ComCheck COMcheck Software Version 4.1.1.0
riAlLfii Interior Lighting Co 1. if.= eV ficate
MAY 13 2019
Project Information
,!„.
Energy Code: 2015 IECC TOWN OF QUEENSBURY
Project Title: BUILDING&CODES
Project Type: REVIt Nev::— Lion
Construction site:ENERGY CODE OMPLIANCE 302.6-1-27 CC-0297-2019
Aldi Inc
Additional Efficiency Package(s) -03 Glen St
Unspecified FILE COPYcommerical Alterations 22,830 s.f.
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
. 1-Sales(Retail) 21975 1.26 27688
Total Allowed Watts= 27689
Ir. Proposed Interior Lighting Power
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
1-Sales(Retail)
LED 1:L1/L1E:8 Ft.LED Strip Light:LED Other Fixture Unit 90W: 1 17 88 1496
LED 2:L2/L2E:4 Ft.LED Strip Light:LED Other Fixture Unit 46W: 1 4 44 176
LED 3:L4/L4E:2x4 LED Recessed Troffer:LED Other Fixture Unit 46W: 1 16 44 704
LED 4:L10:4 Ft.LED Vaportite:LED Other Fixture Unit 60W: 1 7 63 441
LED 7:N1:3.7 Ft.LED Linear Strip Module:LED Other Fixture Unit 50W: 1 12 54 648
LED 8:N2/N2E:5.5 Ft.LED Linear Strip Module:LED Other Fixture Unit 80W: 1 95 72 6840
LED 9:N3:3.7 Ft.LED Linear Strip Module:LED Other Fixture Unit 36W: 1 12 34 408
LED 10:N3H:3.7 Ft.LED Linear Strip Module:LED Other Fixture Unit 50W: 1 7 54 378
LED 11:N4/N4E:5.5 Ft.LED Linear Strip Module:LED Other Fixture Unit 80W: 1 30 72 2160
LED 12:N5:3.7 Ft.LED Linear Strip Module:LED Other Fixture Unit 36W: 1 4 34 136
LED 13:N5X:5.5 Ft.LED Linear Strip Module:LED Other Fixture Unit 60W: 1 12 54 648
LED 15:N7/N7D: 1.1 Ft.LED Single Spot Module:LED Other Fixture Unit 28W: 1 23 28 644
LED 16:N8/N8D: 1.1 Ft.LED Double Spot Module:LED Other Fixture Unit 46W: 1 18 45 810
LED 14:N4UN4LE:5.5 Ft.LED Linear Strip Module:LED Other Fixture Unit 50W: 1 4 54 216
I; LED 15:L14/L14E:1x4 Ft.LED Recessed Troffer:LED Other Fixture Unit 46W: 1 21 44 924
Total Proposed Watts= 16629
I Interior Lighting PASSES: Design 40% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Project Title: Report date: 04/23/19
Data filename: M:\2018 Jobs\481 -ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 1 of 6
Queensbury NY.cck
"'I
II
ai
1
6.
Anthony DiMascio - MEP Engr. kI4 ^v 1 4/26/19
Name-Title Signature Date
---Of
NE�
•r1 n
Ir- 11021
�
f j� LCFj
m dail! z
y(ZO 09812° F
Ark
() ESS10aP
Project Title: Report date: 04/23/19
Data filename: M:\2018 jobs\481 -ALDI - SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 2 of 6
Queensbury NY.cck
irlA COMcheck Software Version 4.1.1.0
ii Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title:
Location: Glens Falls, New York
Climate Zone: 6a
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
Additional Efficiency Package(s)
Unspecified
Mechanical Systems List
Quantity System Type&Description
1 RTU-1 (Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=540 kBtu/h
Proposed Efficiency=81.00%Et,Required Efficiency: 80.00%Et
t Cooling: 1 each-Single Package DX Unit,Capacity=287 kBtu/h,Air-Cooled Condenser,Air Economizer
f Proposed Efficiency=11.30 EER,Required Efficiency: 9.80 EER + 11.4 IEER
Fan System: RTU-1 I SALES--Compliance(Motor nameplate HP method):Passes
Fans:
FAN 1 Supply,Constant Volume,8095 CFM,8.0 motor nameplate hp,0.0 fan efficiency grade
1 RTU-2(Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=65 kBtu/h
Proposed Efficiency=81.00%Et,Required Efficiency: 80.00%Et or 78%AFUE
Cooling: 1 each-Single Package DX Unit,Capacity=24 kBtu/h,Air-Cooled Condenser,Air Economizer
Proposed Efficiency=17.00 SEER,Required Efficiency: 14.00 SEER
Fan System: RTU-2 I SUPPORT--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 2 Supply,Constant Volume,600 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade
1 FCU-1/HP-1 (Single Zone):
Split System Heat Pump
Heating Mode:Capacity= 12 kBtu/h,
Proposed Efficiency= 10.50 HSPF,Required Efficiency=8.20 HSPF
Cooling Mode:Capacity= 10 kBtu/h,
i. Proposed Efficiency=20.20 SEER,Required Efficiency: 14.00 SEER
.1 Fan System: FCU-1/HP-1 I OFFICE--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 3 Supply,Constant Volume,300 CFM,0.1 motor nameplate hp,0.0 fan efficiency grade
2 UH-1-2(Single Zone):
Heating: 1 each-Unit Heater,Gas,Capacity=75 kBtu/h
Proposed Efficiency=80.00%Ec, Required Efficiency: 80.00%Ec
Fan System: UH-1-2 I BACK ROOM--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 4 Supply,Constant Volume,950 CFM,0.1 motor nameplate hp,0.0 fan efficiency grade
2 EWH-1:
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI - SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 1 of 14
Queensbury NY,cck
mi
Quantity, System Type&Description
Electric Storage Water Heater,Capacity: 19 gallons
Proposed Efficiency:0.00 SL,%/h(if>12 kW),Required Efficiency: 1.66 SL,%/h(if> 12 kW)
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist. �� �^ . ,
Anthony DiMascio - MEP Engineer bki "U uV 04/25/19
Name-Title Signature — Date
OF NE►N
;1 n
n i� jq . w
�c'(`O 098120
%Pess10NP
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI -SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 2 of 14
Queensbury NY.cck
COMcheck Software Version 4.1.1.0
11 Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0,0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# I Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or ❑Complies
[PR2]1 calculations provide all information ❑Does Not
;with which compliance can be
;determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
!document where exceptions to the
'standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2 Plans, specifications, and/or ❑Complies
I. [PR3]1 calculations provide all information ❑Does Not
!with which compliance can be
;determined for the service water ❑Not Observable
'heating systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C406 Plans, specifications, and/or ElComplies
[PR9]1 calculations provide all information ❑Does Not
with which compliance can be
determined for the additional energy ❑Not Observable
efficiency package options. Observable,__,
Applicable
Additional Comments/Assumptions:
t
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI -SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 3 of 14
11 Queensbury NY.cck
sectiog
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.4. Snow/ice melting system sensors for EComplies
5, future connection to controls. Freeze ❑Does Not
C403.2.4. protection systems have automatic
6 controls installed. ❑Not Observable
[F09)3 ❑Not Applicable
Additional Comments/Assumptions:
I
NI
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 4 of 14
Queensbury NY.cck
pi,
i
.
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID •
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 ❑Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
(PL6]3 ❑Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 ❑Not Observable
❑Not Applicable
C404.5, Heated water supply ping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
1' C404.5.2 requirements. Refer to section details.
i [PL6]3 ❑Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
(PL6]3 ❑Not Observable
❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ENot Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
"' [PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
_ cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
•
<= 5 minutes after end of heating ['Not Observable
cycle. DNot Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ['Not Observable
cycle. ❑Not Applicable
II
Nj
•'
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 5 of 14
Queensbury NY.cck
Section
Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C404.7 Water distribution system that pumps ['Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a [Not Observable
demand recirculation water system. Observable,__,
Applicable
I Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F,
C404.7 Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
) demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. LiNot Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
ri pipe back to the heated-water source
" through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water •
entering the cold-water piping to
104°F.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 6 of 14
Queensbury NY.cck
}
fi
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 7 of 14
Queensbury NY.cck
0 Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
t
i & Req.ID
C402.2.6 Thermally ineffective panel surfaces of❑Complies
[ME41]3 sensible heating panels have ❑Does Not
insulation >= R-3.5.
['Not Observable
❑Not Applicable
C403.2.12 HVAC fan systems at design ❑Complies See the Mechanical Systems list for values.
.1 conditions do not exceed allowable ❑Does Not
[ME65]3 fan system motor nameplate hp or fan
system bhp. ❑Not Observable
❑Not Applicable
C403.2.12 Fans have efficiency grade(FEG) >= ❑Complies
.3 67.The total efficiency of the fan at ❑Does Not
[ME117]2 the design point of operation <= 15%
of maximum total efficiency of the ❑Not Observable
fan. ❑Not Applicable
C403.2.13 Unenclosed spaces that are heated ❑Complies
[ME71]2 use only radiant heat. ❑Does Not
['Not Observable
❑Not Applicable
µ C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values.
Irl
[ME55]2 ❑Does Not
['Not Observable
❑Not Applicable
C403.2.4. Fault detection and diagnostics ❑Complies
7 installed with air-cooled unitary DX ❑Does Not
[ME113]2 units having economizers.
li ❑Not Observable
❑Not Applicable
C403.2.6. Demand control ventilation provided ❑Complies
1 for spaces>500 ft2 and >25 ❑Does Not
[ME59]1 people/1000 ft2 occupant density and
served by systems with air side ❑Not Observable •
economizer, auto modulating outside ❑Not Applicable
air damper control,or design airflow
>3,000 cfm.
C403.2.6. Enclosed parking garage ventilation ❑Complies
2 has automatic contaminant detection ❑Does Not
[ME115]3 and capacity to stage or modulate ❑Not Observable
fans to 50%or less of design capacity.
❑Not Applicable
C403.2.7 Exhaust air energy recovery on ❑Complies
f [ME57]1 systems meeting Table C403.2.7(1) ❑Does Not
and C403.2.7(2).
❑Not Observable
❑Not Applicable
C403.2.8 Kitchen exhaust systems comply with ❑Complies
[ME116]3 replacement air and conditioned EDoes Not
supply air limitations, and satisfy hood
rating requirements and maximum ❑Not Observable
J. exhaust rate criteria. ❑Not Applicable
C403.2.9 HVAC ducts and plenums insulated. ❑Complies
[ME60]2 Where ducts or plenums are installed ❑Does Not
in or under a slab,verification may
need to occur during Foundation ❑Not Observable
Inspection. ❑Not Applicable
C403.2.9 Ducts and plenums sealed based on ❑Complies
[ME10]2 static pressure and location. ❑Does Not
❑Not Observable
❑Not Applicable
"I 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI -SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 8 of 14
Queensbury NY.cck
Section
'# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID .
C403.2.9. Ductwork operating >3 in. water ❑Complies
1.3 column requires air leakage testing. ❑Does Not
[ME11]3 ❑Not Observable
❑Not Applicable
C403.2.9. Ductwork operating >3 in. water ❑Complies
''_
I1.3 column requires air leakage testing. ❑Does Not
1 [ME11]3 ❑Not Observable
❑Not Applicable
C403.2.9. Ductwork operating >3 in.water ❑Complies
1.3 column requires air leakage testing. ❑Does Not
it' [ME11]3 [Not Observable
V.
❑Not Applicable
C403.2.9. Ductwork operating >3 in.water ❑Complies
1.3 column requires air leakage testing. ❑Does Not
[ME11]3 ['Not Observable
❑Not Applicable
C403.3 Air economizers provided where ❑Complies
[ME62]' required, meet the requirements for ❑Does Not
design capacity, control signal, ['Not Observable
ventilation controls, high-limit shut-off,
integrated economizer control,and ❑Not Applicable
provide a means to relieve excess
outside air during operation.
C403.4.2. Open-or closed circuit cooling towers ❑Complies •
3.2.2 have a separate heat exchanger to Oboes Not
1 [ME122]3 isolate the cooling tower from the
heat pump loop, and heat loss is ❑Not Observable
it controlled by shutting down the ❑Not Applicable
I " circulation pump on the cooling tower
loop.
C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values.
t 6 of individual zone boxes have static Oboes Not
[ME110]3 pressure setpoint reset controls. ❑Not Observable
�" ❑Not Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values.
6 of individual zone boxes have static ElDoes Not
[ME110]3 pressure setpoint reset controls.
❑Not Observable
❑Not Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls. [Not Observable
ENot Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls.
['Not Observable
❑Not Applicable
; , C408.2.2. Air outlets and zone terminal devices ❑Complies
•
1 have means for air balancing. ❑Does Not
[ME53)3 ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) "3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 9 of 14
Queensbury NY.cck
Section
Mechanical Rough-In Inspection Complies? • Comments/Assumptions
& Req.ID
C403.5, Refrigerated display cases,walk-in ❑Complies
C403.5.1, coolers or walk-in freezers served by ❑Does Not
C403.5.2 remote compressors and remote
[ME123]3 condensers not located in a ❑Not Observable
condensing unit, have fan-powered ❑Not Applicable
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Additional Comments/Assumptions:
I
1 High Impact(Tier 1) [ Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 10 of 14
Queensbury NY.cck
, Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, Furnished O&M manuals for HVAC ❑Complies
C408.2.5. systems within 90 days of system ❑Does Not
3 acceptance.
[F18]3 ❑Not Observable
(: ! ❑Not Applicable
C403.2.2 HVAC systems and equipment ❑Complies
[F127]3 capacity does not exceed calculated ❑Does Not
loads.
ENot Observable
❑Not Applicable
C403.2.4. Heating and cooling to each zone is ❑Complies
1 controlled by a thermostat control. ❑Does Not
[FI47]3 Minimum one humidity control device
per installed ['Not Observable
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ❑Complies
1 controlled by a thermostat control. ❑Does Not
[F147]3 Minimum one humidity control device
per installed ENot Observable
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ❑Complies
1 controlled by a thermostat control. ❑Does Not
[F147]3 Minimum one humidity control device
per installed ❑Not Observable
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ❑Complies •
1 controlled by a thermostat control. ❑Does Not
[FI47]3 Minimum one humidity control device
per installed ENot Observable
humidification/dehumidification ENot Applicable
system.
C403.2.4. Heat pump controls prevent ❑Complies
1.1 supplemental electric resistance heat ❑Does Not
[F142]3 from coming on when not needed.
❑Not Observable
❑Not Applicable
C403.2.4. Thermostatic controls have a 5 °F ❑Complies
1.2 deadband. ❑Does Not
[F138]3 ❑Not Observable
❑Not Applicable
C403.2.4. Temperature controls have setpoint ❑Complies
1.3 overlap restrictions. ❑Does Not
(F120]3 ENot Observable
; ENot Applicable
C403.2.4. Each zone equipped with setback ❑Complies
2 controls using automatic time clock or ❑Does Not
[F139]3 programmable control system.
ENot Observable
ENot Applicable •
C403.2.4. Automatic Controls: Setback to 55°F ❑Complies
2.1, (heat)and 85°F (cool); 7-day clock, 2- ❑Does Not
C403.2.4. hour occupant override, 10-hour
2.2 backup [Not Observable
[F140]3 ENot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 11 of 14
Queensbury NY.cck
j1
Section
* Final Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.4. Systems include optimum start ❑Complies
2.3 controls. ❑Does Not
[FI41]3 ❑Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies
2.3 controls. ❑Does Not
[F141]3 ❑Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies
2.3 controls. ❑Does Not
[F141]3 ❑Not Observable
", ❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies
i ' 2.3 controls. ❑Does Not
irn` [FI41]3 ❑Not Observable
❑Not Applicable
C404.3 Heat traps installed on supply and ❑Complies
[FI11]3 discharge piping of non-circulating ❑Does Not
systems. ❑Not Observable
❑Not Applicable
C404.4 All piping insulated in accordance with ❑Complies
[F125]2 section details and Table C403.2.10. ❑Does Not
❑Not Observable
❑Not Applicable
C408.2.1 Commissioning plan developed by ❑Complies
[F128]1 registered design professional or ❑Does Not
approved agency.
['Not Observable
; ❑Not Applicable
II 1 C408.2.3. HVAC equipment has been tested to ❑Complies
1 ensure proper operation. ❑Does Not
[FI31]1 ❑Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been ❑Complies
k
2 tested to ensure proper operation, ❑Does Not
[F110]1 calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
C408.2.3. Economizers have been tested to ❑Complies
3 ensure proper operation. ❑Does Not
[FI32]1 ❑Not Observable
❑Not Applicable
C408.2.4 Preliminary commissioning report ❑Complies
[F129]1 completed and certified by registered ❑Does Not
design professional or approved
agency. ❑Not Observable
❑Not Applicable
1'1 C408.2.5. Furnished HVAC as-built drawings ❑Complies
1 submitted within 90 days of system ❑Does Not
h, [FI7]3 acceptance. ❑Not Observable
❑Not Applicable
C408.2.5. An air and/or hydronic system ❑Complies
3 balancing report is provided for HVAC ❑Does Not
ir [F143]1 systems.
['Not Observable
4" ❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 12 of 14
Queensbury NY.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C408.2.5. Final commissioning report due to EComplies
4 4 building owner within 90 days of ❑Does Not
[F130]1 receipt of certificate of occupancy.
�1, ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
M,
I
41
41
I
if
1 ',I 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481-ALDI-SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 13 of 14
Queensbury NY.cck
7�NyI
rl
Project Title: Report date: 04/25/19
Data filename: M:\2018 Jobs\481 -ALDI - SWN XX-Queensbury NY\Buildings\Design Documents\Reports\ALDI Page 14 of 14
Queensbury NY.cck