Loading...
RC-000413-2017 (2) � . C � E I J /a► a J� t �"`� TOWN OF QUEENSBURY ��. . n* ,+�+ vt- 1 0 14 COMMUNITY DEVELOPMENT 1:*\, ;S iv o a s U,�t cv 0-0 ./ to .• ` �}1ut�� it SLl Via. �y er. 6P a pq s, a L" u t n _ ✓✓` 1 N s 33 NOTICE: Smoke detectors are required ii bedrooms (a , a adjacent to bedrooms and on = floor 3 c C lever including cellar or asement. All smoke detectors&carbon rnonOxIde ' ,2- © N a `o detectors shall be Int h battery backup and locatedn on4a v F Carbon monoxide detectors a -. re required I HAVE PER ONALLY MEASURED THE DISTANCE r, a c outside sleeping areas and on all leve FROK O PROPERTY LINES TO TH a ° a C ti 1 aqa� S ` 7� G t —(� i PRO , TRUCTURE(S)OR SI N( ) :.p i�` �i e L rpt l t `t ro vN OF�I=t� -� t , a E . BUILDING pi SIGN T E v ^ C BUIil.,DINto & COD- PT. � t1 TE � Based on our limited��C0tiliit�tt�fiy� � ee RC-viewed with our com"rits thali not b ir8ti�tF�@��s indicatingthe ens end a voi pdtib"§ ait Ir, FILE C O f Y Dale: t� full comliance with th@ ��II@IhQ D8�@§ bf New York State, I � na Lu t(rdou) ctc�s � r 13t 1 �J � �l�b � u.r ��CL✓ t..f - 1y� s� �' 4O-y\ f200a �. > cy Or t20ool" ow 3 �`C�� S�4C�L. b J y..ti.. 1'A'•wt a �`� � r . 3311121, / Generated by REScheck-Web Software Compliance Certificate ETOWN UVE Project Queensbury.7.6.17 Energy Code: 2015 IECC Location: Warren County, New York EENSBUAEConstruction Type: Single-family VELOPMENT Project Type: Alteration Climate Zone: 6 (8499 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 11 Ryan Ave Bendetti Architectural Plans Queensbury, New York alterationCompliance:Passes using prescriptive requirements for - cts Envelope Assemblies Gross Area Cavity Cont. Perimeter Ceiling area of the home forming the top of the structure's insulation --- --_ --- --- --- envelope: Flat or Scissor Truss Exemption: Framing cavity not exposed. Wall area of the second floor forming the sides of the insulation envelope for --- --- --- --- --- the area: Wood Frame, 16in. o.c. Exemption: Framing cavity filled with insulation Wall area of the first floor forming the sides of the structure's insulation 1,014 13.0 10.0 0.044 35 envelope: Wood Frame, 16in. o.c. Window area of the home using energy efficient units: Vinyl Frame, 2 Pane w/ 213 0.300 64 Low-E Subfloor of home forming the bottom of the structure's insulation envelope: --- --- --- --- --- All-Wood Joist/Truss Over Uncond.Space Exemption: Framing cavity not exposed. Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 5.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name Title i nature Date 309.14-1-73 RC 413-2017 James Benedetti 11 Ryan Avenue Residential Interior Alterations - entire house and garage walls for fire safety Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 1 of 9 CREScheck Software Version 5.5.0 �(J Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the !, building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Manual J or other methods Btu/hr Btu/hr ❑Not Observable approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact(Tier 3) Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 2 of 9 Section # Foundation Inspection Complies? Comments/Assumptions &Re .ID 303.2.1 A protective covering is installed to ❑Complies [F011]z protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below ❑ grade. Not Observable ❑Not Applicable 403.9 Snow-and ice-melting system controls ❑Complies [FO12]2 installed. []Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Queens bury.7.6.17 Report date: 07/06/17 Data filename: Page 3 of 9 Section Plans Verified Field Verified # Framing/ Rough-in Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 []Not Applicable [FR2]1 9A 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not 14 with the NFRC test procedure or taken from the default table. ❑Not Observable ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not a¢ instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting []Does Not AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate s2.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.2.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >_ R-6 where < 3 inches. Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R- R- []Complies [FR17]2 above 105 QF or chilled fluids ❑Does Not tt, below 55 QF are insulated to>_R- - ❑ 3 Not Observable _ ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies [FR24]1 piping. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact(Tier 3) j Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 4 of 9 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) i 3 1Low Impact(Tier 3) Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 5 of 9 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Re .ID 303.1 All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values ❑Does Not provided. ;t ❑Not Observable []Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ❑Not Observable V ❑Not Applicable 303.2, Floor insulation installed per ❑Complies 402.2.7 manufacturer's instructions and ❑Does Not [IN2]1 in substantial contact with the t underside of the subfloor, or floor []Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not []Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 6 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Re .ID 402.1.1, Ceiling insulation R-value. R- R- []Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ❑ 402.2.6 Not Observable [FI1]1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ftz. ❑Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies [F122]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. ❑Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies [FI3]1 insulation >_R-value of the []Does Not adjacent assembly. ❑Not Observable []Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F117]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [F14]1 cfm/100 ft2 across the system or ft2 ft2 []Does Not <=3 cfm/100 ft2 without air []Not Observable handler @ 25 Pa. For rough-in tests, verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch []Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies [F124]1 by manufacturer at <=2%of ❑Does Not design airflow. ❑Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [F19]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies [FI11]2 systems have automatic or ❑Does Not accessible manual controls. []Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 +Medium Impact(Tier 2) 3 Low Impact (Tier 3) Project Title: Queen sbury.7.6.17 Report date: 07/06/17 Data filename: Page 7 of 9 Section Plans Verified Field Verified # 1 Final Inspection Provisions Complies? Comments/Assum tions & Req.ID Value Value p 403.6.1 All mechanical ventilation system ❑Complies [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits. ❑Not Observable ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies [FI26]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F]28]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies [F129]2 comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [F130]2 have recirculation pumps that []Does Not pump water from a heated water supply pipe back to the heated ❑Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1049F. 403.5.4 Drain water heat recovery units []Complies [FI31]2 tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. _ 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75% of permanent []Does Not fixtures have high efficacy lamps. Does not apply to low-voltage ❑Not Observable lighting. []Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F123]3 no continuous pilot light. ❑Does Not v ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 8 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 401.3 Compliance certificate posted. ❑Complies [F17]2 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F11813 mechanical and water heating []Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Queensbury.7.6.17 Report date: 07/06/17 Data filename: Page 9 of 9 15 IECC Energy Efficiency Certificate Insulation . Above-Grade Wall 23.00 Below-Grade Wall 0.00 Floor 0.00 Ceiling / Roof 0.00 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.30 Door CoolingHeating & Heating System: Cooling System: Water Heater: Name: Date: Comments Lily o W-40,'a—s—S IT-.09 IS fi P,e Eta clany Af AY vi Typa PP L I A H C E 5, Ix all Ala; T—i Front oil, Runge Men (S) -P p r 0 V RaIr MUM R/ STYLE N I SH Pull Other LOIA PATTERN 5V .113 5 N t. V./b A v ov ii YA ff Olt SyspithA5G AR D E M C, I f Y, aJ Y C '1964 ApseA.