ResCheck ,
REScheck Software Version 4.6.4
Compliance Certificate
11
IL[ rMARO8 2019 I //I
Project Foothills Builders Inc _
TOWN OF O YEs.':N:St`IPY
Energy Code: 2015 IECC BHP t ,~ �'c
Location: Glens Falls, New York
Construction Type: Single-family
Project Type: New Construction •
RC-0110-2019
Conditioned Floor Area: 2,096 ft2 Foothills Builders LLC
Glazing Area 14% 56 John Clendon Rd, Lot 6
Climate Zone: 6 (7635 HDD)
Permit Date: SFD 2096 s.f., Garage 440 s.f.
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
56 John Clendon Drive Daniel W. Ryan P.E.
Lot#6 206 Glen Street
Queensbury, NY 12804 Ste 30
Glens Falls, NY 12801
518-792-9264
ompliance:Passes using UA trade-off
Compliance: 0.0%Better Than Code Maximum UA: 295 Your UA: 295
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont,
Assembly or U-Factor UA
Perimeter R-Value R-Value
Ceiling 1: Raised or Energy Truss 1,036 38.0 0.0 0.025 26
Ceiling 2: Cathedral Ceiling 185 21.0 0.0 0.048 9
Wall 1: Wood Frame, 16" o.c. 1,185 21.0 0.0 0.057 56
Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 77 0.290 22
Door 1: Solid 20 0.240 5
Door 2: Solid 18 0.140 3
Door 3: Glass 80 0.290 23
Wall 2: Wood Frame, 16" o.c. 1,134 21.0 0.0 0.057 57
Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 138 0.290 40
Floor 1: All-Wood Joist/Truss:Over Outside Air 10 30.0 0.0 0.033 0
Floor 2: All-Wood Joist/Truss:Over Unconditioned Space 264 30.0 0.0 0.033 9
Basement Wall 1: Solid Concrete or Masonry 1,027 0.0 19.0 0.038 38
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5
Window 4: Vinyl/Fiberglass Frame:Double Pane 5 0.400 2
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 1 of10
Clendon Lot 6\1416 Rescheck.rck
Compliance Statement: The proposed building design described er- is consistent with the building plans, •- I 'cations, and o her
calc. •tions sub itted with the permit application.The propo d • ilding -- .:en designed to m-- e 2015 IECC re irem is in
RE- -ck -rsio' 4.6.4 and to •••• ,. h the mandatory r-q ' eme fisted ' the RESche nspection Checklist.
Na ril' Ti`e 1 _ Signature D e
VI,,:Y 'CI .
C) •,,r,,y
`A,,, " tr
r_ ' o u1
\o► 0. 07'-
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 2 of10
Clendon Lot 6\1416 Rescheck.rck
REScheck Software Version .4
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/PlanReview Value' Value Complies? Comments/Assumptions
&Req.l€1,
103.1, Construction drawings and EComplies
103.2 documentation demonstrate - ' - ❑Does Not
[PR1]1 energy code compliance for the ❑Not Observable
building envelope.Thermal "
envelope represented on r ❑Not Applicable
construction documents. � �' ��
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. - ❑Not Observable
Systems serving multiple ❑Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr EDoes Not
[PR212 on loads calculated per ACCA Cooling: Cooling: [Not Observable
tom; Manual J or other methods Btu/hr Btu/hr
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 3 of10
Clendon Lot 6\1416 Rescheck.rck
. '
_ -
��� ' Foundation Inspection Plans Verified | Field Verified Complies? �wmmm� nmno�ns |
Value / Value
/ "='`����° |
/mReq "� ' `�^�� �
r���-�:���� `-. '
«oa.z.z Conditioned basement wall ' n- . p. i[][nmpnes See the Envelope»su,nm+s
[pOu]' insulation n-va|ue, Where interior n' | n�___ |[]ooe� mot |�mem/«�»e�
insulation `onisuse� verification � ' '
�I-*, !may need to occur during � i ���� ![]wu�Observable !
Insulation Inspection. Not []motAppUoable |
!required i humid locations�
iin Climate Zone s.
303.2 uxm.um/eu basement wall ElComplies �
iF0511 insulation installed oes |
�� .
.... `=.=. � .."""`"""" |
' FlNot Observable
[]mutApp|icaUle �
40229 /Conditioned basement wall | ft | ft /[lComplies See the Envelope Assemblies
[p06]1 |insulation depth or burial or []ooe, mot table for values.
�distance from top urwall. i | []Not Observable �
|[]m,txpp|ioab|e �
3v3 |
' - '
' insulation, ..~ ....... �
-
-�minimumof§ in below grade.
E]Not Applicable
�
403.9
'Snow-and ice+neldngsystem Complies �
'controls installed. Does Not '
Observable !
Applicable
�
_ _ . .
Additi»msVCommmants/Assmmmptions:
-- High Impact(Tier l) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: [:\Users\|nobision\Dnopbux\DVVRPEEngineering\AcdvePnojects\l4lh ' DES ' FHB 5hJohn Page 4ufIO
Oendon Lot 6\l4I0Rescheck.rck
Section _
# Framing(Rough-ln Inspection Plans Verified Field Verified Complies? Comments/Assumptions
& Re ICY Value Value
a�
402.1.1, Door U-factor. U- U ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ❑Not Observable
` ❑Not Applicable ;
402.1.1, Glazing U-factor(area weighted U-___
U- {❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3, •
402.3.6, •
;❑Not Observable
402.5 E '❑Not Applicable
[FR2]1 •
•
303.1.3 :U-factors of fenestration products ❑Complies
[FR4]1 ''are determined in accordance 1 ;° - , , % ❑Does Not
with the NFRC test procedure or :❑Not Observable
taken from the default table. " >:
„ ❑ of Applicable
402.4.1.1 Air; barrier and thermal barrier six �� � � " """❑Complies
[FR23]1 ,installed per manufacturer's tKK _ ❑Does Not
instructions. ❑Not Observable
❑Not Applicable
402.4.3 Fenestration that is not site built ,.M , ❑Complies
[FR20)1 is listed and labeled as meeting ,g , "
❑Does Not
AAMA/WDMA/CSA 101/LS.2/A440
or has infiltration rates per NFRC �, � `t �z, � ❑Not Observable
•400 that do not exceed code # ° °x❑Not Applicable
limits. i:: x
�/S , IC-rated recessed lighting fixtures ❑Complies •
t] •sealed at housing/interior finish r� -❑Does Not
:3 :and labeled to indicate <_2.0 cfm
:' leakage at 75 Pa. -__ ❑Not Observable ;
4.7i m ❑Not Applicable
" ` ❑Com lies
•
403.2.1 ;Supply and return ducts in attics p
[FR12]1 insulated >= R-8 where duct is $ r
`❑Does Not
>= 3 inches in diameter and >= � ❑Not Observable
R-6 where < 3 inches.Supply and f, „ ' ". < £;t ❑Not Applicable
return ducts in other portions of ` , :ar „1,..
the building insulated >= R-6 for s`
•
diameter>= 3 inches and R-4.2 '
for< 3 inches in diameter.
i a :_
403.3,33.5 Building cavities are not used as �� ❑Complies
[FR1513ducts or plenums. .4< .1LDDoes Not
k- ' ['Not Observable
. ..., < [Not Applicable
444- HVAC piping conveying fluids R- R- ❑Complies
M w;above 105°F or chilled fluids ODoes Not
s E � below 55 4F are insulated to>_R- ❑Not Observable
' ,
❑Not Applicable
403.4.1 Protection of insulation on HVAC �`_ � '.❑Complies
[FR24]1 Epiping. s „❑Does Not
a, , � , - ' ❑Not Observable
. W ❑Not Applicable
R- ❑Complies •
403.5.3 Hot water pipes are insulated to R
i[FR1812 -R-3. .❑Does Not
1 ;❑Not Observable
1 "� f❑Not Applicable
❑Complies
403.E Automatic or gravity dampers are :.
[FR19]2 installed on all outdoor air ''" `o ❑Does Not
intakes and exhausts.al ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) Medium Impact(Tier 2) 1 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 5 of10
Clendon Lot 6\1416 Rescheck.rck
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 6 of10
Clendon Lot 6\1416 Rescheck.rck
S Section f Plans Verified Field Verified
I # Insulation Inspection Value Value Complies? Comments/Assumptions
303.1 All installed insulation is labeled EComplies
[1N1312 or the installed R-values ,d fi,'r, ❑Does Not
�7
provided. ,!� ['Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- EComplies See the Envelope Assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
[IN1]1 ❑ Steel ❑ Steel [Not Observable
1-5
❑Not Applicable
303.2, Floor insulation installed per 'EComplies
402.2.7 manufacturer's instructions and ❑Does Not
[IN2]i in substantial contact with the
1, underside of the subfloor, or floor ❑Not Observable
framing cavity insulation is in ❑Not Applicable
contact with the top side of
sheathing, or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing ,..-
�members. �
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least/of the ❑ Wood ❑ Wood ElDoes Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable
[IN3]1 exterior,the exterior insulation
requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation is installed per �� ,'�� , "��u� , 'EComplies
[IN4]1 manufacturer's instructions. Does Not/' �,�1,r , "?1 ❑Not Observable
fi *
,1 =❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) -2 Medium Impact(Tier 2) 55 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 7 of10
