air test APPOLO
oft HEATING
Degrees Above The Rest, S/NCE /9681
Certificate of Completion
Duct Sealing Performed For:
300 N\
Hodorowski Builders , Appolo Heating
115 Richmond Hills Drive
Queensbury , NY 12804 250
200
a.
Overall Sealing Results `?
When we arrived, 150
YOUR DUCTS HAD: m
215.9 CFM of Leakage, equivalent to a '' l00
40.8 Square Inch Hole
This equals 129.5 refrigerators full of air loss every 50
hour.
\ .
After we finished, o
YOUR DUCTS HAVE: 0 5 10 15 20 25
7.9 CFM of Leakage, equivalent to a Sealing Time in Minutes
1.5 Square Inch Hole
This corresponds to a 96.3% Reduction in Aeroseal Technician David
Duct Leakage. Aeroseal Case ID 5068
Date of Seal 10/18/2019
Note: Duct Leakage results are calculated in System Description Basement Upflow
Cubic Feet per Minute (CFM) measured at a Seal Description Supply
standard OPERATING PRESSURE of 25 Pa. ,
Hardware HomeSeal Connlct t
�O_ Viil
,4 EFR05EAL® Duct Sealing Performed By: Z O cn
Duct Sealing From The Inside 0p r lu6
Appolo Heating, Inc. 9°m o
m
c) r
868 Burdeck St m av'
Schenectady,NY 12306 0
co
Phone:(518)355-0433 cn c 1n
- lt J
2-cc — D 'Lc-A')