Loading...
PB Staff Notes_10 15 19 Town of Queensbury Planning Board Community Development Department Staff Notes October 15, 2019 Subdivision Mod. 6-2019 BARRY & JACQUELINE LASHINSKY Moon Hill Road SEQR Unlisted Material Review: revised submission plans and stormwater Parcel History:SUB 17-1989, AV 90-1989 __________________________________________________________________________________________ Requested Action Planning Board review and approval to modify an existing subdivision “Imperial Acres” (April 1990). Resolutions 1. SEQR 2. PB decision Project Description Applicant proposes to modify an existing subdivision “Imperial Acres” (April 1990). The application has been revised to show 8 lots where seven lots are residential and one lot is for stormwater management. The stormwater management has been updated in regards to grading and adding basins. Pursuant to Chapter 183 of the Zoning Ordinance, modification of an approved subdivision shall be subject to Planning Board review and approval. Staff Comments The applicant proposes modification to a previously approved subdivision due to stormwater easement location and function as it was directing stormwater to Moon Hill Road versus maintaining stormwaer on site. Preliminary Review – [[148,2014,403,2071][12][,I,][Times New Roman]]Layout plan [[403,2014,422,2071][12][,I,][Times New Roman]]s [[422,2014,447,2071][12][,,][Times New Roman]] [[447,2014,472,2071][12][,,][Times New Roman]]– [[471,2014,2414,2071][12][,,][Times New Roman]]the plans show the existing conditions on the site including the topography, setbacks and associated work to be completed. [[150,2186,556,2243][12][,I,][Times New Roman]]Construction details [[556,2186,569,2243][12][,,][Times New Roman]] [[569,2186,594,2243][12][,,][Times New Roman]]– [[594,2186,607,2243][12][,,][Times New Roman]] [[607,2186,2202,2243][12][,,][Times New Roman]]The plans show the locations of the homes, septic and stormwater management. [[2202,2186,2225,2243][12][,,][Times New Roman]] [[148,2301,487,2358][12][,I,][Times New Roman]]Landscape plans [[487,2301,500,2358][12][,I,][Times New Roman]] [[499,2301,525,2358][12][,I,][Times New Roman]]– [[525,2301,739,2358][12][,,][Times New Roman]]The projec [[739,2301,767,2358][12][,,][Times New Roman]]t [[767,2301,1873,2358][12][,,][Times New Roman]]has less than 10 lots so no landscaping plan is required. [[1873,2301,1896,2358] [12][,,][Times New Roman]] [[150,2416,429,2473][12][,I,][Times New Roman]]Clearing plan [[429,2416,442,2473][12][,,][Times New Roman]] [[442,2416,467,2473][12][,,][Times New Roman]]– [[467,2416,1716,2473][12][,,][Times New Roman]]The applicant has provided areas to be cleared for each home. [[1716,2416,1739,2473][12][,,][Times New Roman]] Revised. [[329,2531,344,2588][12][,I,][Times New Roman]] [[344,2531,891,2588][12][,I,][Times New Roman]]Grading and erosion plans [[891,2531,906,2588][12][,,][Times New Roman]] [[906,2531,931,2588][12][,,][ Times New Roman]]– [[931,2531,2413,2588][12][,,][Times New Roman]]plans show site grading and lot arrangement for the homes, however the lots may require addition site plan review prior to issuance of a building permit if lot grading and home are modified. The applicant has indicate grading has been reduced in some areas of the basins to minimize tree clearing and steep slopes. In addition the applicant has proposed additional tree plantings along the basin between the neighboring property where the basin is located at the road entrance. [[150,2876,681,2933][12][,I,][Times New Roman]]The Environmental report [[680,2876,697,2933][12][,,][Times New Roman]] [[697,2876,722,2933][12][,,][Times New Roman]]– [[722,2876,739,2933][12][,,][Ti mes New Roman]] [[739,2876,2413,2933][12][,,][Times New Roman]]the applicant has completed a Long Environmental assessment review noting the previous environmental assessment form was completed with a negative declaration, a new assessment form is provided as the forms have been updated by NYSDEC since the 1989 approval of the original subdivision. [[149,206,320,263][12][B,I,][Times New Roman]]Revised. [[320,207,342,264][12][,I,][Times New Roman]] [[342,207,852,264][12][,I,][Times New Roman]]Stormwater management [[851,207,873,264][12][,,][Times New Roman]] [[873,207,898,264][12][,,][Times New Roman]]– [[898,207,1231,264][12][,,][Times New Roman]]the applicant ha [[1231,207,1272,264][12][,,][Times New Roman]]s [[1272,207,1498,264][12][,,][Times New Roman]]revised the [[1498,207,1520,264][12][,,][Times New Roman]] [[1520,207,2287,264][12][,,][Times New Roman]]stormwater pollution prevention plan [[2287,207,2300,264][12][,,][Times New Roman]]. [[2300,207,2322,264 ][12][,,][Times New Roman]] [[2322,207,2413,264][12][,,][Times New Roman]]The applicant has noted an individual NYSDEC SPDES permit is required. The plans where updated to a 25 year storm. Test pit locations and soil data have been added to the plans. These updates and additional updates have been forwarded to the Town Engineer for review and comment. [[148,495,243,552][12][,I,][Times New Roman]]Fees [[243,495,256,552][12][,,][Times New Roman]] [[256,495,281,552][12][,,][Times New Roman]]– [[281,495,605,552][12][,,][Times New Roman]]per application. [[605,495,628,552][12][,,][Times New Roman]] [[150,610,313,667][12][,I,][Times New Roman]]Waivers [[313,610,326,667][12][,,][Times New Roman]] [[326,610,351,667][12][,,][Times New Roman]]– [[351,610,1094,667][12][,,][Times New Roman]]the applicant has requested a waivers [[1094,610,1117,667][12][,,][Times New Roman]] [[150,725,396,782][12][,I,][Times New Roman]]Open Space [[396,725,415,782][12][,,][Times New Roman]] [[415,725,440,782][12][,,][Times New Roman]]– [[440,725,2413,782][12][,,][Times New Roman]]there is no proposal for open space however the areas to be used for stormwater management should be noted to remain as stormwater management areas in perpetuity. Final Review: Final plat –7 lots for residential and 1 lot for stormwater manaagment (note the applicant has indicated lots 1 and 3 are to be combined) of the proposed road are shown for the lot layout and building envelopes shown on plan. [[150,1127,562,1184][12][,I,][Times New Roman]]State/County agency [[562,1127,575,1184][12][,,][Times New Roman]] [[575,1127,600,1184][12][,,][Times New Roman]]– [[600,1127,2080,1184][12][,,][Times New Roman]]The Planning Board, NYSDEC and Army Corp are subject to the review. [[2080,1127,2103,1184][12][,,][Times New Roman]] [[150,1242,544,1299][12][,I,][Times New Roman]]Other plans reports [[544,1242,557,1299][12][,,][Times New Roman]] [[557,1242,582,1299][12][,,][Times New Roman]]– [[582,1242,2328,1299][12][,,][Times New Roman]]stormwater report and pollution prevention plan provided to the Town Engineer for rev [[2328,1242,2413,1299][12][,,][Times New Roman]]iew and comment. [[148,1415,594,1472][12][,I,][Times New Roman]]Protected open space [[594,1415,614,1472][12][,,][Times New Roman]] [[614,1415,639,1472][12][,,][Times New Roman]]– [[639,1415,2413,1472][12][,,][Times New Roman]]the areas noted as stormwater would be considered only as stormwater management areas and no residential development. [[150,1587,285,1644][12][,I,][Times New Roman]]Streets [[285,1587,298,1644][12][,,][Times New Roman]] [[298,1587,323,1644][12][,,][Times New Roman]]– [[323,1587,336,1644][12][,,][Times New Roman]] [[336,1587,878,1644][12][,,][Times New Roman]]the new street is to be a cul [[878,1587,895,1644][12][,,][Times New Roman]]- [[895,1587,942,1644][12][,,][Times New Roman]]de [[942,1587,959,1644][12][,,][Times New Roman]]- [[959,1587,1690,1644][12][,,][Times New Roman]]sac and to be dedicated to the Town [[1690,1587,1713,1644][12][,,][Times New Roman]] Summary The applicant has completed a modification of the preliminary and final stage for a 7-lot residential and 1 lot stormwater management (Lots 1 and 3 are to be combined). Meeting History: PB: 8/27/19 - 2 -