Staff Notes_11 26 19
Town of Queensbury Planning Board
Community Development Department Staff Notes
November 26, 2019
Site Plan 75-2019 LANDCRAFTER, LLC
704 Glen Street / CI – Commercial Intensive / Ward 2
SEQR Type II
Material Review: site plan application, site drawings, plan sheet information for 708 Glen Street
Parcel History:SP 14-2013, SP 20-2002, SP 79-2010, SB 4-2002, SB 7-2002, AV 53-2019, SP 76-2019
__________________________________________________________________________________________
Requested Action
Planning Board review and approval for a site plan modification to add 1,523 sq. ft. of new pavement for
interconnect with 708 Glen Street.
Resolutions
1. PB Decision
Project Description
Applicant proposes a site plan modification to add 1,523 sq. ft. of new pavement for interconnect with 708 Glen
Street. The existing building is 11,975 sq. ft. for Buy Low and other commercial businesses. Project includes a
stormwater basin and management area. There are no other changes to the site or building. Pursuant to Chapter
179-9-120 of the Zoning Ordinance, amendments to a commercial site shall be subject to Planning Board
review and approval.
Staff Comments
Location-The project site is located at 704 Glen Street.
Arrangement- The applicant proposes an additional 1,523 sq ft of pavement as an inter-connect with 708
Glen Street.
Site Design-The project includes the new pavement, an area two ev charging parking space and an area for
stormwater management of the new paved surface.
Building – There are no changes to the building.
Signage-The applicant has shown directional signage area that indicate “one way do not enter”.
Site conditions-The existing site contains a multi –use building with associated parking.
Traffic- The inter-connect is to be 24 ft wide for traffic from 708 to have access to 704 and to Lafayette
Street.
Grading and drainage plan, Sediment and erosion control –The site plan shows the shallow grassed basin on
the 704 parcel and to install a gravel section on the edge of the pavement. The stormwater runoff is to run
off from the new paved area to the gravel and the depression area.
Landscape plan – There is no new landscaping for 704 Glen Street.
Site lighting plan – There are no new lighting to be placed on 704 Glen Street.
Utility details – There are no changes to utilities other than 2 EV charging stations to be installed near the
new interconnect driveway.
Elevations and Floor plans – There is no change to the building so elevations and floor plans were not
required.
Waivers-Planning staff has reviewed the applicants request for waivers that include items j. stormwater
(Stormwater management description provided for 708 and 704 under site plan 76-2019, k. topography, n
traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition
disposal s. snow removal.
The waivers requested–Staff finds it reasonable to request a waiver for these items because the only site
changes is for the new pavement for the inter-connect and the stormwater management for the new
pavement.
Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the
written request of an applicant. The Board is to review the waivers and to determine if they are to be
granted.
Nature of Variance
Granted 11/20/19. The applicant requests relief from permeability where the existing site is 28.4% and
proposed to be 25.2% and 30% is required.
Summary
The applicant has completed a site plan application for the development of an inter-connect to 708 Glen Street
with 1,523 sq ft of pavement and associated site work.
Meeting History: PB: 11/19/19; ZBA: 11/26/19
- 2 -