Loading...
proposed 73 Sheridan Street, Glens Falls, NY 12801 Phone-518-796-2515 December 17, 2015 Project# 222 Dave Hatin Code Enforcement Officer Town of Queensbury DEC 17 2015 742 Bay Road Queensbury, NY 12804 Re: Dean—Replacement Septic System Dear Dave: On December 17, 2015, I performed a deep soil test pit and percolation test at the Lands of Susan Dean located at 30 Parkview Avenue in Queensbury. The test was performed to the west of the existing residence in the location where construction of a new leach field is proposed. The residence has an existing failed septic system which will be decommissioned upon completion and certification of the replacement system. The results of the testing are as follows: Deep Soil Test Pit Percolation Test 0-10" Topsoil Stabilization percolation rate- I" in I min., 01 sec. 10—26" Loamy Medium Fine Sand 26—72" Medium Fine Sand Mottling observed at 52" F I L E COPY No groundwater observed The hole was presoaked and the test was run x times until it stabilized with three consecutive runs of 1:00, 1:01 and 1:01 respectively. The design flow for this 3 bedroom residence at 110 gpd per bedroom requires 347 sf of absorptive area. The new replacement absorption system should consist of the existing 1,000 gallon septic tank located west of the residence, a new distribution box, a 20 foot wide by 20 feet long absorption bed(400 sf) with 4— 15 foot long laterals located to the east of the residence. Please call me if you have any questions. Sincerely, TOWINI r;r QAt ;n ]Li) i;v &Thomas R. Center, PE F'Fvie,v%led By Date: INSTALLATION OF DISPOSAL FIELDS CONCRETE OR STONE APPROXIMATE MARKER ABOVE ALL 1. CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING, 6. ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL FINISH GRADE BUCoE covERs AND TO DIVERT SURFACE RUNOFF FROM ADJACENT AREAS AWAY __14RECOMMENDED. AND SHALL BE IN ACCORDANCE WITH THE N.Y.S. FROM THE DISPOSAL FIELD. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS, AND ASTM F481-76 INSTALLATION OF THERMOPLASTIC PIPE AND INLET BAFFLE 12'MIN. COVER OVER CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. 7. REMOVE LEAVES, ROOTS, PLANTS AND ORGANIC DEBRIS. PLOW SURFACE PRIOR if7TALL STRUCTURES TO SPREADING FILL MATERIAL. gg�� DISTRIBUTION BOX 2. NO HEAVY EQUIPMENT SHALL BE ALLOWED WITHIN THE LIMITS 9Y FORT MILLER OR OF THE DISPOSAL FIELDS AFTER PIPE INSTALLATION HAS BEGUN. 8. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION FIELD AREA. EQUAL MIN. SLOPE ®O 3. AFTER EXCAVATION OF ABSORPTION BED TO THE DEPTHS REQUIRED, 9. PLACE FILL AND ALLOW TO STABILIZE IN ACCORDANCE WITH NEW YORK STATE 1/a'PER FOOT MIN.SLOPE THE WALLS AND FLOOR OFABSORPTION BED SHOULD BE CLEANED DEPARTMENT OF HEALTH STANDARDS. 1/8'PER FOOT ALL OUTLET INVERTS AND RAKED TO ACHIEVE AN EVEN SURFACE AND TO LOOSEN EXISTNG 1.000 GAL SEPTIC TANK TO BE SET AT SMEARED SECTIONS OF TRENCH. vEt ELEVATITION. SAME 4. PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND UNTREATED BUILDING DISTRIBUTION BOX (USE OF SPEED LEVELERS PAPER OR STRAW SHALL BE AS SHOWN, AND CARE SHALL BE xrs ENCOURAGED) EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND OTHER WASTE MATERIAL IN THE STONE AND PIPE. 5. THE PIPE SHOULD BE LAID AT THE GRADES AND TO THE -3�jnIVNJIS RELATIONSHIPS SHOWN ON THIS DRAWING, MAINTAINIKOYSTRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED—JOINTS OR OTHER UNSUITABLE CONDITIONS. THE PIPE SHALL BE LAID _ a �� V3I�l WITH THE HOLES DOWN IN ALL CASES. VdVHJ',M SIH1 PJ 03 IIv, H EXISTING 1.000 SEPTIC TANK 01VNOS�Jld IMH 1 1N7W(lOOO SIH 1 ,noys N.T.S. old 'S3�N�J 'S73d1`SlIIPA'S3SnOH SV Hons Sloy90 ljv C'd� SSe N33S 3AVH I NyId� ( CI1ddS =1III. IIS—=1111= 0 6" MIN. 100 ft 50 ft j— INTERCONNECT ENDS 6" MIN. = BOTTOM OF BED 4" PERFORATED PVC OF LATERALS NEVA T- LATERAL, LAID LEVEL Y Q' THOWSR. �'� - STANDARD ABSORPTION BED PROFILE LANDS OF SUSAN DEAN CENTER,JR. N.T.S. 3 HOUSE O N N cli �p82282.1 SS1 20' WIDE X 20 FT LONG SWALE AT UPHILL SIDE EXISTING 1,000 GAL SEPTIC TANK-,,,, so ABSORPTION BED OF BED TO DRAIN RUNOFF PROPERTY =CL AWAY FROM BED SLOPED TO DRAIN UNE 10.0• 0 MIN. EARTH LANDS OF SUSAN DEAN GARAGE 6" TO 12" BACKFILL FILL FILTER FABRIC OR GEEgO�TpERXTTILE PLAf%% . 4" tTED cim DISTRIBUTION BOX 12"MAX. 00 100 ft 6" MIN. 000 3/4" TO 1 1/2" SEWAGE DISPOSAL LAYOUT— AS—BUILT 50 ft CRUSHED STONE , m ... 2'-6" 5'-O" 5'-0" 5'-0" 24" MIN.2'-6' NOTES: —_ — MAXIMUM 1. TILE FIELD TO BE 100'OR MORE FROM ANY - GROUNDWATER LAKE, SWAMP,DITCH OR WATERCOURSE AND 10' ELEVATION OR MORE FROM ANY WATER LINE UNDER PRESSURE OR IN-GROUND POOL ABSORPTION BED SECTION 2. FOR SEWAGE PIPE BETWEEN HOUSE AND DISTRIBUTION BOX USE DUCTILE OR CAST IRON PIPE, OR SCHEDULE 40 PVC WITH CEMENTED JOINTS. 3. DISCHARGE FOOTING,ROOFAND CELLAR DRAINAGE AWAY FROM SEWERAGE SYSTEM. DEAN RESIDENCE SEPTIC SYSTEM 4. DISPOSAL FIELD SHALL BE CONSTRUCTED PARALIEL CENTER PROJECT DETAILS WTH CONTOUR LINES. SERVICES 30 PARVIEW AVENUE 5. FOR RAISED ABSORPTION TRENCH SYSTEMS HORIZONTAL SEPARATION 73 SHERIDAN STREET DISTANCES SHALL BE MEASURED FROM THE EDGE OF THE FlLL QUEENSBURY, NY GLENS FALLS, NY aos #zzz scers: NOT TO scAr.E DATE: 12/17/15