Loading...
SOLAR-0797-2019 a i � r Office Use OnIV Permit#: �lr�'Q_.�' � I �5- '� '---R Fee: $ 742 Bay Road,Queensbury,NY 12804 Invoice#: 2— P:518-761-8256 www.aueensbury.net SOLAR PANEL PERMIT APPLICATION C L • Property Owner(s): DEC 16 2019 -i-©Vm Oi=QUEE SBURY Name(s): William Duell !,t lit nil v , {c;o;C-S Mailing Address, C/S/Z: 33 Forest Lane, Queensbury, NY 12804 Cell Phone:_( ) Land Line: _( 518 ) 744-1158 Email:info@adirondackquilts.com Project Address: 33 Forest Lane, Queensbury, NY 12804 Section Block Lot: 301.17-1-17 Existing Use: ® Single Family ❑ 2-4 Family ❑ Commercial ❑ Other: • Solar Contractor: Workers' Comp documentation must be submitted with this application Business Name: PIugPV LLC Contact Name: Wendy Mueller Mailing Address, C/S/Z: 875 Broadway, Albany, NY 12207 Cell Phone:_( ) Land Line: _( 518 )728-1055 Email:wmueller@plugpv.com • Electrical Contractor: Workers' Comp documentation must be submitted with this application Business Name: PIugPV LLC Contact Name: Jonathan Brookins Mailing Address, C/S/Z: 875 Broadway,Albany, NY 12207 Cell Phone:_( 518 ) 669-6335 Land Line: _( ) Email: jrookins@plugpv.com Contact Person for Building & Code Compliance:Wendy Mueller Cell Phone: Land Line: 518 ) 728-1055 Email: wmueller@plugpv.com Solar Panel Application Revised March 2019 Estimated cost of construction: $ ], Are the solar panels? Purchased ❑ Leased Total System Capacity Rating (sum of all panels): Solar PV System: kW DC Select System Configuration: ❑ Supply side connection with micro inverters 9. Supply side connection with DC optimizers ❑ Supply side connection with string inverter d Load side connection with DC optimizers ❑ Load side connection with micro inverters ❑ Load side connection with string inverter Please sign below to affirm that all answers are correct and that you have met all the conditions and requirements to submit a unified solar permit. ,zz:Homeowner's-Signature, `Date (.t/ey i�GG.ez 11/11/19 Solar Co. Representative Signature Date Solar Panel Application Revised March 2019 E!t Tklt t�1 e,,Lr,'a tt RIZATj(jN FC?R Lfl ING ANI PERMIT JU'PL1C'AT ll)'� qwbom tt as O*twos)of the prop+XIY rated as liatrtby cieci}ittatir PlugX'V.LLC.as my cc+ntrac for and registered agent for the purp,�of the applyw#for prrrrnts aJtiv"f{Ymnv Box n-prL cntatiun regarding mY solar insWiation pry i-L print #I' l�Gt f t L Siti:n t)"w FILE COPY WESTSHORE FILE COPY y 1 DESIGN ENGINEERS, P.C. ® 100 GREAT OAKS BLVD. I SUITE 117A ALBANY I NEW YORK 1 12203 TOWN OF OUEENSBURY To: PlugPV LLC BUILDING DEPARTMENT 875 Broadway Based on our limited examination,compliance Albany,NY 12207 with our comments shall not be construed as indicating the plans and specifications are in full compliance with the Building Codes of Date: November 25,2019 New York State. Ref.: 19111060 Subject: Duell Residence 33 Forest Ln. Queensbury,NY ®VUd� ®F QU BUILDING0 To Whom It May Concern, Reviewed By. The following references the Duell Residence in Queensbury,NY: Date: 1. Existiniz roof framing: Conventional framing is 2x8 at 16"o.c. with a 10'-4" span (horizontal rafter projection). This existing structure is capable to support all the loads that are indicated below for this photovoltaic project. . 2. Roof Loading: - 4.33psf dead load(modules plus mounting hardware) - 50psf ground snow load - 6.2psf roof materials (2.2psf 2x8, 1.5psf sheathing, 2.5psf asphalt shingles) - Exposure Categoiy B, 115mph wind(3 sec.) This installation design will be in general conformance to the manufacturer's specifications, and complies with all applicable laws, codes, and ordinances, and 2015 IRC, 2015 IBC, and 2017 NYS Uniform Code Supplement. The spacing and fastening of the mounting brackets is to have a maximum of 48"o.c. span between mounting brackets. S-5! CIEtraps formetalnoofo, a% y hem of equivalent values. D E-� E Thank you. " Westshore Design Engineers 1 DEC 1 6 2D19 BUILD6I C— !;ODD:S _ of N E tY S A .43 1,o T V P: 07/21 0z 301.17-117 SOLAR-0797-2019 Duell, William 091373 33 Forest Ln p�OFEssIWO Solar Panel Installation 11/25/2019 John Eibert Nicolas Nitti,PE Project Coordinator President WestShore Design Engineers 0 100 Great Oaks Blvd. (I Suite 117A Albany,NY 12203 1518.313.7153 301-17-1-17 SOLAR-0797-2019 Duell, William 33 Forest Ln A Solar Panel Installation E F G H GENERAL NOTES- - - -- - -- NEW n1r c ctEnn; �,`�O I,�n�� SHEET LIST TABLE .1.1 PROJECT NOTES: I V V V I� V J J I V I U I�U V SHEET NUMBER SHEET TITLE 1 .1.2 THIS PHOTOVOLTAIC(PY) SYSTEM SHALL COMPLY WITH THE p• NATIONAL ELECTRIC CODE (NEC) ARTICLE 690. ALL - T-001 COVERPAGE THE RELEVANT CO LISTING AND INSTALLATION INSTRUCTIONS,AND DUELL RESIDENCE PLUGPV THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING G4101 NOTES JURISDICTION'S(ALD)APPLICABLE CODES. .1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED A-101 SITE PLAN .1.4 AALLL TINT SYSTEMNCOMPONENTS:MODULES,UTILITY-INTERACTIVE 33 FOREST LN A•102 ELECTRICAL PLAN CONTRACTOR- . INVERTERS. AND SOURCE CIRCUIT COMBINER BOXES ARE A-103 SOLAR ATTACHMENT PLAN IDENTIFIED AND USED FOR USE IN PHOTOVOLTAIC SYSTEMS AS QUEENSBURY NY 12804 E-601 LINE DIAGRAM 2 REQUIRED BY NEC 690.4&NEC 690*PV MODULES:011703. PLUGPV IEC61730,AND IEC61215,A14D NFPA 70 CLASS C FIRE INVERTERS:UL T E-602 DESIGN TABLES 17410ERTIFIED,IEEE 1547,929,519 COMBINER BOX(ES):UL 1703 OR ASSESSOR'S #; 52340030117117 PHONE (518)948-5316 UL 1741 ACCESSORY E603 PLACARDS .1.5 NEC 690.35 REFERS SPECIFICALLY TO'UNGROUNDED'PV SYSTEMS. ADDRESS:875 BROADWAY, ALSO DESIGNATED AS 'TRANSFORMERLEW BY INVERTER S-501 ASSEMBLY DETAILS Albmiy,NY 12207,USA MANUFACTURERS AND 'NON ISOLATED' BY UNDERWRITERS LABORATORY. R4XJ1 RESOURCE DOCUMENT LTC.NO.: 82.0674758 .15 INVERTER(S)USED IN UNGROUNDED SYSTEM SHALL BE LISTED FOR R-002 RESOURCE DOCUMENT THIS USE PIEC 690.35(G)I. .1.7 AS SPECIFIED BY THE AHJ,EQUIPMENT USED IN UNGROUNDED R-003 RESOURCE DOCUMENT ELE.NO.: LE SYSTEMS LABELED ACCORDING TO NEC 690,35(F). DDRAWINN�SElrw USE OF .1.8 MAX TIC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED RA04 RESOURCE DOCUMENT PERNIUSSLDNMOMDDNTRACTORLSLN TEMP COEFFICIENT FOR VOC.IF UNAVAILABLE,MAX DC VOLTAGE R-005 RESOURCE DOCUMENT VIOLATIONOF U.S.COPYRIGHT LAWS CALCULATEDACCORDING TO NEC 690.7. OM WILLGESOBJESECUT1 6 3 0171AGESAND PROSECU11CY18 .1.9 ALL INVERTERS,PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A �- 1 NEW PV SYSTEM:5.670 kWp PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE ACCORDING IPER NSTRUCTIONS SHALL BE INSTALLED PROJECT INFORMATION DUELL w4A ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING - " '43 �� `9' NEC 11031. .1.10 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING OWNER CODE.IF EXPOSED TO SUNLIGHT,IT SHALL BE UV RESISTANT.ALL -a� NAME: WILLIAM DUELL RESIDENCE PLAQUES AND SIGNAGE VALL BE INSTALLED AS REQUIRED BY THE NECAND AHJ. PROJECT MANAGER 33 FOREST LN 1.2.1 SCOPE OF WORK: - --- - _ - --"-"" - - NAME: QUEENSBURY,NY 12804 11.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND AERIAL PHOTO PHONE: APN:52340030117117 4 SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM 01 RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR NOT TO SCALE OF N,: COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN.SPECIFY, -� CONTRACTOR �� W X• AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE NAME: PLUGPV PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. PHONE: (518)946-5316 "` f g - .3.1 WORK INCLUDES: W7 )�S -�- 3.2 PV ROOF ATTAC'HMENTS-ECOFASTENGFI {�� cn is..)31 i AUTHORITIES HAVING JURISDICTION ter: '�• nm=i .3.3 PVRACKJNGSY STEM INSTALLATION-IRONRIDGEXR100 ''� •w-- �-- 11 BUILDING: TOWN OF QUEENSBURY L "' 3,4 PV MODULE AND INVERTER INSTALLATION-HANWHA O-CELLS r ® {�J;� W ZONING: TOWN OF QUEENSBURY OPEAK DUO BLKG53151 SOLAR EDGE SE5000H-US(240V) CV 17,{.�IT I UTILITY: NATIONAL GRID-NEW O 091373 F� 35 PVEQUIPME6ITGROUNDING ,',.(,J P b c$? L 1 YORK-RESIDENTIAL ROfESS101" .3.6 PV SYSTEM WIRING TO A ROOPMOUNTED JUNCTION BOX 99 n� r - •I 3.7 PV LOAD CENTERS(IF INCLUDED) 43},.) Tf) I 1 AND FARM 11-25-2019 5 3.8 PV METERINGRAONITORING OF INCLUDED) I G I DESIGN SPECIFICATIONS PAPERSE'n•,Lr(ANSIO) 3.9 PV DISCONNECTS J_•-- 1 - .3.10 PV FINAL COMMISSIONING L1-.� 0 LI 1 OCCUPANCY: II .3.IT(E)ELECTRICAL EQUIPMENT RETROFIT FOR PV �,tl,1 I 11 CONSTRUCTION: SINGLE-FAMILY COVER PAGE 1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE "�' ZONING:• RESIDENTIAL ` I - GROUNDSNOWLOAD: 50PSF DATE: 11.22-2019 SCOPEOFWORK - WIND EXPOSURE: B SYSTEM SIZE: STC:18 X 315W=5.67OKW 1 -- DESIGN BY:K.A. PTC:18 X Z921'N=5.260KW `� 1,--f - FOREST L� WIND SPEED: 109 MPH (18)HANWHAQ-CELLSQ.PEAK DUO BLK•G5 �--�N / CHECKED BY: MM. (1)SOLAR EDGE SE50WH.US(240V) APPLICABLE CODES&STANDARDS REVISIONS ❑ PLAT MAP BUILDING: NYSBC2016,NYSRC2011 6 ATTACHMENT TYPE: ECOFASTENGFI 02 w�E ELECTRICAL: NEC2014 MSPUPGRAOE: NO NOTTOSCALE FIRE: NYSFC2016 T-001.00 s A B C D E F G H (SHEET L) A B C D E F G H 2.1.1 SITE NOTES: 2A.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 GREEN 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA THROUGH 250.106.IF EXISTING SYSTEM IS INACCESSIBLE,OR INADEQUATE,A DC NEGATIVE-BLACK,OR OTHER COLOR EXCLUDING WHITE,GREY REGULATIONS. GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250,NEC 690.47 AND GREEN 1 2.1.3 THE PV MODULES ARE CONSIDERED NONCOMBUSTIBLE AND THIS SYSTEM IS A AND AHJ. 2.7.8 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: Y' UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 2.4.10 ACCORDING TO NEC 690.47(C)(3),UNGROUNDED SYSTEMS INVERTER MAY SIZE DC PHASE A OR L1-BLACK - - 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING,MECHANICAL,OR GEC ACCORDING TO EGC REQUIREMENTS OF NEC 250.122.HOWEVER,DC GEC TO BE PHASE B OR L2•RED,OR OTHER CONVENTION IF THREE PHASE _ LU ..{..�v BUILDING ROOF VENTS. - UNSPLICED OR IRREVERSIBLY SPLICED. PHASE C OR L3-BLUE,YELLOW,ORANGE',CONVENTION OTHER CONVENTION PLUG PV 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED 2.4.11 IN UNGROUNDED INVERTERS, GROUND FAULT PROTECTION IS PROVIDED BY PHASE L-WHITELU GREY ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 'ISOLATION MONITOR INTERRUPTOR,'AND GROUND FAULT DETECTION PERFORMED 2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN BY'RESIDUAL-CURRENT DETECTOR' 'IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S TO BE MARKED ORANGE[NEC 110.15]. CONTRACTOR INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE 2.5.1 INTERCONNECTION NOTES: BUILDING OR STRUCTURE. 2.5.2 LOAMIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH[NEC 690.64 PLUGPV 2 2.2.1 EQUIPMENT LOCATIONS 2.5.3 TH)E SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. NOT EXCEED 120%OF BUSBAR RATING[NEC 705.12(D)(2)(3)]. PHONE (518)948-5316 22.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED 2 5.4 PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31(A),(C)AND NEC TABLES THE BUS FROM THE UTILITY SOURCE OCPD[NEC LOCH705.12(1))(2)(3)].PPADDRESS:875 BROADWAY, 3UNC(8)(2)(A)AND 310.15(B)(3)(C). 2.5.5 AT MULTIPLE INVERTERS OUTPUT COMBINER PANEL,TOTAL RATING OF ALL Albuy,NY 12207.USA 22.3 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC690.34. OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. 22.4 ADDITIONAL AC DISCONNECTS)SHALL BE PROVIDED WHERE THE INVERTER IS NOT HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED UC.NO.: 82-Ob74758 WITHIN SIGHT OF THE AC SERVICING DISCONNECT. ACCORDING TO NEC 705.12(D)(2)(3)(C). ELE NO.: 22.5 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL 2.5.6 FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 UNAMORLMUSEOF H15 ACCORDING TO NEC APPLICABLE CODES. - (D)(2)(1) ORAMCISETMTHOUTWRIITEN 2.2.6 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR 2.5.7 'SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 A WITH. PERMISSroNPROMCOWRALTORtSIN USAGE WHEN APPROPRIATE. () VI=MNOFU.S.COPYRIGHTIAWS SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230A2 AMOLLBESUBAECTTOCNIL 3 2.5.8 BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS DAMAGES AND PROSECUnONS. 2.3.1 STRUCTURAL NOTES: EXEMPT FROM ADDITIONAL FASTENING[NEC 705.12(D)(5)]. NEW PV SYSTEM:5.670 KW 2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO D CODE-COMPLIANT INSTALLATION MANUAL TOP CLAMPS REQUIRE A 26.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: DUELL DESIGNATED SPACE BETWEEN MODULES,AND RAILS MUST ALSO EXTEND A 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH.THAT WHEN THE SWITCH MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAYISUBARRAY, IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO ACCORDING TO RAIL MANUFACTURER'S INSTRUCTIONS. THE TERMINALS MARKED'LINE SIDE'(TYPICALLY THE UPPER TERMINALS). RESIDENCE 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS'SPECIFICATIONS. 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL,BE IF ROOF-PENETRATING TYPE,IT SHALL BE FLASHED&SEALED PER LOCAL LOCKABLE.AND BE A VISIBLE-BREAK SWITCH. REQUIREMENTS. 2.6.4 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED. 33 FOREST LN. 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND THEREFORE BOTH MUST OPEN WHERE A DISCONNECT IS REQUIRED, SEALED WI APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED ACCORDING TO NEC 690.13. QUEENSBURY,NY 12804 CONTRACTOR. 2.6.5 DC DISCONNECT INTEGRATED INTO ROOFTOP DC COMBINER OR INSTALLED APN:52340030117117 4 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE WITHIN 6 FT,ACCORDING TO NEC 690.15(C). O F N E SPAN DISTANCE SPECIFIED BYTHE RACKING MANUFACTURER. 26.6 RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY q� W y 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS.CONTROLLED CONDUCTORS S A STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 530V AND<_240VA[NEC 69DA21.LOCATION OF LABEL ACCORDING TO AHJ. -- 26.7 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8,690.9. 2A.1 GROUNDING NOTES: - AND 240. �xrt i mr_i 2.4.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE,AND 2.6.8 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED, GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH THEREFORE BOTH REQUIRE OVER-CURRENT PROTECTION,ACCORDING TO USE. NEC 240.21.(SEE EXCEPTION IN NEC 690.9) 091371 2.4.3 AS CONVENTIONAL PV SYSTEMS,UNGROUNDED PV SYSTEMS REQUIRE 26.9 .IF REQUIRED BY AHJ,SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION EQUIPMENT GROUNDING CONDUCTOR.ALL METAL ELECTRICAL EQUIPMENT AND ACCORDING TO NEC 690.11 AND UL1699B. P�Q YES S I ONp1 STRUCTURAL COMPONENTS BONGED TO GROUND,IN ACCORDANCE WITH 250.134 OR � � 11-25-2019 250.136(A).ONLY THE DC CONDUCTORS ARE UNGROUNDED. 5 2A.4 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM 2.7.1 WIRING S.CONDUIT NOTES: - PAPER SUE:11'x 17'(ANS]IIINEC TABLE 250.122. 2-7.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE 2.4.5 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURE CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE NOTES CONSIDERED GROUNDED IN ACCORD WITH 260A34 AND 250.136(A). REQUIREMENTS AND ARE NOT MEANTTO LIMIT UP-SIZING. 2A.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN 2.7.3 ALL CONDUCTORS SIZED ACCORDING TO NEC 690.8,NEC 690.7. DATE: 11.22.2019 MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ.IF WEEBS ARE 2.7.4 EXPOSED UNGROUNDED PV SOURCE AND OUTPUT CIRCUITS SHALL USE WIRE NOT USED,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED LISTED AND IDENTIFIED AS PHOTOVOLTAIC.(PV) WIRE 1690.35 (D)]. PV DESIGN BY:KA. GROUNDING LUG HOLES PER THE MANUFACTURERS'INSTALLATION MODULES WIRE LEADS SHALL BE LISTED FOR USE WITH UNGROUNDED REQUIREMENTS. SYSTEMS,ACCORDING TO NEC 690.35(D)(3). CHECKED BY: M.M. 2A.7 THE GROUNDING CONNECTION TOA MODULE SHALL BE ARRANGED SUCH THAT 27 5 PV WIRE BLACK WIRE MAYBE FIELD-MARKED WHITE[NEC 200.6(A)(6)]. THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO 27 6 MODULE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY. REVISIONS 6 GROTHER UNDING AND 2.7.7 ACCORDING TO NEC 200.7, UNGROUNDED SYSTEMS DC CONDUCTORS 2.4.8 GROUNDING AND BONGING CONDUCTORS,IF INSULATED,SHALL BE COLORED GREEN OR MARKED GREEN IF k4 AWG OR LARGER[NEC 250A 19] COLORED OR MARKED AS FOLLOWS: G"OO .00 DCPOSITIVE-RED, OR OTHER COLOR EXCLUDING WHITE, GREY AND A B C D E F G H (SHEET2) A B C D E F G H GENERALNOTESl 1. FIELD VERIFY ALL MEASUREMENTS 1 _ J-� ------ PROPERTY LINE P LU G P V _ f_ DISCONNECTON POLE 1 CONTRACTOR 2 METER l PLUGPV IPHONE: (518)948-5316 1 ADDRESS:875 BROADWAY, INVERTER 1 AC DISCONNECT I Albany,NY 12207,USA 1 7111 UC.NO.: 82-0674758 AREA OF WORK --- 1 HIC.NO.: ELE.NOR uNAUTHDRVTI USE oFTHIS DMEi 1 PERMISSION FROM CONTRACTOR IS IN L 1 VIOLATION OF U.S.COPYRIGHT LAWS 3 1 L 1 ANO WILL BE SUBJECT TO CIVILLL 0R AGESANDPROSECUTIONS 1 ; ; NEW PV SYSTEM:5.670 kWp I o DUELL 11 1 RESIDENCE L L 33 FOREST LN 77-7" ;L i_ _ QUEENSBURY,NY 12804 APN:52340030117117 of NElp 11, 1 1 ne A 1 r gxp; I 07,21 I w CAL-FIRE ROOF ACCESS POINT ENTRANCE 091371 PREFESSIONA� 1 11-25-2019 5 1 CAL-FIRE ROOF ACCESS POINT PAPER sill:n•T Ir LaNs1 B) - - SITE PLAN FOREST LN .� DATE: 11.222019 _ DESIGN BY:KA. CHECKED BY: M.M. ' SITELAN N 6 REVISIONS 01 W E A R C D E F G H (SHEET3) A B C D E F G H DISCONNECTION POLE GENERAL NOTES \\\\J 1 EXTERIOR PV EQUIPMENT 1. FIELD VERIFY ALL MEASUREMENTS + ' (E)(1)METER - //i PLUG PV EXTERIOR PVEQUIPMENT _ / FIRE CLEARANCE (N)(1)INVERTER DISCONNECT O MODULE STRINGING CONTRACTOR (N)(1)AC DISCONNECT INTERIOR PV EQUIPMENT PLUGPV 2 (E)(1)MAIN ELECTRICAL PANEL PHONE (518)948-5316 ADDRESS:875 BROADWAY, Albany.NY 12207.USA LIC.NO.: 82-0674758 HIC.N0: ELE.NO.: UNAUTHORIZED USE OF THIS (N)(t)JUNCTION BOX 0 DRAIYPIG SETWRHOUT WRRTEH FE WSSC N FROM COMPACTOR IS W VIOLATION OF U.S.COPYRIGHT LAWS ANDWILLBE SLMCTTOCMB 3 OM.IAGESAMOPROSECUTWNS. 