Loading...
ResCheck FILE COPY . REScheck Software Version 4.6.3 cn co i w Compliance Certificate co * 0 p , , cie sy Project Neew Model Home U E 7 a �, N * o- 11) Energy Code: 2015 IECC f (n Location: Glens Falls, New York AU� 1 2Q19 111 N 2. Construction Type: Single-family __ _ j l XI Project Type: New Construction +AWN OF QUUE'EW-N--S-B-U.- RUILDJN GDES �) O Conditioned Floor Area: 2,405 ft2 G$c f✓ � (A Glazing Area 12% '•/ Climate Zone: 6 (7635 HDD) 0 N Permit Date: Co..) ON Permit Number: N 1" Construction Site: Owner/Agent: Designer/Contractor: 9 Westberry Way David Howard Ethan Peter Hall Queensbury, NY 12804 500 Luzerne Road Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave 518-361-0674 Glens Falls, NY 12801 Howard35_2000@yahoo.com 518-741-0268 ephall@nycap.rr.com Compliance: Passes using UA trade-off Compliance: 3.5%Better Than Code Maximum UA: 376 Your UA: 363 REVIEWED FOR The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. ENERGY CODE COMPLIANCE Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Raised or Energy Truss 1,105 38.0 0.0 0.025 28 Ceiling 2: Raised or Energy Truss 195 38.0 0.0 0.025 5 Wall 1: Wood Frame, 16" o.c. 1,823 21.0 3.6 0.046 71 Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 185 0.290 54 Door 1: Solid 38 0.300 11 Door 2: Glass 40 0.320 13 Door 3: Solid 18 0.300 5 Wall 2: Wood Frame, 16" o.c. 1,440 21.0 3.6 0.046 60 Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 138 0.290 40 Basement Wall 1: Solid Concrete or Masonry 1,441 0.0 15.0 0.048 68 Wall height: 7.9' Depth below grade: 6.5' Insulation depth: 7.5' Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 28 0.290 8 Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 1 of10 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requirements I' ed in the Sch k Ins ection Checklist. Ethan Peter Hall-Architect Name-Title Signatu 4 . - Date J* L 4i Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 2 of10 . REScheck Software Version 4.6.3 Inspection Checklist Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and EComplies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the ❑Not Observable Location on plans/spec: A- building envelope.Thermal 1 envelope represented on ENot Applicable construction documents. 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2, documentation demonstrate EDoes Not 403.7 energy code compliance for ENot Observable Location on plans/spec: A- [PR3]' lighting and mechanical systems. 1 d Systems serving multiple ENot Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ElDoes Not [PR2)2 on loads calculated per ACCA Cooling: Cooling: ENot Observable Location on plans/spec: A- t* Manual J or other methods Btu/hr Btu/hr 1 approved by the code official. ❑Not Applicable Additional Comments/Assumptions: (1 IHigh Impact (Tier 1) 12 IMedium Impact(Tier 2) 1 3 row Impact(Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 3 of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Conditioned basement wall R- R- EComplies See the Envelope Assemblies [F04]1 insulation R-value. Where interior R- R- EDoes Not table for values. insulation is used,verification ❑Not Observable may need to occur during Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 'Conditioned basement wall ❑Complies Requirement will be met. [F05]1 insulation installed per ElDoes Not manufacturer's instructions. ❑Not Observable Location on plans/spec: A- 1 ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ElComplies See the Envelope Assemblies [F06]1 insulation depth of burial or CI Does Not table for values. d distance from top of wall. [Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies Exception: Requirement is [F011]2 to protect exposed exterior ❑Does Not not applicable. insulation and extends a minimum of 6 in. below grade. ❑Not Observable ONot Applicable 403.9 Snow-and ice-melting system ❑Complies Exception: Requirement is [F012]2 controls installed. ❑Does Not not applicable. e ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High impact(Tier 1) 1 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 4 of10 Section 1Plans Verified Field Verified # 'Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ❑Not Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, :Not Observable 402.5 ❑Not Applicable [FR2]1 V 303.1.3 U-factors of fenestration products ❑Complies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable Location on plans/spec:A- taken from the default table. 1 ENot Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not instructions. Location on plans/spec: A- ❑Not Observable 1 ❑Not Applicable 402.4.3 Fenestration that is not site built ElComplies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not 0 AAMA/WDMA/CSA 101/I.5.2/A440 ❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ENot Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies Exception: Requirement is [FR16]2 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate 52.0 cfm leakage at 75 Pa. ❑Not Observable ENot Applicable 1403.2.1 Supply and return ducts in attics ❑Complies Exception: Ducts located 1[FR12]' insulated >= R-8 where duct is ElDoes Not completely inside the d >= 3 inches in diameter and >= ['Not Observable building envelope. R-6 where < 3 inches. Supply and return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies 'Requirement will be met. [FR15]3 ducts or plenums. EDoes Not d ❑Not Observable Location on plans/spec:A- ONot Applicable 1 403.4 HVAC piping conveying fluids R- R- ❑Complies Exception: Requirement is [FR17]2 above 105 QF or chilled fluids ❑Does Not not applicable. below 55 4F are insulated to zR- [Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies Exception:Requirement is [FR24]1 piping. ❑Does Not not applicable. V [Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies Requirement will be met. [FR18]2 zR-3. ❑Does Not d ❑Not Observable Location on plans/spec:A- 1 ENot Applicable 403.6 Automatic or gravity dampers are ❑Complies Requirement will be met. [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. Location on plans/spec:A- i- ❑Not Observable 1 ENot Applicable High Impact(Tier 1) [2jMedium Impact(Tier 2) 3JLow Impact(Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 5 of10 Additional Comments/Assumptions: 1THigh Impact(Tier 1) 121Medium Impact(Tier 2) T 3TLow Impact (Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 6 of10 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID — — 303.1 All installed insulation is labeled ❑Complies 'Requirement will be met. [IN13)2 or the installed R-values EDoes Not U: provided. :Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the El Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall 0 Mass ❑ Mass ❑Not Observable [IN3]1 exterior, the exterior insulation requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. ❑Does Not ❑Not Observable Location on plans/spec: A- 1 DNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 121Medium Impact(Tier 2) 1 3 ILow Impact(Tier 3) 1 Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 7 of10 • Section Plans Verified Field Verified # Final Inspection Provisions Value Value & Req.ID Complies? Comments/Assumptions 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, 402.2.E ❑ Steel ❑ Steel ENot Observable [Mr ENot Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [FI2]1 Blown insulation marked every Location on plans/spec: A- 300 ft2. Not Observable 1 ENot Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. [FI22]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that Location on plans/spec:A- extends over insulation. ❑Not Observable 1 :Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [F13]1 insulation R-value of the ❑Does Not adjacent assembly. Location on plans/spec:A- , ENot Observable 1 ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50= ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. Location on plans/spec:A- ENot Observable 1 ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ff ft7— ❑Does Not handlers are located within <=3 cfm/100 ft2 without air ENot Observable conditioned space. handler @ 25 Pa. For rough-in tests,verification may need to ENot Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Exception: All ducts and air [F12711 determine air leakage with ft2 ft2 ❑Does Not handlers are located within either: Rough-in test:Total ENot Observable conditioned space. leakage measured with a pressure differential of 0.1 inch ElNot Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies Requirement will be met. [FI24]1 by manufacturer at<=2°/a of ❑Does Not design air flow. Location on plans/spec: A- ENot Observable 1 ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies Requirement will be met. [FI912 installed for control of primary ❑Does Not heating and cooling systems and Location on plans/spec: A- initially set by manufacturer to Not Observable 1 code specifications. ENot Applicable 403.1.2 Heat pump thermostat installed ❑Complies Exception: Requirement is [FI10]2 on heat pumps. ❑Does Not not applicable. ENot Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies Exception:Requirement is [FI11]2 systems have automatic or ❑Does Not not applicable. accessible manual controls. ENot Observable ENot Applicable 1 THigh Impact(Tier 1) 2 Medium Impact (Tier 2) 1 3 Low Impact(Tier 3) 1 Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 8 of10 • Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system EComplies Requirement will be met. [F125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy ENot Observable Location on plans/spec: A- and air flow limits. 1 ❑Not Applicable 403.2 Hot water boilers supplying heat EComplies Exception: Requirement is [F126]2 through one-or two-pipe heating ❑Does Not not applicable. systems have outdoor setback control to lower boiler water [Not Observable temperature based on outdoor ENot Applicable temperature. 403.5.1.1 Heated water circulation systems EComplies Exception: Requirement is [FI28]2 have a circulation pump.The ❑Does Not not applicable. system return pipe is a dedicated return pipe or a cold water supply Not Observable pipe. Gravity and thermos- ENot Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems EComplies Exception: Requirement is [F129]2 comply with IEEE 515.1 or UL ❑Does Not not applicable. 515. Controls automatically adjust the energy input to the ENot Observable heat tracing to maintain the ENot Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that EComplies Exception: Requirement is [F130]2 have recirculation pumps that ❑Does Not not applicable. pump water from a heated water supply pipe back to the heated Not Observable water source through a cold ENot Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1044F. 403.5.4 Drain water heat recovery units ❑Complies Requirement will be met. [F131]2 tested in accordance with CSA ElDoes Not B55.1. Potable water-side Location on plans/spec: A- pressure loss of drain water heat 1 recovery units < 3 psi for ENot Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent EComplies Requirement will be met. [F16)1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Location on plans/spec: A- Does not apply to low-voltage 1 lighting. ENot Applicable 404.1.1 Fuel gas lighting systems have ❑Complies Requirement will be met. [F123]3 no continuous pilot light. ❑Does Not d' ENot Observable Location on plans/spec: A- 1 ENot Applicable 1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 13TLow Impact(Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry - 2019\9 Westberry Way.rck Page 9 of10 • Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [FI7)2 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies Requirement will be met. [FI18)3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 I Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Neew Model Home Report date: 08/21/19 Data filename: Y:\Howard Construction\9 Westberry -2019\9 Westberry Way.rck Page 10 of10 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 24.60 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass &Door Rating U-Factor SHGC Window 0.29 Door 0.32 Heating & Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments