Loading...
Staff Notes SP 24-2019 Connolly_4 16 19 Town of Queensbury Planning Board Community Development Department Staff Notes April 16, 2019 Site Plan 24-2019 BRIAN CONNOLLY 135 Eagan Road / WR – Waterfront Residential / Ward 4 SEQR Unlisted Material Review: site plan application, site plan drawing, letter Parcel History: AV 108-1996, 96680-5402 sf home; __________________________________________________________________________________________ Requested Action Planning Board review and approval to maintain an existing clearing within 50 ft. of the shoreline. Resolutions 1. SEQR 2. PB decision Project Description Applicant requests to maintain an existing clearing within 50 ft. of the shoreline. The disturbance of approximately 9,260 sq. ft. included brush and small trees and placing topsoil within 50 ft. of the shoreline. Applicant stabilized the area with seed, mulch and straw, no further disturbance is proposed. Pursuant to Chapter 179-6-050 of the Zoning Ordinance, clearing within 50 ft. of shoreline shall be subject to Planning Board review and approval. Staff Comments  Location-The project site is located at 135 Eagan Road off of Big Bay Road.  Arrangement-The project site has an existing home and shoreline frontage on the Hudson River.  Site Design-The applicant has complete some tree clearing on the property within 50 ft of the shoreline and has added some topsoil to the same area.  Building -There is no building involved  Site conditions-the applicant has provided some before and after pictures of the site. The site contained small trees that have been removed and the applicant has placed topsoil down. The images show the area strawed and it’s to be a grassed area.  Grading and drainage plan and Sediment and erosion control – The applicant has stabilized the site with straw. The site was reviewed by the Code Compliance officer and noted the site was stabilized with straw.  Landscape plan- the area is to be a new lawn area for the applicant.  Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, l. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The applicant has completed a site plan review application for removal of trees and placing topsoil in an area within 50 ft of the shoreline. The applicant was made aware site plan review was required and the applicant has supplied a letter in response to the work without approvals. st Meeting History: 1 meeting;