mottling letterHODOROOnn
308.7-1-75 RC-0014-2020HodorowskiHomes
Town of Queensbury 98 Richmond Hills Dr,Lot 28
Building Department SFD w/gas FP 2115 s.f.,Gar.365 sf.742 Bay Road
Queensbury,NY 12804
Re:Barringer Heights Subdivision
To Whom It May Concern,
With any new homes in the Barringer Heights Subdivision,Hodorowski Homes will set the
bottom of footings a minimum of 3’-0”above the mottling height,as defined by the Site
Drawings by Nace Engineering/Van Dusen and Steve's Land Surveyors,dated November 2005.
A benchmark will be set at a hydrant to confirm elevations.
Instead of the RC-2 asphalt damp proofing,we will coat the concrete foundation wall,below
grade,with a Polymer-Modified Asphalt coating,a minimum of 40 mils,per IRC 2015 —Section
R406.2.The product is called Tuff-N-Dri,by Tremco.The insulated boards are optional,and not
required by code.
Lastly,Hodorowski Homes uses Appolo Heating and Cooling to perform all of our blower door
tests.They will issue a signed and certified notice,once we pass and achieve 3.0 ach or less per
IRC 2015.
Tristan Hodorowski