Loading...
RC-0548-2018TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518) 761-8201 Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-0548-2018 Tax Map No: 226.19-1-22 Permission is hereby granted to: Laura McNeice For property located at:8 Chestnut LN In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Laura McNeice Single Family-New 150,000.00 Owner Address: 38 Reeves AVE Total Value 150,000.00 East Farmingdale,NY 11735 Contractor or Builder's Name/Address Electrical Inspection Agency Plans&Specifications Single Family Dwelling w/gas FP 1640 s.f. 1,571.90 PERMIT FEE PAID -THIS PERMIT EXPIRES: Tuesday,January 28,2020 If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Queensbury; Monday, January 28,2019 SIGNED BY:rSZ I/ J „ a4--- for the Town of Queensbury. Director of Building&Code Enforcement On PRINCIPLE STRUCTURE PERMIT APPLICATION Permit Fee:$ Town of Queensbury Rec Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.queensbury.net Invoice#: Project Location: 8 CHESTNUT LANE Tax Map ID#: 226.19-1-22 Subdivision Name: SHORE COLONY TOWN BD. RESOLUTION 86-2013: $850 recreation fee for new dwelling units: singI-y famfl -- multiple family, apartments, condominiums,townhouses, and/or manufactured & modu fien bid n t jbE homes. This Is In addition to the permit fee(s). 11 s JCONTACTINFORMATION:J JAN 4 2Q 9 T, H ro iY ii.1RT Applicant: COMMT 5 i_OPMENT Name(s): LAURA MCNEICE Mailing Address, C/S/Z: 38 REEVES AVE, EAST FARMINGDALE,NY 11735 Cell Phone: (646 ) 643-6784 Land Line: ( Email: TMM616@AOL.COM Primary Owner(s): Name(s): SAME AS APPLICANT Mailing Address, C/S/Z: Cell Phone: ( Land Line: ( Email: Contractor(s): Business Name: SAME AS APPLICANT Contact Name(s): Mailing Address, C/S/Z: Cell Phone: ( Land Line: ( Email: Architect(s)/Engineer(s): Business Name: FRANK JELLEY/ED LAPOINT(ARCHITECT) TOM CENTER,HUTCHINS ENGINEERING Contact Name(s): Mailing Address, C/S/Z: LAKE GEORGE,NY 169 HAVILAND RD,QUEENSBURY,NY Cell Phone: ( 518 )796-2515 (CENTER) Land Line: ( 518 ) 796-5611 (JELLEY) Email: TCENTER36@YAHOO.COM FJELLEY@NYCAP.RR.COM Contact Person for Building & Code Compliance: FRANK JELLEY Cell Phone: ( Land Line: ( 518 ) 796-5611 Email: Town of Queensbury Building&Code Enforcement Principle Structure Application Revised February 2017 4 w 4ipx,„ 1:110tor 14".: T PROJECT INFORMATION: TYPE:Commercial X WORK CLASS: X Single-Family Two-Family Family(#of Townhouse Business Office Retail Hotel/Motel Industrial/Warehouse Garage(#ofcars i Other(describe STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1ST floor: 1132 SF 1sT floor: 2" d floor: 518 SF 2nd floor: 3` d floor: Total square feet: N/A 4th floor: Total square feet: 1,650 SF ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 150,000 2. Proposed use of the building: RESIDENTIAL 3. If Commercial or Industrial, indicate the name of the business: N/A 4. Source of Heat (circle one): Gas Oil Propan Solar Other: C)2 Fireplaces need a separate Fuel Burning Appliances& Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? YES ®Explain: 6. Are there any easements on the property? ® NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? 7,500 SF b. Is this a corner lot? YES 4ji c. Will the grade be changed as a result of the construction?NO d. What is the water source? PUBLIC PRIVATE WEL PRIVATESEPTICe. Is the parcel on SEWER or a PRIVATE SEPTIC system? DECLARATION: I . I acknowledge that no construction shall commence prior to issuance of a valid building permit and work will be completed within a 12 month period. 2. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: L(1uVL flnC. n SIGNATURE:i /7 L DATE: I'L `Z cgI Town of Queensbury Building& Code Enforcement Principle Structure Application Revised February 2017 CHECKLIST—SINGLE FAMILY Project Location: CHESTNUT LANE(EAST LOT) REQUIRED —2 SETS YES NO N/A 1. Building Permit application, completed X 2. Energy Code inspector's report from REScheck, completed & signed X 3. Septic alteration application, if applicable X 4. Solid Fuel Burning or Gas Appliance form completed, if applicable X 5. Driveway Permit, if applicable X 6. Structural Drawings: X a. Floor plans b. Foundation plans c. Cross Sections d. Elevations e. Window & Door Schedule f. Natural Light, Ventilation & Emergency Egress 7. Plot Plan: Show proposed structure(s) with setback dimensions X from all surveyed property lines 8. Electrical inspection agency selected CHECKLIST— MULTI-DWELLING/COMMERCIAL Project Location: REQUIRED —2 SETS YES NO N/A 1. Building Permit application, completed 2. Energy Code inspector's report from COMcheck, completed & signed 3. Septic alteration application, if applicable 4. Solid Fuel Burning or Gas Appliance form completed, if applicable 5. Driveway Permit, if applicable 6. Structural Drawings: a. Floor plans b. Foundation plans c. Cross Sections d. Elevations e. Design loads including floor, snow & wind load f. Seismic design g. Plans signed & sealed by registered architect or engineer h. Window & Door schedule 7. Plot Plan: Show proposed structure(s) with setback dimensions from all surveyed property lines 8. Electrical inspection agency selected 9. FINAL AS-BUILT PLANS SUBMITTED ELECTRICONICALLY Town of Queensbury Building& Code Enforcement Principal Structure Application Revised February 2017 FUEL BURNING APPLIANCE & Office Use Only CHIMNEY APPLICATION Permit#: -© La 6 Permit Fee:$ own of(1iCCI shury 742 Bay Road, Queensbury, NY 12804 invoice:#: P: 518-761-8256 www.queensbury.net Project Location: CHESTNUT LANE Tax Map ID#: 226.19-1-22 Room of Install: FIRST FLOOR LIVING Planned Install Date: SPRING 2019 ONE APPLICATION PER APPLIANCE** CONTACT INFORMATION: Applicant: Name(s): LAURA MCNEICE Mailing Address, C/S/Z: 38 REEVES AVE, EAST FARMINGDALE ,NY 11735 Cell Phone: ( 646 ) 643-6784 Land Line: ( Email: TMM616@ICLOUD.COM Primary Owner(s): Name(s): SAME AS APPLICANT Mailing Address, C/S/Z: Cell Phone:_( Land Line: _( Email: Installer/Builder: Business Name: SAME AS APPLICANT Contact Name(s): Mailing Address, C/S/Z: Cell Phone:_( Land Line: _( Email: Contact Person for Building & Code Compliance: FRANK JELLEY Cell Phone: (518 ) 796-5611 Land Line: ( Email: FJELLEY@NYCAP.RR.COM Fuel Burning Appliance & Chimney Application Revised March 2017 FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: X Stove Fireplace Insert Fireplace Fuel Fired Equipment (Garage Only, 18" clearance per IMC 304.3) X Fireplace, factory built** Manufacturer's name: VERMONT CASTINGS Model#: DEFIANT FLEX BURN 1975 SOURCE OF HEAT: X Wood Coal Pellet Gas CHIMNEY INFORMATION: Masonry: block brick stone X Flue: tie X steel _size, in inches X Material*: double-wall X triple-wall X insulated DURA VENT 6 IN Manufacturer's name:Model #: ADDITIONAL INFORMATION: 1. Two inspections are required. A rough-in inspection, prior to installation and a final inspection, after installation. 2. Manufacturer's installation manual must be available at the time of inspection. 3. Masonry fireplaces & chimneys require plans to be submitted. 4. Twenty-four(24) hour notification is required for inspections. Declaration:Construction/installation must conform to NYS Fire Prevention & Building Code and/or manufacturer requirements. The applicant or owner agrees to comply with all applicable laws, ordinances, regulations and all conditions that are part of these requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: L A z A SIGNATURE: ,; ( .L t 1 DATE: ;2I2g/{ g IL Fuel Burning Appliance & Chimney Application Revised March 2017 SEPTIC DISPOSAL PERMIT APPLICATION Office Use Only 742 Bay,, Road,Queensbury,NY 12804 rm. rfcLucen.hur P: 518-761-8256 www. queensbury. net Permit#: .^ OWU ' 2 Tax Map ID#: 226.19-1-22 Permit Fee: $ Invoice#: Project Location: 8 CHESTNUT LANE Septic Variance? Yes No Primary Owner(s) LAURA MCNEICE Mailing Address 38 REEVES AVE., EAST FARMINGDALE,NY 11735 Phone & Email 646-643-6784 TMM616@AOL.CQM Installer/Builder SAME AS OWNER Mailing Address Phone & Email Engineer HUTCHINS ENGINEERING,TOM CENTER Mailing Address 169 HAVILAND RD QUEENBSURY,NY Phone & Email 518-796-2515 TCENTER36@YAHOO.COM Contact Person for Building& Code Compliance: T CENTER Phone: 5187962515 RESIDENCE INFORMATION: Year Built of bedrooms X gallons per bedroom =total daily flow Garbage Grinder Yes ®o 1980 or older Installed? (circle one) 1981-1991 Spa or Hot Tub Yes Installed? (circle one) 1992-Present 2 110 220 PARCEL INFORMATION: Topography X Flat Rolling Steep Slope 5 %Slope Soil Nature X Sand X Loam Clay Other Groundwater At what depth? 32" Bedrock/Impervious material At what depth? NA Domestic Water Supply Municipal X Well (if well, water supply from any septic system absorption is NA ft.) Percolation Test Rate: 7 per minute per inch (test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size 1000 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field with#2 stone Total length ft.; Each Trench ft. Seepage Pit with#3 stone How many: Size: Alternative System Bed or other type: 300 SF Holding Tank System Total required capacity? tank size of tanks NOTES: 1. Alarm system & associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: TOM CENTER HUTCHINS ENGINEERING DATE: 12/27/18 7- 2- 7 SIGNATURE: DATE: 12/27/18 Town of Queensbury Building& Code Enforcement Revised February 2017 STORMWATER MANAGEMENT APPLICATION INSTRUCTIONS A. GENERAL INFORMATION Lake George is a State-owned resource held in custody of the people of the State and protected under several State laws. Because the Lake has a relatively small and steep watershed, its water quality is highly susceptible to pollution caused by stormwater runoff. Development projects, when uncontrolled, can cause runoff problems during construction and after completion. In order to protect water quality, development projects are required to provide for the control of stormwater runoff. This is a general guide for those undertaking projects which may require a permit for the management of stormwater from development projects pursuant to Chapter 147; Stormwater Management, Town of Queensbury Zoning Ordinance. This is not a description of all applicable laws or regulations -other permits may be required for your project. It is the owners' responsibility to obtain all required approvals prior to commencing work. The Lake George Park is comprised of Lake George and, essentially, its land drainage basin. As such, the Park includes private lands some miles from the lake. If there is a question as to whether or not the project site is located within the Park, contact the Town of Queensbury Department of Community Development at (518) 761-8220 or the Lake George Park Commission at (518) 668-9347 for a determination. B. STORMWATER MANAGEMENT PERMIT REQUIREMENTS A permit must be obtained prior to commencing: 1. Projects involving the creation of more than 1000 square feet of impervious surface. Impervious surfaces include buildings, pavement, blacktop, macadam, packed earth and crushed stone. 2. Land clearing, grading or filling involving more than 5000 square feet. It is a violation of the Stormwater Management regulations to maintain a condition, which, due to a human disturbance of land, vegetative cover, or soil, results in the erosion of soil into any water body. If you are not sure if you need a permit you can submit a jurisdictional inquiry for a determination. Just send a cover letter with your name, address, phone number and tax map number of your property asking for a jurisdictional determination, along with a copy of your project plans. Be sure to include all proposed changes to the property including all structures to be removed and added, driveways, sheds, decks, garages, etc. C. PROJECT CLASSIFICATION Minor Projects (projects not falling into one of these categories are Major Projects): 1. Any building, land clearing or development activity affecting less than 15,000 square feet. 2. Creation of a two-lot, three-lot or four-lot subdivision which may result in the construction of no more than one single-family residential structure and related accessory structures per lot, and will require land clearing or alteration activities of less than 15,000 square feet per lot and less than 15,000 square feet total for any subdivision road. 3. Any building, alteration or modification of a stormwater control measure, excluding maintenance, cleaning or repair of such stormwater control measure. If your project site contains any of the following conditions it may be considered as a Major Project: LACRAIG BROWN\TEMPLATESISTWATAPPS\TOWN STORMWATER INSTR.DOC page 1 of 3 1. Soils of high potential for overland or through-soil pollutant transport. 2. An area with a slope of fifteen percent (15%) or greater when measured in any direction over a distance of one hundred (100) feet from the center of the proposed building site. 3. An area with a soil percolation rate slower than sixty (60) minutes per inch. D. FILING YOUR APPLICATION A pre-application meeting with the Zoning administrator may be desirable for large or complex projects. A complete application must include the following: Application form - completed and signed. A general location map of the property sufficient to direct someone to your site. Project plans (see below) For major projects only: The names and legal mailing addresses of all landowners within five hundred (500)feet of the project site. (this information may be obtained from the town tax assessment office). A complete list of all permits or approvals required from other agencies, the status of each application and the status of the action under the State Environmental Quality Review Act(SEQR). A completed Full Environmental Assessment Form. For Major Projects -A Stormwater Control Report. A Stormwater Concept Plan may also be required. See regulations for requirements. NOTE: Failure to include any one of these items will result in an incomplete notice and delay in processing your application. Common mistakes to avoid Information was omitted from the application form -the application was not signed by the owner. Vicinity or location maps not suitable to direct someone to the site. The map should reference a principal highway, road names,etc. Topographic maps or county highway maps are suggested. Vague, incomplete or poor quality plans. Plans should be to scale and show all pertinent distances and dimensions. Incorrect mailing addresses for adjacent owners. Section, block and lot number incorrectly given. This is the legal tax map number assigned to each property. LACRAIG BROWN\TEMPLATES\STWATAPPS\TOWN STORMWATER INSTR.DOC page 2 of 3 PROJECT PLANS The project plans are the basis for review and approval of the project and typically consist of a site plan showing all new development and location of stormwater measures, erosion control plans and construction details for stormwater and erosion control devices. Construction must be in strict accordance with the plans. Applicants for minor projects should consult the Guide for Minor Projects Manual. Your local Soil &Water Conservation District may be able to assist you in the preparation of plans. A Site Plan - Have your builder, engineer, landscaper or architect provide you with a site plan. The plan should be an accurate drawing to scale showing property boundaries, streams, wetlands and lakes within 100 feet of the property, existing and proposed buildings, driveways, wastewater system, wells, patios and other hard surfaces and the areas to be cleared, filled or graded. Label all buildings as existing or proposed and note any existing buildings to be removed. A Erosion &Sedimentation Control Plan - Show locations of all temporary erosion control devices to be utilized during construction on a copy of the site plan. Minimize the disturbance to land by limiting the area to be cleared, cut or filled and the time period that the site will be worked and de-stabilized. Protect downgradient streams, lakes, wetlands with erosion control devices such as haybales, dikes, filter fabric fencing, etc. Stock piled earthen materials should be protected. Contact the Warren County Soil &Water Conservation District for assistance at 623-3119. A Stormwater Control Plan -Show locations of all permanent stormwater control devices on a copy of the site plan. A Construction Details -The stormwater control device details should include a profile view and construction details of such devices as dry wells, infiltrators, trenches, retention ponds, trenches, etc. some detail drawings for typical devices are included in the Guide for Minor Projects) E. PERMITS FROM OTHER AGENCIES Other permits or approvals for projects may be required from Federal, State, Regional or Local agencies. Project sponsors should inquire at these agencies as to authorizations which may be necessary before commencing work. The list of agencies which follow is provided to assist project sponsors. It is not intended to mean that a permit is required from the agency, nor does the list include all agencies from which authorization may be required. Warren County Planning Dept Municipal Center Lake George NY 12845 518)761-6410 Adirondack Park Agency PO Box 99 Ray Brook, NY 12977 518) 891-4050 NYS Department of Environmental Conservation P.O. Box 220 Hudson Avenue Extension Warrensburg, NY 12885 518)623-3671 Lake George Park Commission Fort George Road, P.O. Box 749 Lake George, NY 12845-0749 518)669-9347 L:\CRAIG BROWN\TEMPLATES\STWATAPPS\TOWN STORMWATER INSTR.DOC page 3 of 3 Permit Number town use) Town of Queensbury Application for Stormwater Management Permit Under Chapter 147, Stormwater Management,LL 4-99 THIS APPLICATION IS FOR A Major Project CCrlinor Project 1. OWNER (-INDIVIDUAL-)-PARTNERSHIP -ASSOCIATION -CORPORATION -MUNICIPALITY -AGENCY NAME LAURA MCNEICE PHONE 646-643-6784 MAILING ADDRESS 38 REEVES AVE CITY EAST FARMINGDALE STATE NY ZIP CODE 11735 2, AGENT SAME AS OWNER -CONTRACTOR -ATTORNEY CONSULTANT CONTACT PERSON NAME HUTCHINS ENGINEERING - TOM CENTER PHONE 518-796-2515 MAILING ADDRESS 169 HAVILAND ROAD CITY QUEENSBURY STATE NY ZIP CODE 12804 3. CONTRACTOR -SAME AS AGENT NAME SAME AS OWNER PHONE MAILING ADDRESS CITY STATE ZIP CODE 4. PROJECT LOCATION FACILITY NAME(if not residential)SECTION 226.19 BLOCK 1 LOT 22 STREET 8 CHESTNUT LANE ZONING CLASSIFICATION PR • RTY IS PRESENTLY WR I VACANT -PARTIALLY DEVELOPED -DEVELOPED&OCCUPIED IS PROPERTY PART OF A SUBDIVISION? - No -Yes, name of subdivision SHORE COLONY 5. PROJECT DESCRIPTION PROJECT CONSTRUCT NEW RESIDENCE WITH STORMWATER MANAGEMENT & SEPTIC PROJECT INVOLVES: arthwork/Landscapm ree Clearin louse Constru or Addition rivewa nstruction Garage Construction etached Struct <Septic Systems - odification of a Stormwater Devic Other L:\CRAIG BROWN\TEMPLATES\STWATAPPS\TOWN STORMWATER APPL.DOC 11/2000 Page 1 of 3 L PROPOSED USE - Residential (seasonal) sidential ( year- round -Association -Public -Commercial PROPOSED STARTING DATE SPRING 2019 PROPOSED COMPLETION DATE FALL 2018 DESCRIBE THE MAXIMUM SLOPE OF THE PROPERTY IN THE PROJECT AREA: 0-5% (Level) -.•- 0% (Gradual slope. 10-15% (Moderate slope) a Greater than 15% (Steep Slope) IS ANY PORTION OF THIS ACTIVITY FOR WHICH A PERMIT IS SOUGHT NOW BEGUN OR COMPLETED? Yes No (if yes, please explain) 6. CALCULATIONS & CONTROLS TOTAL AREA OF PROPERTY 7500 SF ACRES FT2 (circle one) TOTAL AREA OF LAND DISTURBANCE: 7300 FT2(do not include area of stormwater controls) TOTAL AREA OF NEWLY CREATED IMPERVIOUS SURFACE: 1536 FT2 TOTAL VOLUME OF STORMWATER TO BE CONTROLLED: 336 CF see instructions) TYPE OF STORMWATER CONTROL MEASURES TO BE USED: PERMEABLE PAVER DRIVEWAY WITH STONE STORAGE AND A DRAINAGE SWALE HAS AN EROSION CONTROL PLAN BEEN PREPARED? 4/Z4 plan is attached -No If no, please contact your County Soil&Water Conservation District for assistance: Warren County 623-3119 7. SITE INSPECTION During the processing of this application town personnel may need to visit this site for the purpose of inspecting, measuring and/or photographing site conditions. I authorize town personnel to conduct such a site inspection'CD9 no I wish to be contacted prior to any site inspection 9 no 8. CERTIFICATION I hereby affirm that the information on this form and all attachments submitted herewith is true to the best of my knowledge and belief. As a condition to the issuance of a permit, the applicant accepts full legal responsibility for all damage, direct and indirect, or whatever nature, and by whomever suffered, arising out of the project described herein and agrees to indemnify and save harmless the town from suits, actions, damages and costs of every name and description resulting from the said project. SIGNATURE OF OWNER t _" ., J d e] DATE / 2112 / SIGNATURE OF AGENT C / DATE 12/27/18 INCLUDE WITH THIS FORM: 9 Site location map 9 Project plans on 81/2 X 11 size paper(Submit 4 copies of any plans larger than 11X17) 9 Names and legal mailing addresses of any co-owners of the property 9 Attachment A (for major projects only) 9 Stormwater Control Report(for major projects only) 9 Environmental Assessment Form (for major projects only) Failure to include any one of the required items will result in an incomplete notice and delay in processing your application. Permits and approvals may be required from other agencies. for town use only L:\CRAIG BROWN\TEMPLATES\STWATAPPS\TOWN STORMWATER APPL.DOC 11/2000 Page 2 of 3 The project is approved as shown on the attached approved plans and subject to the conditions listed on the attached Schedule A. Approved by on Permit Expires Zoning Administrator Date CONDITIONS OF APPROVAL ATTACHMENT A to Stormwater Management Permit Application Permits or approvals required from other agencies Agency Permit or Approval Date Applied Date Issued TOQ BLDG DEPT BUILDING PERMIT 12-27-18 Adjoining Property Owners List all parcels within 500 feet Tax Parcel Number Name Mailing Address L:\CRAIG BROWMTEMPLATES\STWATAPPS\TOWN STORMWATER APPLDOC 11/2000 Page 3 of 3 i 411- ` L{ Al i FIE _LDC0NTROLS dmproving Indoor Environments IS B 1 I etter ir For Living I I The FRESH AIR VENTILATION CONTROL: I k Effe.ct'iv.ely manages the centra-1 fan to meet required Ventilafion an-d i to .deliver fres.h indoor air. k I r v k i i t 11 Fd ( ventiaation solution for_Abe rfre} x huh i ty i - qt gy efcr°ent.. hFome ' r r Wh exhaust air-when au can improve t Ind circuklatelt far the same cost? y` I I 1 EASILY CUST.OMItA LE EXHAUST CREDIT HUMIDITY MO,NITORIK The. Fresh Air Ventilation The.FAVC moriitors.up to•four The Fresh;Air Ventilation, Control.com.es.from the exhaust appliances within"the Control monitors humidity factory'pre=set fora 3= home-to adjust ventilation condition ,-milarto.an. bedroom, 2,000 s .4i. house. HRV/ERV,.and.can inferfaceqneeds.bosed.on.total Iandis.easily ddf usted to• with multi ple:.additional appliance bp,eration, and exhaust'fans".'to.ad'ust anddifferent'size tiorries. The I: - FAVC:is out of the'b-ox- can provid6 Make.=:U:p air in deliver ventilation needs response"to Un exhdustirig ntelli entlcompliantwithASHRAE9 Y standards. appliance. I I A Home Is A System The:'Frbs,h, A4 V'Cin'tillati&h Control te.coghizes the h.om-e; is-a system and 'iht6g_-Nadt-bs the, central fd.h to meet Ventilation reqOireme-nts and i.rhp'ro-Vb J-1hdoor, air qudhty. Todoy's Well-Built,Homes. Require Beilor.-Ventilation, Hoops built today are energy off aentwith betfor-losul afiion:and'ore more tightly sealed. As a result, homes trap stale, unhealthy air i n s i de,.,Th,P ASH RAE-42.2 fresh°o i r,ventilation,standard w- d s,,-,e s to b I i-s*he d I,o"erisuro'a-deauote,:air changes-and bathrooms 8uppl.y.,,qlrffbfn OM'bnttblled.citid pofenfia.l. unh.eolftysbu(ifels like th-e go roob,,?.dtfic- , trawl space, or,basement and;create negative r pressure' 6 the home, Fresh air must come from-.butd' ors,The,, Field.ControlsRESK AI K VENTILA:TIQN.'.CONTROL FAVC) manages fresh-o-vtdo' or,di(,intake; p.er Title 14- le indoorexhaust t ide.whol-,-dw.dwelling, balanced Ventilation while-s-dti.sfyinq,and airto e: e ASHME 62,.2-2201 Or,201.8,dhd 2016'rst(jindard&.. Indoor Air Quality Same Cost, Added Benefit:Time.Spent Indoors Increasing vehfilotion,rates will Higher ventilation-rates We.§pend,as.much as 90%of rodvce respiratory illiiess'and corresponded wif I- b.lower QYf-firne indoors. Consp.querifly, assodafiad sick leave,.(bd'u' Cb Vocs, fqrmoldehyd 'orid' qllergohsond f.rdrh the sick buildingCO2, and improvements,i in-d.,o,or;,onvir-on,mi ht.mdy plo Isystems, and Y CT increase productivity." health—fevver.hioqdach%,. s I Oni4onf,tolo irOriggofiPg eczema, arfd.skinollerqi s, dAmb:and.al[er 'y bpi- -IsO d-e0 s. 7 ca sease report.study ec Francisco 20..1*6 studv CDC.Hb-dithyHO.Using FreA' Air'Veh' filation Cbn'frol.Ben41'fs-: Os with ASHRAE42.2B601erdistributionthroughComplies Optional MEk- 0 filtration" woOx.jstiqqAucr' rk 20 Y01,0 1,13,112-0]6 and Tille:24 combined with a media fille(cabinef N50f fora 3Bedroorn, 2j000 Simple Installation with lowl Multiple:Climate Application Modev. sq-ft home power usage for both single/ Itj-laAy'op_O(qtibn 4 r 0 I LL ollhyNontOS •'• m rF I o Enhances, indoor air quality of the home c) Complies with AShIRAE 62.2 2010, 2013 and 2016, Title 24 o Factory preset for a 3 bed,ro.om, 2,000: sq-ft home o New or existing single/multi-family op-eration o Customizable for nearly any size' home The Fresh Air Ventilation.ControlT11 (FAVC) is designed to provide fresh air ventilation and comply.With ASHRAC 62.2 and Title 24 ventilation standards while greatly improving the indoor air quality and comfort in the home. The FAVC interactively works with a residential HVA.0 system thermostat.and the central fan air handler system to periodically'introduce controlled amounts of F I M L ®'C O N T R O L S fresh air intolhe-home. Improving Indoor.Environments 915,4.Stellar Court Corona, CA'92833 252.522.3031 contact@fieldconirokcom fieldcontrols.com/favc ENGINEERINGDATA LDCONTROLSC.4-0 CIrnpiovinry Indoor C-nviionmrnls V Heo IthyHomeSyslarri i I Model FAVC f•ttr.rrr•>r iII(N n.n+-QIP I Fresh .Air Ventilation Control Part No. 602600100 Healthy Ho me System'1_r.. J 0'1 RLO Co N r 9t)15 ITEMS INCLUDED IN KIT DESCRIPTION Fresh Air Ventilation LController The Fresh Air Ventilation ControlT,'(FAVCI which:is part of the Field Controls Healthy Home SyslemTM product line. Mounting Hole Template interactively works with resideniiol.HVAC system thermostat, in conjunction with the central fan air handler-system to periodically introduce controlled amounts of fresh air into the home. The FAVC is designed to provide fresh.air Instruction Manual venlilation'all year long keeping energy,conservalion, indoor air quality and comfort in mind.The FAVC system meets the requirements of ASHRAE 62.2'standard for ventilation. The controller has several modes of operation: a Mounting Packet containing two(2)Sheet standard mode is designed to work in conjunction with your forced air HVAC fan system and an economy mode Metal Screws designed to function independent of your forced air HVAC fan system. The FAVC will continuously monitor indoor Relative.Humidity.and Temperature used to regulate R/A duct humidity in the winter months and to prevent humid ODT Sensor Packet containing temperature cohdilions during the summer months by reducing the ventilation cycles during periods of high dew points. The sensor;sheet metal screw and two(2)wire FAVC will also monitor outdoor air temperature conditions using a sensor mounted to the duct in front of the Fresh nuts Air Damper,or Heat/Energy Recovery Ventilation products.The controller has built-in protection for furnace plenums during Ike heating,-nonths of'Winter and shoulder seasons That will prevent condensation and corrosion of,the heat exchanger as well as preventing mold growth by habiting ventilation to control humidity levels'in the controlled space.The.FAVC.can monitor multiple exhausting appliances with in your home to adjust ventilation needs based OPTIONAL ACCESSORIES on total appliance operation along with the ability to cycle on/off multiple appliances(dampers,ERV/HRV,HVAC C-Sensor: Current sensor compatible with E-Sensor central blower and various exhausting device/fans)'to evenly balance fresh air ventilalionvith in the-home. and FAVC, used to provide makeup air by sensing FEATURES BENEFITS operationof exhausting devices such as dryers,bath ..Normal'or Economy Mode.of Operation Smart Controller(adjusts ventilation lime based on Ifansandrangehoods.Passive device.with no external Multiple Climate Application Mode: Normal, Hot, central fan.and/or appliances,in operationj power requirement. Cold or Disobled Low power usage P-Sensor: Duct-mounted differenlial pressure • Simple.Fresh Air Ventilation using Fresh Air Damper •Simple Inslallation or HRV/ERV Devices Complies.with ASHRAE 62.2 2016switchcompatiblewithFAVCinputs, similar:use,as .Monitoring Capability(up to 4 appliances—multiple •Adjusts ventilation need based on 30-minute lime C-Sensor, adjustable setpoint, may be installed on bath Fans,exhaust fans,clothes dryer,range hood, periods posiliVb or negative pressure.ducts, draft assisted gas log fireplaces,and/or exhaust fan •Versatility(controls,monitors and C_FM adjustable for devices) appliances). Fresh Air Dampers (FAD) — Return air mounted •Monitoring and Control Capability a Controls three(3)appliances(including fresh air dampers sizes 4"Ihru 20"compatible with a Built-in Selectable Enthalpy Corilrol ventilation damper) FAVC Ventilation terminals..All are 24 VAC actuator °Ternperalure sensor located in R/A ductwork o Monitors four(4)exhaust fan apPltance's powered units. i Compatible with any HVAC,system having o Adjustable air flowe dial settings for each exhaust accessible 24VAC R W.Y G terminals: fan appliance Heal/Energy Recovery Ventilators(HRV/ERV)- The o Conventional Heat/Cool HVAC Systems o Individual Heat and Cool air flow settings for l a.,HeatPurnp Systems HVAC central fanHRV/ERV.products are designed to provide a balanced o Hydronic Alf Handlers o,Ashrae 62.2 Conlinuous,CFM-dial selling.iventilation approach to a space to meet ventilation o Stand-alone.Configirration Factory Pre-set settings irequirements while,saving energy costs on healing or New or existing single/multi-family operation cooling fresh air from the outside.The HRV/ERV con-Inhibits fresh air ventilation based on outside temperature. Irols ore compatible with FAVC.exhaust terminals. levels and'indoor relative humidity selling Inlet' Hood — Irilet hoods with screens. are DIMENSIONAL DATA available fo.fit fresh air inlet diameters of-4,.5 and.6 inches from Field Controls. O ' IWAW FIELDCONTROLS 8 0Improving(nda°r Enrironmenh Field Controls 2630 Airport Road Kinston,NC 28504 Customer Servlce:252522-3031.Field fontroisLLGesemes the right to modify aprodua,tvilhoutpdornotite,whelherindestgn,color orspedfications,In order toofferat all times aquality j Fak:l(800)367-7942 productthatishighly competitive.Pleasecdnsultyaurhational and local building codes tofind out ivhetheithanstallatioriofeleciriralproductirequiresthe Visit us at:www.fieldcontrols.com services of a certified technician or elecbldan.Field Controls and Healthy Home Syslerd"are registered Trademarks used under license byField Controls tlC:All dghlsrgseryed. Pagel oft P/N 780500900 10/17 Rev l i ENGINEERING DATA FAVC PRODUCT SPECIFICATIONS! Power Requirements (Class'2 Appiiance) Power Oulpolt Isolole'd Iripols(Moniloring( Inp6i Voltage 2036VAC F6n'Ctuip61 GF'(Mgz mum Lood 6mem): 3d nduclive"k4VAC Appliance*l JAI,'A I Cj SmA @24VA6;NS prolrxied, Minimum VA Re4uired 1.7 VA Q 24,VAC Veni IV,V)(Ma*num Lodd Cut nil' __ 3A IaducliVd 24VAC' Applfarice`H2'(A2,'A2C) SmA 24VAC;NS'protecled Wiiing'Requiremenis' I8.22-AWG,'24 VAC(Min)EE116a51'(t E)(Mai imurn Load Cuireni): 3A indudliJ 624VAC: Appli6nce H3(A3,AX) ;5fA @24VAC;TVS protected Operaling Temperoture'Range 101 to 160T Fan Inlplit GT Wgniior,CircuiLCulreniJ:' SmA 024VAC, Applionce N4(A4,'44C) .5mA @24VAC;NS.protected: Operating H ilnidiy Range :5:16,95%RH(non•condensing). Heol Input IN(MontloP Circuit Curl/nt)i: SmA.@24VAC WIRING'DIAGRAM FOR,TYPICAL INSTALLATION.(Freih Air'D'amper.Venlilation Onlyi: WIRING'DIAGRAM FOR TYPICAL.INSTALLATION,(HRV/ERV'Deyice Wri ilolion Onlyf I OEriEnlc eClIfiBIC TIIENAOSTAT INEAU071A1_ ' fii:\Lr11_C II1',1(' t:t.\itil('I!\_1C+. rt 11l'.11-III IIYI NI"Nc SI1'.{I:III'11Y/N1 I 211'.1C N A 111'.11' N\'.{t'• t 11{.al' 111:.11N Y/111:.11' 411.11V n III,\i CIS111'NftSON 1' - - - - - Y ('Iml 11111YNI111N• 11An. l 1'lllitln\ 1' t f1/1111n. I:lillllll\r, a lllrillll\ I A I1._I:C•.7 Ci In fr:t'n III"VIA c 1 EU'a nt ;:!,t IP!L.pgYCa:At, FCt'I\:bn2c)Oldl 1?a:P:A:Gl:;n1a•:I nd;:^.:-In&o 1$vive'.••aI a Ir2 h__'i 1:='1i%t`J ei:r:•S?f K: fC i'+\:1+)2!/Allrl c 7 r LtE LtI:':{r lt:':O c b b NI.Imml. 2'I;IS;Y;n2U(vlalnl Nwlel.rrurm 1'.11'(;IlNr sr\(ISN. AI 11 PrE)]IYK V Alt It)ltYi01'tA V A) Atr A CritnuAmu.ulrrA iiaoi are a x• WIRING DIAGRAM FOR'OPTIONALMONITORING'OFAPPLIANCESI'THRU4- _ WRING.DIAGRAM'FOROMONAL MONITORING&CONTROWNGOFAPPLIANCES;142 i MFrffV/I Nar:INAC A1l. oa Fanper,nmmoYs,grdaor5wnm,d N4c lNAC drlwd!:r;lhum•Nm- - ue iamedtmrid.Ao-n Ev ie^il''!A'., I _—_rM/F2N/IKNwA.."roir_.Nrn:MVwnMu'mr6rTj. 1 Y/AtCMICH I'P...,rlailK, rriu I v 1,Ir mnnn. APilUtICE YIi tAI{I fAll ION 1 I i 71YAC AaAT I.11C roil AF7llAtKE s7:EA1N FAII' r t. i U- w YfAl1.!'Y`itICN fI Olt I nrttIANCE.zcton+rsoslTP s. fL..—____ --._.—__J. u:Y 71YAC RELAY r—...—•---_—.---. rCt`if1•IbtNtOil lri0a c171VAC,IDV p r i rCP/1:/Ob1XCa,(Srtp lf0Uta 7NAC;te`7A1 1 t.. - • Olt, I Yii.onv 1LAYFl1A!!CE i;RN14E IIOOD.-- , i bjO t`T-.INFORmATION Quoted b-. Date: No•ect. Remarks:f F"1 E,L:D:C O:.N T.R'0 L S. Quantity:Improving'.rniloor.Eirvifonmenit Field Controls Slte: Model: 26.!Ulrport Road.E Kinston;K .28504 Arthltect. Custo6ierServlce:252,522-3031 En Ineer Fax:1(800)_.367-7942 C011tfaCtOC: i Visit us at:wwmfieldcontrols;com' i Page i of2,' P/N7805009::00_,10/17 Rev A U 1 Owner's ManualAln 1 nc,r and Appliance Setup - Care and Operation INSTALLER: Leave this manual with party responsible for use and operation. OWNER:.Retain this manual for future reference. Call your dealer for questions on Installation, Operation, or Service. C ". NOTICE.SAVE THESE INSTRUCTIONS SAFETY NOTICE: IF THIS APPLIANCE IS NOT T PROPERLY.-,INSTALLED, OPERATED AND MAINTAINED,A HOUSE FIRE MAY RESULT. TO REDUCE THE RISK OF FIRE, ,FOLLOW THE CASTII JGS INSTALLATION INSTRUCTIONS. FAILURE TO Defla ! FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY. F xBurn®Non-CatalytlC/ DAMAGE, BODILY INJURY OR EVEN DEATH. CONTACT LOCAL BUILDING OFFICIALS.ABOUT,Cat lytlC OOd BLlLrnln9 Stove' RESTRICTIONS-AND .INSTALLATION INSPECTION del 19/5 REQUIREMENTS IN YOUR AREA. 40.A WARNING n\ Hol,Please read-this entire manual before installation-and use of this wood-burning room heafe?: Failure to follow these instructions could , G 0 result,in property damage,,bodily injury or even death.. Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. For use in the Do not overtire-If any external part starts.to-glow,you United States and Canada are overfiring.Close air controls. Overfiring will void your warranty. Comply with all minimum clearances to combustibles NATIONAL We recommend that our woodburning as specified.Failure to comply may cause a house fire. FIREPLACE: INSTITUTE hearthproductsroducts be installed'and serviced . by professionals who are certified-in.the U.S. by the.National Fireplace Institutif(NFI)as CAUTION NFI Woodburning.Specialists or who are certified in Canada by Tested and approved for use with dry,seasoned cordwood. Wood Energy Technical only.Do Not Bum Wet or Green Wood.Burning any otherCERTIFIED. Trainin ETf re<nn rro 9 type of fuel will void your warranty. Installation and service of this appliance should be performed by qualified personnel.Hearth&Home Technologies recommends HHT Factory Trained or NFI,certified professionals. NATIONALhearthE ,' FIREPLACE FACrORYTIMI MIS INSTITUTE' Fuel Your fire ROA CEWTIFICAMON AGENCY The French language version of this manual is available online;wwwmermontcastings.com La version francaise de.ce-manuel est disponible en ligne:www.vennontcastings.com 1 Vermont Cast, gs- ,Defiant Flexbum Installation&Operating Manual_1143 - 11118 3-90-30005220 Congratulations on your choice of a Vermont Castings Defiant" stove. With this purchase you have made a Warming Shelfcommitmenttomakethehearthaplaceofwarmth, beauty and comfort in your home.At Vermont Castings,we share that #0210 Classic Black 0217 Brown Majolica joy and appreciation for the hearth.We assure you that your #0211 Biscuit 0219 Twilight cast-iron Vermont Castings stove has been made with the #0218 Bordeaux utmost care and will provide you with many years of service. As you become acquainted with your new stove,you will find #3264 Mobile Home Bracket Kit that its appearance is matched by its functionality,due to cast #3180 Outside Air Adapter. iron's unique ability to absorb and radiate heat. 1907 Firescreen Also, Vermont Castings products are among the cleanest- #1860 6"X 12"Oval Starter Pipe burning wood stoves and fireplaces available today.As an #1855 8"X 11"Oval Starter Pipe owner of a Vermont Castings stove, you make a strong #3190 Pipe Heatshield statement for pollution-free energy. However,clean burning depends on both the manufacturer and the operator. Please FK26 Fan Kit read this manual carefully to-understand how to properly #0180 Rectangular Ceiling Kit operate and maintain your stove. 0181- Round Ceiling Kit At.Vermont Castings, we are equally committed to your. A line of porcelain enamel stove pipe is available in Biscuit, satisfaction.as a customer. That is why we maintain an Bordeaux,Brown Majolica colors. exclusive network of.the finest dealers in the industry. Our dealers,are, chosen for their.expertise and dedication to Table.of Contents customer service.They are factory-trained and knowledgeable Product Specifications and Important Safety Information about every Vermont Castings product. Feel free to contact Appliance Certification:. ......... . . . . . . ... ... . .... 3 yourAuthorized Vermont Castings Dealer anytime you have California safety information. .... . .. . .. . . .. . .. . ... ... 3 a particular question about your stove or its performance. BTU&Efficiency Specifications. . .. . ..... .. . . .. ....... 3 This manual contains valuable instructions on the installation 4 Dimensions ............. .. ..... .. . . . . . . .. . .. . . ... 4 and operation of your Vermont Castings Defiant®. It also Installation contains useful information on maintenance.Please read the Outside Air....:....... .. ..... . ... . . . . . .. ...... .. 5 manual thoroughly and keep it as a reference. Types of Chimney to Use. . . .... .. . . . . . . . . . .. . .. ... 6 This manual describes the installation, operation, and . Chimney Size... .... .:. . ......... . .. . . . . . .. . .... 6 75 Chimney Connector Guidelines. . . .. . . . . . ..... ... . .. 7 maintenance of the Vermont Castings Defiant®Model 19 Non-Catalytic/ Catalytic wood burning.heater..This heater Fireplace Instal . ...tns. .. ... .... .. . . . .. ... . ... . .. . . 8 meets the U.S.Environmental Protection Agency's emission Floor Protection usts bles ..... ..... . . ... . . . . . ... .. .. . .. . .. . . 12 11 Clearances to CombustibleslimitsforwoodheaterssoldonorafterMay15,2015. Assembly The Defiant" Model #1975 has been tested and is listed Setting up your Stove..... . . . ... .......... . .. . ... . 18 by OMNI-Test Laboratories of Portland, Oregon. The test Install Bottom Heat Shield ... . .... ... . .. . .. ... . .18 standards are ANSI/UL-1482-2011 and ANSI/UL-737 for the Adjust Leg Levelers...... . . . ... . . . . .. . ..... .... . 19 United States, and ULC S627-00 for Canada.The Defiant" Installing Catalyst Temperature Probe . ... . ... ..... 19 is listed for burning wood only. Do not bum other fuels.The Attaching Damper Handle .. .... ... . . . . . .. . .. . .. . . 19 Defiant° is not approved for use in manufactured (mobile)Fan Kit Installation .. .... .. .... .. .. . .. . .. . . .. . ... 20 homes. Installing/Removing Catalyst ...... ... . .. . . .. . .. . . 20 Please read this entire manual before you install and use Smoke Alarm/Safety Tips... .......... . ... . ..... . . 21 your new stove. Failure to follow instructions may result in Operation property,damage,bodily injury,or even death. Air Controls........................... . .. ....... 22 Damper Adjustments .... ...... ... .. ............. 22 Wood Burning Operation . .. .... ... . . . . .. .... .....23 Ash Disposal ....... .......... . ... ...27 Draft Management.................. . ......... .... 28 Maintenance.......................... .. . .. ... 30 The Catalytic Element.... . ............. . ... ....... 33 Service Parts List ...................... ... . ...... 35 Warranty.................. ............... . ...... 41 4 =Contains updated information 2 Vermont Castings Defiant Flexbum Installation&Operating Manual_R43 • 11/18 3-90-30005220 Manual S Compliance Report Job: MCNEICE Date: Dec 19,2018 Entire House By: TMM Plan: MCNEICE-01 Project Information For: TMM Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 35622 Btuh Entering coil DB: 75.4°F Outdoor design WB: 71.0°F Latent gain: 5514 Btuh Entering coil WB: 62.7°F Indoor design DB: 75.0°F Total gain: 41135 Btuh Indoor RH: 50% Estimated airflow: 1905 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: York Model: CZFO3614C+FC48C3XNI Actual airflow:1147 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss:100284 Btuh Entering coil DB: 65.4°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X080B12MP11 Actual airflow:1147 cfm Output capacity: 76000 Btuh 76% of load Temp. rise: 50 °F 226.19-1-22 RC-0548-2018 McNeice, Laura 8 Chestnut Ln Meets are all requirements of ACCA Manual S. SFD w/ gas FP 1650 s.f. 2016-Dec-19 16:00: 21wrightsoftRight-Sufee Universal 2017 17.0.16 RSU25116 Page1ACCA ... rs\ scott. lengeworihy\Documents\York1MCNEICErup Cale=MJ7 Front Door faces: N ormiResidentialPlansExaminerReviewForm RP ACCk. for HVAC System Design (Loads. Equipment, Ducts) 15Mar09 ArCaxtin gCatdctysofAmeece • QUEENSBURY NY Header Information Contractor: REQUIRED ATTACHMENTS ATTACHED Manual JI Form(and supporting worksheets): Yes [] No EJ Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes D No OEM performance data(heating,cooling, blower): Yes [] No D Building plan#: MCNEICE-01 Manual D Friction Rate Worksheet:Yes D No D Duct distribution sketch: Yes D No IE Home address(Street or Lot#,Block,Subdivision): , Entire house HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Building Construction information Winter Design Conditions Building Outdoor temperature: 4 °F Orientation: Front Door faces North Indoor temperature: 68 ° F North,East,West,South,North e a st,Northwest,South east,Southwest Total heat loss: 100284 Btuh Number of bedrooms: 2 Conditioned floor area: 5007 ft° Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows Roof Grains difference: 27 gr/lb g60% RH Eave overhang depth: 0 ft < Sensible heat gain: 39580 Btuh Internal shade: none Eave Latent heat gain: 6126 Btuh Blinds.drapes,etc. Depth Window Total heat gain: 45706 Btuh Number of skylights: 0 HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Cooling Equipment Data Blower Data Equipment to Gas furnace Equipment type: Split AC Heating cfm:1147 umace,He pump, Boiler,etc. Ai'Candltloner,Heat pump, etc. Cooling cfm:1147 Model: York Model: York Static pressure: ernatstatrc pressureH20r TM9X080B12MP11 CZFO3614C+FC48C3XN1 design airflow Heating output capacity:76000 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design oudoor conditions Sensible cooling capacity: 0 Btuh Aux.heating output capacity: 0 ..Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 1147 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure( ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TELx 10 ) I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County,Town Municipality or Authority having jurisdiction use. Home qualifies for MJ1AE Form based on Abridged Edition Checklist 41- wrightsoft° Right-Sultea Universal 201717.0.16 RSU25116 i Project Summary Job: MCNEICE Date: Dec 19,2018 Entire House By: TMM Plan: MCNEICE-01 Pro'ect Information For: TMM Notes: Desi• n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db 4 °F Outside db 85 °F Inside db 68 °F Inside db 75 °F Design TD 72 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/lb. Heating Summary Sensible Cooling Equipment Load Sizing Structure 94342 Btuh Structure 33960 Btuh Ducts 5942 Btuh Ducts 1661 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh none Humidificationr 0 Btuh Blower ) 0 Btuh Piping 0 Btuh Equipment load 100284 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 32059 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 5514 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling none) Area(ft') 5007 5007 Equipment latent load 5514 Btuh Volume(ft3) 45063 45063 Air changes/hour 0.70 0.40 Equipment total load 37573 Btuh Equiv.AVF(cfm)526 300 Req. total capacity at 0.70 SHR 3.8 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade AFFINITY Model TM9X080B12MP11 Cond CZFO3614C AHRI ref 2008691 Coil FC48C3XN1 AHRI ref 5646624 Efficiency 95.5AFUE Efficiency 12.3 EER, 14 SEER Heating input 80000 Btuh Sensible cooling 24080 Btuh Heating output 76000 Btuh Latent cooling 10320 Btuh Temperature rise 60 °F Total cooling 34400 Btuh Actual air flow 1147 cfm Actual air flow 1147 cfm Air flow factor 0.011 cfm/Btuh Air flow factor 0.032 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.87 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2018-Dec-1916:00:21 ti - wrightsoft' Right-Suite®Universal 2017 17.0.18 RSU25118 Page 1 ACC*, ...rs1scott.langeworthyU)acumants\York\MCNE10E. rup Calc=MJ7 Front Dooriaces: N Rig ht-J®Worksheet Job: MCNEICE Entire House Date: Dec 19,2018 TM M Plan: MCNEICE-01 MANUAL J:7th Ed. 1 Name of room Room8 Room10 Room11 2 Length of exposed wall 5.0 ft 29.0 ft 0 ft 3 Room dimensions 11.0 x 5.0 ft 14.0 x 17.0 ft 6.0 x 5.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heal/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area EXPOSURE NO. Htg Gig ( ft2) Htg Clg (ft2) Htg Clg ( ft2) Htg Clg Htg Gig 5 Gross a 12E3 5.4 1.0 45 **** *•**261 **** * 0 **** **** Exposed b 0 0 II!!!! **** **** lllill .*** .*** rrinr **** **** walls and c 0 0 III!1! **•* **** 111111 **** .*** Brit *••* *** partitions d 0 0 111111 **** **** !in il **** I!!!! .*•* **** e 0 0 111I1I **** **** !11111 111111 **** M. f 0 0 111111 **** ***. l! llil **.* **** !!l!il •••• •... 6 Windows and a 3A0 39.7 *"10 397 ***" 30 1190 * 0 0 *** glass doors b 0 0 0 **** 0 0 "' 0 0 **** Heating c 0 0 0 *"*. 0 0 *** 0 0 **** d 0 0 0 .** 0 0 .*** 0 0 .,** e 0 .** 0 0 ..* 0 0 * 0 0 " f 0 '* 0 0 **** 0 0 **** 0 0 *"*" 7 Windows and North 19.0 0 •*** 0 0 **** 0 0 "*** 0 glass doors NE/NW 0 0 * * 0 0 0 0 **.* 0 Doling E/W 68.0 10 '680 15 1020 0 0 SE/SW 0 0 **** 0 0 **. 0 0 **** 0 South 34.0 0 **** 0 15 ****510 0 **** 0 1.1 Horz 0 0 .... 0 0 *,** 0 0 *.*. 0 8 Other doors a 1000 33.1 6.3 0 0 0 0 0 0 0 0 0 b 0 0 .0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 35 189 36 231 1247 236 0 0 0 exposed b 0 0 111111 0 0 111111 0 0 !1I111 0 0 walls and c 0 0 in1 0 0 111111 0 0 I!l!l! 0 0 partitions d 0 0 111111 0 0 111111 0 0 !hill 0 0 e 0 0 111111 0 0 fillil 0 0 111111 0 0 f 0 0 nun 0 0 111111 0 0 111!!I 0 0 10 Ceilings a 1600 2.4 1.1 55 131 62 : 238 565 267 30 71 34 b 0 0 111111 0 0 111111 0 0 !l!!f! 0 0 c 0 0 111!!1 0 0 HMI 0 0 !111II 0 0 d 0 0 111111 0 0 111111 0 0 Will 0 0 a 0 0 (Mill 0 0 IOU! 0 0 11111! 0 0 f 0 0 11111! 0 0 IOW 0 0 11111! 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 Note:room b 0 0 fillil 0 0 111111 0 0 111111 0 0 perimeter c 0 0 111111 0 0 lllill 0 0 lllill 0 0 is displ.d 0 0 111111 0 0 illiil 0 0 lllill 0 0 for slab e 0 0 111111 0 0 11111! 0 0 111111 0 0 floors) f 0 D Ifni! 0 0 111111 0 0 111111 0 0 12 Infiltration a 78.0 6.2 10 780 62 30 2339 186 0 0 0 Ventilation 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 1496 *** *`** 5342 **** **** 71 Less external heating D 0 *"** **•* 0 *'** **"* Less transfer 0 **•* 0 **** **•* 0 Heating redistribution 0 **** **** 0 **** **** 0 «.. ...* 14 Duct loss 6% 94 6% 338 **** 6%4 * 15 Total loss=13+14 1590 5679 *"** **** 76 **• **** 16 Int. gains: People® 300 0 **** 0 0 *** 0 0 **** 0 Appl. ® 1200 0 **. 0 0 * 0 0 0 17 Subtot RSH gain= 7+8..+12+16 639 ** Wt.. 2218 **** **** 34 **** *** Less external cooing 0 . 0 **.* 0 *.** .*** Less transfer 0 ** .... 0 .... .... 0 **.. .... Cooling redistribution 0 ** "*"* 0 **** . 1** 0 . 1.* **it** 18 Duct gain 5% **.* 41 ..5% ***,109 5% *. 2 19 Tote!RSH gain=(17+18)*PLF 1.00 ***880 1.00 **** 2327 1.00 ** 35 20 Air required(cfm) 18 28 65 75 1 1 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wrightsoft- 2018-Dec-19 16:00:21 Right-Suite®Universal 2017 17.0.16 RSU25116 Page3CN ... rslscott.langeworthylDocunrehts\YorkIMCNEICE. rup Celc=MJ7 Front Door faces: N i k4 100 ECM HEAT RECOVERY VENTILATOR ENGINEERING DATA LIFEBREf1TH` THERMALLY CONDUCTIVE,PATENTED DEFROST ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams.It is easily removed for cleaning or service. CASE Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to MOTORS AND BLOWERS prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)01).Balancing ports High efficiency electronic commutate ECM motor,for maximum energy savings.Each are located on door. airstream has one centrifugal blower,with multiple fanspeed operations driven by one double shaft motor. ELECTRONICS The DXPLO2 control included with the unit can be wall mounted in a central location of FILTERS the home.3 wire 20 gauge(min.)100 ft length(max.). Washable antimicrobial MERV 6 air filters in exhaust and supply airstreams. MOUNTING WARRANTY Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and units carry a[ifPlmewarrar,lyonth HRV CHIP And aSyear hanging straps supplied with the unit. rep lace me n t parts wa rran ly. OPTIONAL ACCESSORIES: Weather Hood T9-EA ille 9 Terminator Wireless 20/40/60 99-185 9-EAG4 99-TMS FittingMin Timer 99-186 99-FAGS 99-TM4 99-DET02 . 99-187 99 FAGS 11 99-TM6 n v LIFEBREATH CONTROL OPTIONS TIMER OPTIONS 99-DET01-Lifebreath 20/40/60 Minute Timer FEATURES 94-DXPLIU2 99-BCO22 99-BLu3 99-BCC14 Initiates high speed Ventilation for 20,40 or 60 minutes.3 wire connection. 5 speed fan operation on each mode 99-DETO2 2 speed fan operation(Low/High) I Wireless Lifebreath 20/40/60 Minute Timer Continuous low speed fan operation Initiates high speed Ventilation for 20,40 or 60 minutes:Wirelessly connects to main control for Humidity control through adjustable Dehumidistat ease of installation.40'approximate range. Excusive to Lifebreath. Large digital LCD screen 99-RX02-Wireless Lifebreath Repeater LED status indicator lights Extends range of 99-DET02 Wireless Timers.Plugs into 120V power outlet.Wirelessly connects to Continuous Ventilation main control and 99-0E702.Install at halfway point between timer and main wall control if timer Continuous Recirculation is out of range. 20 0N/40 OFF V. j• In. sot 10 ON/50 OFF 20 0N/40 Recirculation 3 20/40/60 min.High speed override button 99 DXPLD2 99-0ETO2 Compatible with 99-DET02 Wireless Timer V V Cca I CQT(/ 3 wire connection LIF BREF ! i x No Indoor Air Systems 100ECM(9-11-18) www.lifebreath.com 3.00 ECM HEAT RECOVERY VENTILATOR H PERFORMANCE(HVI CERTIFIED) LIFEBREFITH Ns 0.1(25) 0.2(50) 6.3(75) U.4(100) 0.5(125) 0.6(150) ELECTRICAL SPECIFICATIONS IN.W.G.(PA) CFM(l/s) (FM(t,$) CFM(LIE) CFM(l,$) (FM(Lis) CFM IL/c) VAC @Mb 120 Net Supply Airflow 161(16) 143(68) 129(61) 114( 54) 97(46) 78(37) Watts(Low Speed 49 Gross Supply Airflow 165(78) 147(69) 131(62) 117(55) 102(48) 81(38)Watts/High Speed 115 Gross Wisest Airflow 229(108) 215(101) 210(99) 203(96) 184(87) 142(67)Amp Rating 135 1E10 Sensible Effectiveness(ASE) 32°F QC78% WEIGHT: 71 LBS(32 KG) @ 641FM(30 Us) 163 Sensible Effloiency(SRE) 32-F(VC) 71% -^, 140 SHIPPING WEIGHT: @ 64 CFM(30 Us) F_ 120 73 LBS(33 KG) u Sensible Effielenny( SRL) 32,1 ro.c, 69% 5 Loo @ 95 CFM(45 Us) 2 NOTE: Sensible Efficiency(SRE1 131Hvej 64% . 47 60 Front clearance of 25 in.(635 mm)is @ 68 CFM(32 Us) recommended for servicing unit.Allducts40 . e........... 20 use 6 in.(152 mm)round collars.Balancing dampers are located in all air streams. ISO 0 cu. 0.2 0.3 0.4 0.5 0.6 c us HIV! 9001 •' 4,----...-, Static Pressure(in im.g.) CERTIFIED lallimso DIMENSIONS FRONT VIEW SIDE VIEW Biter ir 4---__ I 14 3/4 la.(375 nos) I IReirculathig = NM I I 7 Defrost imeielillrr'' I I DimnAr IMMIMMIININ!MM .,11=1 11. ig. IWIIIII 11011111F\ i I 1 A ' Removable ST. I / 11111.1 glove Heat J Motor I state air to outside Recovery Core 1111/, AOLEMIll I Fresh air from outside Elf ‘;: v.•:::::::--------":"----4 Mh e_ ....„ 4. 1 iliK 116. 14. ,_, ,,,, if:i.„ state afr from inside Fresh a I r to inside 11111111111.- V 6ll': 1112011ggi 14 33 5/8 FL(854 ma 0 ' Ilio Date: WARRANTY Contractor. Units carry a lifetime warranty Tag: On the HRV core and a 5 year replacement parts warranty. Project. Oty: Supplier: Quote#: All units conform to CSA and UL standards Engineer NO Control: Submitted By: LIFEBRERTH' 111 Indoor Air Systems Timer: Timer City: 100ECM(9-11-18) www.lifebreath.com rlir, Y k EXHAUST SYSTEMS t rrt_ Y, I .. t•1. 4-._ TABLE MI507:3.3(1) i ,,:, CONTINUOUS WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM AIRFLOW RATE REQUIREMENTS r., UMBER OF BEDROOMS 4 DWELLING UNIT FLOOR AREA 0-1 2_3 4-5 6-7 1 7— eiVaf,: square feet) Airflow in CFM r si 1,500 30 45 60 90 r,1,501-3,000 45 60 75 90 105 3,001—4,500 60 75 90 105 120 4,501—6,000 75 90 105 120 135 6,001—7,500 90 105 120 135 150 Sr• 7,500 I05 120 135 150 165 4.`-. p. For St: I square foot=0.0929 m2,1 cubic foot per minute=0.0004719 mils. i., ). TABLE @M1507.3.3(2) 1:., INTERMITTENT WHOLE-HOUSE MECHANCAL VENTILATION RATE FACTORS RUN-TIME PERCENTAGE IN EACH 4-HOUR 25% 33 60%, 66% 75% 1 h' SEGMENT 1 wiN Factora 4 3 2 1.5 1.3 a.For ventilation system run time values between those given,the factors are peimitted to be determined by interpolation. b.Extrapolation beyond the table is prohibited. TABLE M1507.4 M1507.4 Local exhaust rates.Local exhaust systems shall MINIMUM REQUIRED LOCAL EXHAUST RATES F 14!,;• be designed to have the capacity to exhaust the minimum air ONE-AND TWO-FAMILY DWELLINGS <_''; foi"` '• flow rate determined in accordance with Table M 1507.4. AREA TO BE EXHAUST RATES,i 1 EXHAUSTED Kitchens 100 cfm intermittent or 25 cfu:cotl 1 ',.;= Bathrooms-Toilet Mechanical exhaust capacity,0. I'aF.' I Rooms intermittent or 20 chat coati** LA4.Y,, y„ :' For Si: i cubic foot per minute=0.0004719 m3/s. ii 4 a ra`- r V Y 1 A&( s of (0 t'r-r' i x:z : f QC')C't 1 y ~= A't y;6.r kY 1W 1 --------- P.m,.. 2015 INTERNATIOND e''_..., ciREScheck Software Version 4.6.4 Compliance Certificate 1: 1),:,, L,.,,,_,,,,,, _ ,_ Project McNeice Project i I". ' i Energy Code: 2015 IECC 1 Location: Lake George, New York COMMua, j,I.I---:;'- VELOP$ ,, i E Uiee Construction Type: Single- family MENT Project Type: New Construction Conditioned Floor Area: 0 ft2 Glazing Area 18% Climate Zone: 6 (7377 HDD) rFILEPermitDate: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 8 Chestnut Lane Trevor McNeice Frank Jelley Queensbury, NY 12804 NY NY 646-643-6784 518-796-5611 whence: Passes using UA trade-off Compliance: 3.1%Better Than Code Maximum UA: 289 Your UA: 280 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Raised or Energy Truss 1,132 49.0 0.0 0.020 23 Wall 1:Wood Frame, 16"o.c. 2,244 21.0 0.0 0.057 102 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 364 0.260 95 Door 1: Solid 42 0.280 12 Door 2: Glass 40 0.280 11 Floor 1: All-Wood Joist/Truss:Over Unconditioned Space 1,132 30.0 0.0 0.033 37 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.4 and to comply with the mandatory requirements` liss d i the EScheck Inspection Checklist. Frank r(- h t fri. Zi/v Name-Title nature Date OF NEi9 Y i'."-' co` 1„E iTI-/ C) rj\ Ili /- 226.19-1-22 RC-0548-2018 il it ,;g Fri McNeice, Laura 7, 8 Chestnut Ln c- SFD w/ gas FP 1650 s.f. IONP•\ Project15ProjectTitle: McNeice Report date: 12/12/18 Data filename: C:\FJ\Arch Design\Trevor Neice Project 8 Chestnut Ln.rck Page 1 of 9 rREScheck Software Version 4.6.4 I Inspection Checklist Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section ; Plans Verified Field Verified i I Pre-Inspection/Plan Review 1 1 Complies? 1 Comments/Assumptions Value Value 103.1, Construction drawings and Complies Requirement will be met. 103.2 documentation demonstrate Does Not PR1] 1 energy code compliance for the Not Observable building envelope.Thermal envelope represented on Not Applicable construction documents. 103.1, Construction drawings and Complies Requirement will be met. 103.2, documentation demonstrate Does Not 403.7 energy code compliance for PR3] 1 lighting and mechanical systems. Not Observable j Systems serving multiple Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. i302. 1, Heating and cooling equipment is Heating: Heating: Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr Does Not PR2] 2 on loads calculated per ACCA Cooling: Cooling: Not Observable Manual J or other methods Btu/hr Btu/hr approved by the code official. Not Applicable Additional Comments/Assumptions: 1 1 High Impact(Tier 1) LowI Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\FJWrch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 2 of 9 Section Foundation Inspection Complies? Comments/Assumptions Req.ID 303.2.1 A protective covering is installed to Complies Exception: Requirement is not applicable. FO11] 2 protect exposed exterior insulation Does Not and extends a minimum of 6 in. below grade. Not Observable Not Applicable 403.9 Snow-and ice- melting system controls Complies Exception: Requirement is not applicable. FO12] 2 installed. Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\ FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 3 of 9 1 Section I I Framing/ Rough-In Inspection Plans Verified I Field Verified I Complies? Comments/Assumptions Req.ID i Value Value , 402.1.1, Door U-factor.U- U- Complies See the Envelope Assemblies 402.3.4 Does Not table for values. FR1] 1 Not Observable 14, Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- Complies See the Envelope Assemblies 402.3.1, average). Does Not table for values. 1402.3.3, 402.3.6, Not Observable 402.5 Not Applicable 1[FR2]1 1303.1.3 U-factors of fenestration products Complies Requirement will be met. FR4] 1 are determined in accordance ElDoes Not with the NFRC test procedure or taken from the default table. Not Observable Not Applicable 402.4.1.1 Air barrier and thermal barrier Complies Requirement will be met. FR23] 1 installed per manufacturer's ElDoes Not instructions. Not Observable Not Applicable 1402.4.3 Fenestration that is not site built Complies Requirement will be met. 1[FR20] 1 is listed and labeled as meeting Does Not I AAMA/WDMA/CSA 101/1.5.2/A440 or has infiltration rates per NFRC Not Observable 400 that do not exceed code Not Applicable limits. 1402. 4.5 IC-rated recessed lighting fixtures Complies Requirement will be met. FR16] 2 sealed at housing/ interior finish ElDoes Not and labeled to indicate. 2.0 cfm leakage at 75 Pa. Not Observable Not Applicable 1403.2.1 Supply and return ducts in attics Complies Requirement will be met. FR12] 1 insulated >= R-8 where duct is Does Not 3 inches in diameter and >= Not Observable R-6 where < 3 inches. Supply and return ducts in other portions of Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as Complies Requirement will be met. 1[ FR15] 3 ducts or plenums. Does Not Not Observable Not Applicable i403.4 HVAC piping conveying fluids R- R- DComplies Requirement will be met. 1[FR17} 2 above 105°F or chilled fluids Does Not below 55°F are insulated to .-R- 1]Not Observable 3. Not Applicable 403.4.1 Protection of insulation on HVAC Complies Requirement will be met. FR24] 1 piping. sElDoesNot Not Observable Not Applicable 403.5.3 Hot water pipes are insulated to R- R- Complies Requirement will be met. FR18] z - R-3. Does Not ElNot Observable Not Applicable 403.6 Automatic or gravity dampers are Complies Requirement will be met. FR19] z installed on all outdoor air Does Not intakes and exhausts. Not Observable I Not Applicable 1 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 (Low Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 4 of 9 Additional Comments/Assumptions: 1 T High Impact(Tier 1) T 2 1 Medium Impact(Tier 2) 3 j Low Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\ FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 5 of 9 Section I T II Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions Req. ID I Value Value 303.1 All installed insulation is labeled Complies Requirement will be met. IN13] 2 or the installed R-values Does Not provided. Not Observable Not Applicable 402.1.1, Floor insulation R- value. R- R- Complies See the Envelope Assemblies 402.2.6 Wood Wood Does Not table for values. IN1] 1 Steel Steel Not Observable Not Applicable 303.2, Floor insulation installed per Complies Requirement will be met. 402.2.7 manufacturer's instructions and Does Not IN2] 1 in substantial contact with the underside of the subfloor, or floor Not Observable framing cavity insulation is in ElNot Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/ 2 of the Wood Wood Does Not table for values. 402.2.6 wall insulation on the wall Mass Mass NotObservableIN3]1 exterior,the exterior insulation requirement applies(FR10). Steel Steel Not Applicable 303.2 Wall insulation is installed per Complies Requirement will be met. INC' manufacturer's instructions. Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 1 High Impact(Tier 1) 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\ FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 6 of 9 I r- Section i Plans VerifiedFieldVerified1FinalInspectionProvisions Complies? Comments/Assumptions Req.ID Value Value i 402.1.1, Ceilinginsulation R-value. R- R- Complies See the Envelope Assemblies 402.2.1, Wood Wood Does Not table for values. 402.2.2, 402.2.E Steel ID Steel Not Observable FI1] 1 Not Applicable 303.1.1.1, Ceiling insulation installed per Complies Requirement will be met. 303.2 manufacturer's instructions. Does Not FI2] 1 Blown insulation marked every 300 ft2. Not Observable Not Applicable 402.2.3 Vented attics with air permeable Complies Requirement will be met. FI22] 2 insulation include baffle adjacent Does Not to soffit and eave vents that extends over insulation. Not Observable Not Applicable 402.2.4 Attic access hatch and door R R- Complies Requirement will be met. FI3] 1 insulation >_R value of the ElDoes Not I adjacent assembly. I Not Observable Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = Complies Requirement will be met. FI17] 1 ach in Climate Zones 1-2,and Does Not 3 ach in Climate Zones 3-8. Not Observable Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 Complies Requirement will be met. F14] 1 cfm/100 ft2 across the system or ft2 ft2 Does Not 3 cfm/100 ft2 without air Not Observable handler @ 25 Pa. For rough-in tests,verification may need to Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 Complies Requirement will be met. FI27] 1 determine air leakage with ft2 ft2 Does Not i either: Rough-in test:Total leakage measured with a Not Observable pressure differential of 0.1 inch Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch j w.g. across the entire system including the manufacturer's air handler enclosure. j 403.3.2.1 Air handler leakage designated Complies Requirement will be met. F124] 1 by manufacturer at<=2%of Does Not I design air flow. ENot Observable Not Applicable 1403.1.1 Programmable thermostats Complies Requirement will be met. FI9] 2 installed for control of primary II/Does Not heating and cooling systems and initially set by manufacturer to Not Observable code specifications. Not Applicable 403.1.2 Heat pump thermostat installed Complies Exception: Requirement is FI10] 2 on heat pumps.Does Not not applicable. Not Observable Not Applicable 403.5.1 Circulating service hot water Complies Requirement will be met. FI11] 2 systems have automatic or Does Not accessible manual controls. Not Observable Not Applicable 1 'High Impact(Tier 1) 2 TMedium Impact(Tier 2) - 3 Row Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 7 of 9 Section Plans VerifiedFieldVerifiedFinalInspectionProvisions Value Value Complies? { Comments/Assumptions Req.ID 403.6.1 All mechanical ventilation system Complies Requirement will be met. F125] 2 fans not part of tested and listed ElDoes Not HVAC equipment meet efficacy and air flow limits. Not Observable Not Applicable 403.2 Hot water boilers supplying heat Complies Requirement will be met. F126] 2 through one-or two-pipe heating ElDoes Not systems have outdoor setback control to lower boiler water Not Observable temperature based on outdoor Not Applicable temperature. 403.5.1.1 Heated water circulation systems Complies Requirement will be met. FI28] 2 have a circulation pump.The Does Not system return pipe is a dedicated return pipe or a cold water supply Not Observable pipe. Gravity and thermos- Not Applicable syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems Complies Exception: Requirement is FI29] 2 comply with IEEE 515.1 or UL Does Not not applicable. 515. Controls automatically adjust the energy input to the Not Observable heat tracing to maintain the Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that Complies Requirement will be met. 1[ F130] 2 have recirculation pumps that Does Not pump water from a heated water supply pipe back to the heated Not Observable water source through a cold Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. 403.5.4 Drain water heat recovery units Complies Requirement will be met. I(FI31] 2 tested in accordance with CSA ElDoes Not B55.1. Potable water-side pressure loss of drain water heat Not Observable recovery units < 3 psi for Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 404. 1 75%of lamps in permanent Complies Requirement will be met. 1[ F16] 1 fixtures or 75%of permanent Does Not fixtures have high efficacy lamps. Does not apply to low-voltage Not Observable lighting. Not Applicable 11I I1404.1.1 Fuel gas lighting systems have Complies Requirement will be met. 1[ FI23] 3 no continuous pilot light. Does Not Not Observable Not Applicable 1 High Impact(Tier 1) j 2_Medi• um Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\ FJ\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 8 of 9 Section 1 Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions qRe ID 401.3 Compliance certificate posted.Complies Requirement will be met. FI7] z EDoes Not Not Observable Not Applicable 303.3 Manufacturer manuals for Complies Requirement will be met. FI1813 mechanical and water heating Does Not systems have been provided. Not Observable i Not Applicable Additional Comments/Assumptions: 111HighImpact( Tier 1) 2 Medium Impact(Tier 2) 3 !Low, Impact(Tier 3) Project Title: McNeice Project Report date: 12/12/18 Data filename: C:\ Fj\ Arch Design\Trevor McNeice\McNeice Project 8 Chestnut Ln.rck Page 9 of 9 i20IECEfficie15ncyCC Energy Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 0.00 Floor 30.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.26 Door 0.28 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments