LGPC permit NEW PORK Lake George
STATE OF
OPPORTUNITY_ Park Commission
BRUCE E.YOUNG DAVE WICK
Chairman Executive Director
May 09, 2018
Jeffrey Randles
82 E Claremont Dr r
En gVoorheesville, NY 12186Permit# 5234-17-18 Standard Activity Permit
MAY 1 1 2018 1\2
Parcel# 239.12-2-11, Town of Queensbury Tp W�OF aUEENSBURY
BUILDING CODFS
Dear Mr. Randles: �1�\�`� �,,w: 'r
Enclosed is your permit for work below the mean high water level on supporting structures of existing wharfs.
This permit does not approve any modifications to the size,shape or location of the existing wharf.This permit was
issued in accordance with the applicable provisions of the Park Commission's rules and regulations (6 NYCRR 645
&646)and the Environmental Conservation Law. Please review the general and special conditions included in the
permit; these are intended to minimize any environmental disturbance associated with the authorized activity.
Please note that it is the responsibility of the permittee to comply with all permit conditions. Any failure to comply
with the terms of the permit may be treated as a violation of the Environmental Conservation Law. Questions
regarding this permit should be directed to Molly Gallagher of this office.
Should any aspect of the project change, you must contact this office to determine whether a modification to the
permit is required prior to initiating any change. Please note the expiration date of the permit and request renewal
of the permit prior to this date.
Your interest in maintaining the environmental quality of Lake George is greatly appreciated by the Commission.
Sincerely,
.,e5ti76(
Molly Gallagher
Deputy Permit Administrator
cc: Law Enforcement
Town of Queensbury
Frank De Nardo
75 Fort George Road.P.O.Box 749,Lake George.NY 12845 f 518.668.9347 Fax:518.668.5001 1 www.Igpc.state.ny.us i info@Igpc.state.ny.us
•
LGPC Permit Number Effective Date
5234-17-18 EFG 05/09/2018
Standard Activity Permit Modification or Renewal Date
NEW YORK Lake George
STATE OF OPPORTUNITY. Park Commission
Type of Permit lY'� Expiration Date
® New 05109f2019 y?.
❑ Renewal PERMIT
❑ Modification Under the Environmental Conservation Law
0 Variance
Article 43, Title 1, 6NYCRR 646-1.1 Article 15, Title 5, 6NYCRR 608.5
Construction and Modification of Wharfs X Excavation and Placement of Fill in Navigable Waters
Article 43, Title 1, 6NYCRR 646-1.1 Article 43, Title 1, 6NYCRR 646-1.2
Placement of Moorings Operation and Modification of Class A Marinas
Article 43, Title 1, 6NYCRR 646-1.4 Article 43,Title 1, 6NYCRR 646-1.4
Recreational Use- New Recreational Use- Parasail
Article 43, Title 1, 6NYCRR 646-1.4 Article 43, Title 1, 6NYCRR 646-1.4
Recreational Use-Seaplanes Recreational Use-Tour Boat
Article 43, Title 1, Section 43-0117 Operation of ferries Article 43, Title 1, 6NYCRR 646-4
and certain other boats, barges and vessels restricted. Stormwater Management
X 6 NYCRR Part 608
Water Quality Certification
Permit Issued to Telephone Number
Jeffrey Randles 518-894-1821
Address of Permittee
82 E Claremont Dr
Voorheesville, NY 12186
Contact Person(if not permittee) Telephone Number
Frank De Nardo 518-656-3625
Facility Name Facility Address
Private Lakefront 42 Old Assembly Point Road
County Warren Town Queensbury Parcel# 239.12-2-11
AUTHORIZED ACTIVITY
Repair cribs, piles or other structures for legally existing wharfs on Lake George as shown on the plans
attached as Schedule A and made part of this permit. No change in size, shape or location of existing
wharf(s) is authorized.