18"FIRE ACCESS PATH NEW PV SYSTEM:5.670 kWp 18"FIRE ACCESS PATM DUELL � � � � � � � � � RESIDENCE 33 FOREST LN O O G (D G) (D G G D QAPN:52 4003URY,NY 12804 4 �:J APN:52340030117117 pF NEpyy ARRAY 1-5.67OkW IX78)(N)MODULES TILT: i rxr; u7r_I w 30 DEGREES ROOF a� PITCH:7:12 AZIMUTH: 172 DEGREES o TO �.91373 F� pR�FESsj0 11-25-2019 5 T FIRE ACCESS PATH T FIRE ACCESS PATH PAPERSIZE:11%lr(ANSIB) CAL-FIRE ROOF ACCESS POINT CAL-FIRE ROOF ACCESS POINT ELECTRICAL PLAN 39.4" DATE: 11.22.2019 DESIGN BY:K.A. MODULE: CHECKEDBY: MM, ELECTRICAL PLAN W N 66.3" Q.PEA DUO REVISIONS D 01 vB'=1' o® �E 1 315WATTS A-102.00 . A IT C D E F i— G H SHEET4) A B C D E F G H ` GENERAL NOTES 1 - 1. FIELD VERIFY ALL MEASUREMENTS __—— ROOF RAFTERS .P LU G P V CONTRACTOR 2 PLUGPV PHONE (518)948-5316 ADDRESS:875 BROADWAY, Alb ty.NY 12207.USA LIC.NO.: 82-0674758 HIC.NO.: O -ELE.NO.: UNAUTHBRM USEOF THIS DRAWING SET'WRHOUT WWRTEN PERMISSION FROMCONTRACTOR M DI VIOLATION OF US.COPYRIGHT LAWS AND WILL BESUBJECTTO CNIL 3 OAMAGESANDPROSECU110NS NEW PV SYSTEM:5.670 kWp 11111I � II III IIIII II II II IIII IIII ( IIII III DUELL II IIIIIII 11111111 I I I I I I I I I I I ill . I I I I I I IT ( I I I I I I I I I I I IIII .111II11 I111 IIII IIII ( IIIIIIIIIII RESIDENCE I I I I I I I I I I I I I I I I I I I IIII I I I I I I I I I I I I . ( I I I I I I I I I I I I I I I I II II II III IIIIIIII I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 1 1 1 1 1 1 1 1 33 FOREST LN I I I I I I I I I I I I I I I I I I I I I I ( I I I I I I I I I I I I I I I I I I I I I I I I I QUEENSBURY,NY 12604 I I I I I I I I I I I I I I I I APN:52340030117117 4 I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l l l l t l l 1 1 1 1 1 1 1 I I I I I I I I I I I I I I Exr: n I o- W - W FLUSH MOUNT SOLAR MODULES - 2 ATTACHED TO ROOF SURFACE SEE 29-7" 09 371 V SHEET M01 FOR MOUNTING DETAILS) ROOF MATERIAL IS ASPHALT SHINGLE OP'QOf E$$1 o'0� 11-25.2019 5 PAPER SQE:IPA IT(ANSI B) SOLAR ATTACHMENT PLAN 39.4" DATE: 11.22.2019 DESIGN BY:KA. N MODULE: CHECKED BY: M.M. SOLAR ATTACHMENT PLAN WESE 66.3" Q.CELLS REVISIONS 6 Fo 1 Q.PEAK DUO BLK-G5 315 vB-r o® 315 WATTS A-103.00 A B C D E F G H (SHEET 51 A B C D E F G H CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS 1 D TYPICAL CONDUCTOR CONDUIT RRYING CURRENT-C N CONDUIT NDUCTORS OCPD E- TEMP.CORR.FACTOR CONDUIT FILL fACTOR CONT.CURRENT MAX.CURRENT(125%) BASE AMP. DERATED A.I. TERM.TEMP.RATING AMP. TERMINAL V 1 10 AWG PV WIRE,COPPER FREE AIR 2 NIA G AWG DARE,COPPER 0.760T3.1'C) 1 15A 18.75A 55A 41.BA 75"C SOA 1 10 AWG THWN 2.COPPER 0.5'DIA EMT 2 NIA 10 AWG TFMIN-2.COPPER 0.76(53.1°C) 1 15A 18.75A 40A 30.4A 75°C 35A P l_L.I G P V 1 10 AWG THWN-2,COPPER 0.51DIA EMT - 2 30A 10 AWG THWN-2,COPPER 0.96(31.1-C) 1 21A 26.25A 40A 38.4A 15°C 35A 1 IOAWGTHWN-2,COPPER 0.5'DIA EMT 2 WA 10AWG THWN-2.COPPER 0.96(31.1'C) l' 21A 26.25A 40A 36AA 75°C 35A CONTRACTOR O MODULE STRINGING 1.SYSTEM EQUIPPED WITH RAPID 2 SHUTDOWN DISCONNECT PER NEC 690.12 TO UTILITY PLUGPV 2.SYSTEM COMPLIANT WITH NEC 690.17 GRID(OH ) PHONE (518)948-5316 A A ADDRESS:675 BROADWAY, Albany.NY 12207,USA UC.NO.: 82-0674758 LLI HIC.N0: N ELE.NO.: L2 URWRIOWZFD USEOF THIS ORAW WG SET NITNUUT WWTTFN PE7A°ISSION FROM CONTRACTOR IS IN VIOLATION OF U.S.COPYRIGHT LAWS AND WILL BE SUBJECT TOCN L 3 OMAAGESANOPROSECUTIONS. NEW PV SYSTEM:5.670 kWp (E) DUELL Q.CELLS SOLAR EDGE JUNCTION BOX SOLAR EDGE AC DISCONNECT 30A UTILITY Q.PEAK DUO BLK-G5 315 P320 SE5000H-US(240V) FUSES 30A METER RESIDENCE POWER OPTIMIZER GROUND 33 FOREST LN ROD QUEENSBURY,NY 12804 4 ® ;_____� APN:52 0117117 OF NE{y _ k )IN G i as a. LT(E)MAIN ; (E)GROUNDING 100 A ELECTRODE ErP: nT21 a 01 02 03 � 04 N ` p 09137 5 F��\ TO(E) ffSS10 A� N 0P + I 'LOADS 1 r-25-2019 1 PAPER SRE:11'A 17'(ANSI B) 5 L1 h A av\ 1 ____� LINE DIAGRAM 18 ••• DATE: 11,22.2019 IN BRANCH EQUIPMENT LEFT OF EQUIPMENT RIGHT OF MAIN SERVICE PANEL DESIGN BY:KA. LINE IS(N)NEW LINE IS(E)EXISTING 2401120 V 10,3W CHECKED BY: M.M. UNLESS OTHERWISE MAIN BUSS:100A REVISIONS 6 NOTED. E-601.00 A R m C mD E F G H (SHEET B) A B C D E F G H 1 SYSTEM SUMMARY MODULES STRING BI REF. OTY. MAKE AND MODEL PMAX PTC ISC IMP VOC VMP TEMP.COEFF.OF VOC FUSE RATING POWERBOX MAX OUTPUT CURRENT 15A PMl-18 18 HANWHAQ.CELLSCL EAKDUOBLK.G5315 315W 292.2W 9.89A 9.41A 40.29V 33.46V -0.113V/°C(-0.28WfC) 20A ��1 �^�\ OPTIMIZERS IN SERIES 18 uV v NOMINAL STRING VOLTAGE 380V POWER OPTIMIZERS ARRAY OPERATING CURRENT 14.92A REF. QTY. MODEL RATED INPUT POWER MAX OUTPUT CURRENT MAX INPUT ISC MAX DC VOLTAGE WEIGHTED EFFlCIENCY ARRAY STC POWER 5,670W P01-18 18 SOLAR EDGE P320 320W - 15A 11A 48V 98.8% ARRAY PTC POWER 5.260W CONTRACTOR MAX AC CURREN l 21A INVERTERS OCPD MAX OUTPUT MAX INPUT CEC WEIGHTED MAXAED(CPOWER 5AOON REF.OTY. MAKE AND MODEL AC VOLTAGE GROUND RATING RATED POWER CURRENT CURRENT AX INPUT VOLTAG EFFICIENCY PLUGPV 2 DERATED(CEC)AC POWER 5,000W 11 1 1 1 SOLAR EDGE SE5000H-US(240V) 240V FLOATING 30A I SOOOW I 21A 13.5A I 480V 99.0% DESIGN TEMPERATURES PHONE: (518)9485316 �SHZE EXTREME LOW -33.7°C(-28.7°F),SOURCE:FLOYD BENNETT MEM(43.34°:-73.61°)- DISCONNECTS OCPDS 2%HIGH 31.1°C(88°F),SOURCE:FLOYD BENNETT MEM(43.34°:-73.61°) REF.QTY. MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE REF. RATED CURRENT MAX VOLTAGE ADDRESS:875 BROADWAY, SWl 1 SQUARE D D221NRB OR EQUIV. 30A 240Vh I Fl-2 1 2 1 30A 240VAC Albany,NY 11207,USA LIC.NO.: 82.0674758 HIC.NO.: ELE.NO.: UNAUTHORIZED USEOF THIS DTUW NG SETWTIHOUTWRHTEN PERMISSION FROM CONTRACTOR 44IN VIOLATION OF U.S.COPYRIGHTIAWS AND WALL BE SUBJECT TO CNR 3 DA MAOESPNDPROSECUTIONS. NEW PV SYSTEM:5.670 kWp DUELL RESIDENCE - 33 FOREST LN QUEENSBURY,NY 12804 APN:52340030117117 4 �pF NEW AC f W I 2 O 091371 10 ROFESS10Np� 11-25-2019 5 PAPIRSIZE:11°a17.1ANSIB) DESIGN TABLES DATE: 11.22.2019 DESIGN BY:K.A. CHECKEDBY: M.M. REVISIONS 6 E-602.00 A 8 C D E F G H (SHEET TI A B C D E F G H ° !CAUTION! POWER TO THIS BUILDING IS ALSO SUPPLIED PLUG PV FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CONTRACTOR FROM PV ARRAY PLUGPV 2 PHONE (518)948-53M PHOTOVOLTAIC ADDRESS:875 BROADWAY, OPERATING CURRENT: 13.5A DC Albany,NY 12207,USA p OPERan+GVOLTAGE 380VDC p p AC DISCONNECT p nux SHORT CURRENT: 15 A OC LIC.NO.: 82-0674758 !M%VOLTAGE: EBDV DC OPERATING CURRENT: ]IA AC OPERATINGVOLTAGE 240VAC ELE • NO ELE.NO.: PLACARD 3 LABEL 2 LABEL 3 LABEL 4 UW6WORrzE0 USE OFTHIS AT EACH JUNCTION,COMBINER DISCONNECT AT EACH DISCONNECTING MEANS FOR AT EACH DC DISCONNECTING MEANS AT POINT OF INTERCONNECTION,MARKED URX6"GSETWaHOUTKRRTEN AND DEVICE WHERE ENERGIZED PHOTOVOLTAIC EQUIPMENT [NEC 690.531 AT DISCONNECTING MEANS PERMISSION FROMCONTRACTORISIN UNGROUNDED CONDUCTORS MAY BE [NEC690.171 [NEC690.