Loading...
Subdivision.Approval.Resolution n uCCn.bur. ('omn III miu UC\�I�,hnr.nl � 111ic� Town of Queensbury Planning Board RESOLUTION—Approve Subdivision Final Stage 2-2018 TYLER LINGEL Subdivision Tax Map ID: 290.9-1-4/Property Address: Rockwell Road/Zoning: Hiland PUD A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a two lot subdivision of a 62.9 acre parcel — Lot A to be 5.0 acres and Lot B to be 57.9 acres. Construction of a single family home on Lot A to tie into existing utilities and have access on Overlook Drive. Pursuant to Chapter 183 of the Zoning Ordinance, subdivision of land shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; A public hearing was scheduled and held on 03/20/2018; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE SUBDIVISION FINAL STAGE 2-2018 TYLER LINGEL. Introduced by David Deeb who moved for its adoption. 1. The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative Declaration; and if the application is a modification, the requirements of the State Environmental Quality Review Act have been considered, and the proposed modification[s] do not result in any new or significantly different environmental impacts, and,therefore, no further SEQRA review is necessary; 2. Waiver requests arg nted: stormwater mgmt., grading, landscaping& lighting plans; 3. The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff 4. Engineering sign-off required prior to signature of Planning Board Chairman. 5. The applicant must submit a copy of the following to the Town: a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit or for coverage under an individual SPDES prior to the start of any site work. b) The project NOT (Notice of Termination)upon completion of the project; and 6. The applicant must maintain on their project site,for review by staff: a) The approved final that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; and b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. Page 1 of 2 Phone: 518.761.8220 I Fax: 518.745.4437 1742 Bay Road,Queensbury,NY 128041 www.queensbury.net 7. Final approved plans, in compliance with the Subdivision, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. 8. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. 9. Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; 10. As-built plans to certify that the subdivision is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy; Motion seconded by John Shafer. Duly adopted this 201 day of March, 2018 by the following vote: AYES: Mr. Shafer, Mr.Hunsinger, Mr. Magowan, Mr. Valentine, Mr. Deeb,Ms. White, Mr. Traver NOES: NONE Page 2 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road,Queensbury,NY 12804 1 www.queensbury.net