Loading...
Staff notes for 10 22 19 Town of Queensbury Planning Board Community Development Department Staff Notes October 22, 2019 Site Plan 64-2019 ADIRONDACK FACTORY OUTLET 1444 State Route 9 / CI – Commercial Intensive / Ward 1 SEQR Unlisted Material Review: narrative, site plan application, stormwater report, elevations Parcel History:SP 3-2009, SP 37-2015, SP 30-2018, many others __________________________________________________________________________________________ Requested Action Planning Board review and approval for removal of 13,675 sq. ft. +/- building at front of Adirondack Outlets and to construct new 12,706 sq. ft. building on southwest corner- previous approval had expired. Resolutions 1. SEQR 2. PB decision Project Description Applicant proposes removal of 13,675 sq. ft. +/- building at front of Adirondack Outlets and to construct new 12,706 sq. ft. building on southwest corner. Project will have both buildings 75 ft. from front property line. Project work includes new façade area for existing building, site work grading, landscaping and stormwater for new building. Pursuant to Chapter 179-3-040 of the Zoning Ordinance, new commercial construction shall be subject to Planning Board review and approval. Staff Comments  Location-The project is located at 1444 State Route 9 and is known as the Adirondack Factory Outlets  Arrangement- The plans show the removal of approximately 13,675 sq ft of existing building that included stores such as Under Armor and Timberland shoes. A 12,706 sq ft building will be constructed on the south side of the property at a 75 ft setback.  Site Design- The plans show the location for the new building and the rearrangement of parking for the front of the building and  Building – The building plans show the front elevation of the renovated main building and the view elevations of the new building.  Signage-signage areas or dimensions are not shown on the plan and will be subject to staff review and previous sign variance plans.  Site conditions-The site conditions will be similar as the new building is proposed in an area that was previously parking.  Traffic- The applicant has shown the parking to be 351 spaces on the site for the existing building and new building. The internal traffic flow at the front of the site includes and interconnect to the North property so pedestrians and vehicle traffic can occur between properties –the applicant intends to encourage pedestrian traffic and vehicle to remain parked on site.  Site layout and utility plan –Utilities will be updated to connect to the new building area as needed.  Grading and drainage plan, Sediment and erosion control – The project has been provided to engineering for review and comment. The applicant has indicated the stormwater management will be addressed with existing drywells and new ones to be installed in areas near the new building. The applicant to address the April 12, 2018 Chazen comments.  Landscape plan –the plans show the new building to have a lawn area at the front facing the sidewalk. Additional plantings are proposed around the new building.  Site lighting plan –The plans show the existing pole lights in the parking area and five new wall lights will be added to the building.  Elevations- The elevations show the view fronts indicating the height of the main portions of the building are 29 ft 3 in and the tower features are at 40 ft. The façade colors are provided with dark green clapboard siding, field stone at the building base, and white trim.  Floor plans –Floor plans where not shown, the board may request floor plan arrangement for the existing and proposed.  Waivers-Planning staff has reviewed the applicants request for waivers that include, k. topography, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal.  The waivers requested–Staff would request additional information on snow removal.  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The application form identified as “Requirements” outlines the items to appear on the site plan or included as attachments. At the time of application the applicant has either requested waivers, indicated the item not applicable or has not addressed the item/ left check box blank. This includes the follow items listed under Requirements of the applicant’s application: k. topography, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. Summary The applicant has completed a site plan application for the demolition of 13,675 sq ft portion of an existing building, construction of new building at 12,706 sq ft and associated site work. st Meeting History: 1 meeting - 2 -