ComCheck.pdf COMcheck Software Version 4.1.1.0
il Inspection Checklist
Energy Code: 2015 IECC
IrriII
Requirements: 11.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans and/or specifications provide all ❑Complies
[PR1]' information with which compliance ❑Does Not
can be determined for the building
envelope and document where [:]Not Observable
exceptions to the standard are ONot Applicable
claimed.
C103.2 Plans,specifications, and/or ❑Complies
[PR2]1 calculations provide all information ❑Does Not
with which compliance can be •
determined for the mechanical ❑Not Observable
systems and equipment and ONot Applicable •
document where exceptions to the
standard are claimed.Load
calculations per acceptable
engineering standards and
handbooks.
C103.2 Plans,specifications, and/or ❑Complies
[PR3]' calculations provide all information ❑Does Not
with which compliance can be
determined for the service water ONot Observable
heating systems and equipment and ONot Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C103.2 Plans,specifications, and/or '❑Complies
[PR4]' calculations provide all information ❑Does Not
with which compliance can be
determined for the interior lighting :Not Observable
and electrical systems and equipment ONot Applicable
and document where exceptions to
the standard are claimed, Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
C402.4.1 The vertical fenestration area <= 30 ❑Complies
[PR10)1 percent of the gross above-grade wall ❑Does Not
area.
.ONot Observable
ONot Applicable
C402.4.1 The skylight area <= 3 percent of the ❑Complies
[PR11]' gross roof area. ElDoes Not
[Not Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 5 of 17
Pulmonary\Calculations\Queensbury MO.cck
•
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 6 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C303.2 'Below-grade wall insulation installed ❑Complies
[F0212 per manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1 'Exterior insulation protected against :❑Complies
[F0611 damage,sunlight, moisture, wind, :DDoes Not
landscaping and equipment
maintenance activities. .❑Not Observable
❑Not Applicable
C402.1.4 Below-grade wall insulation R-value. ❑Complies See the Envelope Assemblies table for values.
[F01)2 ❑Does Not
❑Not Observable
❑Not Applicable
C403.2.4, :Snow/ice melting system sensors for ElComplies
5, 'future connection to controls. Freeze ElDoes Not
C403.2.4. protection systems have automatic ❑Not Observable
6 controls installed.
[F09)3 ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 7 of 17
Pulmonary\Calculations\Queensbury MO.cck
•
Section
Framing/Rough-In Inspection Complies? Comments/Assumptions
&Req.ID
C402.5.1 ;The building envelope contains a ❑Complies
[FR1611 continuous air barrier that is sealed in ❑Does Not
an approved manner and either
constructed or tested in an approved ❑Not Observable
manner.Air barrier penetrations are ❑Not Applicable
sealed in an approved manner.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 8 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
Plumbing Rough-In Inspection Complies? Comments/Assumptions
&Req.ID
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL613
❑Not Observable
❑Not Applicable
C404.5, :Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 DNot Observable
❑Not Applicable
C404.6.1, Automatic time switches installed to ❑Complies
C404.6.2 automatically switch off the '❑Does Not
[PL3]1 recirculating hot-water system or heat
trace. ❑Not Observable
,❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply,
(PL713 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<=5 minutes after end of heating :Not Observable
cycle. ❑Not Applicable
C404.7 Water distribution system that pumps ❑Complies Exception: Requirement does not apply.
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a [Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies
[PL8I3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source ❑Not Observable
through a cold-water supply pipe is a
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 9 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C402.2.6 Thermally ineffective panel surfaces of DComplies
[ME4113 sensible heating panels have DDoes Not
insulation >=R-3.5.
:Not Observable
❑Not Applicable
C402.5.5, Stair and elevator shaft vents have DComplies
C403.2.4. motorized dampers that automatically DDoes Not
[ME3]3 close. ENot Observable'
❑Not Applicable
C402.5.5, Outdoor air and exhaust systems have;DComplies
C403.2.4. motorized dampers that automatically :❑Does Not
3 shut when not in use and meet
[ME5813 maximum leakage rates.Check ❑Not Observable
gravity dampers where allowed. '❑Not Applicable
C403.2.13 Unenclosed spaces that are heated DComplies •
[ME7112 use only radiant heat. DDoes Not
:Not Observable
❑Not Applicable
C403.2.3 HVAC equipment efficiency verified. DComplies See the Mechanical Systems list for values.
[ME55]2 DDoes Not
1 ❑Not Observable
❑Not Applicable
C403.2.6, Demand control ventilation provided :❑Complies
1 for spaces >500 ft2 and >25 ❑Does Not
[ME59]1 people/1000 ft2 occupant density and
served by systems with air side ❑Not Observable
economizer,auto modulating outside ❑Not Applicable
air damper control, or design airflow
>3,000 cfm.
C403.2.6. Enclosed parking garage ventilation DComplies
2 has automatic contaminant detection DDoes Not
[ME115]3 and capacity to stage or modulate
fans to 50%or less of design capacity. ❑Not Observable
❑Not Applicable
C403.2.7 Exhaust air energy recovery on DComplies
[ME57]1 systems meeting Table C403.2.7(1) ❑Does Not
and C403.2.7(2).
