ResCheck t
i REScheck Software Version 4.6.4
Compliance. Certificate
ECOVE
Project Foothills Builders
JAN 2 9 2019
Energy Code: 2015 IECC IC
Location: Glens Falls, New York TOWN OF QUEENSBURY
Construction Type: Single-family BUILDING&CODES
Project Type: New Construction
Conditioned Floor Area: 1,422 ft2
Glazing Area 11%
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
John Clendon Dr Daniel W. Ryan P.E.
Lot 15 206 Glens Street
Queensbury, NY 12804 Suite 30
Glens Falls, NY 12801
:Compliance: Passes usih!y UA trade-off
Compliance: 2.7%Better Than Code Maximum UA: 239 Your UA: 235
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area cavity Cont.
Assembly or U-Factor UA
Ceiling 1: Flat Ceiling or Scissor Truss 1,465 38.0 0.0 0.030 44
Wall 1: Wood Frame, 16"D.C. 1,520 21.0 0.0 0.057 76
Window 1: Metal Frame:Double Pane with Low-E 108 0.290 31
Door 1: Solid 18 0.140 3
Door 2: Glass 40 0.290 12
Door 3: Solid 20 0.240 5
Basement Wall 1: Solid Concrete or Masonry 1,482 0.0 19.0 0.038 55
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 2:Vinyl/Fiberglass Frame:Double Pane 9 0.400 4
Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5
295.15-2-12 RC-0043-2019
Foothills Builders
61 John Clendon Rd, Lot 15
SFD w/gas FP 1950 s.f., Gar. 528 s.f.
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES- FHB Lot Page 1 of10
15 John Clendon\1405 Rescheck.rck
Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building ha en designed to meet the 2015 IECC requirements in
REScheck Versi and to comply with the mandatory requirem fisted ' the REScheck Inspection Checklist.
Name-Title Sign at e a
0 1=
;1�1,'r� yr:�,•
A ° 079OG
�OFESS ION
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 2 of
15 John Clendon\1405 Rescheck.rck
REScheck Software Version 4.6.4
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section "' '` Plans Verified Field Verified
# Pre-Inspection/Plan Review Complies? Comments/Assumptions
Req.ID
value .Value
103.1, ;Construction drawings and ❑Complies
103.2 documentation demonstrate JE]Does Not
[PRl]1 ;energy code compliance for the
L; ;building envelope.Thermal ❑Not Observable
envelope represented on ❑Not Applicable
1
;construction documents. i
103.1, ,Construction drawings and "IElComplies
103.2, documentation demonstrate } +❑Does Not ;
403.7 ;energy code compliance for j
[PR3]1 ;lighting and mechanical systems. {❑Not Observable
!Systems serving multiple ❑Not Applicable
;dwelling units must demonstrate
;compliance with the IECC IN
Commercial Provisions.
f
302.1; ;Heating and cooling equipment is; Heating: Heating: ;❑Complies
403:7 !sized per ACCA Manual 5 based Btu/hr Btu/hr :❑Does Not
[PR2]z !on loads calculated per ACCA Cooling: Cooling: :❑Not Observable ,
Manual J or other methods Btu/hr Btu/hr f❑Not Applicable ;
!approved by the code official. ;
j i 1 t 1
i 1 f 1
Additional Comments/Assumptions:
11 High Impact(Tier 1) 1,2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 3 of10
15 John Clendon\1405 Rescheck.rck
Section Plans Verified Field Verified,-
# Foundation.lnspection Value Value Complies? Comments%Assumptions
Req.ID
402.1.1 ;,Conditioned basement wall R- R- "❑Complies ;See the Envelope Assemblies
[F0411 .insulation R-value.Where interior "❑Does Not
i ;table for values.
insulation is used,verification
R- � R-
may need to occur during ❑Not Observable ,
;Insulation Inspection. Not " "❑Not Applicable ;
!required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies ;
[F0511 "insulation installed per ❑Does Not
ij !manufacturer's instructions. „
❑Not Observable
❑Not Applicable
402.2.9 "Conditioned basement wall ft ft ❑Complies ;see the Envelope Assemblies
[F06]1 "insulation depth of burial or " "❑Does Not "table for values.
!distance from top of wall.
"❑Not Observable "
"❑Not Applicable
3012.1 !A protective covering is installed ❑Complies
[FO11]2 !to protect exposed exterior ❑Does Not "
;!insulation and extends a ❑Not Observable
minimum of 6 in. below grade. "
IE]Not Applicable
403.9 ;Snow-and ice-melting system i❑Complies
[17012]2 !controls installed. y �I❑Does Not
! t
.4I❑Not Observable ;
.{❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 4 of10
15 John Clendon\1405 Rescheck.rck
Sectdon a '° Plans Verified :Field Verified ".
#= Framingl Rough n 1n"spectionComplies? `° Comments/Assumptions
&,Req.ID Value. Value
402.1.1, ;Door U-factor. ; U- ; U- ;❑Complies ;See the Envelope Assemblies
402.3.4 ; i❑Does Not ;table for values.
[FR1]1
❑Not Observable
❑Not Applicable
402.1.1, ;Glazing U-factor(area-weighted ; U- ; U- ;❑Complies ;See the Envelope Assemblies
402.3.1, average). I ❑Does Not :table for values.
402.3.3,
402.3.6, :❑Not Observable
402.5 ; ; ; ;❑Not Applicable
[FR2]1
303.1.3 ;U-factors of fenestration products ❑Complies
[FR4]1 !are determined in accordance ❑Does Not
;with the NFRC test procedure or ❑Not Observable
;taken from the default table. " '
]❑Not Applicable
402.4.1.1 ;Air barrier and thermal barrier ❑Complies
[FR23]1 !installed per manufacturer's ❑Does Not
instructions.
8 []Not Observable
[]Not Applicable
402.4.3 :Fenestration that is not site built ❑Complies ;
[FR20]1 ;is listed and labeled as meeting ❑Does Not
�AAMA/W D MA/CSA 101/l.S.2/A440 '
:or has infiltration rates per NFRC []Not Observable
�400 that do not exceed code �� � ❑Not Applicable
;limits. �,A _'�..... .,
z>
402,4:5 `,IC-rated recessed lighting fixtures []Complies
[FR-161'2 !sealed at housing/interior finish ' ❑Does Not
;and labeled to indicate :52.0 cfm
,leakage at 75 Pa. [-]Not Observable
❑Not Applicable
403.2.1 :Supply and return ducts in attics ❑Complies ;
[FR12]1 :insulated >= R-8 where duct is -; ❑Does Not
>=3 inches in diameter and >_ []Not Observable
R-6 where <3 inches.Supply and
return ducts in other portions of ' ro.❑Not Applicable ;
:the building insulated >= R-6 for 1
;diameter>=3 inches and R-4.2 ' ,
!for< 3 inches in diameter.
403.3.3.5;!Building cavities are not used as x ❑Complies
[F1115]3 Iducts or plenums. , Ki ❑Does Not
[]Not Observable
pF � ❑Not Applicable ;
403A: I HVAC piping conveying fluids : R- ; R- , pry:❑Complies
[FR17jz.:, !above 105 sF or chilled fluids ![]Does Not
+below 55°F are insulated to>_R-
i :❑Not Observable
13' :❑Not Applicable
403.4.1 :Protection of insulation on HVAC , ❑Complies ;
(FR24]1 piping., , F ❑Does Not
l ,
x �� ,'" m,.��i ;;• � ❑Not Observable :
[]Not Applicable
403 5.3.: 'I Hot water pipes are insulated to R- ; R- :❑Complies
(FR18P �j aR-3. ;❑Does Not
;❑Not Observable
❑Not Applicable
403:6 ';Automatic or gravity dampers are ❑Complies ;
[1711191z !installed on all outdoor air ❑Does Not
:'- %i intakes and exhausts. x<.❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3. Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01%28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 5 of10
15 John Clendon\1405 Rescheck.rck
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES-FHB Lot Page 6 of10
15 John Clendon\1405 Rescheck.rck
Section
Pla
14 , Insulation Inspection
Verified Field Verified
Complies? Comments/Assumptions,
& Req.ID Value Value '
303.1, ;All installed insulation is labeled j❑Complies
[IN13]2 or the installed R-values IE]Does Not
p .
rovided ❑Not Observable
,,❑Not Applicable
402.1.1, ;,Wall insulation R-value. If this is a: R- ; R- ;❑Complies ;See the Envelope Assemblies
402.2.5, ;mass wall with at least 1/2 of the 1❑ Wood ;❑ Wood ;❑Does Not table for values.
402.2.E I wall insulation on the wall ;El Mass ❑ Mass tNot Observable
[IN3]1 exterior,the exterior insulation ❑ Steel I❑ Steel I❑Not Applicable
U :requirement applies(FR10).
303.2 ;Wall insulation is installed per ❑Complies
[IN4]1 !manufacturer's instructions. ❑Does Not
❑Not Observable
I o• ,❑Not Applicable ;
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 7 of10
15 John Clendon\1405 Rescheck.rck
Section Plans.Verified Field'Verified y
#-- Final Inspection Provisions Value Value Complies? comments7?assumptions
&Req.ID
402.1.1, ;Ceiling insulation R-value. ; R- ; R- ;❑Complies ;See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not ;table for values.
402.2.2,
402.2,E ❑ Steel ❑ Steel ❑Not Observable
[Fill' ; ; ;❑Not Applicable
303.1.1.1,;Ceiling insulation installed per f "❑Complies
303.2 ;manufacturer's instructions. t
=`❑Does Not
[F1211 Blown insulation marked every
:300 ft2. i �, [:]Not Observable ;
I I ❑Not Applicable
402.2.3 ;Vented attics with air permeable ❑Complies
(F122]2 )insulation include baffle adjacent i a❑Does Not
:to soffit and eave vents that t ? " '
extends over insulation. ❑Not Observable
I EINot Applicable
402.2.4 ;Attic access hatch and door R- R- ;❑Complies
[F1311 :insulation >R-value of the :❑Does Not
adjacent assembly.
;❑Not Observable
❑Not Applicable
402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ;❑Complies
[F117]1 .ach in Climate Zones 1-2, and 1 :❑Does Not
<=3 ach in Climate Zones 3-8. ;❑Nat Observable
❑Not Applicable
403.2.3 ;Duct tightness test result of<=4 ; cfm/100 cfm/100 ;❑Complies
[FI4]1 lcfm/100 ft2 across the system or ft2 ft2 ;❑Does Not
<=3 cfm/100 ft2 without air ;❑Not Observable
handler @ 25 Pa. For rough-in
tests,verification may need to ; ;❑Not Applicable
;occur during Framing Inspection.
403.3.2 ;Ducts are pressure tested to cfm/100 ; cfm/100 ;❑Complies
[F]27]1 :determine air leakage with ft2 ft2 :❑Does Not
either: Rough-in test:Total
leakage measured with a ;❑Not Observable
pressure differential of 0.1 inch ; ;❑Not Applicable
w.g. across the system including ;
;the manufacturer's air handler ;
.enclosure if installed at time of
;test. Postconstruction test:Total
leakage measured with a
!pressure differential of 0.1 inch
w.g.across the entire system
;including the manufacturer's air
handler enclosure.
403.3.2.1 ;Air handler leakage designated 3 ❑Complies ;
[F124]1 .by manufacturer at<=2%of "°❑Does Not
design air flow. ''IE]Not Observable ;
I❑Not Applicable
403.1.1 ;Programmable thermostats } S❑Complies ;
[FI9]2„ installed for control of primary ! ❑Does Not
heating and cooling systems and `
I initially set by manufacturer to ❑Not Observable ,
I code specifications. ❑Not Applicable
403.1.2 ,Heat pump thermostat installed ❑Complies
[FI10]2 ion heat pumps. ❑Does Not
i ❑Not Observable ;
" t ❑Not Applicable
403.5.1 ;Circulating service hot water ❑Complies
[FI11]2 ;systems have automatic or i ❑Does Not
:accessible manual controls.
-❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 1 2 IMedium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES -.FHB Lot Page 8 of10
15 John Clendon\1405 Rescheck.rck
Section Plans�Verified Field Verified`
#. , Final Inspection Provisions „Value Value Complies? Comments/Assumptions
& Req.iD .
403.6.1 ;All mechanical ventilation system r ❑Complies
[FI21 !fans not part of tested and listed ( (❑Does Not
IHVAC equipment meet efficacy 1 o ❑Not Observable
-,and airflow limits.
I ',I❑Not Applicable ;
403.2 'Hot water boilers supplying heat ❑Complies
�u
[F1261z through one-or two-pipe heating ❑Does Not ;
jsystems have outdoor setback j
control to lower boiler water [-]Not Observable
]temperature based on outdoor I❑Not Applicable ;
"'temperature.
403.5.1.1 !Heated water circulation systems } ❑Complies
[F12$]2. jhave a circulation pump.The t - =I❑Does Not
;system return pipe is a dedicated
return pipe or a cold water supply ❑Not Observable
pipe. Gravity and therm-s- ❑Not Applicable
syphon circulation systems area;
not present.Controls for z , .j
circulating hot water system c
pumps start the pump with signal
-;for hot water demand within the
!occupancy. Controls
automatically turn off the pump
;when water is in circulation loop n
is at set-point temperature and
!no demand for hot water exists.
403.5 1:2 ;Electric heat trace systems ❑Complies
[FI29]2 - ,comply with IEEE 515.1 or UL ❑Does Not
Y kl .• i
515. Controls automatically +
adjust the energy input to the [:]Not Observable
heat tracing to maintain the '❑Not Applicable
;desired water temperature in the
piping, . 1
403.5.2. J Water distribution systems that ❑Complies
[FI30]� have recirculation pumps that ❑Does Not ;
pump water from a heated water
;supply pipe back to the heated ' '❑Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a ,
;demand recirculation water
;system. Pumps have controls
;that manage operation of the Ar"�
',pump and limit the temperature
!of the water entering the cold
;water piping to 1049F.
403 5.4' 1 Drain water heat recovery units ❑Complies
[FI31]2 !tested in accordance with CSA �❑Does Not
B55.1. Potable water-side
pressure loss of drain water heat ❑Not Observable ,
!recovery units < 3 psi for s ❑Not Applicable ;
!individual units connected to one ;
Iortwo showers. Potable water-
side pressure loss of drain water
!heat recovery units< 2 psi for
jindividual units connected to � `„,•��
Ithree or more showers. f
404.1 175%of lamps in permanent ;, ❑Complies
[FI6]1 fixtures or 75%of permanent ❑Does Not ;
;fixtures have high efficacy lamps '
Does not apply to low-voltage ❑Not Observable
lighting. ❑Not Applicable
404:1'.1, Fuel gas lighting systems have '❑Complies
[FI23]3` no continuous pilot light. ❑Does Not
❑Not Observable ;
J❑Not Applicable
1 High Impact(Tier 1) 2'1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES - FHB Lot Page 9 of10
15 John Clendon\1405 Rescheck.rck
Section
Plans Verified Field Verified
#. Final Inspection Provisions Complies? Comments/'dssumptions
&'Req.ID Value Value
i
401.3 ;`;Compliance certificate posted. ❑Complies
[FI7]2 i ❑Does Not
i ❑Not Observable
❑Not Applicable
303:3 ;Manufacturer manuals for ,°I❑Complies
[FI18]3 !mechanical and water heating ❑Does Not j
systems have been provided.
} ,,'`I❑Not Observable
-" ❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 01/28/19
Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects VE\1405 - DES- FHB Lot Page 10 of10
15 John Clendon\1405 Rescheck.rck
w
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 19.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass&Door Rating 1.1-Factor SHGC
Window 0.29
Door 0.29
Cooling;'Heating&
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments