Loading...
Full EAF [[880,75,1682,132][12][B,I,][Times New Roman]]Full Environmental Assessment Form [[993,133,1607,190][12][B,I,][Times New Roman]]Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant orproject sponsor. Responses become part of the applicationfor approval or funding, are subject topublicreview, and may be subject to further verification. Complete Part 1basedon information currently available. If additional research or investigation would beneeded to fully respond to any item, please answer as thoroughly aspossible basedoncurrent information; indicatewhether missing informationdoesnot exist, or is notreasonably available to the sponsor;and,whenpossible, generally describeworkor studieswhichwould be necessaryto updateor fully developthat information. Applicants/sponsors must complete all items in SectionsA & B. InSectionsC, D & E,most items contain an initial question that must be answered either“Yes”or “No”.If the answer tothe initial question is“Yes”, complete the sub-questions thatfollow. If the answer to the initial question is “No”,proceedto thenextquestion.Section F allows the project sponsor to identify and attach any additional information. Section G requires thename and signatureof theproject sponsor toverify that the information contained inPart1is accurate and complete. A.Project and SponsorInformation. Name of Action or Project: õÊ×ÛÈ÷ÉÙÛÌ×ûÏÇÉ×Ï×ÎÈìÛÊÑõÐ×ÎðÛÑ×úÊÍÍÑéÈÛÚÓÐÓÂÛÈÓÍÎ Project Location (describe, and attach a general location map): õÐ×ÎðÛÑ×úÊÍÍÑÅÓÈÔÓÎÈÔ×õÊ×ÛÈ÷ÉÙÛÌ×ûÏÇÉ×Ï×ÎÈìÛÊÑ Brief Description of Proposed Action (include purpose or need): èÔÓÉÌÊÍÒ×ÙÈÓÎÙÐÇØ×ÉÈÔ×Ê×ÌÛÓÊÓÎÕÛÎØÉÈÛÚÓÐÓÂÓÎÕÍÖ×ÓÕÔÈÊ×ÛÙÔ×ÉÍÖÖÛÓÐÓÎÕÉÈÊ×ÛÏÚÛÎÑÉÅÓÈÔÓÎõÐ×ÎðÛÑ×úÊÍÍÑÓÎÈÔ×èÍÅÎÍÖëÇ××ÎÉÚÇÊÃåÛÊÊ×Î ùÍÇÎÈÃî×ÅãÍÊÑèÔ××ÊÍÉÓÍÎÍÙÙÇÊÊÓÎÕÛÈÈÔ×É×ÓØ×ÎÈÓÖÓ×ØÊ×ÛÙÔ×ÉÓÉØÇ×ÈÍÐÛÙÑÍÖÚÛÎÑÆ×Õ×ÈÛÈÓÍÎÛÎØÛÊÏÍÊÓÎÕÛÎØÓÉÛÙÍÎÈÊÓÚÇÈÓÎÕÖÛÙÈÍÊÈÍ É×ØÓÏ×ÎÈÛÈÓÍÎÍÖÈÔ×ÅÛÈ×ÊÅÛÃèÔ×õÊ×ÛÈ÷ÉÙÛÌ×ìÊÍÌ×ÊÈÓ×ÉÓÉÉ××ÑÓÎÕÈÍÊ×ÌÛÓÊÈÔ×É××ÊÍØÓÎÕÉÈÊ×ÛÏÚÛÎÑÉÈÍÌÊ×Æ×ÎÈÖÇÊÈÔ×ÊÉ×ØÓÏ×ÎÈÛÈÓÍÎÅÔÓÙÔÔÛÉ Ú××ÎÌÊ×Æ×ÎÈÓÎÕÌÛÉÉÛÕ×ÖÍÊÈÔ×ÓÊÉÅÛÎÚÍÛÈÛÏÇÉ×Ï×ÎÈÊÓØ×÷ÛÙÔÊ×ÛÙÔÅÓÐÐÊ×ËÇÓÊ×ÈÔ×ÌÐÛÙ×Ï×ÎÈÍÖÖÓÐÐÚ×ÐÍÅÈÔ×íÊØÓÎÛÊÃôÓÕÔåÛÈ×Ê÷Ð×ÆÛÈÓÍÎ íôå÷ÍÖõÐ×ÎðÛÑ×úÊÍÍÑóÎÕ×Î×ÊÛÐÈÔ×ÚÛÎÑÉÅÓÐÐÚ×Ê×ÕÊÛØ×ØÛÎØÊÍÙÑÛÊÏÍÊÓÎÕÅÓÐÐÚ×ÓÎÉÈÛÐÐ×ØÓÎÉÇÌÌÍÊÈÍÖÛÐÍÎÕÈ×ÊÏÆ×Õ×ÈÛÈÓÍÎ×ÉÈÛÚÐÓÉÔÏ×ÎÈ ùÍÓÊÐÍÕÉÅÓÐÐÚ×ÇÈÓÐÓÂ×ØÛÈÈÔ×ÚÛÎÑ íôå÷ÓÎÈ×ÊÉ×ÙÈÓÍÎÈÍÛÐÐÍÅÖÍÊÈÔ×Æ×Õ×ÈÛÈÓÍÎÈÍÈÛÑ×ÊÍÍÈèÔ×ÚÛÎÑÉÐÍÌ×ÉÅÓÐÐÚ×ÕÊÛØ×ØÈÍÊÛÈÓÍÉÈÔÛÈÅÓÐÐÊÛÎÕ× Ú×ÈÅ××Î  ÛÎØ  Ø×Ì×ÎØ×ÎÈÍÎÈÔ×ÉÌ×ÙÓÖÓÙÙÍÎØÓÈÓÍÎÉÍÖÈÔ×ÉÈÊ×ÛÏÚÛÎÑûØØÓÈÓÍÎÛÐÐÃÙÔÛÎÎ×ÐØÊ×ØÕÓÎÕÓÉÌÐÛÎÎ×ØÈÍÊ×ÉÈÍÊ×ÈÔ×ÚÊÍÍÑÈÍÍÊÓÕÓÎÛÐ Ø×ÌÈÔÛÎØÛÐÐÍÅÖÍÊÙÍÎÈÓÎÇ×ØÇÉ×ÍÖÈÔ×éÅÛÎúÍÛÈêÓØ× Name of Applicant/Sponsor: Telephone:     èÔ×õÊ×ÛÈ÷ÉÙÛÌ×ìÊÍÌ×ÊÈÓ×Éù íê×Ú×ÙÙÛåÍÍØìÛÊÑìÊ×ÉÓØ×ÎÈ E-Mail: Address:  éÈÛÈ×êÍÇÈ× City/PO: State:Zip Code: ëÇ××ÎÉÚÇÊà îã   Project Contact (if not same as sponsor; give name and title/role): Telephone:     éÈ×ÌÔ×Îð×ö×ÆÊ×ìÊÍÒ×ÙÈïÛÎÛÕ×Ê E-Mail: ÉÐ×Ö×ÆÊ×üÚÛÊÈÍÎÛÎØÐÍÕÇÓØÓÙ×ÙÍÏ Address: ûÓÊÐÓÎ×øÊÓÆ× City/PO:State: ZipCode: ûÐÚÛÎÃîã  Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO:State: ZipCode: Page 1 of 13 ÚÛßÚ îðïç B.Government Approvals B.Government Approvals Funding, orSponsorship. (“Funding” includesgrants, loans, taxrelief,and anyotherforms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a.CityTown,Yes No  èÍÅÎÍÖëÇ××ÎÉÚÇÊÃèÍÅÎúÍÛÊØ or Village Board of Trustees b.City, Town or Village Yes No  éÓÈ×ìÐÛÎûÌÌÊÍÆÛÐ èÍÅÎÍÖëÇ××ÎÉÚÇÊÃìÐÛÎÎÓÎÕúÍÛÊØ Planning Board or Commission c.City Townor Yes No  Village Zoning Board of Appeals d.Other local agencies Yes No  e.County agencies Yes No  f.Regional agencies Yes No  g. State agencies Yes No  îãéø÷ù h.Federal agencies Yes No  çéûù÷ i.Coastal Resources. [[195,1301,245,1349][10][,I,][Times New Roman]]i [[206,1301,256,1349][10][,,][Times New Roman]]. [[248,1301,350,1349][10][,,][Times New Roman]]Is th [[321,1301,371,1349][10][,,][Times New Roman]]e [[349,1301,679,1349][10][,,][Times New Roman]]project site within [[661,1301,711,1349][10][,,][Times New Roman]]a [[690,1301,1245,1349][10][,,][Times New Roman]]Coastal Area, or the waterfront [[1206,1301,1285,1349][10][,,][Times New Roman]] ar [[1249,1301,1367,1349][10][,,][Times New Roman]]ea of [[1342,1301,1570,1349][10][,,][Times New Roman]]a Designate [[1538,1301,1588,1349][10][,,][Times New Roman]]d [[1569,1301,1705,1349][10][,,][Times New Roman]]Inland [[1676,1301,1794,1349][10][,,][Times New Roman]] Wat [[1756,1301,1908,1349][10][,,][Times New Roman]]erway? [[2157,1301,2256,1349][10][,,][Times New Roman]]Yes [[2260,1301,2371,1349][10][,,][Times New Roman]] No   [[184,1397,246,1445][10][,I,][Times New Roman]]ii [[207,1397,257,1445][10][,,][Times New Roman]]. [[249,1397,351,1445][10][,,][Times New Roman]]Is th [[322,1397,372,1445][10][,,][Times New Roman]]e [[350,1397,694,1445][10][,,][Times New Roman]]project site located [[676,1397,1051,1445][10][,,][Times New Roman]]in a community with [[1022,1397,1101,1445][10][,,][Times New Roman]] an [[1082,1397,1266,1445][10][,,][Times New Roman]]approved [[1237,1397,1323,1445][10][,,][Times New Roman]] Lo [[1294,1397,1381,1445][10][,,][Times New Roman]]cal [[1352,1397,1807,1445] [10][,,][Times New Roman]]Waterfront Revitalization [[1779,1397,1897,1445][10][,,][Times New Roman]] Prog [[1868,1397,1982,1445][10][,,][Times New Roman]]ram? [[2151,1397,2276,1445][10][,,][Times New Roman]] Yes [[2265,1397,2376,1445][10][,,][Times New Roman]] No [[174,1445,247,1493][10][,I,][Times New Roman]]iii [[208,1445,827,1493][10][,,][Times New Roman]].Is the project site within a Coasta [[795,1445,1218,1493][10][,,][Times New Roman]]l Erosion Hazard Area? [[2151,1445,2276,1493][10][,,][Times New Roman]] Yes [[2265,1445,2376,1493][10][,,][Times New Roman]] No  C.Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the Yes No  only approval(s) which must be granted to enable the proposed action to proceed? If Yes, complete sections C, F and G. If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a.Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site Yes No  where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No  would be located? b.Is the siteof theproposed actionwithin anylocal orregional special planning district(for example:Greenway Yes No  Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s): _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c.Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No  or an adopted municipal farmland protection plan? If Yes, identify the plan(s): ________________________________________________________________________________________________________ èÍÅÎÍÖëÇ××ÎÉÚÇÊÃíÌ×ÎéÌÛÙ×æÓÉÓÍÎìÐÛÎòÇÎ× éÓÈ×ÓÉÐÓÉÈ×ØÓÎ C.3. Zoning a.Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Yes No  If Yes, what is the zoning classification(s) including any applicable overlay district? _________________________________________________________________________________________________________ ùÍÏÏ×ÊÙÓÛÐïÓÄ×ØçÉ×ô×ÛÆÃÛÎØïÍØ×ÊÛÈ×ê×ÉÓØ×ÎÈÓÛÐ _________________________________________________________________________________________________________ b.Is the use permitted or allowed by a special or conditional use permit? Yes No  c.Is a zoning change requested as part of the proposed action? Yes No  If Yes, [[167,584,229,632][10][,I,][Times New Roman]]i. [[199,584,2420,632][10][,,][Times New Roman]]What is the proposed new zoning for the site? __________________________________________________________ _________ C.4. Existing community services. a.In what school district is the project site located? ________________________________________________________________ ëÇ××ÎÉÚÇÊÃçÎÓÍÎöÊ××éÙÔÍÍÐøÓÉÈÊÓÙÈ b.What police or other public protection forces serve the project site? _________________________________________________________________________________________________________ î×ÅãÍÊÑéÈÛÈ×ìÍÐÓÙ×èÊÍÍÌõ c.Which fire protection and emergency medical services serve the project site? __________________________________________________________________________________________________________ ëÇ××ÎÉÚÇÊÃù×ÎÈÊÛÐ ÖÓÊ×ØÓÉÈÊÓÙÈÛÎØå×ÉÈõÐ×ÎÉöÛÐÐÉ÷ïé d.What parks serve the project site? __________________________________________________________________________________________________________ õÐ×ÎðÛÑ×ùÛÎÍ×ðÛÇÎÙÔ __________________________________________________________________________________________________________ D.Project Details D.1. Proposed and Potential Development a.What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? ùÍÏÏ×ÊÙÓÛÐÛÎØÊ×ÙÊ×ÛÈÓÍÎÛÐ _________________________________________________________________________________________________________ b.a. Total acreage of the site of the proposed action?_____________ acres  b.Total acreage to be physically disturbed?_____________ acres  c.Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor?_____________ acres  c.Is the proposed action an expansion of an existing project or use? Yes No  [[192,1914,254,1962][10][,I,][Times New Roman]]i. [[224,1914,930,1962][10][,,][Times New Roman]]If Yes, what is the approximate percenta [[898,1914,1669,1962][10][,,][Times New Roman]]ge of the proposed expansion and identify th [[1640,1914,2330,1962][10][,,][Times New Roman]]e units (e.g., acres, miles, housing units [[2297,1914,2347,1962][10][,,][Times New Roman]], square feet)? % ____________________ Units: ____________________ d.Is the proposed action a subdivision, or does it include a subdivision? Yes No  If Yes, [[182,2125,244,2173][10][,I,][Times New Roman]]i. [[214,2125,1040,2173][10][,,][Times New Roman]]Purpose or type of subdivision? (e.g., residentia [[1009,2125,1868,2173][10][,,][Times New Roman]]l, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ [[171,2221,244,2269][10][,I,][Times New Roman]]ii. [[204,2221,947,2269][10][,,][Times New Roman]] Is a cluster/conservation layout proposed? [[2138,2221,2263,2269][10][,,][Times New Roman]] Yes [[2252,2221,2363,2269][10][,,][Times New Roman]] No [[161,2269,246,2317][10][,I,][Times New Roman]]iii. [[216,2269,888,2317][10][,,][Times New Roman]]Number of lots proposed? ________ [[171,2317,251,2365][10][,I,][Times New Roman]]iv. [[222,2317,1825,2365][10][,,][Times New Roman]]Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ Willproposed actionbe constructed in multiple phases? Yes No  If No, anticipatedperiod of construction: _____ months IfYes: Total numberof phases anticipated _____ Anticipated commencement date ofphase 1(includingdemolition) _____ month _____ year   Anticipated completiondateof finalphase _____ month _____year Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ÷ÓÕÔÈÊ×ÛÙÔ×ÉÍÖÉÈÊ×ÛÏÅ×Ê×ÛÉÉ×ÉÉ×ØøÇÊÓÎÕìÔÛÉ×óÈÔÊ××ÍÖÈÔ×É×Ê×ÛÙÔ×ÉÅÓÐÐÚ×ÉÈÛÚÓÐÓÂ×ØûØØÓÈÓÍÎÛÐÌÔÛÉ×ÉÅÓÐÐÚ×ÙÍÏÌÐ×È×ØÛÉÖÇÎØÓÎÕÚ×ÙÍÏ×É ____________________________________________________________________________________________________ ÛÆÛÓÐÛÚÐ×ÛÎØÅÓÐÐÓÎÙÐÇØ×ÈÔ×Ê×ÏÛÓÎØ×ÊÍÖÈÔ×ÉÓÈ×É Page 3 of 13 f.Does the project include new residential uses? YesNo  If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ g.Does the proposed action include new non-residential construction (including expansions)? Yes No  If Yes, [[181,532,231,580][10][,I,][Times New Roman]]i [[193,532,926,580][10][,,][Times New Roman]].Total number of structures ___________ [[171,580,244,628][10][,I,][Times New Roman]]ii. [[215,580,2023,628][10][,,][Times New Roman]]Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length [[161,627,246,675][10][,I,][Times New Roman]]iii. [[216,627,1056,675][10][,,][Times New Roman]]Approximate extent of building space to be heat [[1018,627,1296,675][10][,,][Times New Roman]]ed or cooled: [[1256,627,1577,675][10][,,][Times New Roman]]______________ [[1548,627,1945,675][10][,,][Times New Roman]]________ square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any Yes No  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, [[171,842,233,890][10][,I,][Times New Roman]]i. [[203,842,2414,890][10][,,][Times New Roman]]Purpose of the impoundment: _____________________________________________________________________________ ___ [[160,890,233,938][10][,I,][Times New Roman]]ii. [[204,890,1434,938][10][,,][Times New Roman]]If a water impoundment, the principal source of the water: [[1423,890,1735,938][10][ ,,][Times New Roman]] Ground water [[1722,890,2161,938][10][,,][Times New Roman]] Surface water streams [[2149,890,2435,938][10][,,][Times New Roman]] Other specify: _________________________________________________________________________________________________________ [[150,986,235,1034][10][,I,][Times New Roman]]iii. [[205,986,1675,1034][10][,,][Times New Roman]]If other than water, identify the type of impounded/contained liquids and their source. _________________________________________________________________________________________________________ [[160,1082,240,1130][10][,I,][Times New Roman]]iv. [[211,1082,1202,1130][10][,,][Times New Roman]]Approximate size of the proposed impoundment. Vo [[1173,1082,1578,1130][10][,,][Times New Roman]]lume: ____________ [[1539,1082,2011,1130][10][,,][Times New Roman]]million gallons; surface ar [[1975,1082,2440,1130][10][,,][Times New Roman]]ea: ____________ acres [[171,1130,240,1178][10][,I,][Times New Roman]]v. [[210,1130,1851,1178][10][,,][Times New Roman]]Dimensions of the proposed dam or impounding structure: ________ height; _______ length [[160,1177,240,1225][10][,I,][Times New Roman]]vi. [[211,1177,938,1225][10][,,][Times New Roman]]Construction method/materials for the pr [[902,1177,1436,1225][10][,,][Times New Roman]]oposed dam or impounding st [[1397,1177,1847,1225][10][,,][Times New Roman]]ructure (e.g., earth fill, ro [[1818,1177,2197,1225][10][,,][Times New Roman]]ck, wood, concrete): ________________________________________________________________________________________________________ D.2. Project Operations a.Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No  (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: [[171,1595,243,1643][10][,I,][Times New Roman]]i . [[203,1595,2438,1643][10][,,][Times New Roman]]What is the purpose of the excavation or dredging? _________________________________________________ ______________ ê×ÉÈÍÊ×ÉÈÊ×ÛÏÙÔÛÎÎ×ÐÚÛÉ××Ð×ÆÛÈÓÍÎ [[150,1646,223,1694][10][,I,][Times New Roman]]ii. [[194,1646,1898,1694][10][,,][Times New Roman]]How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? Volume (specify tons or cubic yards): ____________________________________________  ÙÇÚÓÙÃÛÊØÉ Over what duration of time? ____________________________________________________ çÎÑÎÍÅÎ [[150,1796,235,1844][10][,I,][Times New Roman]]iii. [[206,1796,2263,1844][10][,,][Times New Roman]]Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ éÓÐÈÃÉ×ØÓÏ×ÎÈÉÈÍÚ×ÌÇÏÌ×ØÈÔ×ÈÔ×õÊ×ÛÈ÷ÉÙÛÌ×ÉÍÎÉÓÈ×ÕÊÛÆ×ÐÌÓÈÆÓÛÖÍÊÙ×ÏÛÓÎ ________________________________________________________________________________________________________ i[[182,1940,251,1988][10][,I,][Times New Roman]]v. [[222,1940,1413,1988][10][,,][Times New Roman]]Will there be onsite dewatering or processing of excavated materials? [[2153,1940,2278,1988][10][,,][ Times New Roman]] Yes [[2267,1940,2357,1988][10][,,][Times New Roman]] No  If yes, describe. ___________________________________________________________________________________________ ø×ÅÛÈ×Ê×ØÛÈØÓÉÙÔÛÊÕ×ÉÓÈ×ÈÔÊÍÇÕÔÐÛÊÕ×ÖÓÐÈ×ÊÚÛÕÉ ________________________________________________________________________________________________________ [[171,2095,240,2143][10][,I,][Times New Roman]]v. [[210,2095,1953,2143][10][,,][Times New Roman]]What is the total area to be dredged or excavated? _____________________________________acres [[161,2143,241,2191][10][,I,][Times New Roman]]vi. [[211,2143,1959,2191][10][,,][Times New Roman]]What is the maximum area to be worked at any one time? _______________________________ acres   [[150,2195,241,2243][10][,I,][Times New Roman]]vii. [[212,2195,1932,2243][10][,,][Times New Roman]]What would be the maximum depth of excavation or dredging? __________________________ feet [[150,2242,253,2290][10][,I,][Times New Roman]]viii. [[224,2242,871,2290][10][,,][Times New Roman]]Will the excavation require blasting? [[2143,2242,2269,2290][10][,,][Times New Roman]] Yes [[2256,2242,2367,2290][10][,,][Times New Roman]] No  [[150,2293,230,2341][10][,I,][Times New Roman]]ix. [[201,2293,2406,2341][10][,,][Times New Roman]]Summarize site reclamation goals and plan: __________________________________________________________ ___________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ b.Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No  into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: [[182,2656,244,2704][10][,I,][Times New Roman]]i. [[214,2656,2368,2704][10][,,][Times New Roman]]Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ õÐ×ÎðÛÑ×úÊÍÍÑ [[212,2752,2430,2800][10][,I,][Times New Roman]]_________________________________________________________________________________________________________ Page 4 of 13 [[171,79,244,127][10][,I,][Times New Roman]]ii. [[215,79,395,127][10][,,][Times New Roman]]Describe [[363,79,444,127][10][,,][Times New Roman]] ho [[415,79,517,127][10][,,][Times New Roman]]w th [[488,79,538,127][10][,,][Times New Roman]]e [[517,79,709,127][10][,,][Times New Roman]] proposed [[680,79,822,127][10][,,][Times New Roman]] action [[803,79,936,127][10][,,][Times New Roman]]would [[907,79,968,127][10][,,][Times New Roman]] a [[936,79,1124,127][10][,,][Times New Roman]]ffect that [[1095,79,1300,127][10][,,][Times New Roman]]waterbody [[1281,79,1352,127][10][, ,][Times New Roman]]or [[1316,79,1467,127][10][,,][Times New Roman]] wetlan [[1438,79,1488,127][10][,,][Times New Roman]]d [[1459,79,1509,127][10][,,][Times New Roman]], [[1480,79,1659,127][10][,,][T imes New Roman]]e.g. exca [[1625,79,1739,127][10][,,][Times New Roman]]vatio [[1710,79,1781,127][10][,,][Times New Roman]]n, [[1751,79,2073,127][10][,,][Times New Roman]]fill, placement of [[2047,79,2189,127][10][,,][Times New Roman]]structu [[2161,79,2301,127][10][,,][Times New Roman]]res, or alterationof channels,banks and shorelines.Indicate extent ofactivities, alterations and additions insquare feetor acres: _________________________________________________________________________________________________________ èÔ×ÉÔÍÊ×ÐÓÎ×ÅÓÐÐÚ×ÉÈÛÚÓÐÓÂ×ØÅÓÈÔÉÍÏ×ÌÐÛÙ×Ï×ÎÈÍÖÖÓÐÐÚ×ÐÍÅÈÔ×ÅÛÈ×ÊÐÓÎ×ÛÈÈÔ×ÈÍ×ÍÖÉÐÍÌ×èÔÓÉÅÓÐÐÓÎÙÐÇØ×Ê×ÕÊÛØÓÎÕÛÉÅ×ÐÐÛÉ _________________________________________________________________________________________________________ ÌÐÛÙ×Ï×ÎÈÍÖÊÍÙÑÛÎØÆ×Õ×ÈÛÈÓÍÎ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[160,367,245,415][10][,I,][Times New Roman]]iii. Willproposed action cause or result in disturbance tobottom sediments?YesNo  If Yes,describe:__________________________________________________________________________________________ úÍÈÈÍÏÉ×ØÓÏ×ÎÈÉÅÓÐÐÚ××ÄÙÛÆÛÈ×Ø [[172,463,252,511][10][,I,][Times New Roman]]iv. [[222,463,272,511][10][,,][Times New Roman]]W [[262,463,335,511][10][,,][Times New Roman]]ill [[368,463,550,511][10][,,][Times New Roman]]proposed [[520,463,730,511][10][,,][Times New Roman]] action cau [[701,463,796,511][10][,,][Times New Roman]]se o [[767,463,1212,511][10][,,][Times New Roman]]r result in the destruction [[1183,463,1243,511] [10][,,][Times New Roman]] o [[1214,463,1395,511][10][,,][Times New Roman]]r remova [[1363,463,1413,511][10][,,][Times New Roman]]l [[1385,463,1456,511][10][,,][Times New Roman]]of [[1420,463,1520,51 1][10][,,][Times New Roman]] aqu [[1490,463,1784,511][10][,,][Times New Roman]]atic vegetation? [[2153,463,2262,511][10][,,][Times New Roman]] Yes [[2267,463,2378,511][10][,,][Times New Roman]] No  IfYes: a ofvegetation proposedto be removed ___________________________________________________________ acreageof aquatic vegetation remaining after project completion________________________________________ purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ proposed method of plant removal: ________________________________________________________________________ if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ [[171,861,240,909][10][,I,][Times New Roman]]v. [[210,861,2428,909][10][,,][Times New Roman]]Describe any proposed reclamation/mitigation following disturbance: ______________________________________ ___________ _________________________________________________________________________________________________________ c.Will the proposed action use, or create a new demand for water? Yes No  If Yes: [[182,1075,244,1123][10][,I,][Times New Roman]]i. [[214,1075,1829,1123][10][,,][Times New Roman]]Total anticipated water usage/demand per day: __________________________ gallons/day [[171,1123,244,1171][10][,I,][Times New Roman]]ii. [[215,1123,1516,1171][10][,,][Times New Roman]]Will the proposed action obtain water from an existing public water supply? [[2153,1123,2278,1171][10 ][,,][Times New Roman]] Yes [[2267,1123,2378,1171][10][,,][Times New Roman]] No If Yes: Name of district or service area: _________________________________________________________________________ Does the existing public water supply have capacity to serve the proposal? Yes No Is the project site in the existing district? Yes No Is expansion of the district needed? Yes No Do existing lines serve the project site? Yes No [[161,1495,246,1543][10][,I,][Times New Roman]]iii. [[216,1495,1007,1543][10][,,][Times New Roman]]Will line extension within an existing district [[968,1495,1532,1543][10][,,][Times New Roman]] be necessary to supply the proj [[1493,1495,1591,1543][10][,,][Times New Roman]]ect? [[2153,1495,2278,1543][10][,,][Times New Roman]] Yes [[2267,1495,2378,1543][10][,,][Times New Roman]] No If Yes: Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ Source(s) of supply for the district: ________________________________________________________________________ [[171,1766,251,1814][10][,I,][Times New Roman]]iv. [[222,1766,793,1814][10][,,][Times New Roman]]Is a new water supply district or [[756,1766,1188,1814][10][,,][Times New Roman]] service area proposed t [[1149,1766,1379,1814][10][,,][Times New Roman]]o be formed [[1351,1766,1798,1814][10][,,][Times New Roman]] to serve the project site? [[2153,1766,2278,1814][10][,,][Times New Roman]] Yes [[2267,1766,2378,1814][10][,,][Times New Roman]] No If, Yes: Applicant/sponsor for new district: ________________________________________________________________________ Date application submitted or anticipated: __________________________________________________________________ Proposed source(s) of supply for new district: _______________________________________________________________ [[182,2027,251,2075][10][,I,][Times New Roman]]v. [[221,2027,2416,2075][10][,,][Times New Roman]]If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________ _________________________________________________________________________________________________________ [[161,2126,230,2174][10][,I,][Times New Roman]]vi [[191,2126,241,2174][10][,,][Times New Roman]]. [[212,2126,276,2174][10][,,][Times New Roman]]If [[250,2126,482,2174][10][,,][Times New Roman]]water suppl [[442,2126,493,2174][10][,,][Times New Roman]]y [[474,2126,620,2174][10][,,][Times New Roman]]will be [[599,2126,698,2174][10][,,][Times New Roman]]from [[690,2126,987,2174][1 0][,,][Times New Roman]]wells (public or [[951,2126,1058,2174][10][,,][Times New Roman]] priv [[1028,2126,1140,2174][10][,,][Times New Roman]]ate), [[1302,2126,1489,2174][10][,,][Times New Roman]]maximum [[1471,2126,1531,2174][10][,,][Times New Roman]] p [[1501,2126,1604,2174][10][,,][Times New Roman]]ump [[1575,2126,1657,2174][10][,,][Times New Roman]]ing [[1629,2126,1727,2174][1 0][,,][Times New Roman]] cap [[1697,2126,1975,2174][10][,,][Times New Roman]]acity: _______ [[1956,2126,2253,2174][10][,,][Times New Roman]]gallons/minute. d. Will the proposed action generate liquid wastes? Yes No  If Yes: [[171,2308,233,2356][10][,I,][Times New Roman]]i. [[214,2308,1616,2356][10][,,][Times New Roman]]Total anticipated liquid waste generation per day: _______________ gallons/day [[171,2356,244,2404][10][,I,][Times New Roman]]ii. [[215,2356,2270,2404][10][,,][Times New Roman]]Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[150,2547,235,2595][10][,I,][Times New Roman]]iii. [[205,2547,976,2595][10][,,][Times New Roman]]Will the proposed action use any existing pu [[946,2547,1579,2595][10][,,][Times New Roman]]blic wastewater treatment facilities? [[2143,2547,2269,2595][10][,,][Times New Roman]] Yes [[2257,2547,2347,2595][10][,,][Times New Roman]] No If Yes: Name of wastewater treatment plant to be used: _____________________________________________________________ Name of district: ______________________________________________________________________________________ Does the existing wastewater treatment plant have capacity to serve the project? Yes No Is the project site in the existing district? Yes No Is expansion of the district needed? Yes No Page 5 of 13 Do existingsewer lines serve theproject site? Yes No Willline extensionwithin anexisting districtbenecessary to servetheproject? Yes No If Yes: Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ [[150,392,230,440][10][,I,][Times New Roman]]iv. [[201,392,1664,440][10][,,][Times New Roman]]Will a new wastewater (sewage) treatment district be formed to serve the project site? [[2143,392,2269,44 0][10][,,][Times New Roman]] Yes [[2257,392,2368,440][10][,,][Times New Roman]] No If Yes: Applicant/sponsor for new district: ____________________________________________________________________ Date application submitted or anticipated: _______________________________________________________________ What is the receiving water for the wastewater discharge? __________________________________________________ [[150,640,219,688][10][,I,][Times New Roman]]v. [[200,640,1188,688][10][,,][Times New Roman]]If public facilities will not be used, describe plans to prov [[1159,640,2265,688][10][,,][Times New Roman]]ide wastewater treatment for the project, including specifying pr [[2229,640,2376,688][10][,,][Times New Roman]]oposed receiving water (name and classification if surfacedischargeordescribesubsurface disposalplans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[150,832,230,880][10][,I,][Times New Roman]]vi. [[201,832,2403,880][10][,,][Times New Roman]]Describe any plans or designs to capture, recycle or reuse liquid waste: ________________________________ _______________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e.Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No  sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction? If Yes: [[171,1209,233,1257][10][,I,][Times New Roman]]i. [[203,1209,1108,1257][10][,,][Times New Roman]]How much impervious surface will the project creat [[1070,1209,1805,1257][10][,,][Times New Roman]]e in relation to total size of project parcel? _____ Square feetor _____ acres (impervious surface) _____ Square feet or _____ acres (parcel size) [[161,1352,234,1400][10][,I,][Times New Roman]]ii. [[204,1352,2409,1400][10][,,][Times New Roman]]Describe types of new point sources. _______________________________________________________________ ___________ _________________________________________________________________________________________________________ [[150,1448,235,1496][10][,I,][Times New Roman]]iii. [[205,1448,1220,1496][10][,,][Times New Roman]]Where will the stormwater runoff be directed (i.e. on-site [[1180,1448,2280,1496][10][,,][Times New Roman]]stormwater management facility/structures, adjacent properties, groundwater, on-site surface water or off-site surface waters)? ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Will stormwater runoff flow to adjacent properties? Yes No [[150,1838,230,1886][10][,I,][Times New Roman]]iv. [[201,1838,321,1886][10][,,][Times New Roman]]Does [[358,1838,540,1886][10][,,][Times New Roman]]proposed [[522,1838,1142,1886][10][,,][Times New Roman]]plan minimize impervious surfaces [[1107,1838,1157,1886][10][,,][Times New Roman]], [[1128,1838,1199,1886][10][,,][Times New Roman]]us [[1165,1838,1215,1886][10][,,][Times New Roman]]e [[1194,1838,1372,1886][10][,,][Times New Roman]]pervious [[1338,1838,1398,1886][10][,,][Times New Roman]] m [[1381,1838,1659,1886][10][,,][Times New Roman]]aterials or coll [[1620,1838,2100,1886][10][,,][Times New Roman]]ect and re-use stormwater? [[2147,1838,2273,1886][10][,,][Times New Roman]] Yes [[2260,1838,2350,1886][10][,,][Times New Roman]] No f.Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No  combustion, waste incineration, or other processes or operations? If Yes, identify: [[181,2042,231,2090][10][,I,][Times New Roman]]i [[193,2042,1774,2090][10][,,][Times New Roman]].Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ éÍÏ×È×ÏÌÍÊÛÊÃÇÉ×ÍÖÔ×ÛÆÃ×ËÇÓÌÏ×ÎÈ [[171,2138,244,2186][10][,I,][Times New Roman]]ii. [[215,2138,1979,2186][10][,,][Times New Roman]]Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ________________________________________________________________________________________________________ [[160,2234,245,2282][10][,I,][Times New Roman]]iii. [[216,2234,1839,2282][10][,,][Times New Roman]]Stationary sources during operations (e.g., process emissions, large boilers, electric generation) ________________________________________________________________________________________________________ g.Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, Yes No  or Federal Clean Air Act Title IV or Title V Permit? If Yes: [[150,2492,212,2540][10][,I,][Times New Roman]]i. [[193,2492,1156,2540][10][,,][Times New Roman]]Is the project site located in an Air quality non-attainme [[1124,2492,2041,2540][10][,,][Times New Roman]]nt area? (Area routinely or periodically fails to meet [[2143,2492,2269,2540][10][,,][Times New Roman]] Yes [[2256,2492,2367,2540][10][,,][Times New Roman]] No ambient air quality standards for all or some parts of the year) [[150,2588,223,2636][10][,I,][Times New Roman]]ii. [[194,2588,1593,2636][10][,,][Times New Roman]]In addition to emissions as calculated in the application, the project will generate: ___________Tons/year ()of CarbonDioxide (CO) 2 ___________Tons/year() of NitrousOxide (N) 2 ___________Tons/year() of Perfluorocarbons (PFCs) ___________Tons/year() of Sulfur Hexafluoride (SF) 6 ___________Tons/year ()of CarbonDioxide equivalent ofHydroflorocarbons (H) ___________Tons/year ()ofHazardous Air Pollutants (HAPs) Page 6 of 13 h.Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, Yes No  landfills, composting facilities)? If Yes: [[171,223,233,271][10][,I,][Times New Roman]]i. [[203,223,2422,271][10][,,][Times New Roman]]Estimate methane generation in tons/year (metric): _______________________________________________________ _________ [[161,271,223,319][10][,I,][Times New Roman]]ii [[184,271,2334,319][10][,,][Times New Roman]].Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat o [[2305,271,2355,319][10][,,][Times New Roman]]r electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i.Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No  quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No  new demand for transportation facilities or services? If Yes: [[181,861,243,909][10][,I,][Times New Roman]]i. [[214,861,1207,909][10][,,][Times New Roman]]When is the peak traffic expected (Check all that apply): [[1252,861,1405,909][10][,,][Times New Roman]] Morni [[1367,861,1438,909][10][,,][Times New Roman]]ng [[1552,861,1751,909][10][,,][Times New Roman]] Evening [[1852,861,2039,909][10][,,][Times New Roman]]Weekend Randomly between hours of __________ to ________. [[181,957,254,1005][10][,I,][Times New Roman]]ii. [[225,957,939,1005][10][,,][Times New Roman]]For commercial activities only, projected [[920,957,1065,1005][10][,,][Times New Roman]]numbe [[1033,957,1083,1005][10][,,][Times New Roman]]r [[1057,957,1354,1005][10][,,][Times New Roman]]of truck trips/da [[1322,957,1373,1005][10][,,][Times New Roman]]y Parking spaces:Existing_____________ Proposed___________Netincrease/decrease_____________ [[172,1193,241,1241][10][,I,][Times New Roman]]v. [[150,1292,230,1340][10][,I,][Times New Roman]]vi. [[211,1292,305,1340][10][,,][Times New Roman]]Are [[284,1292,786,1340][10][,,][Times New Roman]]public/private transportation [[757,1292,866,1340][1 0][,,][Times New Roman]] serv [[837,1292,966,1340][10][,,][Times New Roman]]ice(s) [[939,1292,1010,1340][10][,,][Times New Roman]]or [[985,1292,1035,1340][10][,,][Times New Roman]]f [[998,1292,1308,1340][10][,,][Times New Roman]]acilities availabl [[1270,1292,1320,1340][10][,,][Times New Roman]]e [[1298,1292,1401,1340][10][,,][Times New Roman]]with [[1372,1292,1434,1340][10][,, ][Times New Roman]]in [[1415,1292,1612,1340][10][,,][Times New Roman]]½ mile of [[1576,1292,1648,1340][10][,,][Times New Roman]] th [[1619,1292,1919,1340][10][,,][Times New Roman]]e proposed site? [[2143,1292,2269,1340][10][,,][Times New Roman]] Yes [[2257,1292,2368,1340][10][,,][Times New Roman]] No [[150,1340,230,1388][10][,I,][Times New Roman]]vii [[212,1340,379,1388][10][,,][Times New Roman]]Will the [[358,1340,540,1388][10][,,][Times New Roman]]proposed [[522,1340,946,1388][10][,,][Times New Roman]]action include access to [[926,1340,1062,1388][10][,,][Times New Roman]]public [[1041,1340,1135,1388][10][,,][Times New Roman]]tran [[1106,1340,1354,1388][10][,,][Times New Roman]]sportation or [[1328,1340,1486,1388][10][,,][Times New Roman]]accomm [[1469,1340,1644,1388][10][,,][Times New Roman]]odations [[1621,1340,1730,1388][10][,,][Times New Roman]]for u [[1700,1340,1766,1388][10][,,][Times New Roman]]se [[1745,1340,1816,1388][10][,,][Times New Roman]]of [[1790,1340,2074,1388][10][,,][Times New Roman]]hybrid, electric [[2143,1340,2269,1388][10][,, ][Times New Roman]] Yes [[2257,1340,2368,1388][10][,,][Times New Roman]] No or other alternative fueled vehicles? No [[150,1436,241,1484][10][,I,][Times New Roman]]viii [[203,1436,274,1484][10][,,][Times New Roman]].W [[264,1436,1137,1484][10][,,][Times New Roman]]ill the proposed action include plans for pedestrian [[1107,1436,1649,1484][10][,,][Times New Roman]] or bicycle accommodations fo [[1621,1436,1916,1484][10][,,][Times New Roman]]r connections to [[1887,1436,2058,1484][10][,,][Times New Roman]] existing [[2143,1436,2269,1484][10][,,][Times New Roman]] Yes pedestrian or bicycle routes? k.Will the proposed action (for commercial or industrial projects only) generate new or additional demand Yes No  for energy? If Yes: [[171,1761,233,1809][10][,I,][Times New Roman]]i. [[203,1761,2426,1809][10][,,][Times New Roman]]Estimate annual electricity demand during operation of the proposed action: __________________________ __________________ _________________________________________________________________________________________________________ [[160,1857,233,1905][10][,I,][Times New Roman]]ii. [[204,1857,254,1905][10][,,][Times New Roman]]A [[234,1857,777,1905][10][,,][Times New Roman]]nticipated sources/suppliers of [[741,1857,1462,1905][ 10][,,][Times New Roman]] electricity for the project (e.g., on-site co [[1433,1857,2250,1905][10][,,][Times New Roman]]mbustion, on-site renewable, via grid/local util [[2212,1857,2348,1905][10][,,] [Times New Roman]]ity, or other): ________________________________________________________________________________________________________ [[150,2000,235,2048][10][,I,][Times New Roman]]iii. [[205,2000,532,2048][10][,,][Times New Roman]]Will the proposed [[503,2000,644,2048][10][,,][Times New Roman]] action [[626,2000,804,2048][10][,,][ Times New Roman]]require a [[783,2000,854,2048][10][,,][Times New Roman]]ne [[822,2000,902,2048][10][,,][Times New Roman]]w, [[873,2000,987,2048][10][,,][Times New Roman]]or an [[967,2000,1132,2048][ 10][,,][Times New Roman]]upgrade [[1112,2000,1376,2048][10][,,][Times New Roman]] to an existing [[1346,2000,1444,2048][10][,,][Times New Roman]] sub [[1415,2000,1576,2048][10][,,][Times New Roman]]station? [[2143,2000,2269,2048][10][,,][Times New Roman]] Yes [[2256,2000,2367,2048][10][,,][Times New Roman]] No l.Hours of operation. Answer all items which apply. [[181,2152,243,2200][10][,I,][Times New Roman]]i. [[203,2152,607,2200][10][,,][Times New Roman]] During Construction: [[1215,2152,1288,2200][10][,I,][Times New Roman]]ii. [[1269,2152,1631,2200][10][, ,][Times New Roman]]During Operations: Monday - Friday: _________________________Monday - Friday: ____________________________ î û ÛÌ Saturday: ________________________________Saturday: ___________________________________ î û  Sunday: _________________________________Sunday: ____________________________________ î û  Holidays: ________________________________Holidays: ___________________________________   Page 7 of 13 m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No  operation, or both? If yes: [[150,223,212,271][10][,I,][Times New Roman]]i. [[193,223,1226,271][10][,,][Times New Roman]]Provide details including sources, time of day and duration: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ [[150,366,212,414][10][,I,][Times New Roman]]ii [[173,366,223,414][10][,,][Times New Roman]]. [[204,366,316,414][10][,,][Times New Roman]]Will [[350,366,532,414][10][,,][Times New Roman]]proposed [[502,366,644,414][10][,,][Times New Roman]] action [[615,366,675,414][10][,,][Times New Roman]] r [[639,366,740,414][10][,,][Times New Roman]]emo [[710,366,782,414][10][,,][Times New Roman]]ve [[750,366,829,414][10][,,][Times New Roman]] ex [[800,366,1004,414][10][,,][Times New Roman]]isting natu [[974,366,1056,414][10][,,][Times New Roman]]ral [[1027,366,1189,414][10][,,][Times New Roman]]barriers [[1166,366,1361,414][10][,,][Times New Roman]]that could [[1342,366,1470,414][10][,,][Times New Roman]]act as [[1446,366,1546,414][10][,,][Times New Roman]]a no [[1516,366,1594,414][10][,,][Times New Roman]]ise [[1572,366,1623,414][10][,,][Times New Roman]]b [[1593,366,1719,414][10][,,][Times New Roman]]arrier [[1694,366,1765,414][10][,,][Times New Roman]]or [[1728,366,1874,414][10][,,][Times New Roman]] screen [[1845,366,1895,414][10][,,][Times New Roman]]? [[2143,366,2269,414][10][,,][Times New Roman]] Yes [[2257,366,2368,414][10][,,][T imes New Roman]] No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ n.Willtheproposedactionhaveoutdoorlighting? Yes No  If yes: Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: [[165,625,227,673][10][,I,][Times New Roman]]i. _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[150,768,212,816][10][,I,][Times New Roman]]ii [[173,768,223,816][10][,,][Times New Roman]]. [[204,768,1129,816][10][,,][Times New Roman]]Will proposed action remove existing natural barriers [[1095,768,1824,816][10][,,][Times New Roman]] that could act as a light barrier or screen? [[2143,768,2269,816][10][,,][Times New Roman]] Yes [[2256,768,2346,816][10][,,][Times New Roman]] No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ o[[171,945,221,993][10][,I,][Times New Roman]]. [[192,945,1790,993][10][,,][Times New Roman]]Does the proposed action have the potential to produce odors for more than one hour per day? [[2143,945,2269,993][10][,,][Times New Roman]] Yes [[2257,945,2347,993][10][,,][Times New Roman]] No  If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p.Will theproposed action include any bulkstorageof petroleum (over1,100gallons) Yes No  or chemical products? If Yes: Product(s) to be stored ______________________________________________________________________________________ Volume(s)______perunit time___________(e.g., month, year) Generally describeproposed storagefacilities________________________________________________________________ ________________________________________________________________________________________________________ q.Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, Yes No  insecticides) during construction or operation? If Yes: Describe proposed treatment(s): [[192,1723,254,1771][10][,I,][Times New Roman]]i. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[180,1962,253,2010][10][,I,][Times New Roman]]ii. [[224,1962,1399,2010][10][,,][Times New Roman]]Will the proposed action use Integrated Pest Management Practices? [[2143,1962,2289,2010][10][,,][Tim es New Roman]] Yes [[2277,1962,2388,2010][10][,,][Times New Roman]] No r.Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No  of solid waste (excluding hazardous materials)? If Yes: [[181,2157,243,2205][10][,I,][Times New Roman]]i. [[214,2157,1020,2205][10][,,][Times New Roman]]Describe any solid waste(s) to be generated du [[990,2157,1771,2205][10][,,][Times New Roman]]ring construction or operation of the facility: Construction: ____________________ tons per ________________ (unit of time) Operation : ____________________ tons per ________________ (unit of time) [[171,2307,244,2355][10][,I,][Times New Roman]]ii. [[215,2307,2131,2355][10][,,][Times New Roman]]Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ [[150,2553,235,2601][10][,I,][Times New Roman]]iii. [[205,2553,888,2601][10][,,][Times New Roman]]Proposed disposal methods/facilities fo [[859,2553,1416,2601][10][,,][Times New Roman]]r solid waste generated on-site: Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 8 of 13 s.Does the proposed action include construction or modification of a solid waste management facility? Yes No  If Yes: Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or [[181,175,243,223][10][,I,][Times New Roman]]i. other disposal activities): ___________________________________________________________________________________ [[171,271,244,319][10][,I,][Times New Roman]]ii. [[225,271,924,319][10][,,][Times New Roman]]Anticipated rate of disposal/processing: ________ Tons/month, if transfer or other non-combustion/thermal treatment, or ________ Tons/hour, if combustion or thermal treatment [[171,420,256,468][10][,I,][Times New Roman]]iii. [[226,420,707,468][10][,,][Times New Roman]]If landfill, anticipated site [[667,420,1543,468][10][,,][Times New Roman]]life: _______________________ _________ years t.Willproposed action at thesite involve the commercial generation, treatment,storage,ordisposalof hazardous Yes No  waste? If Yes: [[181,635,243,683][10][,I,][Times New Roman]]i. [[214,635,879,683][10][,,][Times New Roman]]Name(s) of all hazardous wastes or co [[850,635,1509,683][10][,,][Times New Roman]]nstituents to be generated, handled or [[1472,635,1863,683][10][,,][Times New Roman]] managed at facility: [[1824,635,2145,683][10][,,][Times New Roman]]______________ [[2116,635,2416,683][10][,,][Times New Roman]]_____________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[171,779,244,827][10][,I,][Times New Roman]]ii. [[215,779,1156,827][10][,,][Times New Roman]]Generally describe processes or activities involving ha [[1124,779,2410,827][10][,,][Times New Roman]]zardous wastes or constituents: ___________________________________ _________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[171,923,244,971][10][,I,][Times New Roman]]iii [[205,923,1293,971][10][,,][Times New Roman]].Specify amount to be handled or generated _____ tons/month [[171,971,251,1019][10][,I,][Times New Roman]]iv. [[222,971,1198,1019][10][,,][Times New Roman]]Describe any proposals for on-site minimization, recycli [[1160,971,2414,1019][10][,,][Times New Roman]]ng or reuse of hazardous constituents: ____________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[182,1114,251,1162][10][,I,][Times New Roman]]v. [[221,1114,1013,1162][10][,,][Times New Roman]]Will any hazardous wastes be disposed at an [[973,1114,1414,1162][10][,,][Times New Roman]]existing offsite hazardou [[1385,1114,1684,1162][10][,,][Times New Roman]]s waste facility? [[2143,1114,2269,1162][10][,,][Times New Roman]] Yes [[2257,1114,2378,1162][10][,,][Times New Roman]] No If Yes: provide name and location of facility: _______________________________________________________________________ ________________________________________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ E.Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a.Existing land uses. [[198,1664,260,1712][10][,I,][Times New Roman]]i. [[231,1664,1336,1712][10][,,][Times New Roman]]Check all uses that occur on, adjoining and near the project site. Urban Industrial Commercial Residential (suburban) Rural (non-farm)  Forest Agriculture Aquatic Other (specify): ____________________________________  ûÏÇÉ×Ï×ÎÈìÛÊÑ [[177,1808,250,1856][10][,I,][Times New Roman]]ii. [[232,1808,838,1856][10][,,][Times New Roman]]If mix of uses, generally describe: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ b.Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres +/-) Roads, buildings, and other paved or impervious surfaces Forested Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) Agricultural (includes active orchards, field, greenhouse etc.) Surface water features   (lakes, ponds, streams, rivers, etc.) Wetlands (freshwater or tidal) Non-vegetated (bare rock, earth or fill)  Other Describe: _______________________________ ________________________________________ Page 9 of 13  c.Is the project site presently used by members of the community for public recreation? Yes No [[188,128,250,176][10][,I,][Times New Roman]]i. [[220,128,2404,176][10][,,][Times New Roman]]If Yes: explain: ________________________________________________________________________________________ __ èÔ×Ï×ìÛÊÑêÓØ× d.Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes No  day care centers, or group homes) within 1500 feet of the project site? If Yes, [[188,337,250,385][10][,I,][Times New Roman]]i. [[220,337,565,385][10][,,][Times New Roman]]Identify Facilities: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e.Does the project site contain an existing dam? Yes No  If Yes: [[188,608,250,656][10][,I,][Times New Roman]]i. [[220,608,970,656][10][,,][Times New Roman]]Dimensions of the dam and impoundment: Dam height: _________________________________ feet Dam length: _________________________________ feet Surface area: _________________________________ acres Volume impounded: _______________________________ gallons OR acre-feet [[177,872,250,920][10][,I,][Times New Roman]]ii. [[221,872,320,920][10][,,][Times New Roman]]Dam [[312,872,894,920][10][,,][Times New Roman]]s existing hazard classification: [[854,872,1133,920][10 ][,,][Times New Roman]]____________ [[1104,872,1445,920][10][,,][Times New Roman]]_______________ [[1417,872,2196,920][10][,,][Times New Roman]]____________________________________ [[2167,872,2404,92 0][10][,,][Times New Roman]]__________ ã [[177,920,262,968][10][,I,][Times New Roman]]iii. [[233,920,1171,968][10][,,][Times New Roman]]Provide date and summarize results of last inspection: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ f.Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, Yes No  or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes: [[188,1237,250,1285][10][,I,][Times New Roman]]i. [[210,1237,884,1285][10][,,][Times New Roman]] Has the facility been formally closed? [[2149,1237,2275,1285][10][,,][Times New Roman]] Yes [[2263,1237,2384,1285][10][,,][Times New Roman]] No If yes, cite sources/documentation: _______________________________________________________________________ [[177,1348,250,1396][10][,I,][Times New Roman]]ii. [[221,1348,1084,1396][10][,,][Times New Roman]]Describe the location of the project site relative to [[1054,1348,1259,1396][10][,,][Times New Roman]] the bound [[1231,1348,2014,1396][10][,,][Times New Roman]]aries of the solid waste management facility: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ [[167,1492,252,1540][10][,I,][Times New Roman]]iii. [[222,1492,2408,1540][10][,,][Times New Roman]]Describe any development constraints due to the prior solid waste activities: ______________________ ____________________ _______________________________________________________________________________________________________ g.Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin Yes No  property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: [[177,1765,239,1813][10][,I,][Times New Roman]]i. [[209,1765,2158,1813][10][,,][Times New Roman]]Describe waste(s) handled and waste management activities, including approximate time when activities occurred: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ h.Potential contamination history. Has there been a reported spill at the proposed project site, or have any Yes No  remedial actions been conducted at or adjacent to the proposed site? If Yes: [[188,2080,250,2128][10][,I,][Times New Roman]]i. [[220,2080,1850,2128][10][,,][Times New Roman]]Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site [[2149,2080,2275,2128][10][,,][Times New Roman]] Yes [[2263,2080,2374,2128][10][,,][Times New Roman]] No Remediation database? Check all that apply: Yes – Spills Incidents database Provide DEC ID number(s): ________________________________ Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________ Neither database [[156,2346,229,2394][10][,I,][Times New Roman]]ii. [[200,2346,2394,2394][10][,,][Times New Roman]]If site has been subject of RCRA corrective activities, describe control measures:___________________ ____________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[167,2493,252,2541][10][,I,][Times New Roman]]iii. [[222,2493,1000,2541][10][,,][Times New Roman]]Is the project within 2000 feet of any site in [[961,2493,1949,2541][10][,,][Times New Roman]]the NYSDEC Environmental Site Remediation database? [[2149,2493,2275,2541][10][,,][Times New Roman]] Yes [[2229,2493,2279,2535][10][,,][Z@R6BE9.tmp]] [[2263,2493,2374,2541][10][,,][Time s New Roman]] No If yes, provide DEC ID number(s): ______________________________________________________________________________ [[167,2605,247,2653][10][,I,][Times New Roman]]iv. [[218,2605,831,2653][10][,,][Times New Roman]]If yes to (i), (ii) or (iii) above, desc [[799,2605,914,2653][10][,,][Times New Roman]]ribe [[874,2605,1305,2653][10][,,][Times New Roman]]current status of site(s): _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ Page 10 of 13 [[177,80,246,128][10][,I,][Times New Roman]]v. [[216,80,1487,128][10][,,][Times New Roman]]Is the project site subject to an institutional control limiting property uses? [[2149,80,2275,128][10][,,][ Times New Roman]] Yes [[2263,80,2384,128][10][,,][Times New Roman]] No If yes, DEC site ID number: ____________________________________________________________________________ Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________ Describe any use limitations: ___________________________________________________________________________ Describe any engineering controls: _______________________________________________________________________ Will the project affect the institutional or engineering controls in place? Yes No Explain: ____________________________________________________________________________________________ ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? ________________ feet  b. Are there bedrock outcroppings on the project site? Yes No  If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________% c.Predominant soil type(s) present on project site: ___________________________ __________% éÛ ___________________________ __________%  ôÎú ____________________________ __________%  íÛú d.What is the average depth to the water table on the project site? Average: _________ feet  e.Drainage status of project site soils: Well Drained:_____%ofite   Moderately Well Drained: _____% of site Poorly Drained _____%ofite   f.Approximate proportion of proposed action site with slopes: 0-10%:_____% of site  10-15%: _____% of site 15% or greater: _____% of site g.Are there any unique geologic features on the project site? Yes No  If Yes, describe: _____________________________________________________________________________________________ ________________________________________________________________________________________________________ h.Surface water features. [[177,1697,239,1745][10][,I,][Times New Roman]]i. [[209,1697,1927,1745][10][,,][Times New Roman]]Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, [[2149,1697,2275,1745][10][,,][Times New Roman]] Yes [[2263,1697,2374,1745][10][,,][Times New Roman]] No  ponds or lakes)? [[167,1793,240,1841][10][,I,][Times New Roman]]ii. [[211,1793,1264,1841][10][,,][Times New Roman]]Do any wetlands or other waterbodies adjoin the project site? [[2149,1793,2275,1841][10][,,][Times New Roman]] Yes [[2263,1793,2374,1841][10][,,][Times New Roman]] No  If Yes to either [[418,1849,468,1897][10][,I,][Times New Roman]]i [[429,1849,524,1897][10][,,][Times New Roman]] or [[485,1849,547,1897][10][,I,][Times New Roman]]ii [[508,1849,1065,1897][10][,,][Ti mes New Roman]], continue. If No, skip to E.2.i. [[156,1905,241,1953][10][,I,][Times New Roman]]iii. [[222,1905,1089,1953][10][,,][Times New Roman]]Are any of the wetlands or waterbodies within or [[1050,1905,1928,1953][10][,,][Times New Roman]]adjoining the project site regulated by any federal, [[2149,1905,2275,1953][10][,,][Times New Roman]] Yes [[2263,1905,2374,1953][10][,,][Times New Roman]] No  state or local agency? [[167,2004,247,2052][10][,I,][Times New Roman]]iv. [[218,2004,562,2052][10][,,][Times New Roman]]For each identified [[708,2004,1001,2052][10][,,][Times New Roman]]wetland and wa [[970,2004,1221,2052 ][10][,,][Times New Roman]]terbody on th [[1193,2004,1243,2052][10][,,][Times New Roman]]e [[1221,2004,1531,2052][10][,,][Times New Roman]]project site, prov [[1503,2004,1585,2052][10][,,][Times New Roman]]ide [[1564,2004,1646,2052][10][,,][Times New Roman]]the [[1625,2004,2024,2052][10][,,][Times New Roman]]following information Streams:Name ____________________________________________Classification _______________________ ûûúè     Lakesor Ponds:Name ____________________________________________Classification_______________________ Wetlands:Name ____________________________________________Approximate Size ___________________ ö×Ø×ÊÛÐÅ×ÈÐÛÎØÉ Wetland No. (if regulatedbyDEC) _____________________________ õö  [[156,2257,225,2305][10][,I,][Times New Roman]]v. [[206,2257,1075,2305][10][,,][Times New Roman]]Are any of the above water bodies listed in the mo [[1046,2257,1954,2305][10][,,][Times New Roman]]st recent compilation of NYS water quality-impaired [[2149,2257,2275,2305][10][,,][Times New Roman]] Yes [[2263,2257,2374,2305][10][,,][Times New Roman]] No  waterbodies? If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________ ___________________________________________________________________________________________________________ i.Is theproject site inadesignatedFloodway? Yes No  j.Is theproject site in the100year Floodplain? Yes No  k.Is theproject site in the500year Floodplain? Yes No  l.Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No  If Yes: [[188,2806,250,2854][10][,I,][Times New Roman]]i. [[220,2806,2409,2854][10][,,][Times New Roman]]Name of aquifer: ____________________________________________________________________________________ _____ ìÊÓÎÙÓÌÛÐÛËÇÓÖ×Ê Page 11 of 13 m.Identify the predominant wildlife species that occupy or use the project site: ______________________________ ______________________________ _____________________________________________________________ ÅÔÓÈ×ÈÛÓÐ×ØØ××Ê ÉÍÎÕÚÓÊØÉ ÊÍØ×ÎÈÉ ______________________________ _____________________________________________________________ ÆÛÊÓÍÇÉÖÓÉÔÉÌ×ÙÓ×É n.Does the project site contain a designated significant natural community? Yes No  If Yes: [[188,371,250,419][10][,I,][Times New Roman]]i. [[220,371,353,419][10][,,][Times New Roman]]Descr [[317,371,418,419][10][,,][Times New Roman]]ibe [[379,371,2417,419][10][,,][Times New Roman]]the habitat/community (composition, function, and basis for designation): _____________________________________ ________________________________________________________________________________________________________ é×ØÕ×ï×ÛØÍÅï×ØÓÇÏö×Îê×ØïÛÌÐ×èÛÏÛÊÛÙÑì×ÛÈéÅÛÏÌ [[177,467,250,515][10][,I,][Times New Roman]]ii. [[221,467,2412,515][10][,,][Times New Roman]]Source(s) of description or evaluation: ________________________________________________________________ ________ îãéø÷ùÉ÷ÎÆÓÊÍÎÏ×ÎÈÛÐê×ÉÍÇÊÙ×ïÛÌÌ×Ê [[167,515,252,563][10][,I,][Times New Roman]]iii. [[222,515,297,563][10][,,][Times New Roman]]Ex [[269,515,751,563][10][,,][Times New Roman]]tent of community/habitat: Currently: ______________________ acres  ÛÎØ Following completion of project as proposed: _____________________ acres  ÛÎØ Gain or loss (indicate + or -): ______________________ acres îÍÙÔÛÎÕ× o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as Yes No  endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? óìÛùÓØ×ÎÈÓÖÓ×Øö×Ø×ÊÛÐÉÌ×ÙÓ×ÉÌÍÈ×ÎÈÓÛÐÔÛÚÓÈÛÈ×ÎØÛÎÕ×Ê×ØóÎØÓÛÎÛÚÛÈïÃÍÈÓÉÉÍØÛÐÓÉÈÔÊ×ÛÈ×Î×ØÎÍÊÈÔ×ÊÎÐÍÎÕ×ÛÊ×ØÚÛÈÏÃÍÈÓÉÉ×ÌÈ×ÎÈÊÓÍÎÛÐÓÉ ÛÎØ×ÎØÛÎÕ×Ê×ØñÛÊÎ×ÊÚÐÇ×ÚÇÈÈ×ÊÖÐÃðÃÙÛ×ÓØ×ÉÏ×ÐÓÉÉÛÉÛÏÇ×ÐÓÉ p.Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of Yes No special concern? ìÛÐ×Ì×ÛÈÏÍÉÉéÌÔÛÕÎÇÏÉÇÚÖÇÐÆÇÏÊÛÊ×ÙÊÓÈÓÙÛÐÐÃÓÏÌ×ÊÓÐ×ØÛÎØÉÙÍÊÌÓÍÎÖ×ÛÈÔ×ÊÏÍÉÉéÙÍÊÌÓØÓÇÏÉÙÍÊÌÓÍÓØÓ×ÉÊÛÊ×ÓÏÌ×ÊÓÐ×Ø q.Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? Yes No  If yes, give a brief description of how the proposed action may affect that use: ___________________________________________ ________________________________________________________________________________________________________ E.3. Designated Public Resources On or Near Project Site a.Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Yes No  Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: _________________________________________________________________ b.Are agricultural lands consisting of highly productive soils present? Yes No  [[198,1924,260,1972][10][,I,][Times New Roman]]i. [[231,1924,2405,1972][10][,,][Times New Roman]]If Yes: acreage(s) on project site? _________________________________________________________________ __________ [[188,1972,261,2020][10][,I,][Times New Roman]]ii. [[232,1972,2408,2020][10][,,][Times New Roman]]Source(s) of soil rating(s): _______________________________________________________________________ __________ c.Does the project site contain all or part of, or is it substantially contiguous to, a registered National Yes No  Natural Landmark? If Yes: [[188,2192,250,2240][10][,I,][Times New Roman]]i. [[231,2192,911,2240][10][,,][Times New Roman]]Nature of the natural landmark: [[898,2192,1478,2240][10][,,][Times New Roman]] Biological Community [[1476,2192,1847,2240][10][,,][Times New Roman]] Geological Feature [[188,2240,261,2288][10][,I,][Times New Roman]]ii. [[232,2240,2405,2288][10][,,][Times New Roman]]Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? Yes No  If Yes: [[198,2519,260,2567][10][,I,][Times New Roman]]i. [[230,2519,2403,2567][10][,,][Times New Roman]]CEA name: ____________________________________________________________________________________________ _ õÐ×ÎðÛÑ× [[188,2567,261,2615][10][,I,][Times New Roman]]ii. [[232,2567,2405,2615][10][,,][Times New Roman]]Basis for designation: ______________________________________________________________________________ _______ ú×Î×ÖÓÈÈÍÔÇÏÛÎÔ×ÛÐÈÔÎÛÈÇÊÛÐÉ×ÈÈÓÎÕ [[177,2615,262,2663][10][,I,][Times New Roman]]iii. [[233,2615,2400,2663][10][,,][Times New Roman]]Designating agency and date: ______________________________________________________________________ ________ èÍÅÎÍÖëÇ××ÎÉÚÇÊà  Page 12 of 13