision drawings with wetlands and house locations, stormwater management report. Parcel History: SUB Sketch Plan 4-2018; AV 54-2018 __________________________________________________________________________________________ Requested Action Planning Board review and approval for a 14 lot residential subdivision of a 145.30 acre parcel. Resolutions 1. SEQR 2. Planning Board decision Project Description Applicant proposes a 14 lot residential subdivision of a 145.30 acre parcel. Project is within I-87 overlay zone. Revised information for construction details, landscape plan, clearing plan, grading and erosion and stormwater has been provided. Pursuant to Chapter 183 and Chapter 94 of the Zoning Ordinance, subdivision of land and work within 100 ft. of a wetland shall be subject to Planning Board review and approval. Staff Comments Sketch Plan –Applicant’s concept plan for 15 residential lots was reviewed at sketch Preliminary Review – Layout plans –Revised for 14 residential lots. The plans show the site topography, setbacks wetlands, shared driveway and proposed homes on the site. The project occurs on Big Boom Road and the lots will access the existing road and no new streets are being proposed. Construction details – The plans show layout for septic systems on each house site for a four bedroom home. The plans also show the waterline connections for Lots 1-13. Lot 14 does not show a water connection at this time. Refer to the letter from the Superintendent of Water and Director of Wastewater Landscape plans –Subdivision requires plans with 10 lots or more to develop a landscaping plan. The applicant has requested a waiver from a landscape plan. The updated plans show areas of disturbance and areas outside of the disturbance are vegetation to remain. There should be notes on the plans that direct future owners on tree removal and plantings. Clearing plan – The applicant has indicated the disturbance area for each lot. The plans show the home locations based on the existing site topography and setbacks for wetlands, property lines and northway setback. There should be notes on the plan providing directing to future owners about clearing limits. Grading and erosion plans –The plans show site topography indicating there are steep slopes at the shoreline. The applicant has included the topography information for each parcel existing and proposed. The Environmental report – The applicant has completed a Long Environmental assessment review for 14 lots. The previous 15 lot proposal was adjusted to 14 lots due to the archeological items found on the site. A revised SEQR has been requested and or additional information on the archeological find. Stormwater management –The applicant has provided a stormwater management report that is under review b the Town Engineer. Fees –per application. Waivers –The applicant has not requested any waivers. Open Space –There is no proposal for open space. Streets –The plans show no new streets. Freshwater Wetlands The applicant plans show the location of the wetlands on the parcel. They are noted as isolated wetlands and to be 9.53 acres. The project shows the house locations and a setback line for construction noting the project work for some homes are within a 100 ft of the wetland. Nature of Area Variance Granted 8/22/18. The applicant proposes a 15 lot residential subdivision were relief is requested from the following-  § 179-4-035 Interstate Highway Overlay District. …no new residential subdivision of land within 500 ft of the Northway. Currently the Northway rest area boundary line is within 100 ft of the proposed project.  § 179-4-050 Frontage –lots 2 and 4 are proposed to share a driveway with lot 3 and lots 8 and 9 are proposed to share a driveway with lot 9 and 10 they have road frontage but not physical access to Big Boom Rd. Also lots 14 and 15 to have a shared driveway roadway (Waterline Easement road). (Note revised plans indicate shared driveway is for lots 3 and 4 and lots 9 and 10 located on the boundary line) Water/Wastewater Department Comments – The Superintendent of Water and Director of Wastewater provided comments to the board for review that should be discussed during the application review in regards to the easement language and water supply. - 2 - Application Tentative Process  Submission of an updated SEQR and archeological findings.  SEQR Type moves from an Unlisted to a Type I –the project requires a district extension this is now a coordinated review with the Town Board.  Applicant to make application to the Town Board for a map plan and report for the extension  The Planning Board seeks Lead Agency  Town Board consents or requests Lead Agency  Planning Board accepts Lead Agency or consents to Town  SEQR Review for Subdivision and Map –Plan –Report  Town Board acts on request for district extension  Planning Board completes preliminary review and decision –applicant may make application for Final Summary The board should consider discussion at the board meeting in regards to the Superintendent of Water and Director of Wastewater letter; additional language to the plans for disturbance, clear treeing and shoreline activity noting other review may be required; archeological findings; easement language for shared driveways, and an updated SEQR. Meeting History: PB: PBR 8/21/18, 8/28/18 tabled, 10/16/18 tabled, 12/18/18 tabled; ZBA: 8/22/18; - 3 -