Loading...
ComCheck -�` COMcheck Software Version 4.0.8.2 Interior Lighting Compliance Certificate � ECE0WE � u, Project Information j �� s Energy Code: 2015 IECC ! I, �; NOV 2 S 2018 Li Project Title: Olive Garden#1428 Project Type: Iteration TOWN OF QUEENS BURY Construction Sit GG E Owner/Agent: Designer/Contractor: 756 Glen Str tr,,�6� DeVita Engineering,PC Queensbury, yYr PO Box 1596 1 ;y�¢ Greenville, SC 29602 a� y iEWED FOR 864.232.6642 ENERGY CODE COMPLIANCE Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Common Space Types:Dining Area-Family Restaurant 5775 0.89 5140 Total Allowed Watts= 5140 Proposed Interior Lighting Power A B C D E Fixture ID:Description/Lamp I Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Common.9pace Ty;m-Dirdnq Area-Family Restaurant(5775 sn:ft.) LED:MP:MONOPNT:EXIST/NEW MONOPOINT:Other: 1 107 7 749 LED:H:PENDANT:Other: 1 11 25 275 LED:C:DOWNLIGHT:EXISTINEW:Other: 1 158 7 1106 LED 2:M:STRIP LT:Other: 1 75 1 105 LED 5:To Go:TO GO LIGHT:Other: 2 1 14 14 Incandescent 5:J1,J2,J3:PENDANT CLUSTER:Incandescent 40W: 1 9 40 360 LED 7:Puck Lights:Wine Display:LED MR 10W: 1 6 10 60 Incandescent 6:D:DECOR CHANDELIER:Other: 8 1 300 300 Total Proposed Watts= 2969 Interior Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checkli5, Name-Title Signature Co P,+p �9,9 Date 302.6-1-51.2 CC-0751-2018 Olive Garden 756 Glen St `P'r0A 0971 4? �C9 Commercial Alterations 5323 s.f. Project Title: Olive Garden#1428 Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden(DeVita Engineering PC)\02-OG#1428- Page 1 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury,NY ComCheck.cck - COMcheck Software Version 4.0.8.2 Exterior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Olive Garden#1428 Project Type: Alteration Exterior Lighting Zone 3(Other) Construction Site: Owner/Agent: Designer/Contractor: 756 Glen Street DeVita Engineering, PC Queensbury, NY PO Box 1596 Greenville,SC 29602 864.232.6642 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Entry canopy 103 ft2 0.4 Yes 41 Illuminated area of facade wall or surface 110 ft2 0.15 No 16 Total Tradable Watts(a)= 41 Total Allowed Watts= 58 Total Allowed Supplemental Watts(b)= 750 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 750 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Eby canto 4103 112)*JmdAle_W"11 Compact Fluorescent 1:A 1:EXTERIOR DOWNLIGHTS:Triple 4-pin 26W:Electronic: 1 2 26 52 Illuminated area of facade wall or surface(110 ): Norkradable VNaftaae LED 1:G:EXTERIOR SCONCE:LED A Lamp 8W: 1 2 8 16 Total Tradable Proposed Watts= 52 Exterior Lighting PASSES Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior fighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. UZAY Name-Title Signature 5 A. Co VDate r rA n s a m LU �L� O 0 Project Title: Olive Garden 41428 '9O� pJ. Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden(DeV je A02-0G#1428- Page 2 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY ComCheck.cck COMcheck Software Version 4.0.8.2 Inspection Checklist Energy Code: 2015 IECC Requirements: 0,0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where Compliance is itemized in a separate table, a reference to that table is provided. En w'Plan Review Complies? Comments/Assumptions JD C103.2 :Plans, specifications, and/or ;❑Complies [PR4)1 'calculations provide all information f❑Does Not ;with which compliance can be ;determined for the interior lighting :❑Not Observable: ;and electrical systems and equipment ❑Not Applicable ; and document where exceptions to ,the standard are claimed. Information :provided should include interior ;lighting power calculations, wattage of ;bulbs and ballasts,transformers and control devices. I C103.2 ;Plans,specifications, and/or ;[-]Complies [PR811 :calculations provide all information !❑Does Not ;with which compliance can be determined for the exterior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to ` ;the standard are claimed. Information provided should include exterior :lighting power calculations, wattage of: ,;bulbs and ballasts,transformers and I control devices. Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Olive Garden#1428 Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden (DeVita Engineering PC)\02-OG#1428- Page 3 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY CDmCheck.cck section # Rough-in Electrical Inspection Complies? Comments/Assumptions & Re aD C405.2.1 Lighting controls installed to uniformly:QCompiies [EL15]1 'reduce the lighting load by at least ❑Does Not 50%. ❑Not Observable: g ❑Not Applicable C405.2.1 [Occupancy sensors installed in :❑Complies [EL18]1 !required spaces. :❑Does Not i ❑Not Observable; ❑Not Applicable C405.2.1, independent lighting controls Installed'',❑Complies ; C405.2.2.,'per approved lighting plans and all 'ODoes Not [ 3 :manual controls readily accessible and: [EL23]2; :[]Not Observable visible to occupants. ,❑Not Applicable C405.2.2. Automatic controls to shut off all 'OComplies 1 building lighting installed in all ;❑Does Not S [EL22]2 abuildings. ,❑Not Observable; ❑Not Applicable C405.2.3,Daylight zones provided with ;©Complies [ELI, 1,2 .yindividual controls that control the ❑Does Not Tights independent of general area "lighting. ❑Not Observable ❑Not Applicable C405.2.3, {Primary sidelighted areas are ❑Complies C405.2.3. 1"equipped with required lighting 1❑Does Not 1, ,controls. i C405.2.3. ❑Not Observable: 2 ; ❑Not Applicable [EL20]1 s , i C405.2.3, ;Enclosed spaces with daylight area ;❑Complies : C405.2.3. under skylights and rooftop monitors QDoes Not 1, :are equipped with required lighting '❑Not Observable; C405.2,3. ,controls. ; 3 ;❑Not Applicable [EL21]1 1 i t C405.2.4 ;Separate lighting control devices for 1,0Complies } [EL4]1 !specific uses installed per approved ❑Does Not ;lighting plans. ❑Not Observable; ❑Not Applicable C405.2.4 ;Additional interior lighting power ;[]Complies [EL8]1 :allowed for special functions per the :❑Does Not :approved lighting plans and is ❑ , Not Observable, .automatically controlled and , 'separated from general lighting. ❑Not Applicable C405.2.5 Automatic lighting controls for exterior;DComplies [EL25]no° :lighting installed.Controls will be PDoes Not !daylight controlled,set based on I❑Not Observable; business operation time-of-day, or ONot Applicable e 'reduce connected lighting > 30%. pp C405.3 Exit signs do not exceed 5 watts per OCOMplies [EL6]1 'face. 'QDoes Not r i � R i ,❑Not Observable; ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2'1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Olive Garden#1428 Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden (DeVita Engineering PC)\02-OG#1428- Page 4 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY ComCheck.cck 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Olive Garden*1428 Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden (DeVita Engineering PC)\02-OG#1428- Page 5 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY ComCheck.cck Section # Final Inspection Complies? Comments/Assumptions IDJ C303.3, 'Furnished 0&M instructions for ❑Complies C408.2.5. ',systems and equipment to the !❑Does Not 2 :building ownet-pt designated [FI17]3 ;representative. :❑Not Observable; ❑Not Applicable C405.4.1 {Interior installed lamp and fixture ;❑Complies ,See the Interior Lighting fixture schedule for values. • [F]18]1 :lighting power is consistent with what ;❑Does Not is shown on the approved lighting ❑Not Observable; plans, demonstrating proposed watts I are less than or equal to allowed ;❑Not Applicable watts. C405.5.1 'Exterior lighting power is consistent ;❑Complies ;See the Exterior Lighting fixture schedule for values. [F119]1 :with what is shown on the approved El Does Not lighting plans,demonstrating f[]Not Observable; proposed watts are less than or equal ito allowed_ watts. 1EINot Applicable j C408.2.5. !Furnished as-built drawings for ❑Complies 1 Jelectric power.systems within 90 days ❑Does Not [FI16]3 :of system kreptanCe. ❑Not Observable y j❑Not Applicable C408.3 ;Lighting systems have been tested to TIComplies ; [FI33]1 ensure proper calibration, adjustment, :❑Does Not ;programming, and operation. } :[:]Not Observable; ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2` Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Olive Garden#1428 Report date: 05/30/18 Data filename: G:\PROJECTS\2017 Commercial\17023-Olive Garden (DeVita Engineering PC)\02-OG#1428- Page 6 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY ComCheck.cck r r Project Title: Olive Garden#1428 Report date: 05/30/18 Data filename G:\PROJECTS\2017 Commercial\17023-Olive Garden (DeVita Engineering PC)\02-OG#1428- Page 7 of 7 Queensbury, NY\7Elec\OG 1428 Queensbury, NY ComCheck.cck