Full EAF [[880,76,1721,133][12][B,I,][Times New Roman]]Full Environmental Assessment Form [[993,133,1607,190][12][B,I,][Times New Roman]]Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the project sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and Sponsor Information. Name of Action or Project: WestMountianSkiAreaSitePlanReviewfor"Overflow"ParkingLot,ZipLine,MountainBikeTrailSystemandrezoningof"overflow"parkinglotparcels Project Location (describe, and attach a general location map): 43and57WestMountainRoad,Queensbury,NY12804foroverflowparkinglotand59WestMountainRoadforZipLineandMountainBikeTrailSystem Brief Description of Proposed Action (include purpose or need): Theprojectinvolvesthere-zoningoftwoparcelsofland(315.5-1-3.2and315.5-1-2)fromMDR(ModerateDensityResidential)toRC(Recreational Commercial)toallowfortheexpansionoftheWestMountainSkiAreaparkinglottoaccommodate"overflow"parking.Additionally,siteplanapprovalis alsorequestedfortheparkingexpansionaswellaszip-lineandexistingmountainbikevenueontheexistingWestMountainSkiAreaparceltax no.307.-1-29.ExistingresidentialusesonlandstoberezonedwillcontinueandbeusedforWestMountainSkiareasupportpurposes.. Name of Applicant/Sponsor: Telephone: 518-745-9892 ApexCapital,LLC E-Mail: Address: 59WestMountainRoad City/PO: State:ZipCode: Queensbury NewYork12804 Project Contact (if not same as sponsor; give name and title/role): Telephone: same E-Mail: Address: City/PO:State: ZipCode: Property Owner (if not same as sponsor): Telephone: E-Mail: same Address: City/PO:State: ZipCode: Page 1 of 13 B. Government Approvals B.Government Approvals Funding, orSponsorship. (“Funding” includesgrants, loans, taxrelief,and anyotherforms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a.City Council, Town Board, Yes No TownBoard-Re-Zoning or Village Board of Trustees b.City, Town or Village Yes No PlanningBoard-SEQRDeclarationand Planning Board or Commission SitePlanReview c.City Council, Town or Yes No Village Zoning Board of Appeals d.Other local agencies Yes No e.County agencies Yes No 239-MReferral f.Regional agencies Yes No g. State agencies Yes No h.Federal agencies Yes No i.Coastal Resources. [[195,1301,245,1349][10][,I,][Times New Roman]]i [[206,1301,1083,1349][10][,,][Times New Roman]].Is theprojectsite withinaCoastal Area, or the w [[1063,1301,1908,1349][10][,,][Times New Roman]]aterfront area ofa DesignatedInland Waterway? [[2157,1301,2256,1349][10][,,][Times New Roman]]Yes [[2260,1301,2371,1349][10][,,][Times New Roman]] No [[184,1397,246,1445][10][,I,][Times New Roman]]ii [[207,1397,1072,1445][10][,,][Times New Roman]].Is theproject site locatedin a community with [[1033,1397,1553,1445][10][,,][Times New Roman]]anapproved LocalWaterfron [[1524,1397,1983,1445][10][,,][Times New Roman]]t Revitalization Program? [[2151,1397,2276,1445][10][,,][Times New Roman]] Yes [[2265,1397,2376,1445][10][,,][Ti mes New Roman]] No [[174,1445,247,1493][10][,I,][Times New Roman]]iii [[208,1445,1218,1493][10][,,][Times New Roman]].Is the project site within a Coastal Erosion Hazard Area? [[2151,1445,2276,1493][10][,,][Times New Roman]] Yes [[2265,1445,2376,1493][10][,,][Times New Roman]] No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the Yes No only approval(s) which must be granted to enable the proposed action to proceed? If Yes, complete sections C, F and G. If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a.Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site Yes No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No would be located? b.Is the site of the proposed action within any local or regional special planning district (for example: Greenway Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s): _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ c.Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No or an adopted municipal farmland protection plan? If Yes, identify the plan(s): ________________________________________________________________________________________________________ 2003TownofQueensburyOpenSpaceVisionPlan ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ Page 2 of 13 C.3. Zoning a.Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? _________________________________________________________________________________________________________ TheskiareaiszonedRCRecreationCommerical.ThisisthelocationoftheproposedziplineandMountainBikevenue.Theexpandedparkingis _________________________________________________________________________________________________________inanareacurrentlyzonedMDRMediumDensityResidentialandisproposedtoberezonedtoRC. b.Is the use permitted or allowed by a special or conditional use permit? Yes No c.Is a zoning change requested as part of the proposed action? Yes No If Yes, [[167,585,229,633][10][,I,][Times New Roman]]i. [[199,585,2420,633][10][,,][Times New Roman]]What is the proposed new zoning for the site? __________________________________________________________ _________ RC-RecreationalCommercial C.4. Existing community services. a.In what school district is the project site located? ________________________________________________________________ QueensburyUnionFreeSchoolDistrict b.What police or other public protection forces serve the project site? _________________________________________________________________________________________________________ WarrenCountySheriffandNewYorkStatePolice c.Which fire protection and emergency medical services serve the project site? __________________________________________________________________________________________________________ FireprotectionisprovidedbytheWestGlensFallsFireDepartment.EMSisprovidedbyWestGlensFallsEMS. d.Whatparks serve the project site? __________________________________________________________________________________________________________ AllTownofQueensburyParks __________________________________________________________________________________________________________ D. Project Details D.1. Proposed and Potential Development a.What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, includeall components)? Theprojectincludesrezoningoftwoparcelsforexpandedparking,andsiteplanreviewfortheexpandedparking,newziplineand approvalofexistingmountainbiketrails. _________________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ acres 382.34 b.Total acreage to be physically disturbed?_____________ acres parkingexpansionand0.04acreszipline 2.07 c.Total acreage (project site and any contiguous properties) owned towers or controlled by the applicant or project sponsor?_____________ acres 382.34 c.Is the proposed action an expansion of an existing project or use? Yes No [[192,1914,254,1962][10][,I,][Times New Roman]]i. [[224,1914,1368,1962][10][,,][Times New Roman]]IfYes, what is the approximate percentage of the proposed expans [[1334,1914,1895,1962][10][,,][Times New Roman]]ion and identify the units (e.g., [[1856,1914,2347,1962][10][,,][Times New Roman]]acres, miles, housing units, square feet)? % ____________________ Units: ____________________ 2.11acrestotalparkingexpansionandziplinetowers. 