By the acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance
with the Environmental Conservation Law, the Navigation Law, all applicable regulations, and the General
and Special Conditions included as part of this permit.
Deputy Permit Administrator: Molly Gallagher
Lake George Park Commission, PO Box 749, Lake George NY 12845, 518-668-9347
Authorized Si ature Date
` /��� 4/7 (! Page 1 of 4
GENERAL CONDITIONS
1. All activities authorized by this permit must be in strict 10. The permittee has accepted expressly, by the
conformance with the plans attached as Schedule A and execution of the application, the full legal responsibility of
made part of this permit. Modifications to the project all damages, direct or indirect, or whatever nature, and by
require prior approval in writing from the Commission. whomever suffered, arising out of the project described
herein and has agreed to indemnify and save harmless
2. The permittee and any contractor, project engineer, or the State from suits, actions, damages and costs of every
other person responsible for the overall supervision of this name and description resulting from the said project.
project shall read, understand and comply with this permit,
including all conditions to prevent environmental 11. The State of New York shall in no case be liable for
degradation. any damage or injury to the structure or work herein
authorized which may be caused by or result from future
3. The Commission and/or the Department of operations undertaken by the State for the conservation or
Environmental Conservation (the Department) may improvement of navigation, or for other purposes, and no
conduct such on-site surveys, investigations, claim or right to compensation shall accrue from any such
examinations, and evaluations from time-to-time as it damage.
deems necessary to ensure compliance with the terms
and conditions of this permit, and may conduct a final 12. Regulatory fees are due April 1 of each year for
inspection at any time after construction to determine docks,wharfs and moorings.
compliance with the permit.
13. Wharfs and moorings authorized herein are for
4. A copy of this permit must be available at all times at residential use only and shall not be used for commercial,
the project site during performance of the authorized association or marina purposes.
activities. Failure to produce a copy of the permit upon
request by a Commission or a Department representative Environmental Protection
is a violation of this permit. 14. Disturbance to the bed and banks of Lake George
shall be kept to the minimum necessary to complete the
5. The permittee is responsible for keeping the permit project.
active by submitting a renewal application, including any
forms, fees or supplemental information which may be 15. All necessary precautions shall be taken to preclude
required by the Commission, no later than 30 days prior to contamination of any wetland or waterway by suspended
the expiration of this permit. solids, sediment, fuels, solvents, lubricants, epoxy
coatings, paint, concrete, leachate or any other
6. Any change or modification in any of the activities environmentally deleterious materials associated with the
authorized by this permit is subject to prior review and project.
approval by the Commission. Any modification of this
permit granted by the Commission must be in writing and 16. Heavy equipment, including bulldozers, backhoes,
attached hereto. payloaders, etc., shall not be driven in the water.
7. The permittee is responsible for obtaining any other 17. Any material dredged in the prosecution of the work
permits, approvals, land easements, and rights-of-way herein permitted shall be removed evenly, without leaving
which may be required for this activity. large refuse piles, ridges across the bed of a waterway or
floodplain or deep holes that may have a tendency to
8. Granting of this permit does not relieve the permittee cause damage to navigable channels or to the banks of a
of the responsibility of obtaining any other permission, waterway.
consent, permit, or approval from the US Army Corps of
Engineers, US Coast Guard, NYS Office of General 18. Any debris or excess materials from construction of
Services, NYS Department of Environmental this project shall be immediately and completely removed
Conservation, NYS Department of Health,Adirondack from the bed and banks of all water areas to an
Park Agency, or local government which may be required. appropriate upland area for disposal.
9. This permit shall not be construed as conveying to the 19. There shall be no unreasonable interference with
permittee any right to trespass upon the lands or interfere navigation by the work herein authorized.
with the riparian rights of others in order to perform the
permitted work or as authorizing the impairment of any 20. Wood treated with Creosote, Pentachlorophenol or
rights, title or interest in real or personal property held or CCA(Chromated Copper Arsenate) is prohibited for
vested in a person not a party to the permit. in-water and above-water use.
LGPC Permit#: 5234-17-18 Page 2 of 4
GENERAL CONDITIONS
21. If upon the expiration or revocation of this permit, the
project hereby authorized has not been completed, the
permittee shall, without expense to the State, and to such
extent and in such time and manner as the Commission
or the Department may require, remove all or any portion
of the uncompleted structure or fill and restore the site to
its former condition. No claim shall be made against the
State of New York on account of any such removal or
alteration.
22. If future operations by the State of New York require
an alteration in the position or the structure or work herein
authorized, or if, in the opinion of the Commission or the
Department, it shall cause unreasonable obstruction to
the free navigation of said waters or flood flows or
endanger the health, safety or welfare of the people of the
State, or cause loss or destruction of the natural
resources of the State, the owner may be ordered by the
Commission or the Department to remove or alter the
structural work, obstructions, or hazards caused thereby
without expense to the State.
Water Quality Certification
23. If granted under 6NYCRR Part 608, the Lake George
Park Commission hereby certifies that the subject project
will not contravene effluent limitations or other limitations
or standards under Sections 301, 302, 303, 306 and 307
of the Clean Water Act of 1977 (PL 95-217) provided that
all of the conditions listed herein are met.
Crib Work
24. Stone used for filling shall be clean (not contain any
material than can pass through a No. 8 sieve). The stone
shall not be less than six(6) inches in diameter.
25. No rocks for use in construction are to come from the
lake bed.
The following specifications apply to the construction or
replacement of rock-filled cribs. Existing cribs may be
repaired.
26. The size of any individual crib shall not exceed 8 feet
by 12 feet.
27. Spacing between cribs shall not be less than 8 feet.
A minimum of 6 feet of open water shall be maintained
between the shoreline and the first crib to allow for free
circulation of water.
28. Completed cribs shall be of the"open-sided"type
construction and provide for at least 40% unboarded
water contact area to the rock fill.
LGPC Permit#: 5234-17-18 Page 3 of 4
1
i
\ .'Vo\
c ,.ick noP`)S.
cft%*
16.Qt
\ L
1
21 t4 t 2c" 6' F'
�
-)..3.9f N 116-
A`
VI.2' r
3
d
nd Y,0,--
0
0
i
5/8/2018 Site Inspection MG Schedule A
Parcel 239.12-2-11 Town of Queensbury Page 4 of 4
1"=10' drawn 5/9/2018 MG Permit #5234-17-18
42 Old Assembly Point Rd
7I
! EWYORK
STATE OF
OPPORTUNITY_
LA
GEORGE PARK
COMMISSION
NOTICE : A permit has been issued for wharf repair,
modification or construction at this site. For further
information, contact the Lake George Park Commission
at PO Box 749, Lake George NY, 12845, 518-668-9347
11
Permit ID: 5234-17-18
Permittee: Jeffrey Randles
Expiration Date of Authorization: May 09, 2019
This notice must be posted in a conspicuous place & protected from the elements during
fl
the period of construction.
To the permittee:
Please sign, fold, tape shut and return upon completion of the project.
FOLD #2
Place
Jeffrey Randles Stamp
82 E Claremont Dr Here
Voorheesville, NY 12186
Lake George Park Commission
PO Box 749
Lake George NY 12845
FOLD #1
Certification of Completion of Work Authorized By Permit#5234-17-18
issued on May 09, 2018 Parcel #239.12-2-11, Town of Queensbury
Project: Repair cribs, piles or other structures for legally existing wharfs on Lake George
as shown on the plans attached as Schedule A and made part of this permit.
No change in size, shape or location of existing wharf(s) is authorized.
The project authorized by the above referenced permit was completed on / / .
The dock was installed/constructed by .
X
Owner's Signature Date
An inspection will be made once this form is received. The permit must be kept active during
construction.