Subdivision Mod. 6-2019 BARRY & JACQUELINE LASHINSKY
Moon Hill Road
SEQR Unlisted
Material Review: revised submission plans and stormwater
Parcel History:SUB 17-1989, AV 90-1989
__________________________________________________________________________________________
Requested Action
Planning Board review and approval to modify an existing subdivision “Imperial Acres” (April 1990).
Resolutions
1. SEQR
2. PB decision
Project Description
Applicant proposes to modify an existing subdivision “Imperial Acres” (April 1990). The application has been
revised to show 8 lots where seven lots are residential and one lot is for stormwater management. The
stormwater management has been updated in regards to grading and adding basins. Pursuant to Chapter 183 of
the Zoning Ordinance, modification of an approved subdivision shall be subject to Planning Board review and
approval.
Staff Comments
The applicant proposes modification to a previously approved subdivision due to stormwater easement location
and function as it was directing stormwater to Moon Hill Road versus maintaining stormwaer on site.
Preliminary Review –
[[148,2014,403,2071][12][,I,][Times New Roman]]Layout plan [[403,2014,422,2071][12][,I,][Times New Roman]]s [[422,2014,447,2071][12][,,][Times New Roman]] [[447,2014,472,2071][12][,,][Times
New Roman]]– [[471,2014,2414,2071][12][,,][Times New Roman]]the plans show the existing conditions on the site including the topography, setbacks and
associated work to be completed.
[[150,2186,556,2243][12][,I,][Times New Roman]]Construction details [[556,2186,569,2243][12][,,][Times New Roman]] [[569,2186,594,2243][12][,,][Times New Roman]]– [[594,2186,607,2243][12][,,][Times
New Roman]] [[607,2186,2202,2243][12][,,][Times New Roman]]The plans show the locations of the homes, septic and stormwater management. [[2202,2186,2225,2243][12][,,][Times New Roman]]
[[148,2301,487,2358][12][,I,][Times New Roman]]Landscape plans [[487,2301,500,2358][12][,I,][Times New Roman]] [[499,2301,525,2358][12][,I,][Times New Roman]]– [[525,2301,739,2358][12][,,][Times
New Roman]]The projec [[739,2301,767,2358][12][,,][Times New Roman]]t [[767,2301,1873,2358][12][,,][Times New Roman]]has less than 10 lots so no landscaping plan is required. [[1873,2301,1896,2358]
[12][,,][Times New Roman]]
[[150,2416,429,2473][12][,I,][Times New Roman]]Clearing plan [[429,2416,442,2473][12][,,][Times New Roman]] [[442,2416,467,2473][12][,,][Times New Roman]]– [[467,2416,1716,2473][12][,,][Times
New Roman]]The applicant has provided areas to be cleared for each home. [[1716,2416,1739,2473][12][,,][Times New Roman]]
Revised.
[[329,2531,344,2588][12][,I,][Times New Roman]] [[344,2531,891,2588][12][,I,][Times New Roman]]Grading and erosion plans [[891,2531,906,2588][12][,,][Times New Roman]] [[906,2531,931,2588][12][,,][
Times New Roman]]– [[931,2531,2413,2588][12][,,][Times New Roman]]plans show site grading and lot arrangement for the homes, however the
lots may require addition site plan review prior to issuance of a building permit if lot grading and home are
modified. The applicant has indicate grading has been reduced in some areas of the basins to minimize tree
clearing and steep slopes. In addition the applicant has proposed additional tree plantings along the basin
between the neighboring property where the basin is located at the road entrance.
[[150,2876,681,2933][12][,I,][Times New Roman]]The Environmental report [[680,2876,697,2933][12][,,][Times New Roman]] [[697,2876,722,2933][12][,,][Times New Roman]]– [[722,2876,739,2933][12][,,][Ti
mes New Roman]] [[739,2876,2413,2933][12][,,][Times New Roman]]the applicant has completed a Long Environmental assessment review noting the
previous environmental assessment form was completed with a negative declaration, a new assessment form is
provided as the forms have been updated by NYSDEC since the 1989 approval of the original subdivision.
[[149,206,320,263][12][B,I,][Times New Roman]]Revised.
[[320,207,342,264][12][,I,][Times New Roman]] [[342,207,852,264][12][,I,][Times New Roman]]Stormwater management [[851,207,873,264][12][,,][Times New Roman]] [[873,207,898,264][12][,,][Times
New Roman]]– [[898,207,1231,264][12][,,][Times New Roman]]the applicant ha [[1231,207,1272,264][12][,,][Times New Roman]]s [[1272,207,1498,264][12][,,][Times New Roman]]revised the
[[1498,207,1520,264][12][,,][Times New Roman]] [[1520,207,2287,264][12][,,][Times New Roman]]stormwater pollution prevention plan [[2287,207,2300,264][12][,,][Times New Roman]]. [[2300,207,2322,264
][12][,,][Times New Roman]] [[2322,207,2413,264][12][,,][Times New Roman]]The
applicant has noted an individual NYSDEC SPDES permit is required. The plans where updated to a 25 year
storm. Test pit locations and soil data have been added to the plans. These updates and additional updates have
been forwarded to the Town Engineer for review and comment.
[[148,495,243,552][12][,I,][Times New Roman]]Fees [[243,495,256,552][12][,,][Times New Roman]] [[256,495,281,552][12][,,][Times New Roman]]– [[281,495,605,552][12][,,][Times New Roman]]per
application. [[605,495,628,552][12][,,][Times New Roman]]
[[150,610,313,667][12][,I,][Times New Roman]]Waivers [[313,610,326,667][12][,,][Times New Roman]] [[326,610,351,667][12][,,][Times New Roman]]– [[351,610,1094,667][12][,,][Times New
Roman]]the applicant has requested a waivers [[1094,610,1117,667][12][,,][Times New Roman]]
[[150,725,396,782][12][,I,][Times New Roman]]Open Space [[396,725,415,782][12][,,][Times New Roman]] [[415,725,440,782][12][,,][Times New Roman]]– [[440,725,2413,782][12][,,][Times
New Roman]]there is no proposal for open space however the areas to be used for stormwater management
should be noted to remain as stormwater management areas in perpetuity.
Final Review: Final plat –7 lots for residential and 1 lot for stormwater manaagment (note the applicant has
indicated lots 1 and 3 are to be combined) of the proposed road are shown for the lot layout and building
envelopes shown on plan.
[[150,1127,562,1184][12][,I,][Times New Roman]]State/County agency [[562,1127,575,1184][12][,,][Times New Roman]] [[575,1127,600,1184][12][,,][Times New Roman]]– [[600,1127,2080,1184][12][,,][Times
New Roman]]The Planning Board, NYSDEC and Army Corp are subject to the review. [[2080,1127,2103,1184][12][,,][Times New Roman]]
[[150,1242,544,1299][12][,I,][Times New Roman]]Other plans reports [[544,1242,557,1299][12][,,][Times New Roman]] [[557,1242,582,1299][12][,,][Times New Roman]]– [[582,1242,2328,1299][12][,,][Times
New Roman]]stormwater report and pollution prevention plan provided to the Town Engineer for rev [[2328,1242,2413,1299][12][,,][Times New Roman]]iew
and comment.
[[148,1415,594,1472][12][,I,][Times New Roman]]Protected open space [[594,1415,614,1472][12][,,][Times New Roman]] [[614,1415,639,1472][12][,,][Times New Roman]]– [[639,1415,2413,1472][12][,,][Times
New Roman]]the areas noted as stormwater would be considered only as stormwater management
areas and no residential development.
[[150,1587,285,1644][12][,I,][Times New Roman]]Streets [[285,1587,298,1644][12][,,][Times New Roman]] [[298,1587,323,1644][12][,,][Times New Roman]]– [[323,1587,336,1644][12][,,][Times
New Roman]] [[336,1587,878,1644][12][,,][Times New Roman]]the new street is to be a cul [[878,1587,895,1644][12][,,][Times New Roman]]- [[895,1587,942,1644][12][,,][Times New Roman]]de
[[942,1587,959,1644][12][,,][Times New Roman]]- [[959,1587,1690,1644][12][,,][Times New Roman]]sac and to be dedicated to the Town [[1690,1587,1713,1644][12][,,][Times New Roman]]
Summary
The applicant has completed a modification of the preliminary and final stage for a 7-lot residential and 1 lot
stormwater management (Lots 1 and 3 are to be combined).
Meeting History: PB: 8/27/19