0.55% d.Is the proposed action a subdivision, or does it include a subdivision? Yes No If Yes, [[182,2125,244,2173][10][,I,][Times New Roman]]i. [[214,2125,792,2173][10][,,][Times New Roman]]Purpose or type of subdivision? [[752,2125,1259,2173][10][,,][Times New Roman]](e.g., residential, industrial, [[1219,2125,1868,2173][10][,,][Times New Roman]]commercial; if mixed, specify types) ________________________________________________________________________________________________________ [[171,2221,244,2269][10][,I,][Times New Roman]]ii. [[204,2221,947,2269][10][,,][Times New Roman]] Is a cluster/conservation layout proposed? [[2138,2221,2247,2269][10][,,][Times New Roman]] Yes [[2252,2221,2363,2269][10][,,][Times New Roman]] No [[161,2269,246,2317][10][,I,][Times New Roman]]iii. [[216,2269,888,2317][10][,,][Times New Roman]]Number of lots proposed? ________ [[171,2317,251,2365][10][,I,][Times New Roman]]iv. [[222,2317,1825,2365][10][,,][Times New Roman]]Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ e.Will proposed action be constructed in multiple phases? Yes No [[171,2430,233,2478][10][,I,][Times New Roman]]i. [[214,2430,1824,2478][10][,,][Times New Roman]]If No, anticipated period of construction: _____ months Spring2019toFall2019 3-4 [[161,2478,234,2526][10][,I,][Times New Roman]]ii. [[215,2478,368,2526][10][,,][Times New Roman]]If Yes: Total number of phases anticipated_____ Anticipated commencement date of phase 1 (including demolition) _____ month _____ year Anticipated completion date of final phase _____ month _____year Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 3 of 13 f.Does the project include new residential uses? YesNo If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase ___________ ___________ ____________ ________________________ At completion of all phases ___________ ___________ ____________ ________________________ g.Does the proposed action include new non-residential construction (including expansions)? YesNo (parkinglotandzipline) If Yes, [[181,532,231,580][10][,I,][Times New Roman]]i [[193,532,926,580][10][,,][Times New Roman]].Total number of structures ___________ none [[171,580,244,628][10][,I,][Times New Roman]]ii. [[215,580,1105,628][10][,,][Times New Roman]]Dimensions (in feet) of largest proposed structure: [[1065,580,2023,628][10][,,][Times New Roman]]________height; ________width; and _______ length n/a [[161,627,246,675][10][,I,][Times New Roman]]iii. [[216,627,1945,675][10][,,][Times New Roman]]Approximate extent of building space to be heated or cooled: ______________________ square feet n/a h.Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, [[171,842,233,890][10][,I,][Times New Roman]]i. [[203,842,2414,890][10][,,][Times New Roman]]Purpose of the impoundment: _____________________________________________________________________________ ___ [[160,890,233,938][10][,I,][Times New Roman]]ii. [[204,890,1435,938][10][,,][Times New Roman]]If a water impoundment, the principal source of the water: [[1423,890,1735,938][10][ ,,][Times New Roman]] Ground water [[1722,890,2161,938][10][,,][Times New Roman]] Surface water streams [[2149,890,2435,938][10][,,][Times New Roman]] Other specify: _________________________________________________________________________________________________________ [[150,986,235,1034][10][,I,][Times New Roman]]iii. [[205,986,903,1034][10][,,][Times New Roman]]Ifother than water, identify the type of [[864,986,1676,1034][10][,,][Times New Roman]]impounded/conta ined liquids and their source. _________________________________________________________________________________________________________ [[160,1082,240,1130][10][,I,][Times New Roman]]iv. [[211,1082,2440,1130][10][,,][Times New Roman]]Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres [[171,1130,240,1178][10][,I,][Times New Roman]]v. [[210,1130,1852,1178][10][,,][Times New Roman]]Dimensions of the proposed dam or impounding structure: ________ height; _______ length [[160,1177,240,1225][10][,I,][Times New Roman]]vi. [[211,1177,2197,1225][10][,,][Times New Roman]]Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): ________________________________________________________________________________________________________ D.2. Project Operations a.Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: [[171,1595,243,1643][10][,I,][Times New Roman]]i . [[203,1595,2439,1643][10][,,][Times New Roman]]What is the purpose of the excavation or dredging? _________________________________________________ ______________ gradesiteforparkinglotandfootersforziplinetowers [[150,1646,223,1694][10][,I,][Times New Roman]]ii. [[194,1646,842,1694][10][,,][Times New Roman]]How much material (including rock, [[802,1646,1899,1694][10][,,][Times New Roman]] earth, sediments, etc.) is proposed to be removed from the site? Volume (specify tons or cubic yards): ____________________________________________ none Over what duration of time? ____________________________________________________ n/a [[150,1796,235,1844][10][,I,][Times New Roman]]iii. [[206,1796,2264,1844][10][,,][Times New Roman]]Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. ________________________________________________________________________________________________________ gradesiteforparkinglotandfootersforziplinetowers-nomaterialtoberemovedfromsite ________________________________________________________________________________________________________ i[[182,1940,251,1988][10][,I,][Times New Roman]]v. [[222,1940,1413,1988][10][,,][Times New Roman]]Will there be onsite dewatering or processing of excavated materials? [[2153,1940,2278,1988][10][,,][ Times New Roman]] Yes [[2267,1940,2378,1988][10][,,][Times New Roman]] No If yes, describe. ___________________________________________________________________________________________ ________________________________________________________________________________________________________ [[171,2095,240,2143][10][,I,][Times New Roman]]v. [[210,2095,1954,2143][10][,,][Times New Roman]]What is the total area to be dredged or excavated? _____________________________________acres 2.11 [[161,2143,241,2191][10][,I,][Times New Roman]]vi. [[211,2143,1960,2191][10][,,][Times New Roman]]What is the maximum area to be worked at any one time? _______________________________ acres 2.11 ---- [[150,2195,242,2243][10][,I,][Times New Roman]]vii. [[212,2195,1933,2243][10][,,][Times New Roman]]What would be the maximum depth of excavation or dredging? __________________________ feet 1footexpandedparkingarea [[150,2243,253,2291][10][,I,][Times New Roman]]viii. [[224,2243,871,2291][10][,,][Times New Roman]]Will the excavation require blasting? [[2143,2243,2269,2291][10][,,][Times New Roman]] Yes [[2256,2243,2367,2291][10][,,][Times New Roman]] No and4feetziplinefootings [[150,2293,230,2341][10][,I,][Times New Roman]]ix. [[201,2293,2406,2341][10][,,][Times New Roman]]Summarize site reclamation goals and plan: __________________________________________________________ ___________ ________________________________________________________________________________________________________ Re-seedziplinebaseareas,re-seedparkingareaonparcelat43WestMountainRoadandgravelsurfaceparkingareaontheparcelat57West ________________________________________________________________________________________________________ MountainRoad. b.Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: [[181,2656,243,2704][10][,I,][Times New Roman]]i. [[214,2656,1277,2704][10][,,][Times New Roman]]Identify the wetland or waterbody which would be affected (b [[1246,2656,2367,2704][10][,,][Times New Roman]]y name, water index number, wetland map number or geographic description): ______________________________________________________________________________________________ [[212,2752,2430,2800][10][,I,][Times New Roman]]_________________________________________________________________________________________________________ Page 4 of 13 [[171,80,244,128][10][,I,][Times New Roman]]ii. [[215,80,1353,128][10][,,][Times New Roman]]Describe how the proposed action would affect that waterbody or [[1316,80,2302,128][10][,,][Times New Roman]] wetland, e.g. excavation, fill, placement of structures, or alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[160,367,245,415][10][,I,][Times New Roman]]iii. [[216,367,2166,415][10][,,][Times New Roman]]Will proposed action cause or result in disturbance to bottom sediments? [[2153,367,2278,415][10] [,,][Times New Roman]] Yes [[2267,367,2357,415][10][,,][Times New Roman]] No If Yes, describe: __________________________________________________________________________________________ [[171,463,251,511][10][,I,][Times New Roman]]iv. [[222,463,1725,511][10][,,][Times New Roman]]Will proposed action cause or result in the destruction or removal of aquatic vegetation? [[2143,463,2279,511][10][,,][Times New Roman]] Yes [[2267,463,2378,511][10][,,][Times New Roman]] No If Yes: a ofvegetation proposedto be removed ___________________________________________________________ acreageof aquatic vegetation remaining after project completion________________________________________ purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________ ____________________________________________________________________________________________________ proposed method of plant removal: ________________________________________________________________________ if chemical/herbicide