Loading...
ResCheck GComplianceenerated by REScheck-Web Software 0 Certificate Project 0 Ridge road Energy Code: 2015 IECC Location: Warren County, New York Construction Type: Single-family 297.6-1-29 RC-0489-2019 Project Type: New Construction Beshara Enterprises LLC Conditioned Floor Area: 2,600 ft2 733 Ridge Rd Glazing Area 6 SFD 1301 s.f., Garage 391 s.f. Climate Zone: 6 (8499 HDD) g Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 0 Ridge road Beshara Enterprises LLC queenbury, ny 12804 4 Jon Kay Rd. Fort Edward, NY 12828 michaelbeshara2@yahoo.com Compliance: Passes using UA trade-off Compliance: 2.7%Better Than Code Maximum UA: 221 Your UA: 215 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA R-Value R-Value Perimeter Ceiling: Raised or Energy Truss 1,300 38.0 0.0 0.025 33 Main Floor Walls: Wood Frame, 16" o.c. 1,404 21.0 0.0 0.057 68 Front Door: Solid Door(under 50%glazing) 20 0.200 4 Fire Door: Solid Door(under 50%glazing) 18 0.200 4 Sliding Door: Glass Door(over 50%glazing) if it >- 40 0.280 11 Main Floor Windows: Vinyl Frame L=! - Ct U) 129 0.280 36 Ix]Li.] Basement: Solid Concrete or Masonry g (4O 981 0.0 19.0 0.041 39 Wall height: 8.0' N W U Depth below grade: 6.0' c Lu Insulation depth: 8.0' n n o N D Basement Windows: Vinyl Frame pub LLB? 32 0.280 9 LJ Basement: Solid Concrete or Masonry 0G 107 0.0 19.0 0.043 5 Wall height: 4.0' e�n�np Depth below grade: 3.5' L`"� •d Insulation depth: 4.0' I— Basement(back wall-wood portion): Wood Frame 107 21.0 0.0 0.060 6 Wall height: 4.0' Depth below grade: 0.0' Insulation depth: 4.0' Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 1 of10 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. /� d�le( . 60sti�,rg -Z e�n6g✓J *rrate J1 Lr 020i1,, i9 Name-Title ignature Date Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 2 of10 REScheck Software VersionChecklist: REScheck-Web 0 Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and EComplies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the 0 building envelope.Thermal ['Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable ** Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]z on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ['Not Observable u Btu/hr Btu/hr ❑Not Applicable approved by the code official. PP Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 3 of10 Section Plans Verified Field Verified Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Conditioned basement wall R- R- ElComplies See the Envelope Assemblies [FO4]1 insulation R-value. Where interior R_ R- ❑Does Not table for values. insulation is used, verification may need to occur during ['Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [FO5]1 insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft Complies See the Envelope Assemblies [FO6]1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [FO11]2 to protect exposed exterior ❑Does Not insulation and extends a minimum of 6 in. below grade. ❑Not Observable ❑Not Applicable 403.9 Snow-and ice-melting system Complies [FO12]2 controls installed. ❑Does Not :Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ['Not Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.5 ❑Not Observable [FR2P ❑Not Applicable 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or taken from the default table. ['Not Observable ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not instructions. ['Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ElDoes Not AAMA/WDMA/CSA 101/I.S.2/A440 ['Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]z sealed at housing/interior finish ❑Does Not and labeled to indicate s2.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.3.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= R-6 where < 3 inches. Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.5 Building cavities are not used as ElComplies [FR15]3 ducts or plenums. ❑Does Not :Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R- R- ❑Complies [FR17]z above 105°F or chilled fluids ❑Does Not below 55 °F are insulated to >R- ep 3 ❑Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies [FR24]1 piping. ❑Does Not ['Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]z installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ENot Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 5 of10 Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 6 of10 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values ❑Does Not provided. ['Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the El Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass El Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 7 of10 Section # Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel [Not Observable 402.2.6 [F11]1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. EDoes Not [F12]1 Blown insulation marked every 300 ft2. ❑Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies [F122]2 insulation include baffle adjacent ElDoes Not to soffit and eave vents that extends over insulation. ['Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies [FI3]1 insulation >_R-value of the ElDoes Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F117]1 ach in Climate Zones 1-2, and EDoes Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ElDoes Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in [Not Observable tests, verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test: Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated EComplies [F124]1 by manufacturer at <=2%of EDoes Not design air flow. ['Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed for control of primary ElDoes Not heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. EDoes Not ['Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies [FI11]2 systems have automatic or ElDoes Not accessible manual controls. [Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 8 of10 Section # Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 403.6.1 All mechanical ventilation system ❑Complies [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits. ['Not Observable ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies [FI26]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ['Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies [FI29]2 comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [F130]2 have recirculation pumps that ❑Does Not pump water from a heated water supply pipe back to the heated ['Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1044F. 403.5.4 Drain water heat recovery units EComplies [FI31]2 tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat ['Not Observable recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Does not apply to low-voltage ['Not Observable lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [FI23]3 no continuous pilot light. ❑Does Not ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies [FI7]2 ❑Does Not [Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not systems have been provided. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Ridge road Report date: 10/04/18 Data filename: Page 10 of10 c2015 IECC Energy ..(1 Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.28 Door 0.28 Heating & Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments