Loading...
Erosion Control Plan Unit Construction �-- LP -� „--__ � � ' GAS PAIN—T ---- LIP GAP WATER VALVE `�. ® \ GAS PANT G �_PAIN — V ARNTON VERIZION L oca noN zs' slpE SE �.` I y I PAINT VERIZION• DUMPSTER, / crc PAINT VERI AREA ° PAINT PVC ENQIE WV t 1 j -V \ , � I � - � � \� ELEC I / / \ RANS RME TP7 WATERLIN P - E INE GUI POST / �ti / / / (TYPFCAL) \ \ / CN N O' 448 I / /+I T T TIT / END OF DISTURBANCE '1 I I I T T T SlL T FENCE / / / — I 44 \ ___ T dr W TERLINE ..� �I I TP6 T E � -A _ LIMIT OF / LP / // ` / 'ti l� e I I. DISTURBANCE I J i PERMANENT BUFFER ON NORTH ' I I FF - 447.g I / ,� �c'� I� N SIDE OF UTILITY EASEMENT 41 / i �n RAN CON UCTI / � / / � s� i ,,.r \ � ` "`► - £ + _� 44 Al`tiI X NCE F)EALONG TER INE EA SILT F1ENCE I^O \ d �443\ 35 7NG E ASEM NT FOR WATERLINES OOK OF DEEDS 26, PAGE 37) a F GLENS FALLS WATER EASEMENT \ I / / ♦ o \ I I 50Rl 40, I `� / / .}. '' /% // // \ ,- / / ,,% ♦ � � � � I it I I III I ��I � / / ,// ',� � � 4efLn I II I I L II► I I I I l I i •` �! ���� l _I Az 1 l I\\\ \/\\�\\\\i\\\ \\\\\\ I�I ►II,�I�I LI iII 1� II� �II �IIII 9II �IJI'CI�I I1 / I/// /// /1 /q /// �l l l// / / ,/ � } � 2`x2'MIN. END OF WOODEN E SILT FENCE N ' MAx/ If fiP FENCE �r / AMOCO380 O R EQUAL_ TP 3 4"MIN. MANUFACTURERS CTURERS E PER \ Y � %� / / � / �� RECOMMENDA I10NS GUY WI ROAD CLEANING SHALL_0CCUR AT THE ' l I l ` I If 448 I / �/ / // �� --_I \ END OF EACH CONSTRUCnOTV'6�!? 1F� -�.j�_ s / (�` / -QR)' SWEEPING DOES NOT CLEAN THE I ' � / i / ` � � FLOW RZOALYSURFACE' ADDI nONAL MEASURES - .� �' ( 45 I SILT FENCE / 16'MIN. / \ y (TYPICAL) �CLUDING WEt(SWEEEPING SHALL BE h� �• � � 452 P P N M E PL0Ea " �` \ \/y ,ll a� / LAP FABRIC 6'MIN. wH , ` ' - —30 r RbIdT�E. \\ y 454 / I. ' / / / / I \ & FOLD AT JOINTS if \ C8°48 SO„ E GUY 4' E I \ — l '1 -�L/MIT OF OF I \ l 4s 1 DISTURBANCE6' rOE IN MIN FOR / \ ' � AREA, B / SIL SOP FENCE WIRE T FENCE I ; / / / / 18' FABRIC THE CONTRACTOR SHALL AS A MINIMUM IMPLEMENT THE \ P NMRE- FOLLOWING EROSION AND SEDIMENT CONTROL MEASURES: 1,333 8 GUX E I I O ° AND MAINTENANCE OF EROSION AND l SlL T FENCE DETAIL a, -CONSTRUCTION _ �`! SEDIMENT CONTROL MEASURES IN ACCORDANCE WI7H THE —452 PP NM 9 �' / / NOTE NTS N NEW YORK GUIDELINES FOR URBAN EROSION AND _ SEDIMENT CONTROL. / �� r - - SILT FENCES ARE SHOWN IN DRIVEWAY AREAS. THOSE FENCES SOIL EROSION AND STABILIZATION: f / \i �— �� /i_ / ARE TO BE UTILIZED FOR INITIAL GRADING PURPOSES CONTROL I x \ _ i � o -INSTALLATION OF EROSION AND SEDIMENT SHOWN ON THE PLANS AND AS NEEDED 1. PLANS SHOW TEMPORARY SOIL EROSION _VD , � � r� AND REMOVED AS NEEDED AS CONSTRUCTION PROGRESSES. MEASURES AS x- DURING THE GENERAL COURSE OF WORK. STABILIZATION MEASURES WHICH SHALL MAINTAINED \ -PRIOR TO SITE DISTURBANCE, EROSION AND SEDIMENT UNTIL ALL AREAS ARE STABILIZED. / CONTROL MEASURES SHALL BE IN-PLACE. 0 2. THE CONTRACTOR SHALL BE RESPONSIB.� TO SEED AND Ln TEMPORARY INSTALLATION OF STABILITY CONSTRUCT70N MULCH (OR HYDROSEED). THE OWNER S-=_L BE c PADS AT ALL LOCATIONS WHERE CONSTRUCTION VEHICLES PUBLIC STREETS RESPONSIBLE TO PROVIDE AN ADEQUA TL r,'A TER SOURCE � Lu a WOULD ENTER ONTO AND HOSES AND GERMINATION OF THE = =D. THE r w -EXCA VA TION WORK TO BE CARRIED OUT DURING PERIODS CONTRACTOR SHALL NOT BE RESPONSl6_- FOR WAT ERING ,� o ALTERATION OF THIS EROSION CON TROL PLAN OF INCLEMENT WEATHER SHALL REQUIRE ADDIT71ONAL UNLESS THE CONTRACT STATES SUCH. a a DOCUMENT RO ES BY A of EROSION CONTROL MEASURES AS MAY BE NECESSARY LICENSED P ENGINEER IS ILLEGAL ROFESSIONAL UNIT CONSTRUCTION N BASED ON CONDITIONS. J. SOIL EROSION /N SAND WILL OCCUR AF-`= EVERY ;� m ' RAINFALL UNTIL TURF IS ESTABLISHED. SHALL BE THE OOD APARTMENTS Ln -STABILIZATION OF PROPOSED ASPHALT AREAS BY OWNERS RESPONSIBILITY TO REPAIR ER( )N AFTER EVERY COMPACTION AND APPLICATION OF SUBBASE WITHIN TWO RAINFALL. FAILURE TO REPAIR MINOR E= -SION WILL WEEKS AFTER UTILI TES ARE INSTALLED. RESULT /N MAJOR EROSION AND POSSIE_ - PAVEMENT AND BURKE DRI I/E '= -VEGETATIVE STABILIZATION OF DISTURBED AREAS STRUCTURE FAILURE. THE ENGINEER SH=__ NOT BE ~ w z ®� ME�j' TOWN OF QUEENSBURY WARREN COUNTY a� a_ INCLUDING R.O.W. AND EASEMENTS WITHIN TWO WEEKS OF RESPONSIBLE /F EROSION OCCURS. a o ��e" � FINAL GRADING. STATE of NEW YORK 4. ADDITIONAL EROSION CONTROL METHODS JCLUDING SAIL Lu -WEEKLY INSPECT7ON OF EROSION AND SEDIMENT CONTROL MENT OF S-=',E PLACEMENT GRAPHIC SCALE Cr W * �c�. WEEKL STABILIZATION MATS, PLACE MEASURES AND DOWNSTREAM PROPERTIES TO DETERMINE ENGINEERS "' OF SOIL MA Y BE REQUIRED DUE TO CLI'.� TIC CONDITIONS Z fV 40 0 20 40 80 7E Q O � 2 � D N EFFECTIVENESS, IMPLEMENTATION OF ADD177ONAL 3 SURVEYORS THEIR EFFECT!VE (EXCESS RAIN, ETC.) THE ENGINEER Sr _L NOT BE MEASURES AS NECESSARY TD PR07ECT ADJACENT AND RESPONSIBLE FOR ANY COSTS ASSOCIA__ WITH THE � � 411 Union Street Schenectady, N.Y. 12305 DOWNSTREAM PROPERTIES AS DETERMINED BY THE DESIGN EXTRA MEASURES AND IT SHALL NOT E- ONSIOERED AN ENGINEER AND OR INSPECTOR. PLAN IF i- E ADDITIONAL 518-377-0315 Fax.518-377-0379 / OMISSION OR ERROR ON THE ( IN FEET ) MEASURES ARE NOT SPECIFIED INITIALL`. 1 inch = 40 ft. N o T.Y.S. C. AE NO. , P.E. DATE: SCALE: DWG SHEET OF as -INSPECTION PER THE N.O.I./S.WP.P.P. z N.Y.S. LICENSE N0. 61836 JANUARY 16, 2013 1" = 40' 4225A-S2 5 7 ,