Loading...
Manual J Your Company Here... LIZ&GEORGE RHEIN JR. Your Address Here...-City Here..., State Here..Zip Here... CHESTNUT RIDGE RD ' Phone Here -Email Here... QUEENSBURY , NY 12804 Sales Consultant: (IS L N I r) E Job#: _ ! E- ►_ ' 1, Date: 06/27/2018 14 1 ►l 1- , j R ., ‘--;` System 1 (Average Load Procedure) Design Conditions Location: Glens Falls AP, New York Elevation: 335 ft Daily Range: Medium Input Data: Outdoor Dry Bulb Indoor Dry Bulb Latitude: 43°N Design Grains: 26 Summer: 92 72 Heated Area 4812 Sq.Ft. Winter: -17 70 Cooled Area 4812 Sq.Ft. Heat/Loss Summary (July Heat Load Calculations) rj ---- cc Cl)REVIEWED FOR Gross Sensible Latent �j °" oci)�W ENERGY CODE COMPLi,q Area Loss Gain Gain 3813 18640 2975 0 1UN I • 3_0 Windows 444 17425 12034 0 = p G Doors 21 713 254 0 MA Io m Ceilings 2572.15 6490 2007 0 t-- J Skylights 0 0 0 0 Floors 4844.15 6672 469 0 Room Internal Loads 0 4428 1083 Blower Load 1707 0 r,o,r,,,« Hot Water Piping Load 0 0 0 Winter Humidification Load 0 0 0 i1na OL J Infiltration 25844 2825 2270 Approved ACCA Ventilation 16460 3784 3041 MJ8 Calculations Duct Loss/Gain EHLF=O ESGF=0 0 0 0 AED Excursion n/a 1609 n/a Subtotal 92244 32092 6394 Total Heating 92244 Btuh Total Cooling 38486 Btuh 181 Linear ft. of Hydronic Baseboard *Calculations are based on the ACCA Manual J 8th Edition and are approved by ACCA.All computed calculations are estimates based on building use, weather data, and inputted values such as R-Values,window types,duct loss, etc. Equipment selection should meet both the latent and sensible gain as well as building heat loss. This application has glass areas that produce relatively large cooling loads for part of the day. Variable air volume devices maybe required to overcome spikes in solar load for one or more rooms.A zoned system may be required, or some rooms may require zone control(provided by individual, motorized, thermostatically controlled dampers). Adtek AccuLoad Report Version 17.3.5 Page 1 Your Company Here... LIZ&GEORGE RHEIN JR. Your Address Here... -City Here...,State Here..Zip Here... CHESTNUT RIDGE RD ?hone Here -Email Here... QUEENSBURY, NY 12804 Sales Consultant: Job#: Date: 06127/2018 System I Load Chart II Heat Loss Percentages Walls Windows & Skylights 18% 20% II Doors Ceilings '-1 Floors �yrtp,�4l}� `bu.. 1T_. Misc System Loss G 19% 28% IllInfiltration IN Ventilation 1% 7% II Duct Loss Heat Gain Percentages al Walls 8% Windows & Skylights 19% is Doors yj Ceilings II Floors 14% t ` ,' 34% ro,RI Internal Gains Gj Fla �-;. i Infiltration U Ventilation 16% 1%6% 1% IN Duct Loss Adtek AccuLoad Report Version 17.3.5 Page 2 Your Company Here., LIZ&GEORGE RHEIN JR. Yc44r Address Here...-City Here...,State Here..Zip Here... CHESTNUT RIDGE RD Phone Here.....-Email Here... GUEENSBURY, NY 12804 Sales Consultant: Job#: Date: 06/27/2018 Equipment Selection Design Conditions Design Location: Glens Falls AP, New York Relative Humidity: 50% Elevation: 335 ft Summer Outdoor Design: 92 Latitude: 43° N Winter Outdoor Design: -17 Daily Range: Medium Summer Indoor Design: 72 Design Grains 26 Winter Indoor Design: 70 Heating Equipment Mfg: Altitude Correction Factor: 0 Model: Heating Input(btuh): AHRI Ref#: Heating Output(btuh): 0 Efficiency(AFUE): Calculated HeatPump 0 Output @ Design (btuh): Cooling Equipment Mfg: CHAMPION BY JOHNSON Altitude Correction Factor: 0 Oudoor Unit Model: TC3B4821 Rated Total Cooling (btuh): 46000 Coil: FC/MC/PC48D+TXV Sensible Cooling (btuh): 34500 Furnace: TM9E100C2OMP11 Latent Cooling (btuh): 11500 AHRI Ref#: 8538544 SEER - EER@95: Heat Pump HSPF: Summary MJ8 Calculations Status Equipment Capacities Sensible Gain (btuh): 32092 Sufficient Sensible Capacity (btuh): 34500 Latent Gain (btuh): 6394 Sufficient Latent Capacity (btuh): 11500 Total Heat Gain(btuh): 38486 Sufficient Total Capacity(btuh): 46000 Heat Loss (btuh): 92244 Not Sufficient Heating Capacity (btuh): 0 +idtek AccuLoad Report Version 17.3.5 Page 3 Your Company Here... LIZ&GEORGE RH©N JR. Thar Address Here... -City Here...,State Here..Zip Here,.. CHESTNUT RIDGE RD • Phone Here -Email Here... QUEENSBURY,NY 12804 Sales Consultant: Job#: Date: 06/27/2018 System I AED Curve — DAL — 1.3 16000 14000 12000 10000 - _ �,,,,...... 8000 6000 4000 2000 0 8 9 10 11 12 13 14 15 16 17 18 19 20 Hour AED Excursion: 1609 btuh AED Status: System does NOT have Adequate Exposure Diversity. AED Flag This application has glass areas that produce relatively large cooling loads for part of the day.Variable air volume devices may be required to overcome spikes in solar load for one or more rooms.A zoned system may be required,or some rooms may require zone control(provided by individual,motorized,thermostatically controlled dampers). Hours are listed in 24-hour format 8 is 8am,20 is 8pm. ! ltek AccuLoad Report Version 17.3.5 Page 4 i otioinparay ere.— LIZ&GEORGE RHEIN JR. '1'% °Address' Here... City Here. .,State Heine..Zip Ned-- CHESTNUT RIDGE RD . none Here..— -Email Here— 0.1JEENSBURY,NY 12804 Sales Consultant: Job#: Date: 06/27/2018 I System I Breakdown Item Name U-Value /SHGC Net Area Htg. HTM. Gig. HTM Sens. Htg. Sens.Cig. Lat. Cig. Total Cig. Construction Type System I 0 1707 0 1707—. BASEMENT SIDE A 0 0 0 0 Floor 0.02 1120 1.74 1949 0 0 0 -- Basement Floor(2ft+Below Grade)jNA1NAINAjNo lnsulationfAny Floor Covering132 feetiNA Southeast Wall 0.071 256 6.177 1581 0 0 0 Basement WalljNAjEight Inch Brick, Stone or Concrete WalIIWoodIR-111NoneINAIBiockj2ft Northeast Wall 0.071 256 6.177 1581 0 0 0 — Basement WalijNAJEight Inch Brick, Stone or Concrete WalliWoodjR-11INonejNAfBlockj2ft Northwest Wall 0.051 273 4.437 1211 0 0 0 Basement WalljNAjEight Inch Brick, Stone or Concrete WallIWoodjR-11jNonejNAjBlockj8ft Window-6x7 0.42/0.39 42 36.54 24.07 1535 1011 0 1011 French DooriFrench DoorjClear12 PanejWood,Wood with Metal Clad, or Vinyl basement side b 0 0 0 0 Floor 0.02 1152 1.74 2004 0 0 0 Basement Floor(2ft+Below Grade)jNA(NAjNAjNo InsulationjAny Floor Coveringj32 feetiNA Northwest Wail 0.051 282 4.437 1251 0 0 0 Basement WalljNAjEight Inch Brick,Stone or Concrete WatljWood1R-11jNoneINAjBlockj8ft Wndow-6x7 0.42/0.39 42 36.54 24.07 1535 1011 0 1011 French Door-French DoorjCiearj2 PanejWood,Wood with Metal Clad,or Vinyl Southwest Wall — 0.051 324 4.437 1438 0 0 0 Basement WaIl NAjEight Inch Brick,Stone or Concrete Wall1WoodjR-11$NonejNAjBlockj8ft ______ BEDROOM 0 460 400 860 Adtek AccuLoad Report Version 17.3.5 Page 5 Your Company Here_ LIZ&GEORGE RHEIN JR. Ychir Address Here... -City Here...,State Here..Zip Here... CHESTNUT RIDGE RD . Phone Here........Email Here... QUEENSBURY, NY i 2804 Sales Consultant: Jobe Date: 06/27/2018 Ceiling 0.029 342 2.523 0.78 863 267 0 ._267--_ Ceiling Below Roof JoistslDark or Bold Color Asphalt ShinglesfNA1R-38 blanket or loose fill Floor 0 - 342 - -- 0 0 --0 0 --- Floor Over Conditioned SpaceINAINAINAINAANA1NAINA West Wall 0.068 35.5 5.916 1.52 210 54 0 54 Frame Wall/PartitionJNAINAIWoodIR-19INone1NAISiding or StuccoINA Window-2.5x5 0.47/0 12.5 40.89 36.72 511 459 0 459-- OperablejNormal WndowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl Northwest Wall 0.068 114.5 5.916 1.52 677-_- 174 0 - - 174 Frame Wall/PartitionlNAINAIVVood1R-191NoneINAlSiding or StuccolNA Window-2.5x5 0.47/0 12.5 40.89 27.2 511 340 0 340 OperablelNormal Window3Low-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad, or Vinyl Vllndow-2.5x5 0.47/0 12.5 40.89 27.2 511 340 0 340 Operabie1Normal Window1Low-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl 1A4ndow-2.5x5 0.47/0 12.5 40.89 27.2 511 340 0 340 OperablelNormai WindowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad, or Vinyl - BONUS - 0 0 0 0 Ceiling 0.029 625 2.523 0.78 1577 488 0 488 Ceiling Below Roof JoistslDark or Bold Color Asphalt Shingles1NAIR-38 blanket or loose fill Floor - 0.05 625 4.35 2719 469 0 469 Floor Over Open Crawl Space or Garage1NA1Passive1NAIR-19 board1Any Floor Covering1NAlNA - Northwest Wall 0.068 187.5 5.916 1.52 1109 285 0 285 Frame Wall/PartitionlNAINAIWood1R-191NoneINAlSiding or StuccolNA 1Mndow-2.5x5 0.47/0 12.5 40.89 27.2 511 340 0 340 OperablelNormal WndowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl West Wall 0.068 187.5 5.916 1.52 1109 285 0 285 kdtek AccuLoad Report Version 17.3.5 Page 6 Your Company Here_ LIZ&GEORGE RHEIN JR. Your Address Here...-City Here...,State Here..Zip Hem... CHESTNUT RIDGE RD Phone Here -Email Here... QUEENSBURY,NY 12804 Sales Consultant Job#: Date: 06/27/2018 Frame Wall/Partition INAINAIWood1R-191NoneINAjSiding or Stuccof NA Vihndow 2.5x5 0.47/0 12.5 40.89 36.72 511 459 0 459 OperablelNormal V4findowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl Southeast Wall - 0.068 187.5 5.916 1.52 1109 285 0 285 Frame Wadi/ParbbonlNAINAIWood1R-19)None)NAISiding or StucoolNA Window-2.5x5 0.4710 12.5 40.89 32.16 511 402 0 402 OperablelNormal Window1Low-e(0.20)12 Pane(0.05)Surface 21Vlbod, Wood with Metal Clad,or'Any! DINING----------------_----------.....------------------ 0 ----Q--------- 0------ -- 0----- Ceiling 0.029 267.15 2.523 0.78 674 208 0 208 Ceiling Below Roof JoistslDark or Bold Color Asphalt Shingles1NAIR-38 blanket or loose fill __-----------------_-____---------------------_-_----------------------- --_._.___-_------------ Floor 0 267.15 0 0 0 0 Floor Over Conditioned SpacelNAJNA)NAINAINAINA)NA Southeast Wall 0.068 111 5.916 1.52 657 169 0-._-_- 169 Frame Wall/PartitionlNA1NA1UVoodIR-191None1NAlSiding or StuccolNA Window-3x5 0.47/0 15 40.89 14.6 613 219 0 219 OperablelNormal Window1Low-e(0.20)12 Pane(0.05) Surface 21Wood, Wood with Metal Clad, or Vinyl Window-6x5 0.47/0 30 40.89 32.17 1227 965 0 965 Operable1Normal WindowlLow-e(0.20)12 Pane(0.05)Surface 21Wood, Wood with Metal Clad, or Vinyl FOYER.-_____ ___--_ _____--__- --__-_ ----------------- ----_-0__--- ----_ 0---- ----0 - - -- - 0 ---- ---_-_.-_-__.--__---...___ Ceiling 0.029 100 2.523 0.78 252 78 0 78 Ceiling Below Roof Joistsf Dark or Bold Color Asphalt Shingles}NAIR-38 blanket or loose fill Floor-- ---- - - 100 -__.`.----- - 0 - - 0 0 0 Floor Over Conditioned Space)NAJNA)NAINAINAINAJNA Southwest Wad 0.068 45 5.916 1.51 266 68 --- 0 68 Frame WalliPartitionf NAINAIV1bodIR-191None1NA)Siding or StuccolNA Door-3x7 0.39 21 33.93 12.1 713 254 0 254 idtek AccuLoad Report Version 17.3.5 Page 7 Your Company Here. LIZ 8 GEORGE RHEIN JR. Your Address Here...-City Here...,State Here..Zip Here... CHESTNUT RIDGE RD Phone Here -Email Here... QUEENSBURY,NY 12804 Sales Consultant: Job#: Date: 08/27/2018 WoodiSolid CorelNo Storm _— Window-1 x7 - —— 0.47/0--- 7 40.89 14.57 286 102 0 102 OperablelNormal Window1Low-e(0.20)12 Pane(0.05)Surface 21Wood, Wood with Metal Clad,or Vinyl Wndow-1 x7 _ 0.47/0 7 40.89 14.57 286 102 0 102 OperablejNormai WndowlLow-e(0.20)12 Pane(0.05)Surface 21Wood, Wood with Metal Clad,or Vinyl _GREATkOOW! 0 0 0 0-- Ceiling 0.029 450 2.523 0.78 1135 351 0 351 Ceiling Below Roof JoistslDark or Bold Color Asphalt ShingleslNAIR-38 blanket or loose fill Floor— 0 50 0 0 0_.. 0 Floor Over Conditioned SpaceINA1NAINAINAlNAJNAINA Northwest Wall 0.068 166 5.916 1.52 982 _"-252 0---- 252 Frame Wall/PartitionlNAINA1WoodjR-191None1NA1Siding or StuccolNA Wndow-6x7 0.42/0 42 36.54 24.07 1535 1011 0 1011 French DoorlFrench Door)Clear12 PanejWood, Wood with Metal Clad,or Vinyl Wndow-6x7 0.42/0 42 36.54 24.07 1535 1011 0 1011 French DoorjFrench DoorjCiearl2 PanejW od, Wood with Metal Clad, or Vinyl Kitchen 0 2952 683 3635 Ceiling 0.029 289 2.523 0.78 729 225 0 - 25 Ceiling Below Roof Joists)Dark or Bold Color Asphalt Shingles1NAlR-38 blanket or loose fill —Floor —__--— 0- 289 — - - 0 ----0 0 - —--0 Floor Over Conditioned Space1NA1NA1NAINAINA1NAJNA ____ Wall 0.068 66 5.916 1.52 - 390 — 100 0 100 Frame Wall/Partitlon1NA3NAIWood1R-199None1NAlSiding or StuccolNA — - Wndow-6x5 _ 0.47/0 30 40.89 27.2 1227 — 816 0 T 816 Operable)Normal WndowjLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl . -_Northeast Wall 0.068 136 5.916 1.52 805 207 0 207 kdtek AccuLoad Report Version 17.3.5 Page 8 Your Company Here#¢. LIZ&GEORGE RH®N JR. Y®irr Address Here...-City Here...,State Here..Zip Here... CHESTNUT RIDGE RD . Phone Here..... -Email Here... QUEENSBURY,NY 12804 Safes Consultant: Job#: Date: 06/2712018 Frame WaIVParti ionINAINAIWoodIR-19INonejNAISiding or StuccolNA ift4ndow-2.5x4 0.47/0 10 40.89 27.2 409 272 0 272 OperabielNormal WindowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl Wndow-2.5x4 0.47/0 0_. 40.89 27.2 409 272 0 272 OperableINormal V hndowlLow-e(0.20)12 Pane(0.05)Surface 2jWood, Wood with Metal Clad,or Vinyl _..__._------------------ --------____ — __ --------- --- ------.___.._-- LAUNDRY 0 478 0 478 _ Ceiling 0.029 70 2.523 0.79 177 55 0 55 Ceiling Below Roof JoistslDark or Bold Color Asphalt Shinglesf NA1R-38 blanket or loose fill ---Floor --_ —0 -- 70 0 0 0 Floor Over Conditioned SpacelNAINAINA1NAINAINAINA Northwest Wall 0.068 48 5.916 1.52 284 73 0 73 Frame Wail/PartitionlNAINAIWoodIR-191Nonef NAJSiding or Stucco1NA MASTER BATH 0 0 0 0 Ceiling 0.029 187 2.523 0.78 472 146 0 146 — Ceiling Below Roof JoistslDark or Bold Color Asphalt ShingiesINAIR-38 blanket or loose fill Floor 0 187 0 0 0 0 Floor Over Conditioned SpaceINA1NAINAINAINAINAINA Southwest Wall 0.068 88 5.916 1.52 521 134 0 134 Frame Wall/Partition1NAINA1WoodIR-191NoneINAlSiding or Stucco1NA West Wall 0.068 132 5.916 1.52 781 201 0 201- Frame Wali/PartitionlNAINA1WoodlR-19lNone)NAISiding or StuccolNA - - Window-6x2 0.47/0 12 40.89 36.75 491 441 0 441 Operable)Nonnal WlndowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl Northwest Wall 0.068 63 5.916 1.52 373 96 0 96 Frame Wall/PartitionINA1NAIWood1R-191NoneINAISiding or Stucco1NA Window-5x5 0.47/0 25 40.89 27.2 1022 680 0 680 4dtek AccuLoad Report Version 17.3.5 Page 9 Your Company Here. LIZ&GEORGE RHEIfI3 JR. Y oir Address Here...-City Here...,State Here..Zip Here.., CHESTNUT RIDGE RD , Phgne Here.....-Email Here... QUEEHSBURY,NY 12804 Sales Consultant: Job#: Date: 06127/2018 Operable1Normai VlindowlLow-e(0.20)12 Pane(0.05)Surface 21VVood, Wood with Metal Clad,or Vinyl OFFICE - —- -. -_— 0 538 0 -538 - _ Ceiling - 0.029 110 2.523 0.78 278 86 0 86 - Ceiling Below Roof JoistslDark or Bold Color Asphalt ShinglessNAIR-38 blanket or loose fill Floor 0 110 0 0 0 -----a- - Floor Over Conditioned SpaceINAINAINAINAINAINAINA West Wall --- 0.068 80 5.916 1.53 473 122 0 122 Frame VVall/PartitionINAINAIV1k odJR-19jNoneINAlSiding or StuccolNA East Wall 0.068 50 5.916 1.52— 296 76 0 76 --- Frame Wall/PartitionlNAINAIWoodIR-191NoneINAjSiding or StuccolNA ---Vlhndow-6x5 - - 0.47/0 _ — 30 40.89 36.7 1227 1101 0 1101 OperablelNormal WindowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl PANTRY - - --- — — - - 0 - - 0 0 Ceiling 0.029 48 2.523 0.77 121 37 0 37 Ceiling Below Roof JoistslDark or Bold Color Asphalt ShinglesJNAIR-38 blanket or loose fill Floor 0 48 0 0 0 0 Floor Over Conditioned Space1NAINAINAJNAINAJNAINA East Wall 0.068 64 5.916 1.52 379 97 0 _...._._. 97 Frame Wall/Partition1NAINAjWoodlR-19INone1NA1Siding or StuccolNA Southeast Wall ------0.068 64 5.916 1.52 379 97 0 _--97 Frame Wall/PartitionlNAINAIWOod1R-191NoneINAJSiding or StuccoINA WIC - 0 0 0 0 — - - Ceiling - 0.029 - 84 2.523 0.79 212 66 0 66 Ceiling Below Roof JoistslDark or Bold Color Asphalt Shingles)NAJR-38 blanket or loose fill -..._ Floor 0 84 --------- 0 0 ------0 - -- 8 dtek AccuLoad Report Version 17.3.E Page 10 Your Company Here,- LIZ&GEORGE RHEIN JR. Your Address Here... -City Here...; State Here..Zip Here... CHESTNUT RIDGE RD Phone Here..... -Email Here... QUEENSBURY,NY 280,. Sales Consultant: Job#: Date: 08/2712018 Floor Over Conditioned SpaceINAINAINA1NAINAINAINA North Wall 0.068 56 5.916 1.52 331 85 0 85 Frame Wall/PartitionlNA1NA1Wood1R-191None1NA1Siding or StuccolNA Northwest Wall 0.068 75.5 5.916 1.52 447 115 0 -. 115 -- Frame Wall/Partition)NA1NA1WoodlR-191NonefNA4Siding or StuccolNA 1Mndow-2.5x5 0.47/0 12.5 40.89 27.2 511 340 0 340 OperablelNormai W+ndowlLow-e(0.20)12 Pane(0.05)Surface 21Wood,Wood with Metal Clad,or Vinyl Adtek AccuLoad Report Version 17.3.5 Page 11 Your Company Hey :,.. IZ&GEORGE RHEIH JR. Your Address Here... ..City Here.,.,State Here„Zip Here CHESTNUT RIDGE RD , Phone Here...,. A Ernaii -1ere . QUEENSBURY,NY `2804 Sales Consultant: Job#: Date: 06f27/201 8 System Design Conditions Location: Elevation: 0 Daily Range: 0 Design Data: Outdoor Dry Bulb Indoor`.ley BEA Latitude: 0 Design Grains: 0 Summer: 92 72 Summer Design RH% 0 Winter: -17 70 Heating Equipment Mfg: Heating Input(btuh): N/A Model: Heating Output(btuh): 0 AHRI Ref#: Calculated HeatPump 0 Efficiency (AFUE): N/A Output Design (btuh):a�? Outdoor Equipment Mfg: CHAMPION BY JOHNSON Rated Total Cooling (btuh): 46000 Oudoor Unit Model: TC3B4821 Sensible Cooling (btuh): 34500 Coil: FC/MC/PC48D+TXV Latent Cooling (btuh): 11500 Indoor Unit: TM9E100C2OMP11 AHRI Ref#: 8538544 Adtek AccuLoad Report Version 17.3.5 Page 13 Your Company Here.. LIZ&GEORGE RHEIN JR. Your Address Here...-City Here...,State Here..Zip Here... CHESTNUT RIDGE RD Phone Here..... a Email Here... QUEENSBURY, NY 12804 Sales Consultant: Job#: Date: 06/27/2018 Expanded Manual S (ACCA Guidelines) MJ8 Design Calculations Sensible Gain (btuh): 32092 Design TD for Airflow: 17 Latent Gain(btuh): 6394 Design CFM: 1514 Total Heat Gain (btuh): 38486 SHR: 0.89 Heat Loss(btuh): 92244 Manufacturers Performance Data(A) Entering Coil Temperature= 75 (F db) Lower Return Air Total Sensible Latent SHR CFM (F wb) BTUH BTUH BTUH Rated CFN @ Rated RA Temperature: 0 0 0 0 Rated CFN @ Design RA Temperature: 0 63 0 0 0 Rated CFN @ Rated RA Temperature: 0 0 0 0 Manufacturers Performance Data (B) Entering Coil Temperature= 75(F db) Higher Return Air Total Sensible Latent CFM (F wb) BTUH BTUH BTUH SHR Rated CFN @ Rated RA Temperature: 0 0 0 0 Rated CFN @ Design RA Temperature: 0 63 0 0 0 Rated CFN re Rated RA Temperature: 0 0 0 0 Equipment Performance Data Entering Coil Temperature= 75 (F db) Design Return Air Total Sensible Latent CFM (F wb) BTUH BTUH BTUH SHR Intopolated Equipment Capacity 0 0 0 Excess Latent Capacity Calculation 0 0 0 0 0 Capacity @ Design CFM/RA (F wb) 0 0 0 Equipment Capacity as a %of Design s Equipment Performance Data CapacityCapacity Thermal Supplemental Entering Coil Temperature=75 (F db) $ F 17 F db Balance Heat Required @ Point Heat Pump Data N/A N/A 0 I 0 Input Output Desired Calculated f' p AFUE Temperature Capacity Capacity Rise Airflow Furnace Data; NIA ( N/A N/A N/A 0 Adtek AccuLoad Report Version 17.3.5 Page 14 Fr— Project#: liz & george rhein Heat Loss Details JUN 2 9 2018 Date: Jun 25, 2018 TOWN OF QUEENSBURY Prepared For: SECURITY PLUMBING BUILDING&CODES & HEATING SUPPLY Project Summary Project#: liz &george rhein Project Name: liz& george rhein Location: CloseDate: Engineer: Design Data Location: (User-Specified Location) Outdoor Temperature: -17 °F Wind Speed: 10 mph Total Area: 4,816 ft2 Construction Quality: Best RFH Glycol Level: 30% Glycol Design Temp. Drop: 10 °F Radiant Tubing Volume: 61.7 gallons(US) Volume Water: 43.2 gallons(US) Volume Glycol: 18.5 gallons(US) Total-Components Load: 33,916 Btu/hr Total Infiltration Load: 17,281 Btu/hr Total Floor Downward Load: 14,669 Btu/hr Total-Radiant Into Rooms: 51,196 Btu/hr Total-Supplemental Load: 0 Btu/hr Total-Project Heat Loss: 65,865 Btu/hr Heat Loss Data dining (Floorplan 1) Total Area: 253 ft2 Components: 2,481 Btu/hr Average Height: 8 ft Infiltration: 886 Btu/hr Volume: 2,024 ft' Ceiling Upward: 532 Btu/hr Air Changes: 0.3/hr Floor Downward: 1,072 Btu/hr RoomTemperature: 65°F Total Heat Loss: 4,971 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 3,899 Btu/hr Unit Load: 15.4 Btu/hr/ft2 Total Radiant Load: 4,971 Btu/hr Unit Load: 19.6 Btu/hr/ft2 Page 1 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Floor Total Area: 253 ft' Downward Load: 1,072 Btu/hr Unheated Area: 0 ft' Heated Area: 253 ft' Construction: Joist(16"OC) Cover Rv: 0.5°F•ft'•hr/Btu Structure Rv: 1 °F•ft'•hr/Btu Insulation Rv: 5°F•ft'•hr/Btu Space Below Heated: No Surface Temperature: 72.7°F Design Temp. Drop: 10°F Ceiling Total Area: 253 ft2 Upward Load: 532 Btu/hr Unheated Area: 253 ft' Heated Area: 0 ft' Construction: Gypsum Wall board Cover Rv: 0°F-ft'-hr/Btu Insulation Rv: 38°F•ft'•hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(ft)eight Area(ft2) Rv(°F•ft=•hr/Btu) Heat Loss(Btu/hr) Wall-1 19 8 152 20 2263 Window-1 6 6 36 2 1476 Window-2 3 3 9 2 369 Net Wall 107 20 418 Wall-2 7 8 56 20 219 Net Wall 56 20 219 Page 2 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY PANTRY (Floorplan 1) Total Area: 45 ft2 Components: 437 Btu/hr Average Height: 8 ft Infiltration: 158 Btu/hr Volume: 360 ft' Ceiling Upward: 95 Btu/hr Air Changes: 0.3/hr Floor Downward: 190 Btu/hr RoomTemperature: 65°F Total Heat Loss: 880 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 690 Btu/hr Unit Load: 15.3 Btu/hr/ft2 Total Radiant Load: 879 Btu/hr Unit Load: 19.5 Btu/hr/ft2 Floor Total Area: 45 ft2 Downward Load: 190 Btu/hr Unheated Area: 0 ft2 Heated Area: 45 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2.hr/Btu Structure Rv: 1 °F•ft2•hr/Btu Insulation Rv: 5°F•ft2-hr/Btu Space Below Heated: No Surface Temperature: 72.7°F Design Temp. Drop: 10°F Ceiling Total Area: 45 ft2 Upward Load: 95 Btu/hr Unheated Area: 45 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F-ft2•hr/Btu Insulation Rv: 38°F-ft2-hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(ft)eight Area(ft') Rv(°F•ft2•hr/Btu) Heat Loss(Btu/hr) Wall-1 6 8 48 20 187 Net Wall 48 20 187 Wall-2 8 8 64 20 250 Net Wall 64 20 250 Page 3 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY KITCHEN (Floorplan 1) Total Area: 261 ft' Components: 3,257 Btu/hr Average Height: 8 ft Infiltration: 914 Btu/hr Volume: 2,088 ft' Ceiling Upward: 549 Btu/hr Air Changes: 0.3/hr Floor Downward: 1,222 Btu/hr RoomTemperature: 65°F Total Heat Loss: 5,941 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 4,719 Btu/hr Unit Load: 18.1 Btu/hr/ft' Total Radiant Load: 5,941 Btu/hr Unit Load: 22.8 Btu/hr/ft2 Floor Total Area: 261 ft' Downward Load: 1,222 Btu/hr Unheated Area: 0 ft' Heated Area: 261 ft' Construction: Joist(16"OC) Cover Rv: 0.5°F-ft2-hr/Btu Structure Rv: 1 °F•ft'•hr/Btu Insulation Rv: 5°F•ft'•hr/Btu Space Below Heated: No Surface Temperature: 74°F Design Temp. Drop: 10°F Ceiling Total Area: 261 ft' Upward Load: 549 Btu/hr Unheated Area: 261 ft' Heated Area: 0 ft' Construction: Gypsum Wall board Cover Rv: 0°F.ft'•hr/Btu Insulation Rv: 38°F•ft'•hr/Btu Space Above Heated: No Other Components Component Length(ft) Width ft/H eight Area(ft?) Rv(°F•ft'•hr/Btu) Heat Loss(Btu/hr) Wall-1 15 8 120 20 1804 Window-1 6 6 36 2 1476 Net Wall 84 20 328 Wall-2 18 8 144 20 1453 Window-1 4 3 12 2 492 Page 4 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Window-2 4 3 12 2 492 Net Wall 120 20 469 FOYER (Floorplan 1) Total Area: 100 ft2 Components: 1,870 Btu/hr Average Height: 8 ft Infiltration: 350 Btu/hr Volume: 800 ft' Ceiling Upward: 228 Btu/hr Air Changes: 0.3/hr Floor Downward: 575 Btu/hr RoomTemperature: 65°F Total Heat Loss: 3,023 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 2,448 Btu/hr Unit Load: 24.5 Btu/hr/ft2 Total Radiant Load: 3,023 Btu/hr Unit Load: 30.2 Btu/hr/ft2 Floor Total Area: 100 ft2 Downward Load: 575 Btu/hr Unheated Area: 0 ft2 Heated Area: 100 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2•hr/Btu Structure Rv: 1 °F-ft2-hr/Btu Insulation Rv: 5°F-ft2-hr/Btu Space Below Heated: No Surface Temperature: 77.2°F Design Temp.Drop: 10°F Ceiling Total Area: 100 ft2 Upward Load: 228 Btu/hr Unheated Area: 100 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F•ft2•hr/Btu Space Above Heated: No Other Components Component Length(ft) Wrdt(ft)eight Area(ft') Rv(°F•ft2.hr/Btu) Heat Loss(Btu/hr) Wall-1 10 8 80 20 1871 Door-1 3 7 21 2 861 Window-1 1.5 7 10.5 2 431 Page 5 of 14 Created using Uponor Advanced Design Suite-7.9.0 Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Window-2 1.5 7 10.5 2 431 Net Wall 38 20 148 GREAT ROOM (Floorplan 1) Total Area: 475 ft2 Components: 3,780 Btu/hr Average Height: 10 ft Infiltration: 2,079 Btu/hr Volume: 4,750 ft' Ceiling Upward: 1,082 Btu/hr Air Changes: 0.3/hr Floor Downward: 1,948 Btu/hr RoomTemperature: 65°F Total Heat Loss: 8,889 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 6,941 Btu/hr Unit Load: 14.6 Btu/hr/ft2 Total Radiant Load: 8,889 Btu/hr Unit Load: 18.7 Btu/hr/ft2 Floor Total Area: 475 ft2 Downward Load: 1,948 Btu/hr Unheated Area: 0 ft2 Heated Area: 475 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2•hr/Btu Structure Rv: 1 °F-ft2•hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 72.3°F Design Temp. Drop: 10°F Ceiling Total Area: 475 ft2 Upward Load: 1,082 Btu/hr Unheated Area: 475 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F-ft2.hr/Btu Insulation Rv: 35°F.ft2•hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(fftt))eight Area(ft2) Rv(°F•ft'•hrBtu) Heat Loss(Btu/hr) Wall-1 17 10 170 20 3780 Door-1 6 7 42 2 1722 Door-2 6 7 42 2 1722 Page 6 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Net Wall 86 20 336 OFFICE (Floorplan 1) Total Area: 110 ft2 Components: 1,738 Btu/hr Average Height: 8 ft Infiltration: 385 Btu/hr Volume: 880 ft' Ceiling Upward: 251 Btu/hr Air Changes: 0.3/hr Floor Downward: 579 Btu/hr RoomTemperature: 65°F Total Heat Loss: 2,952 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 2,373 Btu/hr Unit Load: 21.6 Btu/hr/ft2 Total Radiant Load: 2,952 Btu/hr Unit Load: 26.8 Btu/hr/ft2 Floor Total Area: 110 ft2 Downward Load: 579 Btu/hr Unheated Area: 0 ft2 Heated Area: 110 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F-ft2 hr/Btu Structure Rv: 1 °F-ft2 hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 75.8°F Design Temp.Drop: 10°F Ceiling Total Area: 110 ft2 Upward Load: 251 Btu/hr Unheated Area: 110 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F•ft2-hr/Btu Space Above Heated: No Other Components Component Length(ft) Widtl(ft)eight Area(ft2) Rv(°F•ft2•hr/Btu) Heat Loss(Btu/hr) Wall-1 10 8 80 20 1425 Window-1 6 5 30 2 1230 Net Wall 50 20 195 Wall-2 10 8 80 20 312 Page 7 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Net Wall 80 20 312 LAUNDRY (Floorplan 1) Total Area: 60 ft2 Components: 312 Btu/hr Average Height: 8 ft Infiltration: 210 Btu/hr Volume: 480 ft' Ceiling Upward: 137 Btu/hr Air Changes: 0.3/hr Floor Downward: 210 Btu/hr RoomTemperature: 65°F Total Heat Loss: 869 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 659 Btu/hr Unit Load: 11 Btu/hr/ft2 Total Radiant Load: 869 Btu/hr Unit Load: 14.5 Btu/hr/ft2 Floor Total Area: 60 ft2 Downward Load: 210 Btu/hr Unheated Area: 0 ft2 Heated Area: 60 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F.ft2-hr/Btu Structure Rv: 1 °F-ft2-hr/Btu Insulation Rv: 5°F•ft2 hr/Btu Space Below Heated: No Surface Temperature: 70.5°F Design Temp. Drop: 10°F Ceiling Total Area: 60 ft2 Upward Load: 137 Btu/hr Unheated Area: 60 ft2 Heated Area: 0 ft2 Construction: Gypsum Wail board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F.ft2 hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(ft)eight Area(ft2) Rv(°F•ft2•hr/Btu) Heat Loss(Btu/hr) Wall-1 10 8 80 20 312 Net Wall 80 20 312 Page 8 of 14 Created using Uponor Advanced Design Suite-7.9.0 • Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY BEDROOM (Floorplan 1) Total Area: 323 ft2 Components: 2,316 Btu/hr Average Height: 8 ft Infiltration: 1,131 Btu/hr Volume: 2,584 ft3 Ceiling Upward: 736 Btu/hr Air Changes: 0.3/hr Floor Downward: 1,235 Btu/hr RoomTemperature: 65°F Total Heat Loss: 5,417 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 4,182 Btu/hr Unit Load: 12.9 Btu/hr/ft2 Total Radiant Load: 5,418 Btu/hr Unit Load: 16.8 Btu/hr/ft2 Floor Total Area: 323 ft2 Downward Load: 1,235 Btu/hr Unheated Area: 0 ft2 Heated Area: 323 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2•hr/Btu Structure Rv: 1 °F-ft2•hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 71.5°F Design Temp.Drop: 10°F Ceiling Total Area: 323 ft2 Upward Load: 736 Btu/hr Unheated Area: 323 ft2 Heated Area: 0 ft2 Construction: Gypsum Wail board Cover Rv: 0°F-ft2•hr/Btu Insulation Rv: 35°F•ft2-hr/Btu Space Above Heated: No Other Components Component Length(ft) Width(ft)Height Area(ft2) Rv(°F•ft2 hr/Btu) Heat Loss(Btu/hr) Wall-1 10 8 80 20 2316 Window-1 9 6 54 2 2214 Net Wall 26 20 102 Page 9 of 14 Created using Uponor Advanced Design Suite-7.9.0 Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY MASTER BATH (Floorplan 1) Total Area: 190 ft2 Components: 2,405 Btu/hr Average Height: 8 ft Infiltration: 665 Btu/hr Volume: 1,520 ft' Ceiling Upward: 433 Btu/hr Air Changes: 0.3/hr Floor Downward: 901 Btu/hr RoomTemperature: 65°F Total Heat Loss: 4,404 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 3,503 Btu/hr Unit Load: 18.4 Btu/hr/ft2 Total Radiant Load: 4,404 Btu/hr Unit Load: 23.2 Btu/hr/ft2 Floor Total Area: 190 ft2 Downward Load: 901 Btu/hr Unheated Area: 0 ft2 Heated Area: 190 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2-hr/Btu Structure Rv: 1 °F•ft2•hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 74.2°F Design Temp.Drop: 10°F Ceiling Total Area: 190 ft2 Upward Load: 433 Btu/hr Unheated Area: 190 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F•ft2•hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(ft)eight Area(ft2) Rv(°F•ft2•hr/Btu) Heat Loss(Btu/hr) Wall-1 11 8 88 20 1086 Window-1 4 5 20 2 820 Net Wall 68 20 266 Wall-2 11 8 88 20 344 Net Wall 88 20 344 Page 10 of 14 Created using Uponor Advanced Design Suite-7.9.0 Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Wall-3 17 8 136 20 976 Window-1 4 3 12 2 492 Net Wall 124 20 484 WIC (Floorplan 1) Total Area: 77 ft2 Components: 789 Btu/hr Average Height: 8 ft Infiltration: 270 Btu/hr Volume: 616 ft3 Ceiling Upward: 175 Btu/hr Air Changes: 0.3/hr Floor Downward: 334 Btu/hr RoomTemperature: 65°F Total Heat Loss: 1,568 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 1,234 Btu/hr Unit Load: 16 Btu/hr/ft2 Total Radiant Load: 1,568 Btu/hr Unit Load: 20.4 Btu/hr/ft2 Floor Total Area: 77 ft2 Downward Load: 334 Btu/hr Unheated Area: 0 ft2 Heated Area: 77 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2•hr/Btu Structure Rv: 1 °F•ft2•hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 73°F Design Temp. Drop: 10°F Ceiling Total Area: 77 ft2 Upward Load: 175 Btu/hr Unheated Area: 77 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F-ft2-hr/Btu Space Above Heated: No Other Components Component Length(ft) Widt(ft)eight Area(ft2) Rv(°F•ft'•hr/Btu) Heat Loss(Btu/hr) Wall-1 11 8 88 20 789 Window-1 4 3 12 2 492 Page 11 of 14 Created using Uponor Advanced Design Suite-7.9.0 • Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Net Wall 76 20 297 BONUS ROOM (Floorplan 1) Total Area: 522 ft2 Components: 3,585 Btu/hr Average Height: 8 ft Infiltration: 1,828 Btu/hr Volume: 4,176 ft' Ceiling Upward: 1,189 Btu/hr Air Changes: 0.3/hr Floor Downward: 1,970 Btu/hr RoomTemperature: 65°F Total Heat Loss: 8,572 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 6,602 Btu/hr Unit Load: 12.6 Btu/hr/ft2 Total Radiant Load: 8,572 Btu/hr Unit Load: 16.4 Btu/hr/ft2 Floor Total Area: 522 ft2 Downward Load: 1,970 Btu/hr Unheated Area: 0 ft2 Heated Area: 522 ft2 Construction: Joist(16"OC) Cover Rv: 0.5°F•ft2-hr/Btu Structure Rv: 1 °F•ft2•hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Space Below Heated: No Surface Temperature: 71.3°F Design Temp.Drop: 10°F Ceiling Total Area: 522 ft2 Upward Load: 1,189 Btu/hr Unheated Area: 522 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F•ft2•hr/Btu Insulation Rv: 35°F•ft2•hr/Btu Space Above Heated: No Other Components Component Length(ft) Width(ft)eight Area(ft') Rv(°F•ft2-hr/Btu) Heat Loss(Btu/hr) Wall-1 28 8 224 20 875 Net Wall 224 20 875 Wall-2 29 8 232 20 906 Net Wall 232 20 906 Page 12 of 14 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein Heat Loss Details Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Wall-3 15 8 120 20 1804 Window-1 4 3 12 2 492 Window-2 4 3 12 2 492 Window-3 4 3 12 2 492 Net Wall 84 20 328 BASEMENT (Floorplan 2) Total Area: 2,400 ft' Components: 5,541 Btu/hr Average Height: 8 ft Infiltration: 8,404 Btu/hr Volume: 19,200 ft3 Ceiling Upward: 0 Btu/hr Air Changes: 0.3/hr Floor Downward: 4,434 Btu/hr RoomTemperature: 65°F Total Heat Loss: 18,379 Btu/hr Supplemental: 0 Btu/hr Radiant to Room Load: 13,945 Btu/hr Unit Load: 5.8 Btu/hr/ft2 Total Radiant Load: 18,379 Btu/hr Unit Load: 7.7 Btu/hr/ft2 Floor Total Area: 2,400 ft' Downward Load: 4,434 Btu/hr Unheated Area: 0 ft2 Heated Area: 2,400 ft2 Construction: Concrete Slab Depth: 4 in Cover Rv: 0.5°F•ft2•hr/Btu Structure Rv: 1 °F•ft2-hr/Btu Insulation Rv: 5°F•ft2•hr/Btu Surface Temperature: 67.9°F Design Temp.Drop: 10°F Ceiling Total Area: 2,400 ft' Upward Load: 0 Btu/hr Unheated Area: 2,400 ft2 Heated Area: 0 ft2 Construction: Gypsum Wall board Cover Rv: 0°F.ft2.hr/Btu Insulation Rv: 35°F•ft2•hr/Btu Space Above Heated: From Same Source Other Components Component Length(ft) Widt`ft))eight Area(ft2) Rv(°F•ft2•hr/Btu) Heat Loss(Btu/hr) Page 13 of 14 Created using Uponor Advanced Design Suite-7.9.0 Heat Loss Details Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Wall-1 73 8 584 20 1897 Net Wall 584 20 1897 Wall-2 73 8 584 20 1897 Net Wall 584 20 1897 Wall-3 32 8 256 20 831 Net Wall 256 20 831 Wall-4 32 8 256 20 916 Net Wall 256 20 916 Page 14 of 14 Created using Uponor Advanced Design Suite-7.9.0 • KNIGHT 711 Ji4tI1flI,TaJ4® FIRE TUBE BOILER HIGH EFFICIENCY BOILERS &WATER HEATERS Submittal Sheet KHN-Sub-02 KNIGHT FIRE TUBE BOILER Job Name: Model No. Location: Type Gas: Engineer: Equipment Tag(s): Wholesaler: Contractor: NOTES: �A �` AIR INLET —� - * It WATER OUTLET - ■ IFLUE i�`� • I' GAS CONNECTION 2-3/4' `. .�G' A� I • 43-3/8' 2 7/B' -% • HIGH-VOLTAGE I/ I B • ELECTRICAL t CONNECTIONS IS I!M D LOW-VOLTAGE .-� 0 ELECTRICAL I'IIA 19" •'i� CONNECTIONS G I I H gimm •❑o JI hhY WATER INLET - ,_is�_, C Hi CONDENSATE 16' DRAINI . 1/4'-1-1/4' 1 ADJUSTABLE I _ • ono i Y' E t I KNIGHT BOILER A.•:RITip,FiED. DIMENSIONS AND SPECIFICATIONS Input MBH Net Heating AHRI Model Capacity Rating Gas Water Air Vent Shipping Number Min Max AFUE% MBH MBH A B C D E F G H I I Connect. Connect. Inlet Size Weight 0111055 8.3 55 95 51 44 6' 8-3/8' 11-1/8' 10-1/2" 13-1/4' 37.1/7 32-5/F 32.1/4' 13-1/4" 3.3/8- 1/2' 1" 2 7 160 KH11085 8.5 85 95 79 69 6' 8-3/F 11.1/8' 10-1/7 13-1/4' 37.1/7 32-5/r 32.1/4' I3-I/4' 3-3/8' I/7 1" 2" r 165 KH11110 11 110 95 102 89 7.3/8' 9-3/4' II-1/8' 10-5/" 14-5/8' 37.3/4' 33' 32.1/7 14' 4-5/8" 1/2" 1' 3' 3" 170 0111155 15.5 155 95 149 125 7-3/8' 9-3/4' 11-1/8' 10-5/8' 14-5/8' 37-3/4" 33' 32-1/2' 14" 4-5/8' 1/2' 1' 3" 3' 175 8101199 19.9 199.9 95 185 161 7-1/7 10-i/7 II-I/8' 11-5/8" 15-3/8' 38' 33' 323/4' 14' 4.5/8' 1/2' 1.1/4" 3' 3" 195 1C00285 28.5 285 95 264 229 7-1/2' 10-1/2" 11-1/F 11-5/8' 15-3/W 38' 33" 323/4" 14' 4.5/8" 1/7 1-1/4' 3" 3' 205 Notes: • Indoor installation only.All information subject to change.Change"N"to"L"for • Lochinvar should be consulted beforeselecting a boiler for installations having LP gos models. unusual piping and pickup requirements,such as intermittent system operation, • The NetAHRI Water Ratings shown ore based on a piping and pickup allowance of 1.15. extensive piping systems,etc. • The ratings have been determined under the provisions governing forced draft burners. llir® t t xr1. Y�r45r •i,' - i' $ t • . . clillNIGHa FIRE TUBE BO/LER 1 i FIRING CODES M9 Standard Construction M7 California Code Smart SystemTM Features , >Smart System Digital Operating Control >Low-Voltage Terminal Strip Multi-Color Graphic LCD Display w/Navigation DHW Recirculation Pump Start/Stop Dial,Soft Keys and Loch-N-LinkTM USB 24 VAC Device Relay programming Proving Switch Contacts >Three Boiler Setpoint Temperature Inputs Flow Switch Contacts Plus Domestic Hot Water Prioritization Alarm on Any Failure Contacts >Built-in Cascading Sequencer for up to 8 Runtime Contacts Boilers,with Cascade Redundancy DHW Thermostat Contacts Multiple Size Boiler Cascade 3 Space Heat Thermostat Contacts Lead Lag System Sensor Contacts Efficiency Optimization DHW Tank Sensor Contacts >Vertical&Horizontal Direct Vent Front End Loading Capability Outdoor Air Sensor Contacts PVC,CPVC,Polypropylene or SS Venting up to >Outdoor Reset Control with Outdoor Air Sensor Cascade Contacts 100 feet Programmable for Three Reset Temperature 0-10 VDC BMS External Control Contact >Smart System Control Inputs 0-10 VDC Boiler Rate Output Contacts >Condensate Trap >Prog►ammable System Efficiency Optimizers >Other Features SH Night Setback 0-10 VDC Variable Speed System Pump Automatic Reset High Limit g Signal Input g DHW Night Setback 0-10 VDC Signal to Control Variable Speed Adjustable High Limit w/Manual Reset Anti-Cycling Boiler Pump Boiler Circulating Pump Outdoor Air Reset Curve Modbus Contacts Zero Clearances to Combustible Materials Ramp Delay >Time Clock 15-Year Limited Warranty(See Warranty for Details) Modulation Factor Control >Data Logging 5-Year Limited Parts Warranty Boost Temperature&Time Hours Running,Space Heating >Four Pump Control Hours Running,Domestic Hot Water Optional Equipment System Pump with Parameter for Continuous Ignition Attempts Operation Last 10 Lockouts ❑CON-X•US®Remote Connectivity Boiler Pump with Variable Speed Control >Maintenance Reminder ❑Modbus Communication Domestic Hot Water Pump Custom Maintenance Reminder with ❑BACnet MSTP Domestic Hot Water Recirculation Contractor Contact Information >Domestic Hot Water Prioritization Installer Ability to De-activate Service ❑Flow Switch DHW tank piped with priority in the boiler loop Reminder El Low-Water Cutoff w/Manual Reset&Test DHW tank piped as a zone in the system with >Low-Water Flow Safety Control&indication ❑Alarm Bell the pumps controlled by the SMART SYSTEM >Password Security DHW Modulation Limiting >Customizable Freeze Protection Parameters ❑Concentric Vent Kit Separately Adjustable Space Heat/DHW ❑SMART SYSTEM'PC Software Switching Times Standard Features >Building Management System Integration ❑Condensate Neutralization Kit 0-10 VDC Input to Control Modulation or Setpoint >ENERGY STAR Most Efficient Product El BMS Gateway to LON or BACnet IP 0-10 VDC Modulation Rate Output >95%DOE AFUE Efficiency El Multi-Temperature Loop Control 0-10 VDC Input to Enable/Disable Call for Heat >Modulating Burner with up to 10:1 Turndown >Access to BMS Settings through Graphic LCD Direct Spark Ignition El Sidewall Vent Termination Display Low NOx Operation ❑Wireless Outdoor Sensor >High-Voltage Terminal Strip >ASME Stainless Steel Heat Exchanger ❑LP Gas Conversion Kit 120 VAC/60 Hertz/I Phase Power Supply 30 PSI ASME Relief Valve Three Sets of Pump Contacts [calmer,LLC -Set-if L is ochinvar ® 300 Maddox Simpson Parkway A V�/ Lebanon,Tennessee 37090 �iaV�t CERTIFIED. /7�p�� .'I .4 P:615.889.890O/F.615.547.1000 MEMBER \ � j. ,� HIGH EFFICIENCY BOILERS&WATER HEATERS Cl©®toLochlnvar.com rs H 4/18—Printed In U.SA. .\ Project#: liz& george rhein • Heat Loss Summary Date: June 25, 2018 Prepared For: SECURITY PLUMBING &HEATING SUPPLY - Project Summary Project#: liz&george rhein Total-Components Load: 33,916 Btu/hr Project Name: liz&george rhein Total Infiltration Load: 17,281 Btu/hr Location: Total Floor Downward Load: 14,669 Btu/hr CloseDate: Total-Radiant Into Rooms: 51,196 Btu/hr Engineer: Total-Supplemental Load: 0 Btu/hr Design Data Location: (User-Specified Location) Total-Project Heat Loss: 65,865 Btu/hr Outdoor Temperature: -17 °F RFH Glycol Level: 30% Glycol Wind Speed: 10 mph Design Temp. Drop: 10°F Total Area: 4,816 ft2 Radiant Tubing Volume: 61.7 gallons(US) Construction Quality: Best Volume Water: 43.2 gallons(US) Volume Glycol: 18.5 gallons(US) Heat Loss Data Floorplan 1 Heated Ceiling Radiant Into Floor Total Total Room Design Room Area Area Walls Windows Doors Upward Skylights Infiltration Room Downward Radiant Load Temp. Load Drop dining 253 253 637 1,845 0 532 0 886 3,899 1,072 4,971 4,971 10 PANTRY 45 45 437 0 0 95 0 158 690 190 879 879 10 KITCHEN 261 261 797 2,460 0 549 0 914 4,719 1,222 5,941 5,941 10 FOYER 100 100 148 862 861 228 0 350 2,448 575 3,023 3,023 10 Units: Heat Loss=Btu/hr,Area=ft°,Temperature=°F Page 1 of 2 Created using Uponor Advanced Design Suite-7.9.0 Project#: liz & george rhein - Heat Loss Summary Date: June 25, 2018 Prepared For: SECURITY PLUMBING & HEATING . SUPPLY GREAT ROOM 475 475 336 0 3,444 1,082 0 2,079 6,941 1,948 8,889 8,889 10 OFFICE 110 110 507 1,230 0 251 0 385 2,373 579 2,952 2,952 10 LAUNDRY 60 60 312 0 0 137 0 210 659 210 869 869 10 BEDROOM 323 323 102 2,214 0 736 0 1,131 4,182 1,235 5,418 5,418 10 MASTER BATH 190 190 1,094 1,312 0 433 0 665 3,503 901 4,404 4,404 10 WIC 77 77 297 492 0 175 0 270 1,234 334 1,568 1,568 10 BONUS ROOM 522 522 2,109 1,476 0 1,189 0 1,828 6,602 1,970 8,572 8,572 10 Floorplan 2 Heated Ceiling Radiant Into Floor Total Total Room Design Room Area Area Walls Windows Doors Upward Skylights Infiltration Room Downward Radiant Load Temp. Load Drop BASEMENT 2,400 2,400 5,541 0 0 0 0 8,404 13,945 4,434 18,379 18,379 10 Units: Heat Loss=Btu/hr,Area=ft',Temperature='F Page 2 of 2 Created using Uponor Advanced Design Suite-7.9.0 Radiant Design Project#: liz & george rhein • Summary - Room View Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Project Summary Project#: liz&george rhein Project Name: liz& george rhein Water Channel 1 : 5.6 USGPM @ 8.5 ft(H20) Head Location: (includes S&R and temperature control CloseDate: device head loss, if specified) Engineer: Water Channel 2 : 8.1 USGPM @ 17 ft(H20) Head Design Data Location: (User-Specified Location) (includes S&R and temperature control Outdoor Temperature: -17°F device head loss, if specified) Wind Speed: 10 mph Total Loops: 33 Total Area: 4,816 ft2 Total Manifolds: 4 Construction Quality: Best Total Zones: 4 Min.Tubing Required: 6,702 ft Total Load: 65,865 Btu/hr Total Radiant Load: 51,196 Btu/hr Total Supplemental Load: 0 Btu/hr RFH Glycol Level: 30% Glycol Design Temp. Drop: 10 °F Radiant Tubing Volume: 61.7 gallons(US) Volume Water: 43.2 gallons(US) Volume Glycol: 18.5 aallons(US1 Radiant Design Data Units: Spacing=in,Length=ft,Radiant Load=Btu/hr,Flow Rate=USGPM,Head Loss=ft(H20),Temperature=°F,R-Value=°F•fta hr/Btu Page 1 of 5 "User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Radiant Design Project#: liz & george rhein Summary - Room View Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING • & HEATING SUPPLY Zone 1 Number Of Rooms: 5 Flow Rate: 4.9 USGPM Head Loss: 4.8 ft(H20) Control Type: Zone Valves Floor Design Water Room Floor Plan Attach Method Tube Type Tube # Length Leader Radiant Flow Head Surface Covering Temp. Temp. Spacing Loops Length Load Rate Loss Temp. Supplied/ Rv Drop Required dining -Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 2 210 10.0 4971 1 3.5 72.7 0.5 10 110.3/91.6 PANTRY-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 1 88 10.0 879 0.2 0.3 72.7 0.5 10 110.3/91.5 KITCHEN-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 2 216 10.0 5941 1.2 4.8 74 0.5 10 110.3/97.1 FOYER-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 1 170 10.0 3023 0.6 3.9 77.2 0.5 10 110. / 110.3 GREAT ROOM - Floorplan 1 Joist Trak Plates hePEX 1/2" 8 4 199 10.0 8889 1.9 2.7 72.3 0.5 10 110.3/90 Floor Units: Spacing=in,Length=ft,Radiant Load=Btu/hr,Flow Rate=USGPM,Head Loss=ft(H20),Temperature=°F,R-Value=°F•ft"•hr/Btu Page 2 of 5 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Radiant Design Project#: liz & george rhein - Summary - Room View Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING &HEATING SUPPLY Zone 2 Number Of Rooms: 1 Flow Rate: 3.8 USGPM Head Loss: 2.3 ft(H2O) Control Type: Zone Valves Floor Design Water Room Floor Plan Attach Method Tube Type Tube # Length Leader Radiant Flow Head Surface Covering Temp. Temp. Spacing Loops Length Load Rate Loss Temp. Rv Drop Supplied Required/ BASEMENT- Floorplan 2 Embedded hePEX 1/2" 12 11 239 10.0 18379 3.8 2.3 67.9 0.5 10 86/73.8 Floor Units: Spacing=in,Length=ft,Radiant Load=Btu/hr,Flow Rate=USGPM,Head Loss=ft(H20),Temperature=°F,R-Value=°F•ft'•hr/Btu Page 3 of 5 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Radiant Design Project#: liz & george rhein ' Summary - Room View Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Zone 3 Number Of Rooms: 5 Flow Rate: 3.2 USGPM Head Loss: 4.1 ft(H20) Control Type: Zone Valves Floor Design Water Room Floor Plan Attach Method Tube Type Tube # Length Leader Radiant Flow Head Surface Covering Temp. Temp. Spacing Loops Length Load Rate Loss Temp. Rv Drop Required/ OFFICE-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 1 185 10.0 2952 0.6 4.1 75.8 0.5 10 110.3/ 104.3 LAUNDRY-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 1 110 10.0 869 0.2 0.3 70.5 0.5 10 110.3/82.6 BEDROOM - Floorplan 1 Joist Trak Plates hePEX 1/2" 8 3 182 10.0 5418 1.1 1.8 71.5 0.5 10 110.3/86.6 Floor MASTER BATH- Floorplan 1 Joist Trak Plates hePEX 1/2" 8 2 163 10.0 4404 0.9 2.2 74.2 0.5 10 110.3/97.9 Floor WIC-Floor Floorplan 1 Joist Trak Plates hePEX 1/2" 8 1 136 10.0 1568 0.3 1 73 0.5 10 110.3/92.9 Units: Spacing=in,Length=ft,Radiant Load=Btu/hr,Flow Rate=USGPM,Head Loss=ft(H20),Temperature=°F,R-Value=°F.ft"hr/Btu Page 4 of 5 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Radiant Design Project#: liz & george rhein - Summary - Room View Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING &HEATING SUPPLY Zone 4 Number Of Rooms: 1 Flow Rate: 1.8 USGPM Head Loss: 3.2 ft(H20) Control Type: Zone Valves Floor Design Water Room Floor Plan Attach Method Tube Type Tube # Length Leader Radiant Flow Head Surface Covering Temp. Temp. Spacing Loops Length Load Rate Loss Temp. Rv Drop Supplied/ Required BONUS ROOM - Floorplan 1 Joist Trak Plates hePEX 1/2" 8 4 216 10.0 8572 1.8 3.2 71.3 0.5 10 86/86 Floor Units: Spacing=in,Length=ft,Radiant Load=Btu/hr,Flow Rate=USGPM,Head Loss=ft(H20),Temperature=`F,R-Value=°F•ft2•hr/Btu Page 5 of 5 "User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Loop-To-Coil Mapping Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Project Summary Project#: liz&george rhein Project Name: liz &george rhein Location: CloseDate: Engineer: Design Data Location: (User-Specified Location) Outdoor Temperature: -17 °F Wind Speed: 10 mph Total Area: 4,816 ft2 Construction Quality: Best Total Circuits: 33 Total Coils: 8 Total Coil Length: 7,000 ft Total Assigned Circuit Length: 6,702 ft Unused Coil Percentage: 4% Loop-to-Coil Mapping hePEX 1/2" Coil 1 -1,000 ft(13 ft unused length)-Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 210 Manifold 3 2 Floorplan 1 dining Floor 216 Manifold 3 4 Floorplan 1 KITCHEN Floor 163 Manifold 4 7 Floorplan 1 MASTER BATH Floor 216 Manifold 2 1 Floorplan 1 BONUS ROOM Floor 182 Manifold 4 5 Floorplan 1 BEDROOM Floor Coil 2-1,000 ft(44 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 239 Manifold 1 7 Floorplan 2 BASEMENT Floor 239 Manifold 1 9 Floorplan 2 BASEMENT Floor 239 Manifold 1 10 Floorplan 2 BASEMENT Floor Page 1 of 3 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Loop-To-Coil Mapping Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Loop-to-Coil Mapping hePEX 1/2" 239 Manifold 1 11 Floorplan 2 BASEMENT Floor Coil 3 -1,000 ft(6 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 199 Manifold 3 10 Floorplan 1 GREAT ROOM Floor 185 Manifold 4 1 Floorplan 1 OFFICE Floor 110 Manifold 4 2 Floorplan 1 LAUNDRY Floor 182 Manifold 4 3 Floorplan 1 BEDROOM Floor 182 Manifold 4 4 Floorplan 1 BEDROOM Floor 136 Manifold 4 8 Floorplan 1 WIC Floor Coil 4-1,000 ft(90 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 216 Manifold 2 3 Floorplan 1 BONUS ROOM Floor 216 Manifold 2 4 Floorplan 1 BONUS ROOM Floor 239 Manifold 1 1 Floorplan 2 BASEMENT Floor 239 Manifold 1 2 Floorplan 2 BASEMENT Floor Coil 5 -1,000 ft(17 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 216 Manifold 3 5 Floorplan 1 KITCHEN Floor 170 Manifold 3 6 Floorplan 1 FOYER Floor 199 Manifold 3 7 Floorplan 1 GREAT ROOM Floor 199 Manifold 3 8 Floorplan 1 GREAT ROOM Floor 199 Manifold 3 9 Floorplan 1 GREAT ROOM Floor Page 2 of 3 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Loop-To-Coil Mapping Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Loop-to-Coil Mapping hePEX 1/2" Coil 6 -1,000 ft(73 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 239 Manifold 1 5 Floorplan 2 BASEMENT Floor 239 Manifold 1 6 Floorplan 2 BASEMENT Floor 239 Manifold 1 8 Floorplan 2 BASEMENT Floor 210 Manifold 3 1 Floorplan 1 dining Floor Coil 7-500 ft(10 ft unused length)-Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 163 Manifold 4 6 Floorplan 1 MASTER BATH Floor 239 Manifold 1 3 Floorplan 2 BASEMENT Floor 88 Manifold 3 3 Floorplan 1 PANTRY Floor Coil 8 -500 ft(45 ft unused length) -Custom Length Length(ft) Manifold Circuit# FloorPlan Room Panel 216 Manifold 2 2 Floorplan 1 BONUS ROOM Floor 239 Manifold 1 4 Floorplan 2 BASEMENT Floor Page 3 of 3 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Heat Transfer Plate Summary Project#: liz & george rhein Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING SUPPLY Project Summary Project#: liz&george rhein Project Name: liz&george rhein Location: CloseDate: Engineer: Floorplan 1 Room Area Heated Area Quantity dining 253 ft2 253 ft2 81 PANTRY 45 ft2 45 ft2 14 KITCHEN 261 ft2 261 ft2 83 FOYER 100 ft2 100 ft2 32 GREAT ROOM 475 ft2 475 ft2 152 OFFICE 110 ft2 110 ft2 35 LAUNDRY 60 ft2 60 ft2 19 BEDROOM 323 ft2 323 ft2 103 MASTER BATH 190 ft2 190 ft2 61 WIC 77 ft2 77 ft2 25 BONUS ROOM 522 ft2 522 ft2 167 SubTotal for Floorplan 2: 772 SubTotal for Floorplan 2: 0 Total Heat Transfer Plates: 772 "User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Page 1 of 1 Project#: liz & george rhein - Radiant Panel Summary Date: Jun 25, 2018 Prepared For: SECURITY PLUMBING & HEATING _ SUPPLY Total Area: 4,816 ft2 Total Heat Load: 65,865 Btu/hr Total Flowrate: 13.7 USGPM Maximum Head Loss: 4.8 ft(H20) Floorplan 1 Room Desigr Fluid Fluid Zone Heated Unheated Attachment Tube Ldr. Loop # Surface Flowrate Head Room Heating # Area Area Construction Method Tube Type Spacing Len Length Loops per ft2 Temp Temp (Total) Loss Req. Supplied dining Floor 1 253 0 Suspended/ Joist Trak hePEX 1/2" 8 10 210 2 15.4 72.7 10 1.0 3.5 92 110 Joist 16" Plates Suspended/ Joist Trak PANTRY Floor 1 45 0 Joist 16" Plates hePEX 1/2" 8 10 88 1 15.3 72.7 10 0.18 0.26 92 110 KITCHEN Floor 1 261 0 Suspended/ Joist Trak hePEX 1/2" 8 10 216 2 18.1 74 10 1.2 4.8 97 110 Joist 16" Plates Suspended/ Joist Trak FOYER Floor 1 100 0 Joist 16" Plates hePEX 1/2" 8 10 170 1 24.5 77.2 10 0.63 3.9 110 110 GREAT Suspended/ Joist Trak ROOM Floor 1 475 0 Joist 16" Plates hePEX 1/2" 8 10 199 4 14.6 72.3 10 1.9 2.7 90 110 Suspended/ Joist Trak OFFICE Floor 3 110 0 Joist 16" Plates hePEX 1/2" 8 10 185 1 21.6 75.8 10 0.61 4.1 104 110 LAUNDRY Floor 3 60 0 Suspended/ Joist Trak hePEX 1/2" 8 10 110 1 11 70.5 10 0.18 0.32 83 110 Joist 16" Plates BEDROOM Floor 3 323 0 Suspended/ Joist Trak hePEX 1/2" 8 10 182 3 12.9 71.5 10 1.1 1.8 87 110 Joist 16" Plates MASTER Suspended/ Joist Trak BATH Floor 3 190 0 Joist 16" Plates hePEX 1/2" 8 10 163 2 18.4 74.2 10 0.92 2.2 98 110 WIC Floor 3 77 0 Suspended/ Joist Trak hePEX 1/2" 8 10 136 1 16 73 10 0.33 1.0 93 110 Joist 16" Plates BONUS Suspended/ Joist Trak ROOM Floor 4 522 0 Joist 16" Plates hePEX 1/2" 8 10 216 4 12.6 71.3 10 1.8 3.2 86 86 Floorplan 2 Area=ft2;Spacing=in;Length=ft;Unit Heat=Btu/hr/ft2;Temperature=°F;Flow Rate=USGPM;Head Loss=ft(H2O) Page 1 of 2 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0 Radiant Panel Summary Project#: liz& george rhein Date: Jun 25, 2018 " Prepared For: SECURITY PLUMBING& HEATING ' SUPPLY Room Desigr Fluid Fluid Zone Heated Unheated Attachment Tube Ldr. Loop # Surface Flowrate Head Room Heating # Area Area Construction Method Tube Type Spacing Len Length Loops Load Temp Temp (Total) Loss Temp Temp per ft2Drop Req. Supplied BASEMENT Floor 2 2400 0 Slab BG/ Embedded hePEX 1/2" 12 10 239 11 5.8 67.9 10 3.8 2.3 74 86 Concrete Area=ft2;Spacing=in;Length=ft;Unit Heat=Btu/hr/ft2;Temperature=°F;Flow Rate=USGPM;Head Loss=ft(H2O) Page 2 of 2 *User-Specified Climate Data-Created using Uponor Advanced Design Suite-7.9.0