ResCheck REScheck Software Version 4..6.5
0 i
Compliance Certificate Nui
N 1.
4 to
O N 0
Project Taylor o c
Energy Code: 2015 IECC D 2 tC 2 fi �\/7 fE cn 0 Tr
N
Location: Glens Falls, New York lVi 15 lJ V L� _ N
Construction Type: Single-family
0 . E
Project Type: New Construction , = a
Conditioned Floor Area: 2,224 ft2 _ JUN 2 4 2019 c Li
Glazing Area 12% ^ N E In
Climate zone: 6 (7635 HDD) TOWN OF OUEENSBURY e. 3 E 0
Permit Date:
BUILDING&CODES
ti e 2
Permit Number: 0 O tF 0
Construction Site: Owner/Agent: Designer/Contractor: CO = N.
74 Richmond Hill Drive Hodorowski Homes Northstar Home Design, LLC
Queensbury, NY
Compliance: Passes using UA trade-off
Compliance: 0.6%Better Than Code Maximum UA: 325 Your UA: 323
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or U-Factor UA
Perimeter R-Value R-Value
Ceiling 1: Raised or Energy Truss 1,382 49.0 0.0 0.020 28
Wall 1:Wood Frame, 16"o.c. 2,713 21.0 0.0 0.057 134
Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 278 0.300 83
Door 1:Solid 44 0.190 8
Door 2:Glass 40 0.300 12
Basement Wall 1: Solid Concrete or Masonry 1,256 21.0 0.0 0.043 54
Wall height:8.0'
Depth below grade: 7.0'
Insulation depth: 8.0'
Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 84 30.0 0.0 0.033 3
Floor 2:All-Wood Joist/Truss:Over Outside Air 26 30.0 0.0 0.033 1
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the • check Inspection Checklist.
Name-Title Signature ` s di Date
's 44%,
' , •,,.,
Project Title: Taylor "1 Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Rich - - 'uF' ...rck Page 1 of 9
0 REScheck Software VersionChecklist 4.6.5
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, Construction drawings and ❑Complies
103.2 documentation demonstrate DDoes Not
[PR1]1 energy code compliance for the
V building envelope.Thermal ['Not Observable
envelope represented on ❑Not Applicable
construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ❑Not Observable
31, Systems serving multiple ❑Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
[PR2]2 on loads calculated per ACCA Cooling: Cooling:
Manual J or other methods ❑Not Observable
Btu/hr Btu/hr ❑Not Applicable
approved by the code official. pP
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 2 of 9
•
Section Plans Verified Field Verified
Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies
[F04]1 insulation R-value.Where interior R_ R- ❑Does Not
table for values.
insulation is used,verification
may need to occur during ❑Not Observable
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[F05]1 insulation installed per ❑Does Not
manufacturer's instructions.
42.1' ❑Not Observable
❑Not Applicable
402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies
[F06]1 insulation depth of burial or ❑Does Not table for values.
distance from top of wall.
[Not Observable
❑Not Applicable
303.2.1 A protective covering is installed Complies
[FO11]2 to protect exposed exterior ❑Does Not
insulation and extends a
minimum of 6 in. below grade. DNot Observable
❑Not Applicable
403.9 Snow-and ice-melting system ❑Complies
[F012)2 controls installed. ODoes Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 3 of 9
•
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ❑Not Observable
I4.
ONot Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3,
402.5 ONot Observable
[FR2]1 ONot Applicable
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑Does Not
¢4 with the NFRC test procedure or
taken from the default table. ❑Not Observable
ONot Applicable
402.4.1.1 Air barrier and thermal barrier ❑Complies
[FR23]1 installed per manufacturer's ❑Does Not
4f, instructions.
['Not Observable
ONot Applicable
402.4.3 Fenestration that is not site built ❑Complies
[FR2O]1 is listed and labeled as meeting ElDoes Not
AAMA/WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC ONot Observable
400 that do not exceed code ONot Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate<_2.0 cfm
leakage at 75 Pa. ONot Observable
ONot Applicable
403.3.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >=R-8 where duct is ❑Does Not
41, >=3 inches in diameter and >=
R-6 where<3 inches.Supply and ['Not Observable
return ducts in other portions of ONot Applicable
the building insulated>= R-6 for
diameter>= 3 inches and R-4.2
for<3 inches in diameter.
403.3.5 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
1 ❑Not Observable
ONot Applicable
403.4 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 QF or chilled fluids ❑Does Not
below 55 QF are insulated to>_R-
N
3 ['Not Observable
ONot Applicable
403.4.1 Protection of insulation on HVAC ❑Complies
[FR24]1 piping. ❑Does Not
❑Not Observable
ONot Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
ONot Observable
ONot Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts.
ONot Observable
DNot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 4 of 9
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title:Taylor Report date: 06/05/19
Data filename: C:\Usersjkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 5 of 9
•
Section Plans Verified Field Verified
Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 All installed insulation is labeled ❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided.
❑Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
[IN1]1 ❑ Steel ❑ Steel
['Not Observable
❑Not Applicable
303.2, Floor insulation installed per ❑Complies
402.2.7 manufacturer's instructions and ❑Does Not
[IN2]1 in substantial contact with the
44) underside of the subfloor,or floor ['Not Observable
framing cavity insulation is in ❑Not Applicable
contact with the top side of
sheathing,or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
402.1.1, Wall insulation R-value.If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ['Not Observable
[IN3]1 exterior,the exterior insulation
4t, requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title:Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 6 of 9
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Re..ID
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2,
402.2.E ❑ Steel ❑ Steel ❑Not Observable
[Al]' ❑Not Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. ❑Does Not
[FI2]' Blown insulation marked every
300 ft2. ['Not Observable
❑Not Applicable
402.2.3 Vented attics with air permeable ❑Complies
[FI22]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
extends over insulation. ❑Not Observable
❑Not Applicable
402.2.4 Attic access hatch and door R- R- ❑Complies
[FI3]' insulation .R.-value of the ❑Does Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50= ACH 50 = ❑Complies
[FI17]' ach in Climate Zones 1-2,and ❑Does Not
<=3 ach in Climate Zones 3-8. ❑Not Observable
❑Not Applicable
403.3.4 Duct tightness test result of<=4 cfm1100 cfm/100 ❑Complies
[F14)' cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
handler @ 25 Pa. For rough-in
tests,verification may need to ❑Not Applicable
occur during Framing Inspection.
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[FI27)' determine air leakage with ft2 ft2 ❑Does Not
either: Rough-in test:Total
leakage measured with a DNot Observable
pressure differential of 0.1 inch ❑Not Applicable
w.g.across the system including
the manufacturer's air handler
enclosure if installed at time of
test.Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g.across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated ❑Complies
[FI24]' by manufacturer at<=2%of ❑Does Not
design air flow.
❑Not Observable
❑Not Applicable
403.1.1 Programmable thermostats ❑Complies
(FI9)2 installed for control of primary ❑Does Not
heating and cooling systems and
initially set by manufacturer to :Not Observable
code specifications. ❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10)2 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
403.5.1 Circulating service hot water ❑Complies
[FI11]2 systems have automatic or ODoes Not
accessible manual controls.
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 7 of 9
•
Section Plans Verified Field Verified
Final Inspection Provisions Value Value Complies? Comments/Assumptions
&Req.ID
403.6.1 All mechanical ventilation system ❑Complies
[F125]2 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy
and air flow limits. ['Not Observable
ElNot Applicable
403.2 Hot water boilers supplying heat ❑Complies
[F126]2 through one-or two-pipe heating ❑Does Not
systems have outdoor setback
control to lower boiler water Not Observable
temperature based on outdoor ❑Not Applicable
temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply Not Observable
pipe.Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present.Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy.Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 Electric heat trace systems ❑Complies
IF129]2 comply with IEEE 515.1 or UL ❑Does Not
515.Controls automatically
adjust the energy input to the ['Not Observable
heat tracing to maintain the ONot Applicable
desired water temperature in the
piping.
403.5.2 Water distribution systems that ❑Complies
[F130]2 have recirculation pumps that ❑Does Not
pump water from a heated water
supply pipe back to the heated Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1049F.
403.5.4 Drain water heat recovery units ❑Complies
[FI31]2 tested in accordance with CSA ❑Does Not
B55.1.Potable water-side
pressure loss of drain water heat ❑Not Observable
recovery units < 3 psi for ❑Not Applicable
individual units connected to one
or two showers.Potable water-
side pressure loss of drain water
heat recovery units<2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent ❑Complies
[FI6]1 fixtures or 75%of permanent ❑Does Not
fixtures have high efficacy lamps.
Does not apply to low-voltage Not Observable
lighting. ❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[F123]3 no continuous pilot light. ❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Taylor Report date: 06/05/19
Data filename: C:\Users\jkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 8 of 9
•
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
401.3 Compliance certificate posted. ❑Complies
[F17)2 Does Not
❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[F118)3 mechanical and water heating ❑Does Not
systems have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title:Taylor Report date: 06/05/19
Data filename: C:\Usersjkazl\OneDrive\Documents\REScheck\74 Richmond Hill Drive.rck Page 9 of 9
iC 20 IECC Energy
Efficiency15 Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 21.00
Floor 30.00
Ceiling / Roof 49.00
Ductwork (unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.30
Door 0.19
Heating&Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments