Loading...
ResCheck k' EScheck So ware Version 4.6.4 Compliance Certificate Project Energy Code: 2015 IECC 295.15Foothills B-2-41 Location: Glens Falls, New York uilders LLCRC-03238-2019 Construction Type: Single-family 40 John Clendon Rd, Lot 4 Project Type: New Construction Conditioned Floor Area: 1,644 ft2 SFD W/gas FP 1644 s.f., Gal: 470 s.f. Glazing Area 14% ------ Climate Zone: 6 (7635 HDD) ------- --------- Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: (� Foothills Builders Daniel W. Ryan P.E. FILE COPY 40 John Clendon Drive 206 Glens Street Lot 4 Suite 30 Queensbury, NY 12804 Glens Falls, NY 12801 Compliance: 0.0%Better Than Code Maximum CA: 276 Your CA: 276 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. REVIEWED E\/IEWEt FOR Envelope Assemblies ENERGY CODE COMPLIANCE Grass Area cavity Cont. Assembly Perimeter Vatue ��Yard U-Fa'�tar A Wall 1: Wood Frame, 16" o.c. 1,734 21.0 0.0 0.057 84 Window 1: Vinyl Frame:Double Pane with Low-E 186 0.290 54 Door 1: Glass 40 0.290 12 Door 2: Solid 18 0.140 3 Door 3: Solid 20 0.240 5 Ceiling 1: Raised or Energy Truss 1,644 38.0 0.0 0.025 41 Basement Wall 1: Solid Concrete or Masonry 1,514 0.0 15.0 0.046 69 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2: Vinyl/Fiberglass Frame:Double Pane 7 0.400 3 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 ECEnWE • APR 2 2 L2O191BJ TOWN OF QUEENSBURY BUILDING&CODES Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 1 of10 Clendon Lot 4\1429 Rescheck.rck 4- Compliance Statement: The proposed building design described here is consistent with the building plans, specifications,and other calculations submitted with the permit application.The proposed buil has been d ed o meet the 2015 IECC requirements in REScheck Versio 4.6.4 and omply with the mandatory require ents I sted in RESch ck I ion Checkl. t. Name-Title Signature Da --A_-17-V, )—\\ ig * i a , 079O6',' �? • Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 2 of10 Clendon Lot 4\1429 Rescheck.rck REScheek Software Version s 6.4 a Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions &RecidD 103.1, ;Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the building envelope.Thermal ['Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ;❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]i lighting and mechanical systems. , . ❑Not Observable Systems serving multiple IONot Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1 .Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 :sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR212 Eon loads calculated per ACCA Cooling: Cooling: '[:]Not Observable ,o :Manual) or other methods Btu/hr Btu/hr Ap ;approved by the code official. ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 3 of10 Clendon Lot 4\1429 Rescheck.rck r See:tron. Plans Verified Field Verified # Foupdation inspection Valueal Value Compiles? Comments/Assumptio ts.'_ &'RegJt . 402.1.1 Conditioned basement wall ; R- R- ❑Complies See the Envelope Assemblies [F04]1 ;insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is 4,0 used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations ;in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [F05]' `insulation installed per ❑Does Not E manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [F06]1 Einsulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable `❑Not Applicable 303.2.1 iA protective covering is installed ❑Complies [FOU.1l2 to protect exposed exterior flDoes Not fl, insulation and extends a ,❑Not Observable ;minimum of 6 in. below grade. _ ❑Not Applicable 403,9 ;Snow-and ice-melting system ❑Complies [F01212 controls installed. ❑Does Not kblf ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 4 of10 Clendon Lot 4\1429 Rescheck.rck Section Plans Verified Field Verified # Framing/Rough-in Inspection Complies? omments/AssUmp s ns & Req.lia Value Valuei,. 402.1.1, Door U-factor. U- U- :❑Complies 'See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 °❑Not Observable ' ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, [Not Observable 402.5 i ❑Not Applicable [FR2]1 4ifi 303.1.3 U-factors of fenestration products ]❑Complies [FR4]1 are determined in accordance Does Not frii with the NFRC test procedure or ❑❑Not Observable ; taken from the default table. ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not instructions. ❑Not Observable , 6. ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not ili AAMA/WDMA/CSA 101/1.5.2/A440, ❑Not Observable ,or has infiltration rates per NFRC 400 that do not exceed code • a - '' ,,❑Not Applicable E limits. 402.4.5 `IC-rated recessed lighting fixtures- ❑Complies [FR16]2 =sealed at housing/interior finish ❑Does Not , ;and labeled to indicate s2.0 cfm I leakage at 75 Pa. ❑Not Observable _�..._ ) <: ❑Not Applicable 403.2.1 ;Supply and return ducts in attics ❑Complies [FR12]1 `insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >_ '� R-6 where < 3 inches. Supply and ',❑Not Observable return ducts in other portions of ,❑Not Applicable the building insulated >= R-6 for i ..,,1.. diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403,3.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable i❑Not Applicable 403.4 HVAC piping conveying fluids R-F ' R- ❑Complies [FR17]2 • above 105 °F or chilled fluids ;❑Does Not 'below 55°F are insulated to >_R- <. ❑Not Observable ;3, ❑Not Applicable 16 403.4.1 Protection of insulation on HVAC EComplies _ [FR24]1 piping. ❑Does Not , EINot Observable ❑Not Applicable _ 403.5.3 ;Hot water pipes are insulated to R- i R- ❑Complies [FR1812 `: R-3. r❑Does Not + ;❑Not Observable ❑Not Applicable 403.6 ,Automatic or gravity dampers are ❑Complies 'FR19]2 ',installed on all outdoor air <❑Does Not ;intakes and exhausts. =❑Not Observable ❑Not Applicable ; . Q High Impact(Tier 1) ©Medium Impact(Tier 2) ©Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 5 of10 Clendon Lot 4\1429 Rescheck.rck Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\Irobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 6 of10 Clendon Lot 4\1429 Rescheck.rck c ., Section Plans Verified Field Verified Insulation inspection Value Value Complies? +Comments/Assumptons Req,l 303.1 "All installed insulation is labeled ,' r iEComplies [IN13]2 ;or the installed R-values ❑Does Not l provided. ❑Not Observable ❑Not Applicable ` 402.1.1, Wall insulation R-value. If this is a R- R- ;❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood °❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). ;Ill Steel El Steel ❑Not Applicable 303.2 Wall insulation is installed per ' ❑Complies UNLIT manufacturer's instructions. ", = ;❑Does Not ❑Not Observable i❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 7 of10 Clendon Lot 4\1429 Rescheck.rck Section plans Verified Field Verified Final.inslae €on ProvisionS, - Value = Value Complies? Comments/Assumptions & l egdD 402.1.1, :Ceiling insulation R-value. R- R- ❑Complies 'See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ['Not402.2.E Not Observable [FIl]1 ❑Not Applicable 303.1.1.1,;Ceiling insulation installed per -'.!❑Complies 303.2 `manufacturer's instructions. ❑Does Not [FI2]1 ',Blown insulation marked every 300 ft2. ENot Observable ,ENot Applicable 402.2,3 Vented attics with air permeable ❑Complies [F122]2 !insulation include baffle adjacent ADDoes Not to soffit and eave vents that 'extends over insulation. ENot Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ;❑Complies [FI3]1 insulation .R-value of the iDDoes Not adjacent assembly. ['Not Observable ENot Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F117]1 ach in Climate Zones 1-2, and ,❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.3 ',Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [Fl4]1 :cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air ❑Not Observable handler @ 25 Pa. For rough-in ;tests,verification may need to ENot Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total :leakage measured with a ENot Observable pressure differential of 0.1 inch !ENot Applicable :w.g.across the system including :the manufacturer's air handler :enclosure if installed at time of :test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system ;including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ElComplies [F124)1 :by manufacturer at<=2%of ❑Does Not design air flow. " ❑Not Observable ENot Applicable 403,1.1 'Programmable thermostats (❑Complies [FI9]2 :installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to ['Not Observable code specifications. ENot Applicable 403,1,2 Heat pump thermostat installed ; ❑Complies [Fi10]2 'on heat pumps. ❑Does Not ❑Not Observable {❑Not Applicable 403,5,1 :Circulating service hot water ❑Complies [FI11]2 ;systems have automatic or ,❑Does Not accessible manual controls. ENot Observable ENot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 8 of10 Clendon Lot 4\1429 Rescheck.rck Plans Verified Field Verified on Final Inspection Provisions Complies? Comments/Assumptlons Value Value 403�6,1 All mechanical ventilation system :DComplies 7777771'k'll ' ' I [1712512 fans not part of tested and listed ElDoes Not HVAC equipment meet efficacy "c", :E]Not Observable ;and air flow limits. 'E]Not Applicable 403.2 Hot water boilers supplying heat Ehomplies [F[26]2 :through one-or two-pipe heating ;E]Does Not ,systems have outdoor setback -]Not Observable !control to lower boiler water ,temperature based on outdoor �tll\lot Applicable 403.5AA Heated water circulation systems Complies [5128]2 have a circulation pump.The ___77������Doesl\lot ,system return pipe is a dedicated �E_]Not Observable .return pipe or a cold water supply T­[Not Applicable ,pipe. Gravity and thermos- �syphon circulation systems are ,not present. Controls for circulating hot water system pumps start the pump with signal .for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 40151.2 1 Electric heat trace systems ElComplies :515. Controls automatically I adjust the energy input to the E]Not Observable ElNot Applicable heat tracing to maintain the desired water temperature in the 403.5.2 'Water distribution systems that ElComplies [FI3101 have recirculation pumps that OlDoes Not !pump water from a heated water E]Not Observable ;supply pipe back to the heated water source through a cold E]Not Applicable water supply pipe have a ',dernand recirculation water system. Pumps have controls that manage operation of the :pump and limit the temperature :of the water entering the cold ;water piping to 1049F. 403'.54 , ",Drain water heat recovery units ElComplies [FI3112 tested in accordance with CSA �ODoes Not B55.1. Potable water-side []Not Observable pressure loss of drain water heat E]Not Applicable recovery units< 3 psi for individual units connected to one ',or two showers. Potable water- side pressure loss of drain water heat recovery ..~ - . psi for | � individual units connected ." ` —- - ------- ! ---- ---- 404a 7�.uo|� | permanenti [p|0� 'fixtures or 75%of / fixtures have high efficacy lamps. � ~~^~^~^~pp'/ ~'~```~~°^ E]Not Observable []mot Applicable 404,L1 !Fuel gas lightingkave � [F12313 !no continuous�pilot light. []ooesmot � �� | []NotObsemaNe � / � NotAppUoa�e . . . [] - I High Impact(rierz) 2 Medium Impact(Tier Z) ] Low Impact[rier3) Project Title: Report date: 04/03/19 Datafi|ename: C:\Users\|rubisiun\Dnopbox\DVVRPEEngineehngV\ctivePnojects\l429 DES FHB 4UJohn Page 9oflO Oendon Lot 4\l4Z9Rescheck.rck Section Plans Verified Field Verified # F[ inalsPectioision [s Value Value Compiles? Cornments/Assurrmptions & Recpi i 401.3 Compliance certificate posted. ❑Complies [F17]2 ❑Does Not Not Observable ?❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F118]3 mechanical and water heating 00Does Not systems have been provided. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Report date: 04/03/19 Data filename: C:\Users\lrobision\Dropbox\DWRPE Engineering\Active Projects\1429 - DES - FHB 40 John Page 10 of10 Clendon Lot 4\1429 Rescheck.rck • • 4•4' 2 Vrt 2,7 ; Enemy c•41,-.A L.L.-`‘LA,,,4, '4: Liv er 119 Ric-- frtcy11 -(-- A& osht• Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): .Glieli*D6allArtfort" 4,,p;,,h, ' '4'4 4..7-.fr"?.V044-ti'1;riZt74440 Window 0.29 Door 0.29 Heatingl6CoplIntrEgtiOnent•••2„yd- •a• ": ", r Ire Heating System: Cooling System: Water Heater: 1;::latjttLe4.- ' 4,°.• Name: Date: Comments