Loading...
engineer lettersENGINEERING wucstructuralsolutions October 28,2019 TOWN OF QUEENSBURY Regarding Zappone Residence |___BUILDING &CODES Queensbury,NY Re =04%-2014 \L be Puen Ed. Attention:Sam Thompson Dear Mr.Thompson: To follow up on our conversation earlier today,|reviewed the photos provided showing the construction of the small retaining wall and concrete piers at the Zappone Residence.Based on our conversation and my review of the photos provide |believe the as-built conditions are adequate to support the code required loads.|understand that the retaining walls will only be retaining approximately 3'-0"of soil and were constructed similar to the typical frost wall with the same reinforcement and footing.This construction is adequate to resist the lateral earth pressures for the retaining wall Please let me know if you have any further questions. Sincerely, >Get‘ Scott Burlingame,PE Scott Burlingame,P.E.|900 Rt.146,Clifton Park,NY 12065 |T:518-724-0733 |scott@sbengineeringpllc.com ENGINEERING rucstructuralsolutions July 12,2019 Attention:Sam Thompson Regarding:Zappone Residence Queensbury,NY Dear Mr.Thompson: To follow up on our conversation earlier today,the 4-foot tll frost walls at the Zappone Residence may be poured as a single pour,20-inch wide wall.This would eliminate the need for the separate pour at the footing.The bottom of the 20-inch wall should have a minimum of 4’-0"frost protection to the adjacent grade and the wall should be reinforced as specified on the drawings. Please let me know if you have any further questions. Sincerely, Scot Burlingame,PLE.|900 Rt.146,Clifton Park,NY 12065 |T:518-724-0733 |scott@sbengineeringplle.com