Loading...
SIGN-0121-2019 TD Bank r 4 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Zoning Department (518) 761-8256 SIGN PE IT Permit Number: SIGN-0121-2019 Tax Map No: 302.6-1-64 Permission is hereby granted to: One Stop Signs For property located at: 54 QUAKER RD in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Owner Name: Banknorth Facilities Management Sei Sign-Wall $0.00 Owner Address: 380 Wellington ST,Tower B. 12 Floc TotalValuc $0.00 London,Ont N6A4S Contractor or Builder's Name/ Address Electrical Inspection Agency One Stop Signs 2502 State Route 131 Goshen,OH 45122 Plans&Specifications Wall Sign (B) 18.22 sq.ft. Change of Copy only Sign Copy: TD Bank Sign Location: E02 South Elevation Replacement Sign: BP 2009-026 PERMIT FEE PAID Dated at the Town of Quee�sbury; Tuesday,April 2, 201 U SIGNED BY: �../ for the Town of Queensbury. Zoning Administrator erode Compliance and Informational Sheet for Permit Use Queensbury Dept. of Community Development Project for: EnerGov File No.S(60 I d-i -a6 19 Applicant Name- S Zoning Administrator Tax Map No. Lot # House # t,�C r< 'r �`� 2 Zu' road,street / �J Apartment Building No. Lot Size: Mobile Home Park: Business Plaza: Planned Unit Dev. Subdivision: Phase / Section Effective Year Zoning Designation Zoning Ordinance Prior to 1967, July 10 Subject to current setback requirements at time of development. Section 179-20-10,B Subsequent to Development of lots within subdivisions subsequent to July oe s shall use the f Jul 10, 1967 setback requirements in lace at the time of the a royal of the subdivision. 1967 1982, June 11 1988,Se tember 19 Pri Corner lot rule or to Nov. 23, 1992 approved subdivisions *(see note on back of form) 2002, April 9 2009, May 12 Town of Queensbury no longer regulates docks &boathouses on waters of Lake Effective Year 2013 George. A Building Permit is still needed, but Planning and Zoning issues are not applicable unless the project is on "our side" of the Mean-High-Water-Mark ( MHWM ). Applications for construction are regulated by the Lake George Park Commission. Road Name J— Setbacks _ Existing Required Proposed _ Difference Front l Front 2 Side 1 — --- Side 2 Rear 1 Rear 2 Shoreline - Y Travel '�-. Coondor Overlay._Zone Buffer I�._._...._..._......_�._ � __..._ I _ V Town of Queensbury