Loading...
LGPC applicationNEWYORK|Lake GeorgeSuae“SE Park Commission FILE COPY BRUCE E.YOUNG DAVE WICK Chairman Executive Director Steven Seaboyer PO Box 197 Cleverdale,NY 12820 UI TOMLDING ‘&CODES Permit#5234-65-18 Wharf Construction/Modification Parcel #227.13-2-36 Town of Queensbury Dear Mr,Seaboyer: Enclosed is your permit which was issued in accordance with the applicable provisions ofthe Park Commission's rules and regulations (6 NYCRR 645 &646)and the Environmental Conservation Law.Please review the general and special conditions included in the permit;these are intended to minimize any environmental disturbance associated with the authorized activity. Please note that itis the responsibilty of the permittee and the permittee's agent to comply with all permit conditions. Further,the permit is valid only for the activity expressly authorized.Work beyond the scope of the permit shall be considered as work without a permit.The notice enclosed with the permit must be displayed in a conspicuous place near the project site during the entire petiod of construction and must be suitable protected from the elements.Any failure to comply withthe terms ofthe permit may be treated as a violation ofthe Environmental Conservation Law.Questions regarding this permit should be directed to the undersigned. Should your plans change,you must contact this office to determine whether a modification to the permit is required prior to initiating construction.Please note the expiration date of the permit.If further time is required to complete the project,you must request renewal of the permit prior to this date.Your interest in maintaining the environmental quality of Lake George is greatly appreciated by the Commission. Sincerely,ateES, Deputy Permit Administrator cc:Town of Queensbury Warren County Code Enforcement (boathouses only) Frankie De Nardo 75 Fort George Road,P.O,Box 749,Lake George,NY 12845 |518.668.9347 Fax:518.668.5001 |www lgpe-state.ny.us info@lgpc.state.ny.us LGPC Permit Number Effective Date 6234-5-18 DM 03/15/2018 _Stwyore Lake George Modification or Renewal Date -ween:|Park Commission cypelot enrat Expiration Date New 03/15/2019 C1 Meritcaton REnMIy al Under the Environmental Conservation LawVariance Fx]Atcle 43,Title 1,GNYCRR 646-1.1 Article 18,Title 8,6NYCRR 608.5 Construction and Modification of Wharts Article 43,Title 1,6NYCRR 646-1.1 Placement of Moorings Article 43,Title 1,(NYCRR 646-1.4 Recreational Use -New Article 43,Title 1,BNYCRR 646-1.4 Recreational Use -Seaplanes Article 43,Title 1,Section 43-0117 Operation of ferries Excavation and Placement of Fill in Navigable Waters Article 43,Title 1,6NYCRR 646-1.2 Operation and Modification of Class A Marinas Article 43,Title 1,6NYCRR 646-1.4 Recreational Use Parasail Article 43,Title 1,6NYCRR 646-1.4 Recreational Use -Tour Boat Article 43,Title 1,6NYCRR 646-4 and certain other boats,barges and vessels restricted. SY CRT DarT a ‘Stormwater Management Water Quality Certification Permit Issued to Telephone Number Steven Seaboyer 518-656-3047 Address of Permittee P.O Box 197 Cleverdale,NY 12820 Contact Person (if not permittee)Telephone Number Frankie De Nardo 361-3522 Facility Name Facility Address Private Lakefront 83 Rockhurst Rd County Warren Town Queensbury Parcel #227.13-2-36 AUTHORIZED ACTIVITY Install railings,deck and staircase on existing roof of boathouse in accordance with plans attached as ‘Schedule A and made part of this permit. By the acceptance of this permit,the permittee agrees that the permit is contingent upon strict compliance with the Environmental Conservation Law,the Navigation Law,all applicable regulations,and the General and Special Conditions included as part of this permit. Deputy Permit Administrator:Molly Gallagher Lake George Park Commission,PO Box 749,Lake George NY 12845,518-658-9347 Authorized Signature Date ;MMs a fis Page 1 of 5 GENERAL CONDITIONS 4.Allactiviies authorized by this permit must be in strict conformance with the plans attached as Schedule A and made part of this permit.Modifications to the project require prior approval in writing from the Commission. 2.The permittee and any contractor,project engineer,or other person responsible for the overall supervision of this project shall read,understand and comply with this permit, including all conditions to prevent environmental degradation. 3,The Commission and/or the Department of Environmental Conservation (the Department)may conduct such on-site surveys,investigations, ‘examinations,and evaluations from time-to-time as it ‘deems necessary to ensure compliance with the terms and conditions of this permit,and may conduct a final inspection at any time after construction to determine ‘compliance with the permit. 4,Accopy of this permit must be available at all times at the project site during performance of the authorized activities.Failure to produce a copy of the permit upon request by a Commission or a Department representative is a violation of this permit. 5.The permittee is responsible for keeping the permit ‘active by submitting a renewal application,including any forms,fees or supplemental information which may be required by the Commission,no later than 30 days prior to the expiration of this permit. 6.Any change or modification in any of the activities authorized by this permit is subject to prior review and approval by the Commission.Any modification of this permit granted by the Commission must be in writing and attached hereto. 7.The permittee is responsible for obtaining any other permits,approvals,land easements,and rights-of-way Which may be required for this activity. 8,Granting of this permit does not relieve the permittee of the responsibilty of obtaining any other permission, consent,permit,or approval from the US Army Corps of Engineers,US Coast Guard,NYS Office of General Services,NYS Department of Environmental Conservation,NYS Department of Health,Adirondack Park Agency,or local government which may be required. 9.This permit shall not be construed as conveying to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work or as authorizing the impairment of any rights,ttle or interest in real or personal property held or vested in a person not a party to the permit. 40.The permittee has accepted expressly,by the execution of the application,the full legal responsibilty of all damages,direct or indirect,or whatever nature,and by whomever suffered,arising out of the project described herein and has agreed to indemnify and save harmless the State from suits,actions,damages and costs of every name and description resulting from the said project. 11.The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation,or for other purposes,and no claim or right to compensation shall accrue from any such damage. 12.Regulatory fees are due April 1 of each year for docks,wharfs and moorings. 413.Wharfs and moorings authorized herein are for residential use only and shall not be used for commercial, association or marina purposes. Environmental Protection 414,Disturbance to the bed and banks of Lake George shall be kept to the minimum necessary to complete the project. 16.Allnecessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids,sediment,fuels,solvents,lubricants,epoxy coatings,paint,concrete,leachate or any other environmentally deleterious materials associated with the project. 16.Heavy equipment,including bulldozers,backhoes, payloaders,etc.,shall not be driven in the water. 17.Any material dredged in the prosecution of the work herein permitted shall be removed evenly,without leaving large refuse piles,ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to ‘cause damage to navigable channels or to the banks of a waterway. 48.Any debris or excess materials from construction of this project shall be immediately and completely removed from the bed and banks of all water areas to an appropriate upland area for disposal. 49.There shall be no unreasonable interference with navigation by the work herein authorized. 20.Wood treated with Creosote,Pentachlorophenol or CCA (Chromated Copper Arsenate)is prohibited for in-water and above-water use. LGPC Permit #:5234-5-18 Page 2 of 5 GENERAL CONDITIONS 21.if upon the expiration or revocation of this permit,the project hereby authorized has not been completed,the permittee shall,without expense to the State,and to such extent and in such time and manner as the Commission of the Department may require,remove all or any portion of the uncompleted structure or fill and restore the site to its former condition.No claim shall be made against the State of New York on account of any such removal or alteration. 22.If future operations by the State of New York require ‘an alteration in the position or the structure or work herein authorized,or if,in the opinion of the Commission or the Department,it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health,safety or welfare of the people of the State,or cause loss or destruction of the natural resources of the State,the owner may be ordered by the Commission or the Department to remove or alter the structural work,obstructions,or hazards caused thereby without expense to the State. Wharf Construction Specifications The following conditions apply to all newly constructed ‘wharfs which have not received a variance from any of these limits: 23.The location of the mean low water mark must be field verified prior to construction.In no case shall any part of the wharf extend further than 40'from the mean low water mark. 24,The maximum surface area of any dock or wharf shall be seven hundred square feet,including any walkway. 25,The maximum width of any pier shall be eight feet and the minimum width of any pier shall be two feet. 26.The maximum width of any dock or wharf,including all lateral projections,shall be forty feet. 27.No structure shall be constructed on a dock,wharf or mooring which exceeds sixteen feet in height above the mean high water mark and which is not in compliance with local zoning. 28.Every dock or wharf constructed shall have a minimum setback of twenty feet from the adjacent property line extended into the lake on the same axis as the property line runs onshore where it meets the lake,or atarightangletothemeanhigh-water mark,whichever results in the greater setback. Crib Work 29,Stone used for filing shall be clean (not contain any material than can pass through a No.8 sieve).The stone shall not be less than six (6)inches in diameter. 30.No rocks for use in construction are to come from the lake bed. The following specifications apply to the construction or replacement of rock-filled cribs.Existing cribs may be repaired, 31.The size of any individual crib shall not exceed8feet by 12 feet 32.Spacing between cribs shall not be less than 8 feet.A minimum of6feetofopenwatershallbemaintained between the shoreline and the first crib to allow for free circulation of water. 33.Completed cribs shall be of the “open-sided"type construction and provide for at least 40%unboarded water contact area to the rock fill. 34,If granted under 6NYCRR Part 608,the Lake George Park Commission hereby certifies that the subject project will not contravene effluent limitations or other limitations. of standards under Sections 301,302,303,306 and 307 of the Clean Water Act of 1977 (PL 9-217)provided that all of the conditions listed herein are met. Moorings 35.Moorings must mest the following minimum specifications:the buoy shall be all white with a one inch blue strip placed horizontally around the circumference above the water line and a one inch strip of reflector tape placed around the upper part of the buoy;at least one cubic foot of buoy is to be above the waterline. The following conditions apply to all new moorings which have not received a variance from any of these limits: 36,Moorings shall be placed so that vessels moored to them,at the full swing of their mooring or anchor line,will be no closer than twenty feet to the projection of the property lines extended into the lake along the axis of the property lines as they intersect the lake,or a line extended ata right angle to the mean high-water mark,whichever results in the greater setback. 37.Moorings shall not be placed so that the full swing of the vessel extends more than one hundred feet offshore from the mean high-water mark. Articulating Docks 38,Articulating docks must remain in the lowered position at all times between May 15 and November 1.Boat lifts and canopy frames shall be removed prior to lifting docks into the winter position. LGPC Permit #:5234-5-18 Page 3 of 5 3/1/2018 Site Inspection MG,JL Parcel 227.13-2-36,Town of Queensbury 83 Rockhurst Rd 1"=20'Drawn by MG Schedule A Page 4 of 5 Permit #5234-5-18 “uononjsuod Jo poled ay} 6uyinp sjuauisje ay} wos paj9a}04d »p adejd snonojdsuo; e UJ pa}sod aq Jsnw eoKOU SY) 6102 ‘SL Yue :uoHeZUOUjNY Jo syeq UOHeIIdxy safoqees UBAZJG :dod}PHIUllod BL-S-VETS :CI HWULed LV€6-899-81S ‘GP8ZL ‘AN 2610985 aye ‘6yZ XO Od 32 UOISSIWIWOD YJed e6109¢5) aye] BY} }9e}UOD ‘UOH}EWOJU! JOYLINY JO4 *9}S SIY} Je UOIDNIYSUOD JO UOI}EOIPOW ‘aredoai jueyM JO} ponssi useq sey wuued Wy :3OILON NOISSIININOD MYVd ADYOIAS AVI “ALINALOddO40 aLVIS HOA MAN i To the permittee: Please sign,fold,tape shut and return upon completion of the project. FOLD #2 Place Steven Seaboyer Stamp PO Box 197 Here Cleverdale,NY 12820 Lake George Park Commission PO Box 749 Lake George NY 12845 FOLD #1 Certification of Completion of Work Authorized By Permit #5234-5-18 issued on March 15,2018 Parcel #227.13-2-36,Town of Queensbury Project:Install railings,deck and staircase on existing roof of boathouse in accordance with plans attached as Schedule A and made part of this permit. The project authorized by the above referenced permit was completed on__/_/_. The dock was installed/constructed by x ‘Owner's Signature Date An inspection will be made once this form is received.The permit must be kept active during construction. NeWyORK|Lake George _Grom.|Park Commission 75 Fort George Road,P..Box 749,Lake George,NY 12845 |516.668 5347 Fax:518.668.5001 |www gpc.state.ny.us info@lgpe state.ny.us March 15,2018 NOTICE Owner;Steven &Debby Seaboyer Facility:Private Lakefront Address:83 Rockhurst Rd Parcel #:227.13-2-36,Town of Queensbury Lakefront:90.00 Account#:897 The enclosed permit 7A2authories __new mooring(s),__new whar(s),_new boalPWC lt andor -=3<2 dock modification,__mooring modification and __supercedes Existing Whar or Mooring # andior Permit # Once the permitted project is complete your annual registration fee will be For residential properties: mooring(s)_0 x $50. whari(s)_1 X $50.00 $0.00 New Account $50.00 2 No Change For Commercial or Association properties,fees may need fo be redetermined.