Loading...
Staff notes 9/24/19 Town of Queensbury Planning Board Community Development Department Staff Notes September 24, 2019 Site Plan 54-2019 THE GREAT ESCAPE PROPERTIES 1172 State Route 9 / RC – Recreational Commercial / Ward SEQR Type II Material Review: application, site drawings, narrative Parcel History: SP 3-2019, SP 5-2017, SP 15-2018 __________________________________________________________________________________________ Requested Action Planning Board review and approval for stream bank stabilization for the Swan Boat Ride on Glen Lake Brook. Resolutions 1. PB decision Project Description Applicant proposes stream bank stabilization for the Swan Boat Ride on Glen Lake Brook. The project is to occur in three phases over 1,100 ft. of the brook. Phase I is to include about 80 ft. of the brook with new plantings, grading stabilization methods for the bank. Phase II will be similar to Phase I and will complete the remaining portion of the brook on both the north and south sides. Phase III includes the dredging of the brook for the Swan Boat ride. Only Phase I to be completed for this site plan. Pursuant to Chapter 179-6-050 of the Zoning Ordinance, shoreline work shall be subject to Planning Board review and approval. Staff Comments  Location-The project site is located at 1172 State Route 9  Arrangement- The project is associated with the Swan Boat ride that is to remain and operate in the same area of Glen Brook.  Site Design- The project involves the stabilization of the stream bank and to manage stormwater entering the brook. Three areas on the north bank are to be stabilized as part of the first project phase.  Building – There are no buildings involved  Site conditions-The applicant has explained the existing brook is deteriorating and Swan Boat ride is limited operations due to erosion into the brook.  Traffic- There is no change to the traffic for the site  Site plan overall-The first phase is for three areas and the total number of project areas is 8 areas over 1,100 feet of the brook. There are two additional phases that will require future site plan review as NYSDEC and Army Corp applications have to be completed.  Grading and drainage plan, Sediment and erosion control-Sheet Two shows the cross sections of the existing conditions 1-7. Sheet 3-4 shows the location of the three areas to be worked on. Sheet 5-7 show the north- side excavation, grade level, erosion control, location of the fiber roll.  Landscape plan – The plans show the planting plan to be established when the bank areas are stabilized  Site lighting plan- There is no changes in lighting on the site or nearby rides.  Utility details – There are no utility connection changes.  Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, s. snow removal.  The waivers requested–Staff finds it reasonable to request a waiver as these items are not associated with this specific project for bank stabilization.  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. SEQR The Great Escape Theme Park completed a Generic Environmental Impact Statement and the Final was adopted on 7-11-01 and subsequent update in 7-04. No additional SEQR review is required as long as the proposal is consistent with the impact assessment and thresholds adopted in the Findings Statements.  This includes the following Traffic –the stabilization of the bank is not intended to generate new or additional park attendance; Sound –the existing ride does not have the potential to exceed the noise threshold; Stormwater –the bank stabilization will improve the stormwater management on site and deter errosion; Wastewater –no wastewater generating facilities are proposed for the project; Soils, Geology, Topography and Ecology –the project is for stabilization and will improve the retention of vegetation on the banks to deter soil erosion. Summary The applicant has completed a site plan application for the stream bank stabilization for three areas on Glen Brook for the Swan Boat ride. st Meeting History: 1 meeting; - 2 -