[Not Observable
❑Not Applicable
C403.2.8 ;Kitchen exhaust systems comply with ❑Complies
[ME116]3 :replacement air and conditioned DDoes Not
supply air limitations,and satisfy hood
rating requirements and maximum ❑Not Observable
exhaust rate criteria. ❑Not Applicable
C403.2,9 HVAC ducts and plenums insulated. DComplies
[ME60)2 Where ducts or plenums are installed DDoes Not
in or under a slab,verification may
need to occur during Foundation Not Observable
Inspection. ❑Not Applicable
C403.2.9 Ducts and plenums sealed based on DComplies
[ME10]2 static pressure and location. DDoes Not
❑Not Observable
❑Not Applicable
C403.2.9. Ductwork operating>3 in,water DComplies Exception: Requirement does not apply.
1.3 column requires air leakage testing, ❑Does Not
[ME11]3 :Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\AL8-2018172.00 Saratoga Outpatient Page 10 of 17
Pulmonary\Calculations\Queensbury MO.cck
•
Section
Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C403.4.4. Multiple zone VAV systems with DDC DComplies Exception:Requirement does not apply.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls. ❑Not Observable See the Mechanical Systems list for values.
❑Not Applicable
C408.2.2. Air outlets and zone terminal devices ❑Complies
1 have means for air balancing. :❑Does Not
[ME53J3 :❑Not Observable
❑Not Applicable
C403.5, ;Refrigerated display cases,walk-in ❑Complies
C403.5.1, coolers or walk-in freezers served by Does Not
C403.5.2 remote compressors and remote
[ME12313 condensers not located in a ❑Not Observable
condensing unit, have fan-powered ❑Not Applicable
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5,2..
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 11 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2,1 Lighting controls installed to uniformly'❑Complies
[EL15I' reduce the lighting load by at least IDDoes Not
50%. '❑Not Observable
❑Not Applicable
C405.2.1 Occupancy sensors installed in ❑Complies
[EL18]' required spaces. IDDoes Not
:❑Not Observable
ENot Applicable
C405.2.1, Independent lighting controls installed ❑Complies
C405.2.2. per approved lighting plans and all ❑Does Not
3 manual controls readily accessible and ❑Not Observable
•
[EL23] visible to occupants.
ENot Applicable
C405.2.2. ;Automatic controls to shut off all ❑Complies
1 building lighting installed in all ❑Does Not
[EL22]2 I buildings.
❑Not Observable:
;❑Not Applicable
C405.2.3 ;Daylight zones provided with '❑Complies
[EL16]2 individual controls that control the EDoes Not
lights independent of general area
;lighting. ENot Observable
❑Not Applicable
C405.2.3, Primary sidelighted areas are ❑Complies
C405.2.3. equipped with required lighting EDoes Not
1, controls.
C405.2.3. ENot Observable
2 ❑Not Applicable
[EL2OP
C405.2.3, Enclosed spaces with daylight area ;❑Complies
C405.2.3. under skylights and rooftop monitors EDoes Not
1, are equipped with required lighting Observable
3405.2.3. controls. ;❑Not Applicable
[EL21I'
C405.2.4 Separate lighting control devices for ❑Complies
[EL4I' specific uses installed per approved ❑Does Not
lighting plans.
❑Not Observable
ENot Applicable
C405.2.4 Additional interior lighting power ❑Complies
[EL8I' allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and Not Observable
separated from general lighting. ENot Applicable
C405.3 Exit signs do not exceed 5 watts per ;❑Complies
[EL6]' face. IEDoes Not
❑Not Observable
,ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 12 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
Insulation Inspection Complies? Comments/Assumptions
& Req.ID
C303.1 :Building envelope insulation is labeled Complies
[IN1012 with R-value or insulation certificate ElDoes Not
providing R-value and other relevant
data. [Not Observable
ONot Applicable
C303.2.1 Exterior insulation is protected from :❑Complies
(IN1412 damage with a protective material. ❑Does Not
Verification for exposed foundation
insulation may need to occur during [Not Observable
Foundation Inspection. ❑Not Applicable
C402.2.6 Radiant panels and associated ;❑Complies •
[IN1813 components, designed for heat ❑Does Not
transfer from the panel surfaces to the
occupants or indoor space are ❑Not Observable
insulated with a minimum of R-3.5. ❑Not Applicable
C402.5.1, All sources of air leakage in the ❑Complies
1 building thermal envelope are sealed, ❑Does Not
[IN1]' caulked,gasketed,weather stripped
or wrapped with moisture vapor- :Not Observable
permeable wrapping material to ;❑Not Applicable
minimize air leakage.
Additional Comments/Assumptions:
•
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 13 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, Furnished O&M instructions for ❑Complies
C408.2.5. systems and equipment to the ❑Does Not
2 building owner or designated
[FI17]3 representative. :Not Observable
❑Not Applicable
C303.3, Furnished O&M manuals for HVAC ❑Complies
C408.2.5. systems within 90 days of system '❑Does Not
3 acceptance.
[FI8]3 DNot Observable
❑Not Applicable
C402.5.3 Where open combustion air ducts ❑Complies
[FI51]3 provide combustion air to open ❑Does Not
combustion fuel burning appliances,
the appliances and combustion air ❑Not Observable
opening are located outside the DNot Applicable
building thermal envelope or enclosed
in a room,isolated from inside the
thermal envelope. Such rooms are
sealed and insulated.
C402.5.8 Recessed luminaires in thermal ;❑Complies
[FI2613 envelope to limit infiltration and be IC ❑Does Not
rated and labeled.Seal between
interior finish and luminaire housing. DNot Observable
❑Not Applicable
C403.2.2 HVAC systems and equipment ;❑Complies
[FI27]3 capacity does not exceed calculated :❑Does Not •
loads.
DNot Observable
❑Not Applicable
C403.2.4. Heating and cooling to each zone is ❑Complies :Requirement will be met,
1 controlled by a thermostat control. ❑Does Not
[FI47]3 Minimum one humidity control device DNot Observable Location on plans/spec: H0.1
:per installed
'humidification/dehumidification DNot Applicable
system.
C403.2.4. 'Thermostatic controls have a 5 °F ❑Complies
1.2 deadband. ❑Does Not
[FI38]3
❑Not Observable
DNot Applicable
C403.2.4. Temperature controls have setpoint '❑Complies
1.3 overlap restrictions. ❑Does Not
[FI20]3
DNot Observable
DNot Applicable
C403.2.4. .Each zone equipped with setback ❑Complies
2 controls using automatic time clock or ❑Does Not
[FI3913 programmable control system.
:Not Observable
DNot Applicable
C403.2.4. 'Automatic Controls: Setback to 55°F '❑Complies
2.1, (heat)and 85°F(cool); 7-day clock, 2- ❑Does Not
C403.2.4. :hour occupant override, 10-hour
2.2 backup ONot Observable
[FI40]3 :Not Applicable
C403.2.4. 'Systems include optimum start ❑Complies :Requirement will be met.
2.3 controls. ❑Does Not
[FI41]3 Location on plans/spec: H0.1
DNot Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 14 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
# Final inspection Complies? Comments/Assumptions
&Req.ID
C404.3 :Heat traps installed on supply and ❑Complies
[FI11]3 ;discharge piping of non-circulating ❑Does Not
•systems.
DNot Observable
❑Not Applicable
C404.4 All piping insulated in accordance with ❑Complies
[F12512 section details and Table C403.2.10. EDoes Not
❑Not Observable
❑Not Applicable
C404.6.1 Controls are installed that limit the ❑Complies
[FI1213 operation of a recirculation pump EDoes Not •
installed to maintain temperature of a
storage tank.System return pipe is a ENot Observable
dedicated return pipe or a cold water ❑Not Applicable
supply pipe.
C405.4.1 Interior installed lamp and fixture :❑Complies .See the Interior Lighting fixture schedule for values.
[FI1811 lighting power is consistent with what EDoes Not
is shown on the approved lighting
plans,demonstrating proposed watts Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C408.2.1 Commissioning plan developed by ❑Complies
[FI28]1 registered design professional or ❑Does Not
;approved agency.
❑Not Observable
❑Not Applicable
C408.2.3. HVAC equipment has been tested to ❑Complies
1 ensure proper operation. ❑Does Not
[FI31]1 ['Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been ❑Complies
2 tested to ensure proper operation, ❑Does Not
[F11011 :calibration and adjustment of controls. ['Not Observable
;❑Not Applicable
C408.2.4 Preliminary commissioning report ❑Complies
[F12911 completed and certified by registered ;EDoes Not
design professional or approved
agency. ❑Not Observable
❑Not Applicable
C408.2.5. Furnished HVAC as-built drawings ❑Complies
1 submitted within 90 days of system ❑Does Not
(F17)3 acceptance.
❑Not Observable
❑Not Applicable
C408.2.5. Furnished as-built drawings for ❑Complies
1 electric power systems within 90 days ❑Does Not
[FI1613 of system acceptance.
❑Not Observable
❑Not Applicable
C408.2.5. An air and/or hydronic system ❑Complies
3 balancing report is provided for HVAC EDoes Not
[F143]1 systems.
❑Not Observable
❑Not Applicable
C408,2.5. 'Final commissioning report due to ❑Complies
4 building owner within 90 days of Does Not
[FI30]1 receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 15 of 17
Pulmonary\Calculations\Queensbury MO.cck
Section
Final Inspection Complies? Comments/Assumptions
&Req.ID
C408.3 Lighting systems have been tested to ElComplies
[F133)1 ensure proper calibration,adjustment, 'ODoes Not
programming, and operation. ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-2018172.00 Saratoga Outpatient Page 16 of 17
Pulmonary\Calculations\Queensbury MO.cck
Project Title: Queensbury Medical Offices Report date: 07/02/19
Data filename: P:\Projects\420-Architectural Collaborative\ALB-201B172.00 Saratoga Outpatient Page 17 of 17
Pulmonary\Calculations\Queensbury MO.cck