Loading...
GM1916696.000 - Queensbury NY - Field Report - 07-25-193 352 TURNPIKE ROAD SUITE 320 SOUTHBOROUGH, MA 01772 508.485.0755 whitestoneassoc.com REPORT OF SITE INSPECTION Client: Project: Insp. Date: Aldi, Inc. Aldi Supermarket, 708 Upper Glen Street Queensbury, New York July 25, 2019 WAI Project No.: GM1916696.000 Page 1 of 1 Weather: Overcast Temp. Range: 70 to 85 °F Inspector: S. Brodell Present at Site: K4-H Other Office Locations: WARREN, NJ 908.668.7777 CHALFONT, PA 215.712.2700 ROCKY HILL, CT 860.726.7889 WALL, NJ 732.592.2101 STERLING, VA 703.464.5858 EVERGREEN, CO 303.670.6905 A Whitestone representative arrived on-site to provide construction monitoring associated with site development. Whitestone observed the placement of approximately 20 cubic yards of 3,000 psi, air entrained concrete for footings at the new entrance of the building. Prior to concrete placement, reinforcing steel was inspected for size, splice length, spacing, and clearance. Results indicate compliance with the details and specifications provided. The concrete was tested for temperature, air and slump with results within project specification. One set of six cylinders was fabricated this day for compressive strength testing. Detailed results of the concrete tests are included in the attached Report of Concrete Placement Inspection. At the conclusion of today's services, results were reported to the contractors REPORT OF CONCRETE PLACEMENT INSPECTION Whitestone Associates, Inc. Client: Aldi, Inc. Project: Aldi Market, 708 Upper Glen Street Queensbury, NY Inspection Date: July 25, 2019 WAI Project No. GM1916696.000 Page: 1 of 1 FIELD DATA: SET NO. NO. OF CYLINDERS MADE CONCRETE SUPPLIER TICKET NUMBER TIME TRUCK DISPATCHED TIME TRUCK UNLOAD CUBIC YARDS OF CONCRETE SLUMP (in) AIR CONTENT (%) CONCRETE TEMPERATURE (ºF) 1 6 Pallette 3299 2:29 pm 2:58 pm 10.0 7.25 5.9 77 LOCATION Footing and pier footings for new entrance REMARKS: Approximately 20 cubic yards of 3,000-psi, concrete