Loading...
air test APPOLO oft HEATING Degrees Above The Rest, S/NCE /9681 Certificate of Completion Duct Sealing Performed For: 300 N\ Hodorowski Builders , Appolo Heating 115 Richmond Hills Drive Queensbury , NY 12804 250 200 a. Overall Sealing Results `? When we arrived, 150 YOUR DUCTS HAD: m 215.9 CFM of Leakage, equivalent to a '' l00 40.8 Square Inch Hole This equals 129.5 refrigerators full of air loss every 50 hour. \ . After we finished, o YOUR DUCTS HAVE: 0 5 10 15 20 25 7.9 CFM of Leakage, equivalent to a Sealing Time in Minutes 1.5 Square Inch Hole This corresponds to a 96.3% Reduction in Aeroseal Technician David Duct Leakage. Aeroseal Case ID 5068 Date of Seal 10/18/2019 Note: Duct Leakage results are calculated in System Description Basement Upflow Cubic Feet per Minute (CFM) measured at a Seal Description Supply standard OPERATING PRESSURE of 25 Pa. , Hardware HomeSeal Connlct t �O_ Viil ,4 EFR05EAL® Duct Sealing Performed By: Z O cn Duct Sealing From The Inside 0p r lu6 Appolo Heating, Inc. 9°m o m c) r 868 Burdeck St m av' Schenectady,NY 12306 0 co Phone:(518)355-0433 cn c 1n - lt J 2-cc — D 'Lc-A')