Loading...
architect sign off D ECEOW Er) AIA L TM OCT 22 2019 1 _LJ, Document G704 - 201T TOWN OF QUEENSBURY BUILDING&CODES Certificate of Substantial Completion PROJECT:(name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION: ALDI-SWN#18-Queensbury,NY Contract For:General Construction Certificate Number:001 763 Glen Street Date: 10/17/2019 Date: 10/17/2019 Queensbury,NY 12804 OWNER:(name and address) ARCHITECT:(name and address) CONTRACTOR:(name and address) ALDI Inc. APD Engineering&Architecture,PLLC National Contractors,LLC 295 Rye Street 615 Fishers Run 879C White Pond Road South Windsor,CT 06074 Victor,NY 14564 Elgin,SC 29045 The Work identified below has been reviewed and found,to the Architect's best knowledge,information,and belief,to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated below is the date established by this Certificate. (Identify the Work,or portion thereof that is substantially complete.) Renovations to an existing retail store with new plumbin HVAC,and electrical systems,sidewalks,and site improvements. APD Engineering& Robert McCormick,AIA, Architecture,PLLC Senior Architect 10/17/2019 ARCHITECT(Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION WARRANTIES The date of Substantial Completion of the Project or portion designated above is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: (Identi61 warranties that do not commence on the date of Substantial Completion,if any,and indicate their date of commencement.) WORK TO BE COMPLETED OR CORRECTED A list of items to be completed or corrected is attached hereto,or transmitted as agreed upon by the parties,and identified as follows: (Identify the list of Work to be completed or corrected.) The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of fmal payment,whichever occurs first.The Contractor will complete or correct the Work on the list of items attached hereto within ( )days from the above date of Substantial Completion. Cost estimate of Work to be completed or corrected: $0.00 The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,and other items identified below shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should review insurance requirements and coverage.) The Owner and Contractor hereby ac t thee res/spponsibil' ' assigned to them in this Certificate of Substantial Completion: /Z i off -e 2.. L.i.� dl�2�sc�e �/1 � � U lO�y/f �`' e'en/AA-doff CONTRACTOR(Firm SIGNATURE PRINTED NAME AND TITLE DATE Name) \ OWNER(Firm Name) IGNATURE PRINTED NAME AND TITLE DATE AIA Document G704TM—2017.Copyright® 1963,1978,1992,2000 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or 1 any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 14 18:14 ET on 10/15/2019 under Order No.1546117892 which expires on 03/30/2020,and is not for resale. User Notes: (3B9ADA56)