Clendon Lot 6\1416 Rescheck.rck
SecElon Plans Verified Field si*Ied
# - Final`Inspection Provisions complies?
Comments/Assumptions
& Req.ID Value Va(u
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel E Steel ❑Not Observable
402.2.E
[Fill' ❑Not Applicable
303.1.1.1, Ceiling= insulation installed per k ,A,4 �'������°u' �s ❑Complies
r ��
303.2 manufacturer's instructions. ❑Does Not
[F12]' Blown insulation marked every
300 ft'. }❑Not Observable
❑Not Applicable
402.2.3 Vented attics with air permeable y4 ❑Complies
[F122]� insulation include baffle adjacent �� �� rk'1,❑Does Not
to soffit and eave vents that y
extends over insulation. ��,dV,Vjt� 4�*11� '0,:, ❑Not Observable
��; � x f( ❑Not Applicable
402.2.4 Attic access hatch and door R- EComplies
R
[F131' insulation ?R-value of the ❑Does Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies
[F117]' ach in Climate Zones 1-2, and ❑Not Observable
❑Does Not
<=3 ach in Climate Zones 3-8.
❑Not Applicable
403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[F14]' cfm/100 ft2 across the system or ft2
ft2 ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough in '❑Not Observable
tests, verification may need to ❑Not Applicable
occur during Framing Inspection.
403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[F127]' determine air leakage with ft2 ft2
❑Does Not
either: Rough-in test:Total
leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
_handler enclosure.
403.3.2.1 Air handler leakage designated �' ," a] ', n x",❑Complies
[F124]' by manufacturer at<=2%of � �� .. �❑Does Not
design air flow.
❑Not Observable
�'i ❑Not Applicable
403.1.1 Programmable thermostats p ,� =:❑Complies
[F19]2 installed for control of primary j ro ❑Does Not
heating and cooling systems and4,
initially set by manufacturer to �' ❑Not Observable
code specifications. <<^❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[F110]2 on heat pumps. ❑Does Not
I.
;,❑Not Observable
❑Not Applicable
403.5-1 Circulating service hot water ❑Complies
[Fail]' systems have automatic or ❑Does Not
accessible manual controls. --- Sri d;]4� 6;=
'.; ['Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 8 of10
Clendon Lot 6\1416 Rescheck.rck
€ _Section I # Final Inspection Provisions j Plans Verified Field Verified Complies? ' Comments/Assumptions
1& Req.lD{ Value Value
[403.6.1 All mechanical ventilation system ❑Complies
[F125]2 fans not part of tested and listed Does Not
HVAC equipment meet efficacy [Not Observable
and air flow limits.
❑Not Applicable
403.2 Hot water boilers supplying heat - , _ -.;: :, ❑Complies
F126 2 through one or two-pipe heating ❑Does Not
systems have outdoor setback ', ::x ,
x ° ['Not Observable
Y � x ,.;... . ,.:. fig..
control to lower boiler water 2, >.� ` ; '.1_ t--=-
�:.:: y R >` �.9,TM_ ❑Not Applicable
temperature based on outdoor `:,,:li ' ',7 -A.;,:',',":N µ-. -,
temperature. << �``� '', '. 4;u .5,
.403.5.1.1 Heated water circulation s stems £ ' )' ;a'k,, , `� `. plies
i ;'.::.. .❑Com
%
;[F12812 have a circulation pump.The x ° = ❑Does Not
system return pipe is a dedicated F 4: : ~',. --", . E` ,� k., ❑Not Observable
�:;..:_. 'c t;:,--- ,
return pipe or a cold water supply:� y y -�y sd = , ` z;-;uy ❑Not Applicable
pipe. Gravity and thermos- ::.'. ,..
syphon circulations stems are '�4,•_ - -;. �
YP Y , ara . `, = re
not present.Controls for 0. •f"' _--?£" :`.--._
circulating hot water system i jf, --.4= :'-~:,= ` - V°
pumps start the pump with signal' `ss :; , =€«,: ` _ ',-,-.
for hot water demand within the •;'-'.
occupancy. Controls 5 ..x y'" ;
automatically turn off the pump '^, `i::.: ``''.. ;.; ',' •_.
when water is in circulation loop ;?�`„ •` ::..:, .
is at set-point temperature and ^ • ' ' "`_�' "_
no demand for hot water exists. o' `-..1"-;°;� ', .- :,.
403.5.1.2 Electric heat trace systems ,Complies
[FI2912 comply with IEEE 515.1 or UL EDoes Not
515.Controls automatically ['Not Observable
adjust the energy input to the �P,.�tiA"-u>,.,
heat tracing to maintain the
°' µ ;. °: ❑Not Applicable
:
desired water temperature in the ;
r,
s
403.5,2 Water distribution systems that -`•' .,-. ": �77^::„-A =:. : ; ., '`n❑Complies
[F130] have recirculation pumps that > „ '` x ..:.:. .. ❑Does Not
pump water from a heated water C.. .wtwr >.�'s,^ " rt.w ~'a-
► = `° . ~- :<<r. ,;,..,;❑Not Observable
supply pipe back to the heated 7,;' k> --. :. ', ,..:..... ..
water source through a cold ,' .: : -wr;- `` r::,:=
❑Not Applicable
water supply pipe have a x ?a =,•,. ••,..'..*.
�. a
demand recirculation water :::..: ,1. . < :``'
system. Pumps have controls '4 `.. ',,A : " 0.' "4
that manage operation of the •� �€ a^�>F �,.K
pump and limit the temperature :,' ^A;.,7. :". ' Y . ° ! ?i§a ,1
of the water entering the cold w;.,.„ ' ``x'~
;:..
water piping to 104°F. ,� :��•.._ ;.�:; ' ��.
403.5.4 Drain water heat recovery units :""' `'.. ,:'' '' ❑Com lies
[FI3112 tested in accordance with CSA - ;: . = ' ,'- Does Not
B55.1. Potable water-side ; ' :.:...
:—,, ''..�"1:t,: ;--, ._' . ;❑Not Observable
pressure loss of drain water heat ; '.� •.:., .
R � ❑Not Applicable
recovery units< 3 psi for : ..'° :7 °:' ; ... ,'.:)'', ':< ,..:.....
individual units connected to one ' N , "
or two showers. Potable water- : of 27=' ! .-,„^ :• ' ' a
side pressure loss of drain water ,, . ,: t,.,.' { i`z " °
heat recovery units< 2 psi for e�.,; ," ,:r. Y= _:
individual units connected to `"`'. : '; ° '°
�� =.::. ,r .��>z' y..:,e• ,nA;:�.: fi`'
three or more showers. '=" ;:,,,'''''-''..1',"". :• , :'::;;gym;•;
,...::: ,:-: ,„•,:. . _:m .;':❑Com lies
404.1 75%of lamps in permanent - ,': ``"`° '„.°vF. " ` "'-,� P
[F16]' fixtures or 75%of permanent -=' ... "•
... >�� .M�p ,M�:., .._ h . ❑Does Not
fixtures have high efficacy lamps. ,,.2.,, ;„if x ::„ ,^ ',^ ,; : ,,d.* ,,❑Not Observable
Does not apply to low-voltage : .._:.:x `".h ,X; ., s.' : �', , '❑Not Applicable
lighting. : .. :':: n� a: `: ; »YM`us Pp
404.1,1 Fuel gas lighting systems have ', ; " : -ryr:"x<. - ,::; � : _ z ., ❑Complies
[F123] no continuous pilot light. ,r s ' ❑Does Not
. e
; ';...T.''''.'
: ° .€ �N t Ob
servable, . x fi n '.-.� . : " Not Applicable
. „1,..
1 High Impact(Tier 1) Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 9 of 10
Clendon Lot 6\1416 Rescheck.rck
Section Plans Verified Field Verifi�
# Final Inspecti cl on Previsions Value' Value complies? GoenmerttslAssumptions
& Req.lD
401.3 Compliance certificate posted. .,.. ,$ , ;❑Complies
[F1712 ..,� , ,��"❑Does Not
F�; 1 , '� ` ❑Not Observable
� ', -` ❑Not Applicable
303.3 Manufacturer manuals for �Ut '�❑Complies
[F118]3 mechanical and water heating ' ❑Does Not
systems have been provided. � �
�� �i .❑Not Observable
t ,r. ��-❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2" Medium Impact(Tier 2) 13-!Low Impact(Tier 3)
Project Title: Foothills Builders Inc Report date: 03/04/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1416 - DES - FHB 56 John Page 10 of10
Clendon Lot 6\1416 Rescheck.rck
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 19.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.29
Door 0.29
Heating&Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments