Loading...
SEP-0657-20193F?--o(D5 - zLecoENVIRONMENTALDESIGN PARTNERSHIP, LLP. 900 Route 146 Clifton Park,NY 12065 P)518 371 7621 (F)518 371 9540 edpllp.com April 8, 2020 AS BUILT Town of Queensbury Building & Codes 742 Bay Road ECEOWERQueensbury, NY 12804 Attn: Dave Hatin APR 9 2020 Re: Steinbach Wastewater—211 Assembly Point Road TOWN OF QUEENSBURY COMMUNITY DEVELOPMENT Dear Dave: In compliance with application approvals granted by the Town of Queensbury I offer the following regarding the referenced project. The design plans, prepared by this office and reviewed and approved by the Town as associated with the wastewater system application, are as follows: Proposed Site Improvements For The Steinbach Residence Sheet S-1 Cover Sheet Sheet S-2 Existing Conditions Sheet V-3 Variance Plan Sheet S-4 Wastewater Details Sheet S-5 Enhanced Treatment Details Dated: October 31, 2019 During the course of construction I was on the job site to observe key components of the system installation culminating with the `start-up' of the Clarus Treatment tank,the pump assembly and the control panel system on March 3, 2020. Field location of the absorption system is as per the design plan and since the treatment tank and pump tank have been relocated an `as-built' sketch is provided for the file. Based on my inspection of the system start-up it is my opinion that the wastewater system is in compliance with the intent of the approved design plan and is ready for operation. Sincerely, bennis MacElroy, PE cc: Erin & Frank Steinbach