Loading...
ResCheck , REScheck Software Version 4.6.4 Compliance Certificate 11 IL[ rMARO8 2019 I //I Project Foothills Builders Inc _ TOWN OF O YEs.':N:St`IPY Energy Code: 2015 IECC BHP t ,~ �'c Location: Glens Falls, New York Construction Type: Single-family Project Type: New Construction • RC-0110-2019 Conditioned Floor Area: 2,096 ft2 Foothills Builders LLC Glazing Area 14% 56 John Clendon Rd, Lot 6 Climate Zone: 6 (7635 HDD) Permit Date: SFD 2096 s.f., Garage 440 s.f. Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 56 John Clendon Drive Daniel W. Ryan P.E. Lot#6 206 Glen Street Queensbury, NY 12804 Ste 30 Glens Falls, NY 12801 518-792-9264 ompliance:Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 295 Your UA: 295 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont, Assembly or U-Factor UA Perimeter R-Value R-Value Ceiling 1: Raised or Energy Truss 1,036 38.0 0.0 0.025 26 Ceiling 2: Cathedral Ceiling 185 21.0 0.0 0.048 9 Wall 1: Wood Frame, 16" o.c. 1,185 21.0 0.0 0.057 56 Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 77 0.290 22 Door 1: Solid 20 0.240 5 Door 2: Solid 18 0.140 3 Door 3: Glass 80 0.290 23 Wall 2: Wood Frame, 16" o.c. 1,134 21.0 0.0 0.057 57 Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 138 0.290 40 Floor 1: All-Wood Joist/Truss:Over Outside Air 10 30.0 0.0 0.033 0 Floor 2: All-Wood Joist/Truss:Over Unconditioned Space 264 30.0 0.0 0.033 9 Basement Wall 1: Solid Concrete or Masonry 1,027 0.0 19.0 0.038 38 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Window 4: Vinyl/Fiberglass Frame:Double Pane 5 0.400 2 Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 1 of10 Clendon Lot 6\1416 Rescheck.rck Compliance Statement: The proposed building design described er- is consistent with the building plans, •- I 'cations, and o her calc. •tions sub itted with the permit application.The propo d • ilding -- .:en designed to m-- e 2015 IECC re irem is in RE- -ck -rsio' 4.6.4 and to •••• ,. h the mandatory r-q ' eme fisted ' the RESche nspection Checklist. Na ril' Ti`e 1 _ Signature D e VI,,:Y 'CI . C) •,,r,,y `A,,, " tr r_ ' o u1 \o► 0. 07'- Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 2 of10 Clendon Lot 6\1416 Rescheck.rck REScheck Software Version .4 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/PlanReview Value' Value Complies? Comments/Assumptions &Req.l€1, 103.1, Construction drawings and EComplies 103.2 documentation demonstrate - ' - ❑Does Not [PR1]1 energy code compliance for the ❑Not Observable building envelope.Thermal " envelope represented on r ❑Not Applicable construction documents. � �' �� 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. - ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr EDoes Not [PR212 on loads calculated per ACCA Cooling: Cooling: [Not Observable tom; Manual J or other methods Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 3 of10 Clendon Lot 6\1416 Rescheck.rck . ' _ - ��� ' Foundation Inspection Plans Verified | Field Verified Complies? �wmmm� nmno�ns | Value / Value / "='`����° | /mReq "� ' `�^�� � r���-�:���� `-. ' «oa.z.z Conditioned basement wall ' n- . p. i[][nmpnes See the Envelope»su,nm+s [pOu]' insulation n-va|ue, Where interior n' | n�___ |[]ooe� mot |�mem/«�»e� insulation `onisuse� verification � ' ' �I-*, !may need to occur during � i ���� ![]wu�Observable ! Insulation Inspection. Not []motAppUoable | !required i humid locations� iin Climate Zone s. 303.2 uxm.um/eu basement wall ElComplies � iF0511 insulation installed oes | �� . .... `=.=. � .."""`"""" | ' FlNot Observable []mutApp|icaUle � 40229 /Conditioned basement wall | ft | ft /[lComplies See the Envelope Assemblies [p06]1 |insulation depth or burial or []ooe, mot table for values. �distance from top urwall. i | []Not Observable � |[]m,txpp|ioab|e � 3v3 | ' - ' ' insulation, ..~ ....... � - -�minimumof§ in below grade. E]Not Applicable � 403.9 'Snow-and ice+neldngsystem Complies � 'controls installed. Does Not ' Observable ! Applicable � _ _ . . Additi»msVCommmants/Assmmmptions: -- High Impact(Tier l) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: [:\Users\|nobision\Dnopbux\DVVRPEEngineering\AcdvePnojects\l4lh ' DES ' FHB 5hJohn Page 4ufIO Oendon Lot 6\l4I0Rescheck.rck Section _ # Framing(Rough-ln Inspection Plans Verified Field Verified Complies? Comments/Assumptions & Re ICY Value Value a� 402.1.1, Door U-factor. U- U ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ❑Not Observable ` ❑Not Applicable ; 402.1.1, Glazing U-factor(area weighted U-___ U- {❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, • 402.3.6, • ;❑Not Observable 402.5 E '❑Not Applicable [FR2]1 • • 303.1.3 :U-factors of fenestration products ❑Complies [FR4]1 ''are determined in accordance 1 ;° - , , % ❑Does Not with the NFRC test procedure or :❑Not Observable taken from the default table. " >: „ ❑ of Applicable 402.4.1.1 Air; barrier and thermal barrier six �� � � " """❑Complies [FR23]1 ,installed per manufacturer's tKK _ ❑Does Not instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ,.M , ❑Complies [FR20)1 is listed and labeled as meeting ,g , " ❑Does Not AAMA/WDMA/CSA 101/LS.2/A440 or has infiltration rates per NFRC �, � `t �z, � ❑Not Observable •400 that do not exceed code # ° °x❑Not Applicable limits. i:: x �/S , IC-rated recessed lighting fixtures ❑Complies • t] •sealed at housing/interior finish r� -❑Does Not :3 :and labeled to indicate <_2.0 cfm :' leakage at 75 Pa. -__ ❑Not Observable ; 4.7i m ❑Not Applicable " ` ❑Com lies • 403.2.1 ;Supply and return ducts in attics p [FR12]1 insulated >= R-8 where duct is $ r `❑Does Not >= 3 inches in diameter and >= � ❑Not Observable R-6 where < 3 inches.Supply and f, „ ' ". < £;t ❑Not Applicable return ducts in other portions of ` , :ar „1,.. the building insulated >= R-6 for s` • diameter>= 3 inches and R-4.2 ' for< 3 inches in diameter. i a :_ 403.3,33.5 Building cavities are not used as �� ❑Complies [FR1513ducts or plenums. .4< .1LDDoes Not k- ' ['Not Observable . ..., < [Not Applicable 444- HVAC piping conveying fluids R- R- ❑Complies M w;above 105°F or chilled fluids ODoes Not s E � below 55 4F are insulated to>_R- ❑Not Observable ' , ❑Not Applicable 403.4.1 Protection of insulation on HVAC �`_ � '.❑Complies [FR24]1 Epiping. s „❑Does Not a, , � , - ' ❑Not Observable . W ❑Not Applicable R- ❑Complies • 403.5.3 Hot water pipes are insulated to R i[FR1812 -R-3. .❑Does Not 1 ;❑Not Observable 1 "� f❑Not Applicable ❑Complies 403.E Automatic or gravity dampers are :. [FR19]2 installed on all outdoor air ''" `o ❑Does Not intakes and exhausts.al ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) Medium Impact(Tier 2) 1 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 5 of10 Clendon Lot 6\1416 Rescheck.rck Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 6 of10 Clendon Lot 6\1416 Rescheck.rck S Section f Plans Verified Field Verified I # Insulation Inspection Value Value Complies? Comments/Assumptions 303.1 All installed insulation is labeled EComplies [1N1312 or the installed R-values ,d fi,'r, ❑Does Not �7 provided. ,!� ['Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- EComplies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel [Not Observable 1-5 ❑Not Applicable 303.2, Floor insulation installed per 'EComplies 402.2.7 manufacturer's instructions and ❑Does Not [IN2]i in substantial contact with the 1, underside of the subfloor, or floor ❑Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing ,..- �members. � 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least/of the ❑ Wood ❑ Wood ElDoes Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per �� ,'�� , "��u� , 'EComplies [IN4]1 manufacturer's instructions. Does Not/' �,�1,r , "?1 ❑Not Observable fi * ,1 =❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) -2 Medium Impact(Tier 2) 55 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 7 of10 Clendon Lot 6\1416 Rescheck.rck SecElon Plans Verified Field si*Ied # - Final`Inspection Provisions complies? Comments/Assumptions & Req.ID Value Va(u 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel E Steel ❑Not Observable 402.2.E [Fill' ❑Not Applicable 303.1.1.1, Ceiling= insulation installed per k ,A,4 �'������°u' �s ❑Complies r �� 303.2 manufacturer's instructions. ❑Does Not [F12]' Blown insulation marked every 300 ft'. }❑Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable y4 ❑Complies [F122]� insulation include baffle adjacent �� �� rk'1,❑Does Not to soffit and eave vents that y extends over insulation. ��,dV,Vjt� 4�*11� '0,:, ❑Not Observable ��; � x f( ❑Not Applicable 402.2.4 Attic access hatch and door R- EComplies R [F131' insulation ?R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F117]' ach in Climate Zones 1-2, and ❑Not Observable ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [F14]' cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough in '❑Not Observable tests, verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]' determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air _handler enclosure. 403.3.2.1 Air handler leakage designated �' ," a] ', n x",❑Complies [F124]' by manufacturer at<=2%of � �� .. �❑Does Not design air flow. ❑Not Observable �'i ❑Not Applicable 403.1.1 Programmable thermostats p ,� =:❑Complies [F19]2 installed for control of primary j ro ❑Does Not heating and cooling systems and4, initially set by manufacturer to �' ❑Not Observable code specifications. <<^❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [F110]2 on heat pumps. ❑Does Not I. ;,❑Not Observable ❑Not Applicable 403.5-1 Circulating service hot water ❑Complies [Fail]' systems have automatic or ❑Does Not accessible manual controls. --- Sri d;]4� 6;= '.; ['Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 8 of10 Clendon Lot 6\1416 Rescheck.rck € _Section I # Final Inspection Provisions j Plans Verified Field Verified Complies? ' Comments/Assumptions 1& Req.lD{ Value Value [403.6.1 All mechanical ventilation system ❑Complies [F125]2 fans not part of tested and listed Does Not HVAC equipment meet efficacy [Not Observable and air flow limits. ❑Not Applicable 403.2 Hot water boilers supplying heat - , _ -.;: :, ❑Complies F126 2 through one or two-pipe heating ❑Does Not systems have outdoor setback ', ::x , x ° ['Not Observable Y � x ,.;... . ,.:. fig.. control to lower boiler water 2, >.� ` ; '.1_ t--=- �:.:: y R >` �.9,TM_ ❑Not Applicable temperature based on outdoor `:,,:li ' ',7 -A.;,:',',":N µ-. -, temperature. << �``� '', '. 4;u .5, .403.5.1.1 Heated water circulation s stems £ ' )' ;a'k,, , `� `. plies i ;'.::.. .❑Com % ;[F12812 have a circulation pump.The x ° = ❑Does Not system return pipe is a dedicated F 4: : ~',. --", . E` ,� k., ❑Not Observable �:;..:_. 'c t;:,--- , return pipe or a cold water supply:� y y -�y sd = , ` z;-;uy ❑Not Applicable pipe. Gravity and thermos- ::.'. ,.. syphon circulations stems are '�4,•_ - -;. � YP Y , ara . `, = re not present.Controls for 0. •f"' _--?£" :`.--._ circulating hot water system i jf, --.4= :'-~:,= ` - V° pumps start the pump with signal' `ss :; , =€«,: ` _ ',-,-. for hot water demand within the •;'-'. occupancy. Controls 5 ..x y'" ; automatically turn off the pump '^, `i::.: ``''.. ;.; ',' •_. when water is in circulation loop ;?�`„ •` ::..:, . is at set-point temperature and ^ • ' ' "`_�' "_ no demand for hot water exists. o' `-..1"-;°;� ', .- :,. 403.5.1.2 Electric heat trace systems ,Complies [FI2912 comply with IEEE 515.1 or UL EDoes Not 515.Controls automatically ['Not Observable adjust the energy input to the �P,.�tiA"-u>,., heat tracing to maintain the °' µ ;. °: ❑Not Applicable : desired water temperature in the ; r, s 403.5,2 Water distribution systems that -`•' .,-. ": �77^::„-A =:. : ; ., '`n❑Complies [F130] have recirculation pumps that > „ '` x ..:.:. .. ❑Does Not pump water from a heated water C.. .wtwr >.�'s,^ " rt.w ~'a- ► = `° . ~- :<<r. ,;,..,;❑Not Observable supply pipe back to the heated 7,;' k> --. :. ', ,..:..... .. water source through a cold ,' .: : -wr;- `` r::,:= ❑Not Applicable water supply pipe have a x ?a =,•,. ••,..'..*. �. a demand recirculation water :::..: ,1. . < :``' system. Pumps have controls '4 `.. ',,A : " 0.' "4 that manage operation of the •� �€ a^�>F �,.K pump and limit the temperature :,' ^A;.,7. :". ' Y . ° ! ?i§a ,1 of the water entering the cold w;.,.„ ' ``x'~ ;:.. water piping to 104°F. ,� :��•.._ ;.�:; ' ��. 403.5.4 Drain water heat recovery units :""' `'.. ,:'' '' ❑Com lies [FI3112 tested in accordance with CSA - ;: . = ' ,'- Does Not B55.1. Potable water-side ; ' :.:... :—,, ''..�"1:t,: ;--, ._' . ;❑Not Observable pressure loss of drain water heat ; '.� •.:., . R � ❑Not Applicable recovery units< 3 psi for : ..'° :7 °:' ; ... ,'.:)'', ':< ,..:..... individual units connected to one ' N , " or two showers. Potable water- : of 27=' ! .-,„^ :• ' ' a side pressure loss of drain water ,, . ,: t,.,.' { i`z " ° heat recovery units< 2 psi for e�.,; ," ,:r. Y= _: individual units connected to `"`'. : '; ° '° �� =.::. ,r .��>z' y..:,e• ,nA;:�.: fi`' three or more showers. '=" ;:,,,'''''-''..1',"". :• , :'::;;gym;•; ,...::: ,:-: ,„•,:. . _:m .;':❑Com lies 404.1 75%of lamps in permanent - ,': ``"`° '„.°vF. " ` "'-,� P [F16]' fixtures or 75%of permanent -=' ... "• ... >�� .M�p ,M�:., .._ h . ❑Does Not fixtures have high efficacy lamps. ,,.2.,, ;„if x ::„ ,^ ',^ ,; : ,,d.* ,,❑Not Observable Does not apply to low-voltage : .._:.:x `".h ,X; ., s.' : �', , '❑Not Applicable lighting. : .. :':: n� a: `: ; »YM`us Pp 404.1,1 Fuel gas lighting systems have ', ; " : -ryr:"x<. - ,::; � : _ z ., ❑Complies [F123] no continuous pilot light. ,r s ' ❑Does Not . e ; ';...T.''''.' : ° .€ �N t Ob servable, . x fi n '.-.� . : " Not Applicable . „1,.. 1 High Impact(Tier 1) Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 9 of 10 Clendon Lot 6\1416 Rescheck.rck Section Plans Verified Field Verifi� # Final Inspecti cl on Previsions Value' Value complies? GoenmerttslAssumptions & Req.lD 401.3 Compliance certificate posted. .,.. ,$ , ;❑Complies [F1712 ..,� , ,��"❑Does Not F�; 1 , '� ` ❑Not Observable � ', -` ❑Not Applicable 303.3 Manufacturer manuals for �Ut '�❑Complies [F118]3 mechanical and water heating ' ❑Does Not systems have been provided. � � �� �i .❑Not Observable t ,r. ��-❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2" Medium Impact(Tier 2) 13-!Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 03/04/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 10 of10 Clendon Lot 6\1416 Rescheck.rck 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.29 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments