ResCheck t i REScheck Software Version 4.6.4 Compliance. Certificate ECOVE Project Foothills Builders JAN 2 9 2019 Energy Code: 2015 IECC IC Location: Glens Falls, New York TOWN OF QUEENSBURY Construction Type: Single-family BUILDING&CODES Project Type: New Construction Conditioned Floor Area: 1,422 ft2 Glazing Area 11% Climate Zone: 6 (7635 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: John Clendon Dr Daniel W. Ryan P.E. Lot 15 206 Glens Street Queensbury, NY 12804 Suite 30 Glens Falls, NY 12801 :Compliance: Passes usih!y UA trade-off Compliance: 2.7%Better Than Code Maximum UA: 239 Your UA: 235 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area cavity Cont. Assembly or U-Factor UA Ceiling 1: Flat Ceiling or Scissor Truss 1,465 38.0 0.0 0.030 44 Wall 1: Wood Frame, 16"D.C. 1,520 21.0 0.0 0.057 76 Window 1: Metal Frame:Double Pane with Low-E 108 0.290 31 Door 1: Solid 18 0.140 3 Door 2: Glass 40 0.290 12 Door 3: Solid 20 0.240 5 Basement Wall 1: Solid Concrete or Masonry 1,482 0.0 19.0 0.038 55 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2:Vinyl/Fiberglass Frame:Double Pane 9 0.400 4 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 295.15-2-12 RC-0043-2019 Foothills Builders 61 John Clendon Rd, Lot 15 SFD w/gas FP 1950 s.f., Gar. 528 s.f. Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES- FHB Lot Page 1 of10 15 John Clendon\1405 Rescheck.rck Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building ha en designed to meet the 2015 IECC requirements in REScheck Versi and to comply with the mandatory requirem fisted ' the REScheck Inspection Checklist. Name-Title Sign at e a 0 1= ;1�1,'r� yr:�,• A ° 079OG �OFESS ION Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 2 of 15 John Clendon\1405 Rescheck.rck REScheck Software Version 4.6.4 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section "' '` Plans Verified Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions Req.ID value .Value 103.1, ;Construction drawings and ❑Complies 103.2 documentation demonstrate JE]Does Not [PRl]1 ;energy code compliance for the L; ;building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable 1 ;construction documents. i 103.1, ,Construction drawings and "IElComplies 103.2, documentation demonstrate } +❑Does Not ; 403.7 ;energy code compliance for j [PR3]1 ;lighting and mechanical systems. {❑Not Observable !Systems serving multiple ❑Not Applicable ;dwelling units must demonstrate ;compliance with the IECC IN Commercial Provisions. f 302.1; ;Heating and cooling equipment is; Heating: Heating: ;❑Complies 403:7 !sized per ACCA Manual 5 based Btu/hr Btu/hr :❑Does Not [PR2]z !on loads calculated per ACCA Cooling: Cooling: :❑Not Observable , Manual J or other methods Btu/hr Btu/hr f❑Not Applicable ; !approved by the code official. ; j i 1 t 1 i 1 f 1 Additional Comments/Assumptions: 11 High Impact(Tier 1) 1,2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 3 of10 15 John Clendon\1405 Rescheck.rck Section Plans Verified Field Verified,- # Foundation.lnspection Value Value Complies? Comments%Assumptions Req.ID 402.1.1 ;,Conditioned basement wall R- R- "❑Complies ;See the Envelope Assemblies [F0411 .insulation R-value.Where interior "❑Does Not i ;table for values. insulation is used,verification R- � R- may need to occur during ❑Not Observable , ;Insulation Inspection. Not " "❑Not Applicable ; !required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies ; [F0511 "insulation installed per ❑Does Not ij !manufacturer's instructions. „ ❑Not Observable ❑Not Applicable 402.2.9 "Conditioned basement wall ft ft ❑Complies ;see the Envelope Assemblies [F06]1 "insulation depth of burial or " "❑Does Not "table for values. !distance from top of wall. "❑Not Observable " "❑Not Applicable 3012.1 !A protective covering is installed ❑Complies [FO11]2 !to protect exposed exterior ❑Does Not " ;!insulation and extends a ❑Not Observable minimum of 6 in. below grade. " IE]Not Applicable 403.9 ;Snow-and ice-melting system i❑Complies [17012]2 !controls installed. y �I❑Does Not ! t .4I❑Not Observable ; .{❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 4 of10 15 John Clendon\1405 Rescheck.rck Sectdon a '° Plans Verified :Field Verified ". #= Framingl Rough n 1n"spectionComplies? `° Comments/Assumptions &,Req.ID Value. Value 402.1.1, ;Door U-factor. ; U- ; U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ; i❑Does Not ;table for values. [FR1]1 ❑Not Observable ❑Not Applicable 402.1.1, ;Glazing U-factor(area-weighted ; U- ; U- ;❑Complies ;See the Envelope Assemblies 402.3.1, average). I ❑Does Not :table for values. 402.3.3, 402.3.6, :❑Not Observable 402.5 ; ; ; ;❑Not Applicable [FR2]1 303.1.3 ;U-factors of fenestration products ❑Complies [FR4]1 !are determined in accordance ❑Does Not ;with the NFRC test procedure or ❑Not Observable ;taken from the default table. " ' ]❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ❑Complies [FR23]1 !installed per manufacturer's ❑Does Not instructions. 8 []Not Observable []Not Applicable 402.4.3 :Fenestration that is not site built ❑Complies ; [FR20]1 ;is listed and labeled as meeting ❑Does Not �AAMA/W D MA/CSA 101/l.S.2/A440 ' :or has infiltration rates per NFRC []Not Observable �400 that do not exceed code �� � ❑Not Applicable ;limits. �,A _'�..... ., z> 402,4:5 `,IC-rated recessed lighting fixtures []Complies [FR-161'2 !sealed at housing/interior finish ' ❑Does Not ;and labeled to indicate :52.0 cfm ,leakage at 75 Pa. [-]Not Observable ❑Not Applicable 403.2.1 :Supply and return ducts in attics ❑Complies ; [FR12]1 :insulated >= R-8 where duct is -; ❑Does Not >=3 inches in diameter and >_ []Not Observable R-6 where <3 inches.Supply and return ducts in other portions of ' ro.❑Not Applicable ; :the building insulated >= R-6 for 1 ;diameter>=3 inches and R-4.2 ' , !for< 3 inches in diameter. 403.3.3.5;!Building cavities are not used as x ❑Complies [F1115]3 Iducts or plenums. , Ki ❑Does Not []Not Observable pF � ❑Not Applicable ; 403A: I HVAC piping conveying fluids : R- ; R- , pry:❑Complies [FR17jz.:, !above 105 sF or chilled fluids ![]Does Not +below 55°F are insulated to>_R- i :❑Not Observable 13' :❑Not Applicable 403.4.1 :Protection of insulation on HVAC , ❑Complies ; (FR24]1 piping., , F ❑Does Not l , x �� ,'" m,.��i ;;• � ❑Not Observable : []Not Applicable 403 5.3.: 'I Hot water pipes are insulated to R- ; R- :❑Complies (FR18P �j aR-3. ;❑Does Not ;❑Not Observable ❑Not Applicable 403:6 ';Automatic or gravity dampers are ❑Complies ; [1711191z !installed on all outdoor air ❑Does Not :'- %i intakes and exhausts. x<.❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3. Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01%28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 5 of10 15 John Clendon\1405 Rescheck.rck Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES-FHB Lot Page 6 of10 15 John Clendon\1405 Rescheck.rck Section Pla 14 , Insulation Inspection Verified Field Verified Complies? Comments/Assumptions, & Req.ID Value Value ' 303.1, ;All installed insulation is labeled j❑Complies [IN13]2 or the installed R-values IE]Does Not p . rovided ❑Not Observable ,,❑Not Applicable 402.1.1, ;,Wall insulation R-value. If this is a: R- ; R- ;❑Complies ;See the Envelope Assemblies 402.2.5, ;mass wall with at least 1/2 of the 1❑ Wood ;❑ Wood ;❑Does Not table for values. 402.2.E I wall insulation on the wall ;El Mass ❑ Mass tNot Observable [IN3]1 exterior,the exterior insulation ❑ Steel I❑ Steel I❑Not Applicable U :requirement applies(FR10). 303.2 ;Wall insulation is installed per ❑Complies [IN4]1 !manufacturer's instructions. ❑Does Not ❑Not Observable I o• ,❑Not Applicable ; Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 7 of10 15 John Clendon\1405 Rescheck.rck Section Plans.Verified Field'Verified y #-- Final Inspection Provisions Value Value Complies? comments7?assumptions &Req.ID 402.1.1, ;Ceiling insulation R-value. ; R- ; R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not ;table for values. 402.2.2, 402.2,E ❑ Steel ❑ Steel ❑Not Observable [Fill' ; ; ;❑Not Applicable 303.1.1.1,;Ceiling insulation installed per f "❑Complies 303.2 ;manufacturer's instructions. t =`❑Does Not [F1211 Blown insulation marked every :300 ft2. i �, [:]Not Observable ; I I ❑Not Applicable 402.2.3 ;Vented attics with air permeable ❑Complies (F122]2 )insulation include baffle adjacent i a❑Does Not :to soffit and eave vents that t ? " ' extends over insulation. ❑Not Observable I EINot Applicable 402.2.4 ;Attic access hatch and door R- R- ;❑Complies [F1311 :insulation >R-value of the :❑Does Not adjacent assembly. ;❑Not Observable ❑Not Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ;❑Complies [F117]1 .ach in Climate Zones 1-2, and 1 :❑Does Not <=3 ach in Climate Zones 3-8. ;❑Nat Observable ❑Not Applicable 403.2.3 ;Duct tightness test result of<=4 ; cfm/100 cfm/100 ;❑Complies [FI4]1 lcfm/100 ft2 across the system or ft2 ft2 ;❑Does Not <=3 cfm/100 ft2 without air ;❑Not Observable handler @ 25 Pa. For rough-in tests,verification may need to ; ;❑Not Applicable ;occur during Framing Inspection. 403.3.2 ;Ducts are pressure tested to cfm/100 ; cfm/100 ;❑Complies [F]27]1 :determine air leakage with ft2 ft2 :❑Does Not either: Rough-in test:Total leakage measured with a ;❑Not Observable pressure differential of 0.1 inch ; ;❑Not Applicable w.g. across the system including ; ;the manufacturer's air handler ; .enclosure if installed at time of ;test. Postconstruction test:Total leakage measured with a !pressure differential of 0.1 inch w.g.across the entire system ;including the manufacturer's air handler enclosure. 403.3.2.1 ;Air handler leakage designated 3 ❑Complies ; [F124]1 .by manufacturer at<=2%of "°❑Does Not design air flow. ''IE]Not Observable ; I❑Not Applicable 403.1.1 ;Programmable thermostats } S❑Complies ; [FI9]2„ installed for control of primary ! ❑Does Not heating and cooling systems and ` I initially set by manufacturer to ❑Not Observable , I code specifications. ❑Not Applicable 403.1.2 ,Heat pump thermostat installed ❑Complies [FI10]2 ion heat pumps. ❑Does Not i ❑Not Observable ; " t ❑Not Applicable 403.5.1 ;Circulating service hot water ❑Complies [FI11]2 ;systems have automatic or i ❑Does Not :accessible manual controls. -❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 1 2 IMedium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES -.FHB Lot Page 8 of10 15 John Clendon\1405 Rescheck.rck Section Plans�Verified Field Verified` #. , Final Inspection Provisions „Value Value Complies? Comments/Assumptions & Req.iD . 403.6.1 ;All mechanical ventilation system r ❑Complies [FI21 !fans not part of tested and listed ( (❑Does Not IHVAC equipment meet efficacy 1 o ❑Not Observable -,and airflow limits. I ',I❑Not Applicable ; 403.2 'Hot water boilers supplying heat ❑Complies �u [F1261z through one-or two-pipe heating ❑Does Not ; jsystems have outdoor setback j control to lower boiler water [-]Not Observable ]temperature based on outdoor I❑Not Applicable ; "'temperature. 403.5.1.1 !Heated water circulation systems } ❑Complies [F12$]2. jhave a circulation pump.The t - =I❑Does Not ;system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and therm-s- ❑Not Applicable syphon circulation systems area; not present.Controls for z , .j circulating hot water system c pumps start the pump with signal -;for hot water demand within the !occupancy. Controls automatically turn off the pump ;when water is in circulation loop n is at set-point temperature and !no demand for hot water exists. 403.5 1:2 ;Electric heat trace systems ❑Complies [FI29]2 - ,comply with IEEE 515.1 or UL ❑Does Not Y kl .• i 515. Controls automatically + adjust the energy input to the [:]Not Observable heat tracing to maintain the '❑Not Applicable ;desired water temperature in the piping, . 1 403.5.2. J Water distribution systems that ❑Complies [FI30]� have recirculation pumps that ❑Does Not ; pump water from a heated water ;supply pipe back to the heated ' '❑Not Observable water source through a cold ❑Not Applicable water supply pipe have a , ;demand recirculation water ;system. Pumps have controls ;that manage operation of the Ar"� ',pump and limit the temperature !of the water entering the cold ;water piping to 1049F. 403 5.4' 1 Drain water heat recovery units ❑Complies [FI31]2 !tested in accordance with CSA �❑Does Not B55.1. Potable water-side pressure loss of drain water heat ❑Not Observable , !recovery units < 3 psi for s ❑Not Applicable ; !individual units connected to one ; Iortwo showers. Potable water- side pressure loss of drain water !heat recovery units< 2 psi for jindividual units connected to � `„,•�� Ithree or more showers. f 404.1 175%of lamps in permanent ;, ❑Complies [FI6]1 fixtures or 75%of permanent ❑Does Not ; ;fixtures have high efficacy lamps ' Does not apply to low-voltage ❑Not Observable lighting. ❑Not Applicable 404:1'.1, Fuel gas lighting systems have '❑Complies [FI23]3` no continuous pilot light. ❑Does Not ❑Not Observable ; J❑Not Applicable 1 High Impact(Tier 1) 2'1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 9 of10 15 John Clendon\1405 Rescheck.rck Section Plans Verified Field Verified #. Final Inspection Provisions Complies? Comments/'dssumptions &'Req.ID Value Value i 401.3 ;`;Compliance certificate posted. ❑Complies [FI7]2 i ❑Does Not i ❑Not Observable ❑Not Applicable 303:3 ;Manufacturer manuals for ,°I❑Complies [FI18]3 !mechanical and water heating ❑Does Not j systems have been provided. } ,,'`I❑Not Observable -" ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 01/28/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES- FHB Lot Page 10 of10 15 John Clendon\1405 Rescheck.rck w 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass&Door Rating 1.1-Factor SHGC Window 0.29 Door 0.29 Cooling;'Heating& Heating System: Cooling System: Water Heater: Name: Date: Comments