Erosion Control Plan Unit Construction �-- LP -� „--__ � � ' GAS PAIN—T ----
LIP
GAP WATER VALVE `�. ® \ GAS PANT G �_PAIN — V ARNTON VERIZION
L oca noN zs' slpE SE �.` I y I PAINT
VERIZION• DUMPSTER,
/ crc PAINT VERI AREA
° PAINT
PVC
ENQIE
WV
t 1
j -V \ , � I � - � � \� ELEC I
/ / \ RANS RME
TP7 WATERLIN P
- E INE GUI POST / �ti / / / (TYPFCAL) \ \ / CN N
O'
448
I / /+I T T TIT / END OF
DISTURBANCE '1 I I I T T T SlL T FENCE / / / — I 44
\ ___ T
dr W TERLINE ..� �I I TP6
T E � -A
_ LIMIT OF
/ LP / // ` / 'ti l� e I I. DISTURBANCE I
J
i PERMANENT BUFFER ON NORTH ' I I FF - 447.g I / ,� �c'� I� N
SIDE OF UTILITY EASEMENT
41
/ i
�n
RAN CON UCTI / � / / � s� i ,,.r \ � ` "`► -
£ + _� 44 Al`tiI X
NCE F)EALONG TER
INE EA
SILT F1ENCE I^O \ d
�443\
35
7NG E ASEM NT FOR WATERLINES
OOK OF DEEDS 26, PAGE 37) a
F GLENS FALLS WATER EASEMENT \ I /
/ ♦ o \ I I 50Rl 40,
I
`� / / .}. '' /% // // \ ,- / / ,,% ♦ � � � � I it I I III I ��I � / / ,// ',� � �
4efLn
I II I I L II► I I I I l I i •` �! ���� l _I
Az 1 l I\\\ \/\\�\\\\i\\\ \\\\\\ I�I ►II,�I�I LI iII 1� II� �II �IIII 9II �IJI'CI�I I1 / I/// /// /1 /q /// �l l l// / / ,/ � }
� 2`x2'MIN.
END OF WOODEN
E
SILT FENCE N ' MAx/ If
fiP FENCE
�r / AMOCO380 O R EQUAL_
TP 3 4"MIN. MANUFACTURERS
CTURERS E PER
\ Y � %� / / � / �� RECOMMENDA I10NS
GUY WI ROAD CLEANING SHALL_0CCUR AT THE ' l I l ` I If
448 I / �/ / // �� --_I
\ END OF EACH CONSTRUCnOTV'6�!? 1F� -�.j�_ s /
(�` /
-QR)' SWEEPING DOES NOT CLEAN THE I ' � / i / ` � � FLOW
RZOALYSURFACE' ADDI nONAL MEASURES - .� �' ( 45 I SILT FENCE /
16'MIN.
/ \ y (TYPICAL)
�CLUDING WEt(SWEEEPING SHALL BE h�
�• � � 452
P P N M E PL0Ea " �` \ \/y ,ll a� / LAP FABRIC 6'MIN.
wH , ` ' - —30 r RbIdT�E. \\ y 454 / I. ' / / / / I \ & FOLD AT JOINTS if
\ C8°48 SO„ E GUY 4' E I \ —
l '1 -�L/MIT OF
OF I \ l 4s 1 DISTURBANCE6' rOE IN MIN FOR
/
\ ' � AREA, B / SIL SOP FENCE
WIRE T FENCE I ; / / / / 18' FABRIC
THE CONTRACTOR SHALL AS A MINIMUM IMPLEMENT THE \ P NMRE-
FOLLOWING
EROSION AND SEDIMENT CONTROL MEASURES: 1,333 8 GUX
E
I
I O
° AND MAINTENANCE OF EROSION AND l SlL T FENCE DETAIL
a, -CONSTRUCTION _
�`! SEDIMENT CONTROL MEASURES IN ACCORDANCE WI7H THE —452
PP NM 9 �' / / NOTE
NTS
N NEW YORK GUIDELINES FOR URBAN EROSION AND _
SEDIMENT CONTROL. / �� r
- - SILT FENCES ARE SHOWN IN DRIVEWAY AREAS. THOSE FENCES
SOIL EROSION AND STABILIZATION: f / \i �— �� /i_ / ARE TO BE UTILIZED FOR INITIAL GRADING PURPOSES
CONTROL I x \ _ i �
o -INSTALLATION OF EROSION AND SEDIMENT
SHOWN ON THE PLANS AND AS NEEDED 1. PLANS SHOW TEMPORARY SOIL EROSION _VD , � � r� AND REMOVED AS NEEDED AS CONSTRUCTION PROGRESSES.
MEASURES AS x-
DURING THE GENERAL COURSE OF WORK. STABILIZATION MEASURES WHICH SHALL MAINTAINED \
-PRIOR TO SITE DISTURBANCE, EROSION AND SEDIMENT UNTIL ALL AREAS ARE STABILIZED. /
CONTROL MEASURES SHALL BE IN-PLACE.
0 2. THE CONTRACTOR SHALL BE RESPONSIB.� TO SEED AND
Ln TEMPORARY INSTALLATION OF STABILITY CONSTRUCT70N
MULCH (OR HYDROSEED). THE OWNER S-=_L BE
c PADS AT ALL LOCATIONS WHERE CONSTRUCTION VEHICLES
PUBLIC STREETS RESPONSIBLE TO PROVIDE AN ADEQUA TL r,'A TER SOURCE � Lu
a WOULD ENTER ONTO AND HOSES AND GERMINATION OF THE = =D. THE r
w -EXCA VA TION WORK TO BE CARRIED OUT DURING PERIODS CONTRACTOR SHALL NOT BE RESPONSl6_- FOR WAT
ERING ,� o ALTERATION OF THIS EROSION CON TROL PLAN
OF INCLEMENT WEATHER SHALL REQUIRE ADDIT71ONAL UNLESS THE CONTRACT STATES SUCH. a a DOCUMENT RO ES BY A
of
EROSION CONTROL MEASURES AS MAY BE NECESSARY LICENSED P ENGINEER IS ILLEGAL
ROFESSIONAL UNIT CONSTRUCTION
N BASED ON CONDITIONS. J. SOIL EROSION /N SAND WILL OCCUR AF-`= EVERY ;� m
' RAINFALL UNTIL TURF IS ESTABLISHED. SHALL BE THE OOD APARTMENTS
Ln -STABILIZATION OF PROPOSED ASPHALT AREAS BY OWNERS RESPONSIBILITY TO REPAIR ER( )N AFTER EVERY
COMPACTION AND APPLICATION OF SUBBASE WITHIN TWO RAINFALL. FAILURE TO REPAIR MINOR E= -SION WILL
WEEKS AFTER UTILI TES ARE INSTALLED. RESULT /N MAJOR EROSION AND POSSIE_ - PAVEMENT AND BURKE DRI I/E
'= -VEGETATIVE STABILIZATION OF DISTURBED AREAS
STRUCTURE FAILURE. THE ENGINEER SH=__ NOT BE ~
w z ®� ME�j' TOWN OF QUEENSBURY WARREN COUNTY
a� a_
INCLUDING R.O.W. AND EASEMENTS WITHIN TWO WEEKS OF RESPONSIBLE /F EROSION OCCURS. a o ��e"
� FINAL GRADING. STATE of NEW YORK
4. ADDITIONAL EROSION CONTROL METHODS JCLUDING SAIL
Lu -WEEKLY INSPECT7ON OF EROSION AND SEDIMENT CONTROL MENT OF S-=',E PLACEMENT GRAPHIC SCALE Cr W * �c�.
WEEKL STABILIZATION MATS, PLACE
MEASURES AND DOWNSTREAM PROPERTIES TO DETERMINE ENGINEERS
"' OF SOIL MA Y BE REQUIRED DUE TO CLI'.� TIC CONDITIONS Z
fV 40 0 20 40 80 7E Q O � 2 � D
N EFFECTIVENESS, IMPLEMENTATION OF ADD177ONAL 3 SURVEYORS
THEIR EFFECT!VE (EXCESS RAIN, ETC.) THE ENGINEER Sr _L NOT BE
MEASURES AS NECESSARY TD PR07ECT ADJACENT AND
RESPONSIBLE FOR ANY COSTS ASSOCIA__ WITH THE � � 411 Union Street Schenectady, N.Y. 12305
DOWNSTREAM PROPERTIES AS DETERMINED BY THE DESIGN EXTRA MEASURES AND IT SHALL NOT E- ONSIOERED AN
ENGINEER AND OR INSPECTOR. PLAN IF i- E ADDITIONAL 518-377-0315 Fax.518-377-0379
/ OMISSION OR ERROR ON THE ( IN FEET )
MEASURES ARE NOT SPECIFIED INITIALL`. 1 inch = 40 ft. N o T.Y.S. C. AE NO. , P.E. DATE: SCALE: DWG SHEET OF
as
-INSPECTION PER THE N.O.I./S.WP.P.P. z N.Y.S. LICENSE N0. 61836 JANUARY 16, 2013 1" = 40' 4225A-S2 5 7
,