$41 ANDDVAnuBESUBJECTTOCIVI s 3 EXPOSED DURING SERVICE DIRECTORY s DR..TAG SANDPROSECunoNS. INEC 690.35(F)1 PERMANENT PLAQUE OR a DIRECTORY PROVIDING M MAIN DISTRIBUTION BACK NEW PV SYSTEM:5.670 kWp ICAUTIQN4 INTERACTIVE PHOTOVOLTAIC SYSTEM THE LOCATION OF THE UTILITY DISCONNECT DUELL p. p O CONNECTED O SERVICE N PHOTOVOE`FA( Ki PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED DISCONNECTING MEANS ° 0 RCUITISBAG!Sr'ED NORTH SIDE OF THE HOUSE AND THE PHOTOVOLTAIC I m LABELS LABEL6 PLAQUE SYSTEM DISCONNECTING RESIDENCE MEANS IF NOT IN THE AT POINT OF INTERCONNECTION;LABEL,SUCH AS LABEL 5 OR LABEL 6 MUST IDENTIFY SAME LOCATION PHOTOVOLTAIC SYSTEM [NEC 690.56(B)1 - 33 FOREST LN [NEC 705.12(D)(4)1 WHERE THE INVERTERS ARE REMOTELY LOCATED QUEENSBURY,NY 12804 PHOTOVOLTAIC FROM EACH OTHER,A APN:52340030117117 O O 4 O INTERACTIVE PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC p EQUIPPED DIRECTORY IN ACCORDANCE WITH 705.10 N p�,CONNECTED DC DISCONNECT SHUTDOWN SHALL BE INSTALLED AT 0 F EACH DC PV SYSTEM F4R LABEL 7 LABELS LABEL 9 DISCONNECTING MEANS,AT AT UTILITY METER AT EACH DC DISCONNECTING MEANS AT RAPID SHUTDOWN SWITCH EACH AC DISCONNECTING [NEC 690.56(B)1 [NEC 690.13(8)1 [NEC 690.56(B)1. MEANS,AND AT THE MAIN r, uu•; I mr.I LETTERS AT LEAST 3181NCH;WHITE ON RED SERVICE DISCONNECTING .., BACKGROUND;REFLECTIVE MEANS SHOWING THE flFC605.11.1.11 LOCATION OF ALL AC AND DC PV SYSTEM D 091373 DISCONNECTING MEANS IN PROFE S S I DNA PHOTOVOLTAIC O PHOTOVOLTAIC 0 THE BUILDING. 5 POWER • • AC DISCONNECT INEC 69OA(H)1 PAPER SR8 IT`.Ir(ANSI B) -- PLACARDS LABEL 10 LABEL 11 LABEL 12 AT EXPOSED RACEWAYS,CABLE TRAYS,AND OTHER WIRING AT EACH AC DISCONNECTING MEANS AT POINT OF INTERCONNECTION METHODS;SPACED AT MAXIMUM 10 FT SECTION OR WHERE [NEC 690.13(B)l OVERCURRENT DEVICE DATE: 11,22.2019 SEPARATED BY ENCLOSURES,WALLS,PARTITIONS,CEILINGS, LABELING NOTES [NEC 705.12(D)(7)1 OR FLOORS. 1.1 LABELING REQUIREMENTS BASED ON THE 2014 NATIONAL ELECTRICAL CODE,INTERNATIONAL FIRE CODE 605.11,OSHA DESIGN BY:K.A. INEC 690.31(G)1 STANDARD 1910.145,ANSI Z535 CHECKED BY: MM. LETTERS AT LEAST 3/8INCH;WHITE ON RED BACKGROUND; 12 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. REFLECTIVE 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 6 (IFC 605.11.1.11 'A LABELS TO BE A MINIMUM LETTER HEIGHT OF 318'AND PERMANENTLY AFFIXED. REVISIONS 1.5 ALERTING WORDS TO BE COLOR CODED.'DANGER'WILL HAVE RED BACKGROUND;'WARNING'WILL HAVE ORANGE BACKGROUND;'CAUTION'WILL HAVE YELLOW BACKGROUND.(ANSI Z5351 E-603.00 A B C D E F G H ISHEETBI =.HE D1 - llc A I C D E F G H �. TOWN, OF` C'-UEENSB'UF1,Y 0J.-_sue., a, x 10°°mmx92mmm,clu a et ...... _ ....__ 1685mm dm Lam -�- f LU G 1 V YIeIRbI 18.1kg - hantcpaaP 3.2nm,mermaiy preaUrsed¢6 sa,+in, I _ .reu4ctmn tea�wlaRY '�. , Aact C4aee comp 'cram • �i 6l..ana,1 S1.d Epx 6>2ampMur°ta:ma°RNTnM.ala halfcexa CONTRACTOR bnrllrYbsr 70-8 ..50-70mm x 13-21mm ! Natectlon class 9`67,tilt.bypass died4s Eaplp I'c; .,rablp:(01 too mm-1-11I00mm " f eamraor N.uR,•CpptacrNed.,P65NuIP68 �� - ---- PWGPV PHONE 018)940.5316 Pe1v[2tiuss .' ;'r ' 7u 319 119 '-.370' ADDRESS:875 BROADWAY, ansrvuIt PiAraPi:dRLC>i Sr4xa4s9 q51 COVCmaL'T.STC'IPa7:"cG.T91FR>xC[ wl-a:•n Albany,NY 12207,USA 11-INPN P_ IWI 304 310 '315 320 p 9aat risccilCmlpN• la CA 9,78 9.83 9.99 9,91 UC.NOz 82-0674758 OppaCb.plla'all+pp• V. lv1 39.75 4002 .0,29 4a.56 HIC.NO.: .3 n ELENO.:-IMPF 926 9AI 9.47cu at NPP• VI 32 3.12 7146 93.80 . UW IHOR12FDUSEOF7MS TWO.a[I' A I%I 218.1 z16.4 418.7 '.19.0 oRWMG SET WIIItOUT WRITTEN The new u.Pi.AK 11UO K1!-",5 solar module from Q CELLS impresses PsWSCaCN14ROMCONM%CTORI5IN p anasssP9fs6:aAnc¢ArbnAssalcPE nsc5nslRoss.spe with its outstandingvisual appearance and articular) high erfor- Po"rst NPP^ P_ 1w1 226.0 229-7 2a3s 237.2 w DVILL aFus.CTTOCIV(L pp particularly g p MTI YIILLBE SUfiJELTTO CNIL 3 mance on a small surface thanks to the innovative�.ANTUM LIUO cr,en or44nRor r• w 7a3 r.93 7.97 e.o2 Dar neESAmPPDsa uroNs. Technology.Q.ANTU61's world-record-holding cell concept has now 2Aren Cr[ail Yallaae' V IV] azlfi 37.43 37.69 37.9a Been combined with state-of-the-art circuitry half cells and asix- a Cmnm+IMaP• I_ JAI 7.32 7.36 7.41 7.45 NEW PV SYSTEM:5.670 kWp Yalut..1 MPP• V., tyl 'a.as 3,20 31.!,2 31.84 bushar design',thus achieving,outstanding performance under real �p,.m,,,,.°p,, 4Nlsa „, a a9+C,aTL:b E.6Y pnowm:,xw.r.•>wna a0r.5c •Iw•[°+waxml°ueama^na DUELL conditions-both with low-intensity solar radiation as well as on 4GrtIL P(Cm+lKr(C>9A}RjY!Na PE RISAMMCE AT LOW IRR>CLANCE - hot,clear summer days. MI°,H9e a a rer"•va�lr4 .-_... RESIDENCE •••-^•^--•- a auea:onynsa.As 4ass 9+.1•.d f,�,rr•�'�am^'�,���,, D.AfTrUM TECHNOLOGY.LOW1CVElISEO COST OF ELECTRICITY '$" "`"'-"'- -"-" nM,mn ptaan pP r4 myPax2alrau �N 'ta astsmrcm,wl w..ar aa,4_9Pa<,. rs!/�_� .. Higher yield per surface area,lower DOS costs,higher power .• - classes,and an efficiency rate of up to 19.3 33 FOREST LN nu.„°ames m a[co:aanro.mo m° INNOVATIVE ALL-WEATHER TECHNOLOGY QUEENSBURY,NY 12804 E^ dEax[,ta,a»w'reswnbrapnvr. '* W.[,a rp,....an Optimal yields,whatever the weather with excellent low light APN:52340030117117 4 and temperature behaviour. r.�__ ,�,,: r moaPv.Par!nmaaa,maer lr,wa4�n[<«reamr;< vuen,a9rE rart7rt<"s I:9'410,7p{'am't tELIF[RRIU9E EGTFH iA'S�- - ,. , ENURING HIGH PERFORMANCE (2CEILS U.Puawt CCRCicnrw 1,- 1%191 .0.04 T909mnut ECNliclePI cTYx p IxJKI -0.28 d J f i a E�� Long-term yield security with Anti LID TOchnologg,AnUPro �_ I i lenna4ra'.co [nmwP_ y t%IKI _0.37 xa-1ofr4uo[caurempnmme xom VC) 45 ENGINEER OF RECORD Technologya,Hot-Spot Protect and Traceable Quality Tra.Qsm. l"`` EXTREME WEATHER-RATING `.2� Ma mum9Paamypnye 4 1 4. IVI lea0 satlrclaa[ it x High-tech aluminlum alloy frame•certified for Mnl<un ae.4ne P+lrra 1, 8l1 20 61.It.hrr c S high snow(5400 Pal and wind loads(4000 Pa). P4lbretu laa4 IPal 5400/4000 Parmllid Noa4UT4mperl,Ne aO:c upw4xs'e !iell•Ipad W a[4mam4P MIn Ira a12151 ba Ccal.-T opt, S A RELIABLE INVESTMENT !!A`n7a . - , - I x• O Inclusive 12-year product warranty and 25-year linear t ('>�*.11r:ra; YOEOoa�nr Ratnf.tEC 618161Ep.7l;IFL Lp301W.n.PµJrc,vr•„°°:n PE.warrantyr. _..,_ .• iP.4xa not°w.w•s.,n ax Ex swan. z 5 STATE DF THE ART MODULE TECHNOLOGY m'+nziv' u PAPFA SIZE:II'x 17'(PNSI 61 V MANTUM DUO combines cutting edge cell separation D E �C F` �' RESOURCE DOCUMENT and innovative wiring with Q.ANTUM Technology. APT tat cpnmfionn ac,cidin¢ 7 W IEWS 62804.1Q015. melbrn 81-1500Y.166h) p Sea data at oP,.r xonda,xn<u,r:wpu<Lm>mwa u°toga.,Pa.s.om[,r°Idaty,Pro aperninR m<w>P,co,.mcl,.,,,o.Im<m pan<a uwanm,rt rw rote°,irra.a,ar,.,m,aPpwml��,.,aaun, DATE: 11.22.2019 l4r furNnr inlamwm. aN avvl ais Naaval. THE IDEAL SOLUTION FOR: .DESIGN BY:K.A. ®Wxex.4��.P+ xammaaentz smpx x CHECKEDBY: Kht ,.,,,..,:",t_.n4r. Smrma.:u 1143..166 etr,,:-,""r,aoo,".1(1.49IM1494 c699.3444,41.4a,m949166 99a3oo°I Wa 1:1,0 K 0&r Pl.-,.'.%"'. al REVISIONS CICELLS Q CELLS Engineered in Germany Engineered in Germany p R_oO.p rOo A B C D E F G H SHEET 10 A B C D E F G H 1 /Single Phase Inverter PLUGPV With HD-Wave Technologyfor North America SE300OH-US/SE380OH-US 'SE5000H-US SE6000H-US/ Single Phase Inverter Z SE7600H=US/SE1000OH-US/SE1140OH-US CONTRACTOR with HD-Wave Technology ournur — '.__� _�_ __ PLUGPV _ ,______ (lav r PHONE: (518)9485316 for North America. -------- ------ ADDRESS:- ` - ~' 875BROADWAY, SE3000H-US/SE3800H-US SE5000H-US .SE6000H-US a.w,aw•:� a,,.tiu„r., � �:vr. Albany,NS'122D7,USA SE760OH-US/SE10000H-US/SE1140OH-US m s. - T c i --r - --��- LTC.NO.: 82-0614158 .:c. ..' ...r..._._.._ _........._._ uNnuTxaa VRJ0 r _.................._........_ 1 ....... ...._..__...._.....___.- ----- - 7FausEOFlws _.........._.. _..........__....__.........._...._ - .. @NWMOSET1nnEOFWRITTEN ri Ier.L'7T ;rlipi•. 0 -. .. Cw..,'..•�.�,:oa• r.. - ---_ __._.._.._....__..r.._._._...—..._..._......._..____..............................................._....___...___.._.._........_........_-_.._...._.......—.___.._......__ PERMISSION FROM LONiRACNR 15IN AND VYLL BE SUBJECTTO CIVIL INPUT _ ,.:; _._.._--_. . ,.,.,...��f 1,:.:-,�•.,•�': ;—_____i- i -t`�r: ' )•• NEW PV SYSTEMS 5.670 kWp DUELL .:: :.._ .a,,.._ ._. .... ._ ........._.... _ .......... _ ._......_._....._---...._.................... __ - - _ - --...... _. ...-.._............ NC 6 1 .S ._...__.. _. }y _.. 1 � .. i_ RESIDENCE ,, 4 ---- - ----- -- ---— 33 FOREST LN . . -- —__ ----- - — -- - --- OUEENSBURY,NY 12804 .- APN:.5234003011 11 q .__.� .� <, .. _-_ r `r_._�_._. ..•. ADDITIONAL.FEATURES Rr,•_a+,:e:,.r:.._::,� : .�,�,.,:-R,:13„�:..-„-:-4.:�.,�„-,v.:: ENGINEER OF RECORD Optimized installation with HD-Wave technology ""- STANDARD COMPLIANCE - ----- _ via:,.cen.:�>a.u•,y.[u c.z• :,v...,.rro.:w.0 c,ac: .._..— _ - / Specifically designed to work Witt, / Extremely small �.e:c„�_�,• — _ at'-„•:r Ze".."'' ___-- — — power optimizers r,•::: t r =r•,�sc�.n,s ' Record-breaking efficiency / Built-In module-level monitoring INSTALLATION SPEGFICATIONS 0 Fixed voltage inverter for longer strings / Outdoor and indoor installationir ,,._ .r,.;;;r. - *•.,;,.r-•e=::..f.s„a F_. 5 / integrated arc fault protection rapid shutdown for °"'"""'"`'"""�'„'``""' :r.+.:,:sn;<:.>.•;r,.r: -, -------`--- ----------- NECtnn srFar.D•(nrvsl el g p P / Optional:Revenue grade data,ANSI C12.20 ' _.__.._ PAPER ,i•aliaT.' 2014 and 2017,perarticle 690.11 and 690.12 Class (aso accuracy)l _.—_.—__—. _^_-_�-----_----------------1 --_-_--.----_ ` 4 =' RESOURCE DOCUMENT U1.17415A certified,for CPUC Rule 21 grid —�------•--------_._____-__ —_____� compliance rm•,••>.;''e•-;,a:,t:., ._. ..._..........__..__........____.._.._........_.. _ ..-.. DATE: 11.22.2019 solar am' DESIGN BY:KA. . . � solareCge.com ,-• ..: ,,.-•^•.. ::••.-'.,_�••:,..�-:..:,";•".`.•.« 'CHECKED BY: L4A4 ROHS REVISIONS 6 R-002.00 A B C D E F G H sr:EET n ) A B C D E F G H I For North America .Power Opti rn IZer o P320 P340/P370/P400/P405/P505 For North America spo- PLUG PV ty) P320 P340/P370'/P400/P405/P505. � +72-011 . m . ` ,Nrur. " _ CONTRACTOR r.rw!Ir a�?n�iar=� ._'T- iio..__.T za`+'"c;> --r-s�:;—�-•a�- - . 2 -"s-� - u r U -Y PLUGPV p.mreEn .ESS :� _ rxvi^sn0cr.eu'em _.,. ........... ----- --------------i'=---j=z ADDRESS.875BROADWAY 0PHONE.. (51B)948-5316 _ (I • vEa -.. ca.6 .......__.. Albany.NY R207,USA _.._..,.__.—.___.........._..._.....__................._.._--.__.........._......................._.................._....._....._...:._... ICI OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTEDTO OPERATING SOLAREDGEINVERTER) UC.NO- B2-0E74758 .,--n,.cW 5 F.: HIGNO: uu,-,vn n:mw•.•mnz,......,..!_............ ro .. tii.. .. ,r< _ OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREOGE JfJVEI11R O_R SOLAREDGE UNAUTROUSD USEOFTHS rr� INVERTEROT— DNnwwo SETwmwVrwRITTEN >14ry4.7,Tbt,.,ww PMISS10NFR0NCONT!NCTOR!SUI N rn x-n :e1 __ ..._......._.......___..... YIe llw eFUS.YAPYRlxrwWS -..._...--•---..._.__._..------.................................................._........._...-----._...-- STANDARD COMPLIANCE AM WILLBE SUBJECT TO CIVIL 3 m FI.rC [CC>a11i C!,n a.4:.....4........:q.G3 DAMAGES ANn PROSECU1gN5. ...__...-.-....._......._._.:._.............._._..._...._.....__........_...._._.._..._....._...._..........................-..-........._..._.....�...-. ._.... .:,! NEW P 670 k - _..__.._.._ _- - p /�+ nf,•c.n ..__caw v.v^wrku..a.a.. ._.... V SYSTEM'S iNSTALLATTON SPECINCATLONS -- --- —_ - DUELS Mail .n — RESIDENCE a+x:.n,rv•i-n� —� -i +T3 :,k3,t?. t+Ca+23 """'z>;r 33 FOREST LN : a✓.�D_F2 _: __..._._.T_ -lW:evi.all/M(,e` PV power optimization at the module-level �'a'rr^e..... as/'=' ----------------'�='�'---- APN:52340030117117 : / Specifically designed to work with SolarEdge I Fast installation with a single bolt --„�.�, '_ -+,_,•,,,,,,,,,-_e:.,--„, „ -.,z„r,,,[� inverters ENGINEER OF RECORD -/ Next generation maintenance with module- �' -•*•• -•^•'� I Up to 25%more energy level monitoringo, •u - :+:n,.,e+._ .. I Superior efficiency(99.5%) I Meets NEC requirements for arc fault r ' :.a^,...rs:�:,,+r".P=s.PT:u.Pno.vaa: _. t ... C......._._.-P.._.._.._......_.. ... Pprotection AFCO and Photovoltaic Rapid ,._..__.-__......___.»..._......_......._ ....._._.._..........._......... -............_-.. ( P 1Pr.no.ry,m„cr'n .P as,:ni ........... ......_ .._._ _ .... I Mitigates all es of module mismatch losses, -____ ._,__._._.—.:_.._........._...... ._.____:..._...._..._S_........._.__...............f............._6 9 types Shutdown System(PVRSS) '•vi^••n*s:'^K71^+r^ r; s i from manufacturing tolerance to parlral - Mm"'-.y^°x"• -------------- _._________-- ---_____-.. .:_._.. 7. sIW p+yk1 n�iti,"�- ..j._ �.1.` shading I Module-level voltage shutdown for installer .,,,,,v.,r;,,.:,;,.:s:'•` ;'Lzxs,+i;•sEn>r: ea a>w ._ and firefighter safety Flexible system design for maximums ace - P`""!'`'`'I''ei�t Utilization •rv,, _, �, Y•v PAPOts¢E:u•etr(nNSlel RESOURCE DOCUMENT 0:7[,':a4\^'..wu.�f»:.:¢.ui.T/Ci-c,..:w4•.!a-,.a^:fnpe,du••N�•»a^u..g.:.�:.,-,q:A+Wt:an u•r• s�r.',;ell)i'r,o.<,ry6�ii� w';:`;.'oIi-'.'•`.e,:•set•;c<•�sv-+,..:.:..�,m.+.,,�n::....,,..e.,.:,..,.�;.,,;+n•...+•.sr•..:-:.,:n,.r<r: solari ' ( DATE: 11.222019 Soleredgecom @ • .l_�n RoHS DESIGN BY:KA CHECKED BY: MLM1ti REVISIONS 6 R-003,00 A B C D E F G H SHEET12 1 II • A B C D E F G . H 1 PLUG Pv AMI 1RONRI®GE Flush Mount System — XR Rnits d. XR10 Rail XR100 Rail XR1000 Rail Bonded Splices CONTRACTORis . PLUGPV 1 PHONE: -(518)946-5316 A low-prof8e mounting rail The ultimate residential A heavyweight mounting Ali rails use internal sprees ADDRESS:875 BROADWAY, for regions with light snow. solar mounting rail• lad for commercial projects. for seamless connections. 1 Albany,NY 12207,USA 6'spanning capability 8'spenning capability 12'spanning capability •Sell-drilling screws Moderate load eapablllry •Heavy load capability- Extreme load capability •Varying versions for railsIII UC.NO.: 82-0674759- --1 Clear and black finish Clear and black finish Clear anodized finish Forms secure bonding HIC.NO.: n -. ti U,,M.•-ara""'".,"- ELE.NO.: Clamps Grounding ll uNAutxol7vr;aussoFrEls r s a oammNG SET wmwurWRITTEN UFOs Stopper Sleeves Grounding lugs Micrelnvetler Kits PERIN15eaNFaaa CeNmACrLXfiS ANDM0L uoNofus.CTTOCNILuws 9 ANDw LL ESAND ROSEC TWS • , � _ oANAGFS ANOPftOSECNi1l1NS. NEW PV SYSTEM:5.670 kWp -- �- - DUELL _ - Universal Fastening Objects Snap onto the UFO to turn Connect arrays to Mount Mls or PCs to XR band modules to rails. into a bondad end clamp. equipment ground. Rails. •Fully assembled&Tubed Bonds modules to rails Low profile Bonds devices to rails RESIDENCE •Single,universal size Sized to match.modules Single tool installation Kit comes assembled •Clear and black finish Clear and black finish Mounts In any direction tasted to UL 2703 33 FOREST.LN Built for solar's toughest roofs. IronRidge builds the strongest mounting system for pitched roofs in solar.Every component has been tested to Attachments':; QUEENSBURY,NY 12804 d the limit and proven In extreme environments. FlashFoot2 Slotted L-Feet Bonding Hardware flush Standoffs APN:52340030117117 ' Our rigorous approach has led to unique structural features,such as curved rails and reinforced flashings,and Is also why our products are fully certified,code compliant and backed by a 20-year warranty. M' 4 a< ' ENGINEER OF RECORD ti Strength Tested PE Certified „ ,. _ x..: y -- .- ••�- All components evaluated for superior Pre-stamped engineering letters Flash and mount XR Ralls Drop-in design for rapid rail Bond and attach XR Rails Raise Flush Mount System Structural performance. available In most states. with superior Waterproofing. attachment. to roof attachments. to various heights. •Twist-on Cap eases install Secure rail connections •T&Square Bait options Works with vent gashing Class A Fire Rating ® Design Assistant Wind-driven rain tested SIGI lot vortical adjusting Nut uses 7116"socket 4"and 7t lengths •Mill and black finish Clear and black finish •Assembled and lubricated Ships assembled Certified to maintain the fire resistance PEE Online software makes it simple to 5 rating of the existing roof. create,share,and price projects. — Resources PAPER SIZE:If t 171fNSI e) Design Assistant NASCEP Cenifled Training RESOURCE DOCUMENT UL 2703 Listed System 20-Year Warranty - Go from tough layout to fully Earn free continuing education credits, (/Nit t CPl Entire system and components meet �® Twice the protection offered by _ - - engineered system.For free. `�J while looming more about our systems. DATE: 11.211019 newest effective UL 2703 standard. competitors. Go to InarAidge.coalydost0n Go to tronRldoe.comilmi,nng DESIGN BY:KA CHECKED BY: MIR REVISIONS h R-004.00 A B C D E F G H SHEET 1J A A B C D E F G H 1 y i a` � F 1{ a, GreenFasten"GF1—Product Guide Installation Instructions with Compression Bracket PLUGPV — i' CONTRACTOR 7��t lj f dd r tea. s PLUGPV 2 ��ili{{iC4rJ,ji3lait4 T;f„)I{rt$i I r jv'1 tit • il~�4 }. ft �1 •,q�, a '' ..n F' -� 1#X ]1 ✓i 1 j1nJj}.t� -'i�7 - e '° ;b.. i PHONE: (518)9485316 6 N7 ce .i 4. +� f f t.•�F1. Q } ADDRESS:875 BROADWAY, {fitYx I}f311 !. -.A.Tr. �- _A ar ,+ .^' `7& Albany.NY12207,USA '•Y� �'t� �/�� a LIC.NO.: 82-0674758 HIC.N0: ELE.NO.: =UlNOR USEOPTHS F�►Q1 ,:a r,� ;_+ �:. ` ic. DRAvnnG SE7WInI0UrwRrrEN x 1 y PER/ISSION IRON CONTRACTOR IS IN VIOLA11CNOFUS.COPYRUhriA'N5 AND WILL SUBJECT TO CIVIL 3 1-r.^ !�T V 0A7.WGESANDPROSECUnON3. 17 4 a9 e 1 2 3 4a 4b 4c NEW PV SYSTEM:5.670 kW }} � 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position P for each GreenFasten Flashing. DUELL 1 Jttj f 4Y; �4 2. Drill a pilot hole(11,T'diameter)for the lag bolt.Backfill with sealant.EcoFasten Solar recommends an EPDM mastic. RESIDENCE r Insert the flashin so the to art is under the next row of shingles and pushed far 3 g PP e-enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when 33 FOREST LN tow•qued. See page 2:2 for vertical adjustment when leading edge of flashing hits nails QUEENSBURY,NY 12804 4 tit �f nj" 7~�;F;, in upper shingle courses. APN:52340030117117 4. Line up pilot hole with GreenFasten flashing hole. 1� z €ri w 4_a Insert the lag bolt through the EPDM washer,the top compression component ENGINEER OF RECORD bracket (L-102-3, Rock-It SlideComp*, SCL-101.3'k, Z-101*. Conduit Mount Bracket*)and the gasketed hole in the fl ashing and into the rafter. 4J2 Insert the lag bolt through the EPDM washer,the Comp Mount Slide compression 3 bracket and the gasketed hole in the Flashing and into the ratter. � 4s Insert the lag bolt through the SS washer,the third-parry bracket,the EPDM sdl bonded washer,the CP-SQ-Slotted compression bracket and the gasketed hole in the Consult an engineer or go to wwev.ecofastensolaccom for flashing and into the rafter. Frf1� t JSi<: ; engineering data O PAPERSILE I I'.1r(ANSI a) 5 ;a f tkt' k 5. Torque:The range is between'100-140 torque inch-pounds depending on the type to 5 1 4 of wood and time of year.The visual indicator for proper torque is when the EPOM RESOURCE DOCUMENT on the underside of the bonded washer begins to push out the sides as the washer y compresses.If using an impact wrench to install the fasteners be careful not to over I,Ott 1 torque the fastener.You may need to stop and use a ratchet to finish the install. DATE: tt.2zzm9 DESIGN BY.•KA. ;.y *not pictured. t 1. .._._..__._..._..._.._—......_.........._.. ...__........_..._........................ ..._...._.__..._._.. ----- .---- __...._.._...._.......-_.........__...__.._........_.........._.................... CHECKED BY: MA1 f ..... Fasten Solar tected ts d. V kl$11DwFsto Sols�prErx!ocLM1srep,.1ec1.dbIylhafollotvinyU.S.PaerIsr8.151r5220218i58.700B28.1813r87D2a,166.713B26,146203828,200,914B20.245.45n828.272.174820225. 782 12.1.ZD1fi 2.1 I REVISIONS T R-005,00 A B C 0 E r G H SHEET 14 p A B C D E F G H GENERALNOTES — DO 1. FIELD VERIFYALLMEASUREMENIS 4 s e �. I 1ULLI PLUGPV 3 l 1 I 1 CONTRACTOR 23 24 25 1 2 PLUGPV 2 RACKING DETAIL (LONGITUDINAL) PHONE (518)948.5316 D2 NorroSCALE 0 SHEET KEYNOTES ADDRESS.875 BROADWAY, I. ROOF MATERIAL:ASPHALT SHINGLE Albany,NY 12207.USA I,I 2. ROOF STRUCTURECOLLAR TIE —'J"— 3. ATTACHMENTTYPE:ECOFASTEN GFI UC.NO.: 82-0674752 4. MODULE MANUFACTURER:RANWHA O-CELLS HIC.NO.: CKING DETAIL (TRANSVERSE) 5. MODULE MODEL:OREW 53IN.DUO BLK G5315 UWTOR 6. MODULE LENGTH:66.31N. uwvltxoRllIDusEOFTws H4�- 7: MODULE WIDTH:39.41N. URAWWG SET WITHOUT WRITTEN SCALE 8. MODULE WEIGHT:412 LBS. PSUSSION FROMCONIRACTOR IS IN fir 9. SEE SHEETA•103FORDIMENSION(S), ANDMI..LBE M OF UsueiECT�OFOCIVE ws 3 10. MIN.FIRE OFFSET:IS'FROM RIDGE,3G FROM EDGE OWUSANOFROSECUTIONS. RAFTER 10 a 12' RAFTER SIIZE:SPACING: XB NOMINAL O O NEW PV SYSTEM:5.670 kWp 13' LAG BOLT DIAMETER:51161N 14. LAG BOLT EMBEDMENT:3 IN I[ I !LI 15' TOTAL 9 OF ATTACHMENTS:34 DUE L 1G 16' TOTAL AREA 326.53 SO.FT. 17. TOTAL WEIGHT., PER T:ACHME47.18 BS. RESIDENCE 18. WEIGHT TE AOA:2.59P:24.92 LB5. _ 19. DISTRIBUTED LOAD:2.59 PSF 20. MAX.HORIZONTALSTANOOFF:481N. 21. MAX:VERTICACSTANDOFF: 33 FOREST LN © 21 22, STANDOFF STAGGERNG:YES 3sIN. QUEENSBURY,NY 12804 23. RAIL MANUFACTURER(OR EOUIV.):IRONRIDGE APN:'52340030117117 4 24. RAIL MODEL(OR EQUIVALENT):XR100 I 25. RAILWEIGHT:0.68PLF. 26. MAX.RAIIR SPAN:124 Fr. OF_NEjy 27. MODULE CLEARANCE 3 IN.MIN,6 IN.MAX. 1 F� O # # D3RACKING DETAIL (TOP) W NOTTO SCALE09137 opqOf E S S IONP��� 11z��n�� PAPERSIZE:11'A 1T(ANSI B1 ASSEMBLY DETAILS DATE: 1122.2019 DESIGN BY:KA. CHECKEDBY: M.M. 6 DETAIL (TRANSVERSE) TAIL (LONGITUDINAL) REVISIONS D4 NOTTOSCALE IKZ� SCALE S-501,00 A R C D E F G H lSHEET91 P,002 RX Date/Time 01/2712020 12:56 15182731202 N0. 2587 P. 2/3 Jan. 27. 2020 12:41PM T— MIDDLE DEPARTMENT INSPECTION AGENCY, INC. S o,V!a that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date noted below and is issued subject to the following conditions. Owner: • William Duell Date: 01/17/2020 Occupant. Solar PV stem Location Sy $3 Forest Lane Occupancy- Ingle Family Dwg. Queensbury,Warren Co. NY Applicant: Plug PV • • '; •.�� � �� �� �� �� Steve Weigel d� ..�r 875 Broadway � � � • • - L Albany, NY 12207 A ;JAN 2 7 Z020 -TOWN OF OUEENSSURY Joseph A.Holmes SUILDING&CODES No. 147022117422EL Equipment: 1 18-Solar Modules; 1 -500 Watt Inverter, 1 -AC Disconnect;1'-Line Side Tap This certificate applies to the electrical wiring to the electrical equipment listed immediatery null and void. This certificate applies only to the use,occupancy and above and the instatiation inspected as of the above noted date based on a visual ownership as indicated herein. Upon a change in the use,occupancy or ownership inspection. No warranty is expressed or implied as to the mechanical safety,effi- of the property indicated above,this certificate shall be immediately null and void. ciency or fitness of the equipment for any particular purpose. This certificate shall In the event that this certificate becomes invalid based upon the above conddons. be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon reinspectlon by Middle Department system to which this certificate applies be altered in any way,including but not limit. Inspection Agency,Inc, An application for Inspection must be submitted to Middle ed to,the introduction of additional electrical equipment and/or the replacement of Department Inspaction Agency, Inc.to initiate the inspection and revalidation any of the components inslatled as of the above noted dale,this certificate shall be process. A fee will be charged for Ihls service,