treatment will be used, specify product(s): _________________________________________________ [[171,861,240,909][10][,I,][Times New Roman]]v. [[210,861,2429,909][10][,,][Times New Roman]]Describe any proposed reclamation/mitigation following disturbance: ______________________________________ ___________ _________________________________________________________________________________________________________ c.Will the proposed action use, or create a new demand for water? Yes No If Yes: [[182,1075,244,1123][10][,I,][Times New Roman]]i. [[214,1075,1829,1123][10][,,][Times New Roman]]Total anticipated water usage/demand per day: __________________________ gallons/day [[171,1123,244,1171][10][,I,][Times New Roman]]ii. [[215,1123,933,1171][10][,,][Times New Roman]]Will the proposed action obtain water fro [[903,1123,1516,1171][10][,,][Times New Roman]]m an existing public water supply? [[2153,1123,2278,1171][10][,,][Times New Roman]] Yes [[2267,1123,2378,1171][10][,,][Times New Roman]] No If Yes: Name of district or service area: _________________________________________________________________________ Does the existing public water supply have capacity to serve the proposal? Yes No Is the project site in the existing district? Yes No Is expansion of the district needed? Yes No Do existing lines serve the project site? Yes No [[161,1495,246,1543][10][,I,][Times New Roman]]iii. [[216,1495,1593,1543][10][,,][Times New Roman]]Will line extension within an existing district be necessary to supply the project? [[2153,1495,2278,1543][10][,,][Times New Roman]] Yes [[2267,1495,2378,1543][10][,,][Times New Roman]] No If Yes: Describe extensions or capacity expansions proposed to serve this project: ________________________________________ ____________________________________________________________________________________________________ Source(s) of supply for the district: ________________________________________________________________________ [[171,1766,251,1814][10][,I,][Times New Roman]]iv. [[222,1766,1015,1814][10][,,][Times New Roman]]Is a new water supply district orservice area [[975,1766,1797,1814][10][,,][Times New Roman]]proposed to be formed to serve the project site? [[2153,1766,2278,1814][10][,,][Times New Roman]] Yes [[2267,1766,2378,1814][10][,,][Times New Roman]] No If, Yes: Applicant/sponsor for new district: ________________________________________________________________________ Date application submitted or anticipated: __________________________________________________________________ Proposed source(s) of supply for new district: _______________________________________________________________ [[182,2027,251,2075][10][,I,][Times New Roman]]v. [[221,2027,1221,2075][10][,,][Times New Roman]]If a public water supply will not be used, describe plans to [[1192,2027,1664,2075][10][,,][Times New Roman]] provide water supply for [[1624,2027,2019,2075][10][,,][Times New Roman]]the project: ________ [[1990,2027,2416,2075][10][,,][Times New Roman]]___________________ _________________________________________________________________________________________________________ [[161,2126,230,2174][10][,I,][Times New Roman]]vi [[191,2126,1110,2174][10][,,][Times New Roman]].If water supply will be from wells (public or private [[1078,2126,2066,2174][10][,,][Times New Roman]]), maximum pumping capacity: _______ gallons/minute. d. Will the proposed action generate liquid wastes? Yes No If Yes: [[171,2308,233,2356][10][,I,][Times New Roman]]i. [[214,2308,976,2356][10][,,][Times New Roman]]Total anticipated liquid waste generation pe [[944,2308,1320,2356][10][,,][Times New Roman]]r day: ___________ [[1290,2308,1615,2356][10][,,][Times New Roman]]____ gallons/day [[171,2356,244,2404][10][,I,][Times New Roman]]ii. [[215,2356,1230,2404][10][,,][Times New Roman]]Nature of liquid wastes to be generated (e.g., sanitary wast [[1191,2356,1755,2404][10][,,][Times New Roman]]ewater, industrial; if combinatio [[1726,2356,2270,2404][10][,,][Times New Roman]]n, describe all components and approximate volumes or proportions of each): __________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[150,2548,235,2596][10][,I,][Times New Roman]]iii. [[205,2548,1579,2596][10][,,][Times New Roman]]Will the proposed action use any existing public wastewater treatment facilities? [[2143,2548,2269,2 596][10][,,][Times New Roman]] Yes [[2257,2548,2368,2596][10][,,][Times New Roman]] No If Yes: Name of wastewater treatment plant to be used: _____________________________________________________________ Name of district: ______________________________________________________________________________________ Does the existing wastewater treatment plant have capacity to serve the project? Yes No Is the project site in the existing district? Yes No Is expansion of the district needed? Yes No Page 5 of 13 Do existing sewer lines serve the project site? Yes No Will line extension within an existing district be necessary to serve the project? Yes No If Yes: Describe extensions or capacity expansions proposed to serve this project: ____________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ [[150,392,230,440][10][,I,][Times New Roman]]iv. [[201,392,992,440][10][,,][Times New Roman]]Will a new wastewater (sewage) treatment di [[953,392,1664,440][10][,,][Times New Roman]]strict be formed to serve the project site? [[2143,392,2269,440][10][,,][Times New Roman]] Yes [[2257,392,2368,440][10][,,][Times New Roman]] No If Yes: Applicant/sponsor for new district: ____________________________________________________________________ Date application submitted or anticipated: _______________________________________________________________ What is the receiving water for the wastewater discharge? __________________________________________________ [[150,641,219,689][10][,I,][Times New Roman]]v. [[200,641,930,689][10][,,][Times New Roman]]If public facilities will not be used, descri [[890,641,1625,689][10][,,][Times New Roman]]be plans to provide wastewater treatment [[1586,641,2280,689][10][,,][Times New Roman]]for the project, including specifying pro [[2250,641,2376,689][10][,,][Times New Roman]]posed receiving water (name and classification if surface discharge, or describe subsurface disposal plans): ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[150,832,230,880][10][,I,][Times New Roman]]vi. [[201,832,2403,880][10][,,][Times New Roman]]Describe any plans or designs to capture, recycle or reuse liquid waste: ________________________________ _______________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e.Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e. sheet flow) during construction or post construction? If Yes: [[171,1209,233,1257][10][,I,][Times New Roman]]i. [[203,1209,1805,1257][10][,,][Times New Roman]]Howmuch impervious surface will the project create in relation to total size of project parcel? _____ Square feetor _____ acres (impervious surface) 2.07 forparkingexpansion(nonewimperviousforzipline) _____ Square feet or _____ acres (parcel size) 382.34 [[161,1352,234,1400][10][,I,][Times New Roman]]ii. [[204,1352,2409,1400][10][,,][Times New Roman]]Describe types of new point sources. _______________________________________________________________ ___________ biofilterdischarge _________________________________________________________________________________________________________ [[150,1448,235,1496][10][,I,][Times New Roman]]iii. [[205,1448,1246,1496][10][,,][Times New Roman]]Where will the stormwater runoff be directed (i.e. on-site st [[1208,1448,1822,1496][10][,,][Times New Roman]]ormwater management facility/stru [[1793,1448,2279,1496][10][,,][Times New Roman]]ctures, adjacent properties, groundwater, on-site surface water or off-site surface waters)? ________________________________________________________________________________________________________ On-sitebiofiltrationsystemwithoverflowtoexistingstormwaterpipe. ________________________________________________________________________________________________________ If to surface waters, identify receiving water bodies or wetlands: ________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Will stormwater runoff flow to adjacent properties? Yes No [[150,1838,230,1886][10][,I,][Times New Roman]]iv. [[201,1838,2035,1886][10][,,][Times New Roman]]Doesproposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? [[2147,1838,2273,1886][10][,,][Times New Roman]] Yes [[2260,1838,2371,1886][10][,,][Times New Roman]] No f.Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: [[181,2042,231,2090][10][,I,][Times New Roman]]i [[193,2042,243,2090][10][,,][Times New Roman]]. [[214,2042,301,2090][10][,,][Times New Roman]]Mo [[270,2042,1033,2090][10][,,][Times New Roman]]bile sources during project operations (e.g., [[994,2042,1774,2090][10][,,][Times New Roman]] heavy equipment, fleet or delivery vehicles) _________________________________________________________________________________________________________ [[171,2138,244,2186][10][,I,][Times New Roman]]ii. [[215,2138,1438,2186][10][,,][Times New Roman]]Stationary sources during construction (e.g., power generation, structur [[1401,2138,1979,2186][10][, ,][Times New Roman]]al heating, batch plant, crushers) ________________________________________________________________________________________________________ [[160,2234,245,2282][10][,I,][Times New Roman]]iii. [[216,2234,1016,2282][10][,,][Times New Roman]]Stationary sources during operations (e.g., pro [[987,2234,1840,2282][10][,,][Times New Roman]]cess emissions, large boilers, electric generation) ________________________________________________________________________________________________________ g.Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, Yes No or Federal Clean Air Act Title IV or Title V Permit? If Yes: [[150,2492,212,2540][10][,I,][Times New Roman]]i. [[193,2492,850,2540][10][,,][Times New Roman]]Is the project site located in an Air qu [[821,2492,2042,2540][10][,,][Times New Roman]]ality non-attainment area? (Area routinely or periodically fails to meet [[2143,2492,2269,2540][10][,,][Times New Roman]] Yes [[2256,2492,2367,2540][10][,,][Times New Roman]] No ambient air quality standards for all or some parts of the year) [[150,2588,223,2636][10][,I,][Times New Roman]]ii. [[194,2588,1593,2636][10][,,][Times New Roman]]In addition to emissions as calculated in the application, the project will generate: ___________Tons/year ()of CarbonDioxide (CO) 2 ___________Tons/year() of NitrousOxide (N) 2 ___________Tons/year() of Perfluorocarbons (PFCs) ___________Tons/year() of Sulfur Hexafluoride (SF) 6 ___________Tons/year ()of CarbonDioxide equivalent ofHydroflorocarbons (H) ___________Tons/year ()ofHazardous Air Pollutants (HAPs) Page 6 of 13 h.Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, Yes No landfills, composting facilities)? If Yes: [[171,223,233,271][10][,I,][Times New Roman]]i. [[203,223,2422,271][10][,,][Times New Roman]]Estimate methane generation in tons/year (metric): _______________________________________________________ _________ [[161,271,223,319][10][,I,][Times New Roman]]ii [[184,271,2355,319][10][,,][Times New Roman]].Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or electricity, flaring): ________________________________________________________________________________________ _________________________________________________________________________________________________________ i.Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: [[181,861,243,909][10][,I,][Times New Roman]]i. [[214,861,1208,909][10][,,][Times New Roman]]When is the peak traffic expected (Check all that apply): [[1252,861,1405,909][10][,,][Times New Roman]] Morni [[1367,861,1438,909][10][,,][Times New Roman]]ng [[1552,861,1751,909][10][,,][Times New Roman]] Evening [[1852,861,2039,909][10][,,][Times New Roman]]Weekend Randomly between hours of __________ to ________. [[181,957,254,1005][10][,I,][Times New Roman]]ii. [[225,957,362,1005][10][,,][Times New Roman]]For co [[333,957,1259,1005][10][,,][Times New Roman]]mmercial activities only, projected number of semi-tr [[1222,957,1598,1005][10][,,][Times New Roman]]ailer truck trips/day: [[1560,957,1808,1005][10][,,][Times New Roman]] __________ [[1779,957,2058,1005][10][,,][Times New Roman]]____________ [[2029,957,2079,1005][10][,,][Times New Roman]]_ [[171,1005,256,1053][10][,I,][Times New Roman]]iii. [[226,1005,2332,1053][10][,,][Times New Roman]]Parking spaces: Existing _____________ Proposed ___________ Net increase/decrease _____________ [[171,1052,251,1100][10][,I,][Times New Roman]]iv. [[222,1052,1221,1100][10][,,][Times New Roman]]Does the proposed action include any shared use parking? [[2143,1052,2269,1100][10][,,][Times New Roman]] Yes [[2256,1052,2367,1100][10][,,][Times New Roman]] No [[171,1100,240,1148][10][,I,][Times New Roman]]v. [[221,1100,2344,1148][10][,,][Times New Roman]]If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describ [[2314,1100,2382,1148][10][,,][Times New Roman]]e: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[150,1292,230,1340][10][,I,][Times New Roman]]vi. [[211,1292,1162,1340][10][,,][Times New Roman]]Arepublic/private transportation service(s) or facilities [[1129,1292,1509,1340][10][,,][Times New Roman]] available within ½ m [[1491,1292,1921,1340][10][,,][Times New Roman]]ile of the proposed site? [[2143,1292,2269,1340][10][,,][Times New Roman]] Yes [[2257,1292,2368,1340][10][,,][Times New Roman]] No [[150,1340,230,1388][10][,I,][Times New Roman]]vii [[192,1340,2093,1388][10][,,][Times New Roman]] Will the proposed action include access to public transportation or accommodations for use of hybrid, electric [[2143,1340,2269,1388][10][,,][Times New Roman]] Yes [[2257,1340,2368,1388][10][,,][Times New Roman]] No or other alternative fueled vehicles? [[150,1436,242,1484][10][,I,][Times New Roman]]viii [[203,1436,274,1484][10][,,][Times New Roman]].W [[264,1436,1916,1484][10][,,][Times New Roman]]ill the proposed action include plans for pedestrian or bicycle accommodations for connections to [[1887,1436,2058,1484][10][,,][Times New Roman]] existing [[2143,1436,2269,1484][10][,,][Times New Roman]] Yes [[2257,1436,2347,1484][10] [,,][Times New Roman]] No pede strian or bicycle routes? k.Will the proposed action (for commercial or industrial projects only) generate new or additional demand Yes No for energy? Thereisnoadditionalenergydemandfortheziplineservice.Patronswillbetransporteduphillbyanexistingchairlift. If Yes: Any lightingwillbelowenergyuseLEDfixtures.Anyadditionalenergyusewillbeminimal. [[171,1761,233,1809][10][,I,][Times New Roman]]i. [[203,1761,872,1809][10][,,][Times New Roman]]Estimate annual electricity demand du [[843,1761,1457,1809][10][,,][Times New Roman]]ring operation of the proposed acti [[1417,1761,1760,1809][10][,,][Times New Roman]]on: ____________ [[1731,1761,2427,1809][10][,,][Times New Roman]]________________________________ _________________________________________________________________________________________________________ Minimal [[160,1857,233,1905][10][,I,][Times New Roman]]ii. [[204,1857,254,1905][10][,,][Times New Roman]]A [[234,1857,1648,1905][10][,,][Times New Roman]]nticipated sources/suppliers of electricity for the project (e.g., on-site combustion, [[1609,1857,2273,1905][10][,,][Times New Roman]]on-site renewable, via grid/local utilit [[2234,1857,2348,1905][10][,,][Times New Roman]]y, or other): ________________________________________________________________________________________________________ NationalGrid/localutility [[150,2000,235,2048][10][,I,][Times New Roman]]iii. [[205,2000,959,2048][10][,,][Times New Roman]]Will the proposed action require a new, or [[919,2000,1578,2048][10][,,][Times New Roman]]an upgrade to, an existing substation? [[2143,2000,2269,2048][10][,,][Times New Roman]] Yes [[2256,2000,2367,2048][10][,,][Times New Roman]] No No l.Hours of operation. Answer all items which apply. [[181,2152,243,2200][10][,I,][Times New Roman]]i. [[214,2152,608,2200][10][,,][Times New Roman]]During Construction: [[1215,2152,1288,2200][10][,I,][Times New Roman]]ii. [[1269,2152,1631,2200][10][,, ][Times New Roman]]During Operations: Monday - Friday: _________________________Monday - Friday: ____________________________ 9:00am-10:00pm-wintermonths 8:00am-4:00pm Saturday: ________________________________Saturday: ___________________________________ 9:00am-10:00pm-wintermonths 8:00am-4:00pm Sunday: _________________________________Sunday: ____________________________________9:00am-10:00pm-wintermonths None Holidays: ________________________________Holidays: ___________________________________9:00am-10:00pm-wintermonths None Page 7 of 13 m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: [[150,223,212,271][10][,I,][Times New Roman]]i. [[193,223,1226,271][10][,,][Times New Roman]]Provide details including sources, time of day and duration: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ [[150,366,212,414][10][,I,][Times New Roman]]ii [[173,366,1836,414][10][,,][Times New Roman]].Will proposed action remove existing natural barriers that could act as a noise barrier or screen? [[2143,366,2269,414][10][,,][Times New Roman]] Yes [[2257,366,2368,414][10][,,][Times New Roman]] No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ n.[[181,529,231,577][10][,I,][Times New Roman]]. [[192,529,1051,577][10][,,][Times New Roman]] Will the proposed action have outdoor lighting? [[2143,529,2269,577][10][,,][Times New Roman]] Yes [[2256,529,2377,577][10][,,][Times New Roman]] No If yes: Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: [[165,625,227,673][10][,I,][Times New Roman]]i. _________________________________________________________________________________________________________ Theziplinewillnotbeilluminatedtohighlightthetowers.VerylowlevelLEDstandswillbeaddedalongtheridecables.Focusedlightingwillbe _________________________________________________________________________________________________________ addedwithintheziplinetowersbelowtheroofs.Fixtureswillbe"DarkSky"compliant. [[150,768,212,816][10][,I,][Times New Roman]]ii [[173,768,223,816][10][,,][Times New Roman]]. [[204,768,1146,816][10][,,][Times New Roman]]Will proposed action remove existing natural barriers [[1106,768,1824,816][10][,,][Times New Roman]]that could act as a light barrier or screen? [[2143,768,2269,816][10][,,][Times New Roman]] Yes [[2256,768,2367,816][10][,,][Times New Roman]] No Describe: _________________________________________________________________________________________________ _________________________________________________________________________________________________________ o[[171,945,221,993][10][,I,][Times New Roman]]. [[192,945,1059,993][10][,,][Times New Roman]]Does the proposed action have the potential to pro [[1030,945,1790,993][10][,,][Times New Roman]]duce odors for more than one hour per day? [[2143,945,2269,993][10][,,][Times New Roman]] Yes [[2257,945,2368,993][10][,,][Times New Roman]] No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: ______________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ p.Will theproposed action include any bulkstorageof petroleum (over1,100gallons) Yes No or chemical products? If Yes: [[171,1366,233,1414][10][,I,][Times New Roman]]i. [[203,1366,2413,1414][10][,,][Times New Roman]]Product(s) to be stored ______________________________________________________________________________ ________ [[160,1414,233,1462][10][,I,][Times New Roman]]ii. [[204,1414,1397,1462][10][,,][Times New Roman]]Volume(s) ______ per unit time ___________ (e.g., month, year) [[150,1462,235,1510][10][,I,][Times New Roman]]iii. [[208,1462,1001,1510][10][,,][Times New Roman]]Generally describeproposed storagefacilities [[978,1462,2420,1510][10][,,][Times New Roman]] ___________________________________________________________________ ________________________________________________________________________________________________________ q.Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, Yes No insecticides) during construction or operation? If Yes: Describe proposed treatment(s): [[192,1723,254,1771][10][,I,][Times New Roman]]i. ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[180,1962,253,2010][10][,I,][Times New Roman]]ii. [[224,1962,1399,2010][10][,,][Times New Roman]]Will the proposed action use Integrated Pest Management Practices? [[2143,1962,2289,2010][10][,,][Tim es New Roman]] Yes [[2277,1962,2388,2010][10][,,][Times New Roman]] No r.Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: [[181,2157,243,2205][10][,I,][Times New Roman]]i. [[214,2157,746,2205][10][,,][Times New Roman]]Describe any solid waste(s) to [[716,2157,1054,2205][10][,,][Times New Roman]] be generated duri [[1016,2157,1369,2205][10][,,][Times New Roman]]ng construction or [[1329,2157,1771,2205][10][,,][Times New Roman]]operation of the facility: Construction: ____________________ tons per ________________ (unit of time) Operation : ____________________ tons per ________________ (unit of time) [[171,2307,244,2355][10][,I,][Times New Roman]]ii. [[215,2307,1276,2355][10][,,][Times New Roman]]Describe any proposals for on-site minimization, recycling or [[1240,2307,1711,2355][10][,,][Times New Roman]] reuse of materials to avoi [[1671,2307,2131,2355][10][,,][Times New Roman]]d disposal as solid waste: Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ [[150,2553,235,2601][10][,I,][Times New Roman]]iii. [[206,2553,1417,2601][10][,,][Times New Roman]]Proposed disposal methods/facilities for solid waste generated on-site: Construction: ________________________________________________________________________________________ ____________________________________________________________________________________________________ Operation: __________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 8 of 13 s.Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or [[181,175,243,223][10][,I,][Times New Roman]]i. other disposal activities): ___________________________________________________________________________________ [[171,271,244,319][10][,I,][Times New Roman]]ii. [[225,271,619,319][10][,,][Times New Roman]]Anticipated rate of di [[580,271,924,319][10][,,][Times New Roman]]sposal/processing: ________ Tons/month, if transfer or other non-combustion/thermal treatment, or ________ Tons/hour, if combustion or thermal treatment [[171,420,256,468][10][,I,][Times New Roman]]iii. [[226,420,815,468][10][,,][Times New Roman]]If landfill, anticipated site life: __ [[786,420,1148,468][10][,,][Times New Roman]]________________ [[1120,420,1544,468][10][,,][Times New Roman]]______________ years t.Will proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: [[181,635,243,683][10][,I,][Times New Roman]]i. [[214,635,2416,683][10][,,][Times New Roman]]Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ [[171,779,244,827][10][,I,][Times New Roman]]ii. [[215,779,1193,827][10][,,][Times New Roman]]Generally describe processes or activities involving haza [[1161,779,1691,827][10][,,][Times New Roman]]rdous wastes or constituents: [[1651,779,1930,827][10][,,][Times New Roman]]____________ [[1901,779,2180,827][10][,,][Times New Roman]]____________ [[2152,779,2410,827][10][,,][Times New Roman]]___________ _________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[171,923,244,971][10][,I,][Times New Roman]]iii [[205,923,1293,971][10][,,][Times New Roman]].Specify amount to be handled or generated _____ tons/month [[171,971,251,1019][10][,I,][Times New Roman]]iv. [[222,971,1283,1019][10][,,][Times New Roman]]Describe any proposals for on-site minimization, recycling or [[1247,971,1741,1019][10][,,][Times New Roman]] reuse of hazardous constitu [[1712,971,2080,1019][10][,,][Times New Roman]]ents: ____________ [[2051,971,2414,1019][10][,,][Times New Roman]]________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ [[181,1114,250,1162][10][,I,][Times New Roman]]v. [[220,1114,1684,1162][10][,,][Times New Roman]]Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? [[2143,1114,2269,1162][10][,,][Times New Roman]] Yes [[2256,1114,2377,1162][10][,,][Times New Roman]] No If Yes: provide name and location of facility: _______________________________________________________________________ ________________________________________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: ________________________________________________________________________________________________________ Nohazardouswasteswillbegeneratedbytheproposedproject. ________________________________________________________________________________________________________ E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a.Existing land uses. [[198,1664,260,1712][10][,I,][Times New Roman]]i. [[231,1664,1337,1712][10][,,][Times New Roman]]Check all uses that occur on, adjoining and near the project site. Urban Industrial Commercial Residential (suburban) Rural (non-farm) Forest Agriculture Aquatic Other (specify): ____________________________________ [[177,1808,250,1856][10][,I,][Times New Roman]]ii. [[232,1808,838,1856][10][,,][Times New Roman]]If mix of uses, generally describe: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ b.Land uses and covertypes on the project site. Land use orCurrent Acreage After Change Covertype Acreage Project Completion (Acres +/-) Roads, buildings, and other paved or impervious 7.68+/-9.75+/- 2.07+/- surfaces Forested 241.74+/-241.23+/-0.51+/- Meadows, grasslands or brushlands (non- 132.17+/- 130.61+/-1.56+/- agricultural, including abandoned agricultural) Agricultural 000 (includes active orchards, field, greenhouse etc.) Surface water features 0.75+/-0.75+/-0 (lakes, ponds, streams, rivers, etc.) Wetlands (freshwater or tidal) 0 00 Non-vegetated (bare rock, earth or fill) 000 Other Describe: _______________________________ ________________________________________ Page 9 of 13 c.Is the project site presently used by members of the community for public recreation? Yes No [[188,129,250,177][10][,I,][Times New Roman]]i. [[220,129,2405,177][10][,,][Times New Roman]]If Yes: explain: ________________________________________________________________________________________ __ d.Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes No day care centers, or group homes) within 1500 feet of the project site? If Yes, [[188,337,250,385][10][,I,][Times New Roman]]i. [[220,337,565,385][10][,,][Times New Roman]]Identify Facilities: ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ e.Does the project site contain an existing dam? Yes No If Yes: [[188,608,250,656][10][,I,][Times New Roman]]i. [[220,608,970,656][10][,,][Times New Roman]]Dimensions of the dam and impoundment: Dam height: _________________________________ feet Dam length: _________________________________ feet Surface area: _________________________________ acres Volume impounded: _______________________________ gallons OR acre-feet [[177,872,250,920][10][,I,][Times New Roman]]ii. [[221,872,320,920][10][,,][Times New Roman]]Dam [[312,872,2405,920][10][,,][Times New Roman]]s existing hazard classification: ______________________ ___________________________________________________ ã [[177,920,262,968][10][,I,][Times New Roman]]iii. [[233,920,781,968][10][,,][Times New Roman]]Provide date and summarize re [[749,920,1171,968][10][,,][Times New Roman]]sults of last inspection: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ f.Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, Yes No or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility? If Yes: [[188,1237,250,1285][10][,I,][Times New Roman]]i. [[210,1237,884,1285][10][,,][Times New Roman]] Has the facility been formally closed? [[2149,1237,2275,1285][10][,,][Times New Roman]] Yes [[2263,1237,2384,1285][10][,,][Times New Roman]] No If yes, cite sources/documentation: _______________________________________________________________________ [[177,1348,250,1396][10][,I,][Times New Roman]]ii. [[221,1348,1166,1396][10][,,][Times New Roman]]Describe the location of the project site relative to the [[1125,1348,2014,1396][10][,,][Times New Roman]]boundaries of the solid waste management facility: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ [[167,1492,252,1540][10][,I,][Times New Roman]]iii. [[222,1492,891,1540][10][,,][Times New Roman]]Describe any development constraints [[857,1492,1265,1540][10][,,][Times New Roman]] due to the prior solid [[1225,1492,1740,1540][10][,,][Times New Roman]]waste activities: __________ [[1711,1492,2408,1540][10][,,][Times New Roman]]________________________________ _______________________________________________________________________________________________________ g.Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin Yes No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: [[177,1765,239,1813][10][,I,][Times New Roman]]i. [[209,1765,1258,1813][10][,,][Times New Roman]]Describe waste(s) handled and waste management activities, [[1219,1765,2159,1813][10][,,][Times New Roman]] including approximate time when activities occurred: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ h.Potential contamination history. Has there been a reported spill at the proposed project site, or have any Yes No remedial actions been conducted at or adjacent to the proposed site? If Yes: [[188,2081,250,2129][10][,I,][Times New Roman]]i. [[220,2081,1850,2129][10][,,][Times New Roman]]Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site [[2149,2081,2275,2129][10][,,][Times New Roman]] Yes [[2263,2081,2374,2129][10][,,][Times New Roman]] No Remediation database? Check all that apply: 1206507 Yes – Spills Incidents database Provide DEC ID number(s): ________________________________ Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________ Neither database [[156,2346,229,2394][10][,I,][Times New Roman]]ii. [[200,2346,1213,2394][10][,,][Times New Roman]]If site has been subject of RCRA corrective activities, desc [[1181,2346,1622,2394][10][,,][Times New Roman]]ribe control measures:__ [[1593,2346,2018,2394][10][,,][Times New Roman]]___________________ [[1990,2346,2395,2394][10][,,][Times New Roman]]__________________ ________________________________________________________________________________________________________ N/A-NoinformationonRCRAdatabase. ________________________________________________________________________________________________________ [[167,2493,252,2541][10][,I,][Times New Roman]]iii. [[222,2493,680,2541][10][,,][Times New Roman]]Is the project within 2000 [[651,2493,1102,2541][10][,,][Times New Roman]] feet of any site in the NY [[1083,2493,1950,2541][10][,,][Times New Roman]]SDEC Environmental Site Remediation database? [[2149,2493,2275,2541][10][,,][Times New Roman]] Yes [[2263,2493,2374,2541][10][,,][Time s New Roman]] No If yes, provide DEC ID number(s): ______________________________________________________________________________ [[167,2606,247,2654][10][,I,][Times New Roman]]iv. [[218,2606,1305,2654][10][,,][Times New Roman]]If yes to (i), (ii) or (iii) above, describe current status of site(s): _______________________________________________________________________________________________________ Spillsincidentdatabaseindicatesthespillcasewasclosedon01.17.2013becausethenecessarycleanupandremovalactionshavebeencompleted _______________________________________________________________________________________________________ andnofurtherremedialactivitiesarenecessaryand/orduetoadministrativereasons.(Seeattached'SpillIncidentsDatabaseDetails) Page 10 of 13 [[177,80,246,128][10][,I,][Times New Roman]]v. [[216,80,816,128][10][,,][Times New Roman]]Is the project site subject to an ins [[782,80,1487,128][10][,,][Times New Roman]]titutional control limiting property uses? [[2149,80,2275,128][10][,,][Times New Roman]] Yes [[2263,80,2384,128][10][,,][Times New Roman]] No If yes, DEC site ID number: ____________________________________________________________________________ Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________ Describe any use limitations: ___________________________________________________________________________ Describe any engineering controls: _______________________________________________________________________ Will the project affect the institutional or engineering controls in place? Yes No Explain: ____________________________________________________________________________________________ ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? ________________ feet over6.5' b. Are there bedrock outcroppings on the project site? Yes No If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________% c.Predominant soil type(s) present on project site: ___________________________ __________% 100 Hinckleycobblysandyloam ___________________________ __________% ____________________________ __________% d.What is the average depth to the water table on the project site? Average: _________ feet over6.5 e.Drainage status of project site soils: Well Drained:_____%ofite 100 Moderately Well Drained: _____% of site Poorly Drained _____%ofite f.Approximate proportion of proposed action site with slopes: 0-10%:_____% of site 95 10-15%: _____% of site 15% or greater: _____% of site 5 (atzipline) g.Are there any unique geologic features on the project site? Yes No If Yes, describe: _____________________________________________________________________________________________ ________________________________________________________________________________________________________ h.Surface water features. [[177,1697,239,1745][10][,I,][Times New Roman]]i. [[209,1697,1927,1745][10][,,][Times New Roman]]Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, [[2149,1697,2275,1745][10][,,][Times New Roman]] Yes [[2263,1697,2374,1745][10][,,][Times New Roman]] No ponds or lakes)? [[167,1793,240,1841][10][,I,][Times New Roman]]ii. [[211,1793,1264,1841][10][,,][Times New Roman]]Do any wetlands or other waterbodies adjoin the project site? [[2149,1793,2275,1841][10][,,][Times New Roman]] Yes [[2263,1793,2374,1841][10][,,][Times New Roman]] No If Yes to either [[418,1849,468,1897][10][,I,][Times New Roman]]i [[429,1849,524,1897][10][,,][Times New Roman]] or [[485,1849,547,1897][10][,I,][Times New Roman]]ii [[508,1849,1076,1897][10][,,][Ti mes New Roman]], continue. If No, skip to E.2.i. [[156,1905,241,1953][10][,I,][Times New Roman]]iii. [[222,1905,1089,1953][10][,,][Times New Roman]]Are any of the wetlands or waterbodies within or [[1050,1905,1513,1953][10][,,][Times New Roman]]adjoining the project site [[1473,1905,1927,1953][10][,,][Times New Roman]]regulated by any federal, [[2149,1905,2275,1953][10][,,][Times New Roman]] Yes [[2263,1905,2374,1953][10][,,][ Times New Roman]] No state or local agency? [[167,2005,247,2053][10][,I,][Times New Roman]]iv. [[218,2005,562,2053][10][,,][Times New Roman]]For each identified [[708,2005,2024,2053][10][,,][Times New Roman]]wetland and waterbody on theproject site, providethefollowing information Streams:Name ____________________________________________Classification _______________________ 941-397on307.-1-29 C(T) Snowmakingpondon307.-1-29 Lakesor Ponds:Name ____________________________________________Classification_______________________ Wetlands:Name ____________________________________________Approximate Size ___________________ Federalwaters Wetland No. (if regulatedbyDEC) _____________________________ [[156,2256,225,2304][10][,I,][Times New Roman]]v. [[206,2256,761,2304][10][,,][Times New Roman]]Are any of the above water bod [[731,2256,1954,2304][10][,,][Times New Roman]]ies listed in the most recent compilation of NYS water quality-impaired [[2149,2256,2275,2304][10][,,][Times New Roman]] Yes [[2263,2256,2374,2304][10][,,][Times New Roman]] No waterbodies? If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________ ___________________________________________________________________________________________________________ i.Is the project site in a designated Floodway? Yes No j.Is the project site in the 100 year Floodplain? Yes No k.Is the project site in the 500 year Floodplain? Yes No l.Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: Principal Aquifer [[188,2806,250,2854][10][,I,][Times New Roman]]i. [[220,2806,2409,2854][10][,,][Times New Roman]]Name of aquifer: ____________________________________________________________________________________ _____ Page 11 of 13 m.Identify the predominant wildlife species that occupy or use the project site: ______________________________ ______________________________ _____________________________________________________________ Urban-SuburbanWildlife ______________________________ _____________________________________________________________ n.Does the project site contain a designated significant natural community? Yes No If Yes: [[188,371,250,419][10][,I,][Times New Roman]]i. [[220,371,2417,419][10][,,][Times New Roman]]Describe the habitat/community (composition, function, and basis for designation): _______________________ ______________ Pitch Pine-Scrub Oak BarrensandHemlock-NorthernHardwoodForest ________________________________________________________________________________________________________ [[177,467,250,515][10][,I,][Times New Roman]]ii. [[221,467,2412,515][10][,,][Times New Roman]]Source(s) of description or evaluation: ________________________________________________________________ ________ [[167,515,252,563][10][,I,][Times New Roman]]iii. [[222,515,297,563][10][,,][Times New Roman]]Ex [[269,515,751,563][10][,,][Times New Roman]]tent of community/habitat: 700.0 Currently: ______________________ acres and5,232acres Following completion of project as proposed: _____________________ acres Gain or loss (indicate + or -): ______________________ acres o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as Yes No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? p.Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of Yes No special concern? q.Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? Yes No If yes, give a brief description of how the proposed action may affect that use: ___________________________________________ ________________________________________________________________________________________________________ E.3. Designated Public Resources On or Near Project Site a.Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Yes No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: _________________________________________________________________ b.Are agricultural lands consisting of highly productive soils present? Yes No [[198,1924,260,1972][10][,I,][Times New Roman]]i. [[231,1924,2404,1972][10][,,][Times New Roman]]If Yes: acreage(s) on project site? _________________________________________________________________ __________ [[188,1972,261,2020][10][,I,][Times New Roman]]ii. [[232,1972,2408,2020][10][,,][Times New Roman]]Source(s) of soil rating(s): _______________________________________________________________________ __________ c.Does the project site contain all or part of, or is it substantially contiguous to, a registered National Yes No Natural Landmark? If Yes: [[188,2192,250,2240][10][,I,][Times New Roman]]i. [[231,2192,911,2240][10][,,][Times New Roman]]Nature of the natural landmark: [[898,2192,1478,2240][10][,,][Times New Roman]] Biological Community [[1465,2192,1846,2240][10][,,][Times New Roman]] Geological Feature [[188,2240,261,2288][10][,I,][Times New Roman]]ii. [[232,2240,2406,2288][10][,,][Times New Roman]]Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? Yes No If Yes: [[198,2519,260,2567][10][,I,][Times New Roman]]i. [[230,2519,2403,2567][10][,,][Times New Roman]]CEA name: ____________________________________________________________________________________________ _ [[188,2567,261,2615][10][,I,][Times New Roman]]ii. [[232,2567,2405,2615][10][,,][Times New Roman]]Basis for designation: ______________________________________________________________________________ _______ [[177,2615,262,2663][10][,I,][Times New Roman]]iii. [[233,2615,2400,2663][10][,,][Times New Roman]]Designating agency and date: ______________________________________________________________________ ________ Page 12 of 13 e.Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No which is listed on, or has been nominated by the NYS Board of Historic Preservation for inclusion on, the State or National Register of Historic Places? If Yes: [[188,272,250,320][10][,I,][Times New Roman]]i. [[220,272,627,320][10][,,][Times New Roman]]Nature of historic/arch [[598,272,1003,320][10][,,][Times New Roman]]aeological resource: [[991,272,1464,320][10][,,][Times New Roman]] Archaeological Site [[1453,272,2027,320][10][,,][Times New Roman]] Historic Building or District [[177,320,250,368][10][,I,][Times New Roman]]ii. [[221,320,2403,368][10][,,][Times New Roman]]Name: _________________________________________________________________________________________________ [[156,368,241,416][10][,I,][Times New Roman]]iii. [[212,368,1177,416][10][,,][Times New Roman]]Brief description of attributes on which listing is based: _______________________________________________________________________________________________________ f.Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? g.Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: [[188,720,238,768][10][,I,][Times New Roman]]i [[199,720,2418,768][10][,,][Times New Roman]].Describe possible resource(s): __________________________________________________________________________ _____ [[177,768,250,816][10][,I,][Times New Roman]]ii. [[221,768,2404,816][10][,,][Times New Roman]]Basis for identification: _____________________________________________________________________________ ______ h.theproject siteanyofficially designated and publicly accessible federal, state,or local Yes No scenicor aesthetic resource? If Yes: [[188,993,250,1041][10][,I,][Times New Roman]]i. [[220,993,2409,1041][10][,,][Times New Roman]]Identify resource: _____________________________________________________________________________________ ____ [[177,1041,250,1089][10][,I,][Times New Roman]]ii. [[221,1041,1295,1089][10][,,][Times New Roman]]Nature of, or basis for, designation (e.g., established highway [[1255,1041,1809,1089][10][,,][Times New Roman]]overlook, state or local park, st [[1771,1041,2253,1089][10][,,][Times New Roman]]ate historic trail or scenic b [[2222,1041,2363,1089][10][,,][Times New Roman]]yway, etc.): ___________________________________________________________________________________________________ [[156,1137,241,1185][10][,I,][Times New Roman]]iii. [[212,1137,1466,1185][10][,,][Times New Roman]]Distance between project and resource: _____________________ miles. i.Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: [[188,1346,250,1394][10][,I,][Times New Roman]]i. [[220,1346,412,1394][10][,,][Times New Roman]]Identify t [[374,1346,2418,1394][10][,,][Times New Roman]]he name of the river and its designation: ________________________________________________________________ [[177,1397,250,1445][10][,I,][Times New Roman]]ii. [[221,1397,985,1445][10][,,][Times New Roman]]Is the activity consistent with development [[946,1397,1721,1445][10][,,][Times New Roman]]restrictions contained in 6NYCRR Part 666? [[2149,1397,2275,1445][10][,,][Times New Roman]] Yes [[2263,1397,2374,1445][10][,,][Times New Roman]] No F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name ___________________________________ Date_______________________________________ Signature________________________________________________ Title_______________________________________ PRINTFORM Page 13 of 13 ÛßÚ Ó¿°°»® Í«³³¿®§ λ°±®¬ Monday, December 03, 2018 8:55 AM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. B.i.i [Coastal or Waterfront Area]No B.i.ii [Local Waterfront Revitalization Area]No C.2.b. [Special Planning District]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History]Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Listed]Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database]Workbook. E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features]No E.2.h.i [Surface Water Features]No E.2.h.ii [Surface Water Features]No E.2.h.iii [Surface Water Features]No E.2.h.v [Impaired Water Bodies]No E.2.i. [Floodway]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.j. [100 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.k. [500 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.l. [Aquifers]Yes E.2.l. [Aquifer Names]Principal Aquifer E.2.n. [Natural Communities]Yes Full Environmental Assessment Form - EAF Mapper Summary Report [[2414,3217,2464,3255][8][B,I,][Times New Roman]]1 E.2.n.i [Natural Communities - Name]Pitch Pine-Scrub Oak Barrens E.2.n.i [Natural Communities - Acres]700.0 E.2.o. [Endangered or Threatened Species]No E.2.p. [Rare Plants or Animals]No E.3.a. [Agricultural District]No E.3.c. [National Natural Landmark]No E.3.d [Critical Environmental Area]No E.3.e. [National Register of Historic Places]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.3.f. [Archeological Sites]No E.3.i. [Designated River Corridor]No Full Environmental Assessment Form - EAF Mapper Summary Report [[2414,3217,2464,3255][8][B,I,][Times New Roman]]2 ÛßÚ Ó¿°°»® Í«³³¿®§ λ°±®¬ èÇ×ÉØÛÃòÛÎÇÛÊà    ûï øÓÉÙÐÛÓÏ×Ê èÔ×÷ûöïÛÌÌ×ÊÓÉÛÉÙÊ××ÎÓÎÕÈÍÍÐÓÎÈ×ÎØ×ØÈÍÛÉÉÓÉÈ ÌÊÍÒ×ÙÈÉÌÍÎÉÍÊÉÛÎØÊ×ÆÓ×ÅÓÎÕÛÕ×ÎÙÓ×ÉÓÎÌÊ×ÌÛÊÓÎÕÛÎ×ÎÆÓÊÍÎÏ×ÎÈÛÐ ÛÉÉ×ÉÉÏ×ÎÈÖÍÊÏ÷ûöîÍÈÛÐÐËÇ×ÉÈÓÍÎÉÛÉÑ×ØÓÎÈÔ×÷ûöÛÊ× ÛÎÉÅ×Ê×ØÚÃÈÔ×÷ûöïÛÌÌ×ÊûØØÓÈÓÍÎÛÐÓÎÖÍÊÏÛÈÓÍÎÍÎÛÎÃ÷ûö ËÇ×ÉÈÓÍÎÙÛÎÚ×ÍÚÈÛÓÎ×ØÚÃÙÍÎÉÇÐÈÓÎÕÈÔ×÷ûöåÍÊÑÚÍÍÑÉûÐÈÔÍÇÕÔ ÈÔ×÷ûöïÛÌÌ×ÊÌÊÍÆÓØ×ÉÈÔ×ÏÍÉÈÇÌÈÍØÛÈ×ØÓÕÓÈÛÐØÛÈÛÛÆÛÓÐÛÚÐ×ÈÍ ø÷ùÃÍÇÏÛÃÛÐÉÍÎ××ØÈÍÙÍÎÈÛÙÈÐÍÙÛÐÍÊÍÈÔ×ÊØÛÈÛÉÍÇÊÙ×ÉÓÎÍÊØ×Ê ÈÍÍÚÈÛÓÎØÛÈÛÎÍÈÌÊÍÆÓØ×ØÚÃÈÔ×ïÛÌÌ×ÊøÓÕÓÈÛÐØÛÈÛÓÉÎÍÈÛ ÉÇÚÉÈÓÈÇÈ×ÖÍÊÛÕ×ÎÙÃØ×È×ÊÏÓÎÛÈÓÍÎÉ úÓÓáùÍÛÉÈÛÐÍÊåÛÈ×ÊÖÊÍÎÈûÊ×ÛßîÍ úÓÓÓáðÍÙÛÐåÛÈ×ÊÖÊÍÎÈê×ÆÓÈÛÐÓÂÛÈÓÍÎûÊ×ÛßîÍ ù øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ Ôáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ìÍÈ×ÎÈÓÛÐùÍÎÈÛÏÓÎÛÈÓÍÎôÓÉÈÍÊÃßåÍÊÑÚÍÍÑ ÷ ÔÓáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ðÓÉÈ×ØßåÍÊÑÚÍÍÑ ÷ ÔÓáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ÷ÎÆÓÊÍÎÏ×ÎÈÛÐéÓÈ×ê×Ï×ØÓÛÈÓÍÎøÛÈÛÚÛÉ×ßåÍÊÑÚÍÍÑ ÷ ÔÓÓÓáåÓÈÔÓÎ îÍ éÓÈ×ß ÷ ÕáçÎÓËÇ×õ×ÍÐÍÕÓÙö×ÛÈÇÊ×ÉßîÍ ÷ ÔÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×Éßã×É ÷ ÔÓÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×Éßã×É ÷ ÔÓÓÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×Éßã×ÉøÓÕÓÈÛÐÏÛÌÌÓÎÕÓÎÖÍÊÏÛÈÓÍÎÍÎÐÍÙÛÐÛÎØÖ×Ø×ÊÛÐÅ×ÈÐÛÎØÉÛÎØ ÅÛÈ×ÊÚÍØÓ×ÉÓÉÑÎÍÅÎÈÍÚ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûöåÍÊÑÚÍÍÑ ÷    îÛÏ×ß ÷ ùè ùÐÛÉÉÓÖÓÙÛÈÓÍÎß ÷ ö×Ø×ÊÛÐåÛÈ×ÊÉ îÛÏ×ß ÷ ÔÆáóÏÌÛÓÊ×ØåÛÈ×ÊúÍØÓ×ÉßîÍ ÷ ÓáöÐÍÍØÅÛÃßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ Òá ã×ÛÊöÐÍÍØÌÐÛÓÎßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ öÇÐÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÉÉ×ÉÉÏ×ÎÈöÍÊÏ÷ûöïÛÌÌ×ÊéÇÏÏÛÊÃê×ÌÍÊÈ ÷ øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ ã×É ÷ ìÊÓÎÙÓÌÛÐûËÇÓÖ×Ê ÷ ã×É ÷ ÎÓáîÛÈÇÊÛÐùÍÏÏÇÎÓÈÓ×ÉîÛÏ×ßô×ÏÐÍÙÑîÍÊÈÔ×ÊÎôÛÊØÅÍÍØöÍÊ×ÉÈìÓÈÙÔìÓÎ×éÙÊÇÚíÛÑúÛÊÊ×ÎÉ ÷ ÎÓáîÛÈÇÊÛÐùÍÏÏÇÎÓÈÓ×ÉûÙÊ×Éß    ÷ Íá÷ÎØÛÎÕ×Ê×ØÍÊèÔÊ×ÛÈ×Î×ØéÌ×ÙÓ×ÉßîÍ ÷ îÍ ÷ ÛáûÕÊÓÙÇÐÈÇÊÛÐøÓÉÈÊÓÙÈßîÍ ÷ ÙáîÛÈÓÍÎÛÐîÛÈÇÊÛÐðÛÎØÏÛÊÑßîÍ ÷ ØáùÊÓÈÓÙÛÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÊ×ÛßîÍ ÷ ×áîÛÈÓÍÎÛÐê×ÕÓÉÈ×ÊÍÖôÓÉÈÍÊÓÙìÐÛÙ×ÉßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ ÖáûÊÙÔ×ÍÐÍÕÓÙÛÐéÓÈ×ÉßîÍ ÷ Óáø×ÉÓÕÎÛÈ×ØêÓÆ×ÊùÍÊÊÓØÍÊßîÍ öÇÐÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÉÉ×ÉÉÏ×ÎÈöÍÊÏ÷ûöïÛÌÌ×ÊéÇÏÏÛÊÃê×ÌÍÊÈ ÛßÚ Ó¿°°»® Í«³³¿®§ λ°±®¬ èÇ×ÉØÛÃòÛÎÇÛÊà   ûï øÓÉÙÐÛÓÏ×Ê èÔ×÷ûöïÛÌÌ×ÊÓÉÛÉÙÊ××ÎÓÎÕÈÍÍÐÓÎÈ×ÎØ×ØÈÍÛÉÉÓÉÈ ÌÊÍÒ×ÙÈÉÌÍÎÉÍÊÉÛÎØÊ×ÆÓ×ÅÓÎÕÛÕ×ÎÙÓ×ÉÓÎÌÊ×ÌÛÊÓÎÕÛÎ×ÎÆÓÊÍÎÏ×ÎÈÛÐ ÛÉÉ×ÉÉÏ×ÎÈÖÍÊÏ÷ûöîÍÈÛÐÐËÇ×ÉÈÓÍÎÉÛÉÑ×ØÓÎÈÔ×÷ûöÛÊ× ÛÎÉÅ×Ê×ØÚÃÈÔ×÷ûöïÛÌÌ×ÊûØØÓÈÓÍÎÛÐÓÎÖÍÊÏÛÈÓÍÎÍÎÛÎÃ÷ûö ËÇ×ÉÈÓÍÎÙÛÎÚ×ÍÚÈÛÓÎ×ØÚÃÙÍÎÉÇÐÈÓÎÕÈÔ×÷ûöåÍÊÑÚÍÍÑÉûÐÈÔÍÇÕÔ ÈÔ×÷ûöïÛÌÌ×ÊÌÊÍÆÓØ×ÉÈÔ×ÏÍÉÈÇÌÈÍØÛÈ×ØÓÕÓÈÛÐØÛÈÛÛÆÛÓÐÛÚÐ×ÈÍ ø÷ùÃÍÇÏÛÃÛÐÉÍÎ××ØÈÍÙÍÎÈÛÙÈÐÍÙÛÐÍÊÍÈÔ×ÊØÛÈÛÉÍÇÊÙ×ÉÓÎÍÊØ×Ê ÈÍÍÚÈÛÓÎØÛÈÛÎÍÈÌÊÍÆÓØ×ØÚÃÈÔ×ïÛÌÌ×ÊøÓÕÓÈÛÐØÛÈÛÓÉÎÍÈÛ ÉÇÚÉÈÓÈÇÈ×ÖÍÊÛÕ×ÎÙÃØ×È×ÊÏÓÎÛÈÓÍÎÉ úÓÓáùÍÛÉÈÛÐÍÊåÛÈ×ÊÖÊÍÎÈûÊ×ÛßîÍ úÓÓÓáðÍÙÛÐåÛÈ×ÊÖÊÍÎÈê×ÆÓÈÛÐÓÂÛÈÓÍÎûÊ×ÛßîÍ ù øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ Ôáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ìÍÈ×ÎÈÓÛÐùÍÎÈÛÏÓÎÛÈÓÍÎôÓÉÈÍÊÃßåÍÊÑÚÍÍÑ ÷ ÔÓáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ðÓÉÈ×ØßåÍÊÑÚÍÍÑ ÷ ÔÓáø÷ùéÌÓÐÐÉÍÊê×Ï×ØÓÛÈÓÍÎéÓÈ×øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö ÷ÎÆÓÊÍÎÏ×ÎÈÛÐéÓÈ×ê×Ï×ØÓÛÈÓÍÎøÛÈÛÚÛÉ×ßåÍÊÑÚÍÍÑ ÷ ÔÓÓÓáåÓÈÔÓÎ îÍ éÓÈ×ß ÷ ÕáçÎÓËÇ×õ×ÍÐÍÕÓÙö×ÛÈÇÊ×ÉßîÍ ÷ ÔÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×ÉßîÍ ÷ ÔÓÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×Éßã×É ÷ ÔÓÓÓáéÇÊÖÛÙ×åÛÈ×Êö×ÛÈÇÊ×Éßã×ÉøÓÕÓÈÛÐÏÛÌÌÓÎÕÓÎÖÍÊÏÛÈÓÍÎÍÎÐÍÙÛÐÛÎØÖ×Ø×ÊÛÐÅ×ÈÐÛÎØÉÛÎØ ÅÛÈ×ÊÚÍØÓ×ÉÓÉÑÎÍÅÎÈÍÚ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûöåÍÊÑÚÍÍÑ ÷ ÔÆáóÏÌÛÓÊ×ØåÛÈ×ÊúÍØÓ×ÉßîÍ ÷ ÓáöÐÍÍØÅÛÃßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ øÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ ã×É ÷ ìÊÓÎÙÓÌÛÐûËÇÓÖ×Ê ÷ ã×É öÇÐÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÉÉ×ÉÉÏ×ÎÈöÍÊÏ÷ûöïÛÌÌ×ÊéÇÏÏÛÊÃê×ÌÍÊÈ ÷ ÎÓáîÛÈÇÊÛÐùÍÏÏÇÎÓÈÓ×ÉîÛÏ×ßìÓÈÙÔìÓÎ×éÙÊÇÚíÛÑúÛÊÊ×ÎÉ ÷ ÎÓáîÛÈÇÊÛÐùÍÏÏÇÎÓÈÓ×ÉûÙÊ×Éß  ÷ Íá÷ÎØÛÎÕ×Ê×ØÍÊèÔÊ×ÛÈ×Î×ØéÌ×ÙÓ×ÉßîÍ ÷ îÍ ÷ ÛáûÕÊÓÙÇÐÈÇÊÛÐøÓÉÈÊÓÙÈßîÍ ÷ ÙáîÛÈÓÍÎÛÐîÛÈÇÊÛÐðÛÎØÏÛÊÑßîÍ ÷ ØáùÊÓÈÓÙÛÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÊ×ÛßîÍ ÷ ×áîÛÈÓÍÎÛÐê×ÕÓÉÈ×ÊÍÖôÓÉÈÍÊÓÙìÐÛÙ×ÉßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö åÍÊÑÚÍÍÑ ÷ ÖáûÊÙÔ×ÍÐÍÕÓÙÛÐéÓÈ×ÉßîÍ ÷ Óáø×ÉÓÕÎÛÈ×ØêÓÆ×ÊùÍÊÊÓØÍÊßîÍ öÇÐÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÉÉ×ÉÉÏ×ÎÈöÍÊÏ÷ûöïÛÌÌ×ÊéÇÏÏÛÊÃê×ÌÍÊÈ