mottling letter HODOROWSKI
110MI: s
BUILDING ON TRADITION
FILE COPY
DEciEldfE
JUL 2 4g
Town of Queensbury TOWN OF
Building Department )WN OF BUILING QUEENSBURY
742 Bay Road & CODES
Queensbury, NY 12804
Re: Barringer Heights Subdivision
To Whom It May Concern,
With any new homes in the Barringer Heights Subdivision, Hodorowski Homes will set the
bottom of footings a minimum of 3'-0" above the mottling height, as defined by the Site
Drawings by Nace Engineering/Van Dusen and Steve's Land Surveyors, dated November 2005.
A benchmark will be set at a hydrant to confirm elevations.
Instead of the RC-2 asphalt damp proofing, we will coat the concrete foundation wall, below
grade, with a Polymer-Modified Asphalt coating, a minimum of 40 mils, per IRC 2015—Section
R406.2. The product is called Tuff-N-Dri, by Tremco. The insulated boards are optional, and not
required by code.
Lastly, Hodorowski Homes uses Appolo Heating and Cooling to perform all of our blower door
tests. They will issue a signed and certified notice, once we pass and achieve 3.0 ach or less per
IRC 2015.
Since ely,
Kristan Hodorowski