Loading...
ComCheck COMcheck Software Version 4.0.8.2 (111/1 Envelope Compliance Cep 0 M C lj LUN 18 2019 Project Information OF OUEENSBURY Energy Code: 2015 IECC DING& CODES Project Title: Renovation Ex. PEMB-Office/Warehouse Location: Warrensburg, New York Climate Zone: 6a Project Type: Alteration 308.20-1-9.2 CC-0419-2019 Vertical Glazing/Wall Area: 2% Angio Dynamics 24 Native Dr Construction Site: Owner/Agent: 24 Native Drive Tim Barber Comm. Alterations 41,910 s.f. Queensbury, NY JAG 518-812-0044 tim@jaggroupllc.com Building Area Floor Area FILE COPY 1-Warehouse : Nonresidential 27738 Envelope Assemblies R-Value Proposed Max.Allowed Post Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Roof 1:Metal Building,Standing Seam,[Bldg.Use 1 - -- — — -- — — Warehouse],Exemption:Framing cavity not exposed. Floor 1:Slab-On-Grade:Unheated,[Bldg.Use 1 -Warehouse] -- 11.0 0.474 -- 0.540 — NORTH Exterior Wall 3:Metal Building Wall, [Bldg. Use 1 -Warehouse], -- — -- -- -- — Exemption:Framing cavity not exposed. Window 1:Metal Frame:Operable,Other,Operable,Operable, --- -- 0.430 0.530 0.430 0.531 [Bldg.Use 1 -Warehouse] Door 3: Insulated Metal,Swinging, [Bldg. Use 1 -Warehouse] --- -- 0.360 -- 0.370 — Door 4: Insulated Metal,Swinging, [Bldg. Use 1 -Warehouse] -- — 0.360 -- 0.370 — Door 5:Insulated Metal,Non-Swinging,[Bldg.Use 1 - --- — 0.360 -- 0.360 — Warehouse] Door 6:Insulated Metal,Non-Swinging,[Bldg.Use 1 - --- — 0.360 -- 0.360 -- Warehouse] Door 7:Insulated Metal,Swinging, [Bldg.Use 1 -Warehouse] --- -- 0.360 -- 0.370 -- EAST Exterior Wall 2 copy 1:Metal Building Wall, [Bldg.Use 1 - --- — -- -- — — Warehouse],Exemption:Framing cavity not exposed. SOUTH Exterior Wall 4:Steel-Framed,24"o.c.,[Bldg. Use 1 - -- — — -- -- — Warehouse],Exemption:Framing cavity not exposed. WEST Exterior Wall 1:Metal Building Wall,[Bldg. Use 1 -Warehouse], --- -- -- -- -- -- Exemption:Framing cavity not exposed. Door 1: Insulated Metal,Swinging,[Bldg. Use 1 -Warehouse] --- -- 0.360 --- 0.370 --- Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 1 of 19 (a)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Notes Envelope PASSES Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project is Renovation of approximately 61,110 SF out of an existing 115,892 SF 1995 PEMB which has been vacant and being Fit-Up with the ist Tenant within the front portion of the existing building . Use was former factory production of the former Native Textiles.The warehouse is quite comprehensibly adapted for this Tenant , proposed with only minor partition layout changes at the Office. ADA separated Rest Room facilitys exists and are proposed to be shared within the building consistent with the original Tenant Occupancy . Warehouse Unit Heaters and Electrical Lighting demands already meet Tenant needs. Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 2 of 19 COMcheck Software Version 4.0.8.2 rist ii Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Renovation Ex. PEMB-Office/Warehouse Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 24 Native Drive Tim Barber Queensbury, NY JAG 518-812-0044 tim@jaggroupllc.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Manufacturing:High Bay(25-50 ft.Floor to Ceiling Height) 28000 1.23 34440 Total Allowed Watts= 34440 Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp I Wattage Per Lamp/Ballast Lamps! #of Fixture (C X D) Fixture Fixtures Watt. Manufacturing:High Bay(25-50 ft. Floor to Ceiling Height)(28000 sq.ft.) Linear Fluorescent 1:48"T8 32W(Super T8):Electronic: 2 42 40 1680 HID 1:High-Pressure Sodium:Standard: 1 60 60 3600 Total Proposed Watts= 5280 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 3 of 19 IPA COMcheck Software Version 4.0.8.2 Nfil Exterior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Renovation Ex. PEMB-Office/Warehouse Project Type: Alteration Exterior Lighting Zone 3(Other) Construction Site: Owner/Agent: Designer/Contractor: 24 Native Drive Tim Barber Queensbury,NY JAG 518-812-0044 tim@jaggroupllc.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Illuminated area of facade wall or surface 8 ft2 0.15 No 1 Total Tradable Watts(a)= 0 Total Allowed Watts= 1 Total Allowed Supplemental Watts(b)= 750 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 750 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Illuminated area of facade wall or surface(8 ft2):Non-tradable Wattage LED 1:LED A Lamp 11 W: 1 8 60 480 Total Tradable Proposed Watts= 0 Exterior Lighting PASSES Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 4 of 19 11141 COMcheck Software Version 4.0.8.2 ‘fil Mechanical Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Renovation Ex. PEMB-Office/Warehouse Location: Warrensburg, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 24 Native Drive Tim Barber Queensbury, NY JAG 518-812-0044 tim@jaggroupllc.com Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficiency=95.00%Et,Required Efficiency=80.00%Et Fan System: None 1 Water Heater 1: Gas Storage Water Heater,Capacity:50 gallons,Input Rating:75 kBtu/h w/Circulation Pump Proposed Efficiency:95.00 EF,Required Efficiency:0.58 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 5 of 19 COMcheck Software Version 4.0.8.2 II Inspection Checklist Energy Code: 2015 IECC Iirr6 Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans and/or specifications provide all ❑Complies [PR1]' information with which compliance ElDoes Not can be determined for the building envelope and document where ['Not Observable exceptions to the standard are ONot Applicable claimed. C103.2 Plans,specifications,and/or ❑Complies [PR2]' calculations provide all information ❑Does Not with which compliance can be ['Not Observable determined for the mechanical systems and equipment and ONot Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans,specifications,and/or ❑Complies [PR3]' calculations provide all information ElDoes Not with which compliance can be determined for the service water ONot Observable heating systems and equipment and ONot Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C103.2 Plans,specifications,and/or ❑Complies [PR4]' calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting DNot Observable and electrical systems and equipment ONot Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C103.2 Plans,specifications,and/or ❑Complies [PR8]' calculations provide all information ❑Does Not with which compliance can be determined for the exterior lighting ['Not Observable and electrical systems and equipment ONot Applicable and document where exceptions to the standard are claimed.Information provided should include exterior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C402.4.1 The vertical fenestration area <= 30 ❑Complies [PR10]1 percent of the gross above-grade wall ❑Does Not area. ['Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 1Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\lag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 6 of 19 • Section Plan Review Complies? Comments/Assumptions & Req.ID C402.4.1 The skylight area <= 3 percent of the ❑Complies [PR11]1 gross roof area. ❑Does Not :Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 7 of 19 Section # Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID C303.2 Slab edge insulation installed per ❑Complies [FO4J2 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable C303.2.1 Exterior insulation protected against ❑Complies [FO6]1 damage,sunlight, moisture,wind, ❑Does Not landscaping and equipment ❑Not Observable maintenance activities. ❑Not Applicable C402.2.5 Slab edge insulation R-value. ❑Complies See the Envelope Assemblies table for values. [FO312 ODoes Not [Not Observable ❑Not Applicable C402.2.6 Radiant heating systems panels ❑Complies See the Envelope Assemblies table for values. (FO12)3 insulated to>=R-3.5 on face opposite ❑Does Not space being heated. ❑Not Observable ❑Not Applicable C403.2.4. Snow/ice melting system sensors for ❑Complies 5, future connection to controls. Freeze ❑Does Not C403.2.4. protection systems have automatic 6 controls installed. DNot Observable (FO9]3 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings'Jag\24 Native Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 8 of 19 Section # Framing/Rough-In Inspection Complies? Comments/Assumptions & Req.ID C303.1.3 Fenestration products rated in ❑Complies [FR1212 accordance with NFRC. ❑Does Not ['Not Observable ❑Not Applicable C303.1.3 Fenestration products are certified as ❑Complies [FR13]1 to performance labels or certificates ❑Does Not provided. ❑Not Observable ❑Not Applicable C402.4.3 Vertical fenestration SHGC value. ❑Complies See the Envelope Assemblies table for values. [FR10]1 ❑Does Not ❑Not Observable ❑Not Applicable C402.4.3, Vertical fenestration U-Factor. ❑Complies See the Envelope Assemblies table for values. C402.4.3. ❑Does Not 4 1 ❑Not Observable [FR8) [Not Applicable C402.4.4 U-factor of opaque doors associated ❑Complies See the Envelope Assemblies table for values. [FR14J2 with the building thermal envelope ❑Does Not meets requirements. ['Not Observable ❑Not Applicable C402.5.1. The building envelope contains a ❑Complies 2.1 continuous air barrier that is sealed in ❑Does Not [FR19]1 an approved manner and material permeability<= 0.004 dfm/ft2.Air ❑Not Observable barrier penetrations are sealed in an ❑Not Applicable approved manner. _ C402.5.2, Factory-built fenestration and doors ❑Complies C402.5.4 are labeled as meeting air leakage ❑Does Not [FR1813 requirements. ['Not Observable ❑Not Applicable C402.5.7 Vestibules are installed on all building ❑Complies [FR17)3 entrances. Doors have self-closing ❑Does Not devices. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\ag124 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 9 of 19 Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions &Req.ID C404.5, Heated water supply piping conforms ❑Complies C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. [PL6]3 :Not Observable ❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. [PL6]3 ❑Not Observable ❑Not Applicable C404.6.1, Automatic time switches installed to ❑Complies C404.6.2 automatically switch off the ❑Does Not [PL3]1 recirculating hot-water system or heat trace. :Not Observable ❑Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable cycle. ❑Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <= 5 minutes after end of heating :Not Observable cycle. ❑Not Applicable C404.7 Water distribution system that pumps ❑Complies [PL8)3 water from a heated-water supply ❑Does Not pipe back to the heated-water source through a cold-water supply pipe is a ❑Not Observable demand recirculation water system. ❑Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. C404.7 Water distribution system that pumps ❑Complies [PL8]3 water from a heated-water supply ❑Does Not pipe back to the heated-water source through a cold-water supply pipe is a ❑Not Observable demand recirculation water system. Observable,...., Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex.PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 10 of 19 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C402.2.6 Thermally ineffective panel surfaces of❑Complies [ME41)3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable C402.5.5, Stair and elevator shaft vents have ❑Complies C403.2.4. motorized dampers that automatically ODoes Not 3 close. Not Observable [ME313 ❑ ❑Not Applicable C402.5.5, Outdoor air and exhaust systems have ❑Complies C403.2.4. motorized dampers that automatically ODoes Not 3 shut when not in use and meet (ME58)3 maximum leakage rates.Check ❑Not Observable gravity dampers where allowed. ❑Not Applicable C403.2.12 HVAC fan systems at design ❑Complies See the Mechanical Systems list for values. .1 conditions do not exceed allowable ODoes Not (ME65]3 fan system motor nameplate hp or fan system bhp. [Not Observable ❑Not Applicable C403.2.12 Fans have efficiency grade(FEG) >= ❑Complies .3 67.The total efficiency of the fan at ODoes Not [ME117]2 the design point of operation<= 15% of maximum total efficiency of the DNot Observable fan. ❑Not Applicable C403.2.13 Unenclosed spaces that are heated ❑Complies [ME71]2 use only radiant heat. ODoes Not ❑Not Observable ONot Applicable C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME5512 ODoes Not Not Observable ❑Not Applicable C403.2.6. Demand control ventilation provided ❑Complies 1 for spaces>500 ft2 and >25 ODoes Not (ME59)1 people/1000 ft2 occupant density and served by systems with air side ['Not Observable economizer, auto modulating outside ❑Not Applicable air damper control,or design airflow >3,000 cfm. C403.2.6. Enclosed parking garage ventilation ❑Complies 2 has automatic contaminant detection ODoes Not [ME115]3 and capacity to stage or modulate ❑Not Observable fans to 50%or less of design capacity. ❑Not Applicable C403.2.7 Exhaust air energy recovery on ❑Complies (ME57]' systems meeting Table C403.2.7(1) ODoes Not and C403.2.7(2). ❑Not Observable ❑Not Applicable C403.2.8 Kitchen exhaust systems comply with ❑Complies [ME116]3 replacement air and conditioned ODoes Not supply air limitations, and satisfy hood rating requirements and maximum ❑Not Observable exhaust rate criteria. ❑Not Applicable C403.2.9 HVAC ducts and plenums insulated. ❑Complies [ME60]2 Where ducts or plenums are installed ODoes Not in or under a slab,verification may need to occur during Foundation ['Not Observable Inspection. ❑Not Applicable Li High Impact(Tier 1) ' 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) J Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings'Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 11 of 19 Section Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.2.9 Ducts and plenums sealed based on ❑Complies [ME10]2 static pressure and location. ❑Does Not DNot Observable DNot Applicable C403.2.9. Ductwork operating >3 in.water ❑Complies 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ['Not Observable DNot Applicable C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values. 6 of individual zone boxes have static ❑Does Not [ME110]3 pressure setpoint reset controls. ['Not Observable DNot Applicable C404.2.1 Gas-fired water-heating equipment ❑Complies [ME111]2 installed in new buildings: where a ❑Does Not singular piece of water-heating equipment>= 1,000 kBtu/h serves [Not Observable the entire building,thermal efficiency DNot Applicable >=90 Et.Where multiple pieces of water-heating equipment serve the building with combined rating >= 1,000 kBtu/h,the combined input- capacity-weighted-average thermal efficiency>=90 Et.Exclude input rating of equipment in individual dwelling units and equipment<= 100 kBtu/h. C408.2.2. Air outlets and zone terminal devices OComplies 1 have means for air balancing. ❑Does Not [ME53]3 :Not Observable DNot Applicable C403.5, Refrigerated display cases,walk-in ❑Complies C403.5.1, coolers or walk-in freezers served by ❑Does Not C403.5.2 remote compressors and remote [ME123]3 condensers not located in a DNot Observable condensing unit, have fan-powered DNot Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 12 of 19 Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.1 Lighting controls installed to uniformly ❑Complies [EL15]1 reduce the lighting load by at least ❑Does Not 50%. DNot Observable DNot Applicable C405.2.1 Occupancy sensors installed in DComplies [EL18]1 required spaces. Does Not DNot Observable ❑Not Applicable C405.2.1 Independent lighting controls installed DComplies C405.2.2. per approved lighting plans and all ODoes Not 3 manual controls readily accessible and [EL23]2 visible to occupants. ['Not Observable DNot Applicable C405.2.2. Automatic controls to shut off all DComplies 1 building lighting installed in all ❑Does Not [EL22P buildings. ❑Not Observable DNot Applicable C405.2.3 Daylight zones provided with DComplies [EL16]2 individual controls that control the Does Not lights independent of general area lighting. ['Not Observable DNot Applicable C405.2.3, Primary sidelighted areas are DComplies C405.2.3. equipped with required lighting ❑Does Not 1, controls. C405.2.3. :Not Observable 2 ONot Applicable [EL2O]1 C405.2.3, Enclosed spaces with daylight area DComplies C405.2.3. under skylights and rooftop monitors ❑Does Not 1, are equipped with required lighting C405.2.3. controls. ['Not Observable 3 ❑Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for DComplies [EL4]1 specific uses installed per approved ❑Does Not lighting plans. DNot Observable DNot Applicable C405.2.4 Additional interior lighting power DComplies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and DNot Observable separated from general lighting. DNot Applicable C405.2.5 Automatic lighting controls for exterior DComplies [EL25]na0 lighting installed. Controls will be ❑Does Not daylight controlled,set based on business operation time-of-day,or DNot Observable reduce connected lighting > 30%. DNot Applicable C405.3 Exit signs do not exceed 5 watts per DComplies (EL6]1 face. ❑Does Not ❑Not Observable DNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 'Medium Impact(Tier 2) 13 I Low Impact(Tier 3) J Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename; C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 13 of 19 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 14 of 19 Section # Insulation Inspection Complies? Comments/Assumptions & Req.ID C303.1 Roof insulation installed per DComplies [IN3)' manufacturer's instructions. Blown or ❑Does Not poured loose-fill insulation is installed only where the roof slope is<=3 in ❑Not Observable 12. ❑Not Applicable C303.1 Building envelope insulation is labeled DComplies [IN10)2 with R-value or insulation certificate ❑Does Not providing R-value and other relevant ❑ data. Not Observable ❑Not Applicable C303.2 Above-grade wall insulation installed ❑Complies [IN7]' per manufacturer's instructions. ❑Does Not ['Not Observable ❑Not Applicable C303.2.1 Exterior insulation is protected from DComplies [IN14)2 damage with a protective material. ❑Does Not Verification for exposed foundation insulation may need to occur during ['Not Observable Foundation Inspection. ❑Not Applicable C402.1.3 Non-swinging opaque doors have R- DComplies [IN19]3 4.75 insulation. ❑Does Not ['Not Observable ❑Not Applicable C402.2.1 Insulation intended to meet the roof DComplies [IN17]3 insulation requirements cannot be ❑Does Not installed on top of a suspended ceiling. Mark this requirement Not Observable compliant if insulation is installed ❑Not Applicable accordingly. C402.2.3 Above-grade wall insulation R-value. DComplies See the Envelope Assemblies table for values. [IN6]' ❑Does Not ❑Not Observable ❑Not Applicable C402.2.5 Floor insulation R-value. DComplies See the Envelope Assemblies table for values. [IN8)2 ❑Does Not ['Not Observable DNot Applicable C402.2.6 Radiant panels and associated DComplies [IN18)3 components, designed for heat ❑Does Not transfer from the panel surfaces to the ❑Not Observable occupants or indoor space are insulated with a minimum of R-3.5. ❑Not Applicable C402.2.2 Roof R-value. For some ceiling DComplies See the Envelope Assemblies table for values. [IN2)' systems,verification may need to ❑Does Not occur during Framing Inspection. ❑Not Observable ❑Not Applicable C402.5.1. All sources of air leakage in the ❑Complies 1 building thermal envelope are sealed, Does Not [IN1]' caulked, gasketed,weather stripped or wrapped with moisture vapor- ['Not Observable permeable wrapping material to ONot Applicable minimize air leakage. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\lag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 15 of 19 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M instructions for ❑Complies C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [FI17j3 representative. :Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies C408.2.5. systems within 90 days of system ❑Does Not 3 acceptance. [F18]3 ['Not Observable ❑Not Applicable C402.5.3 Where open combustion air ducts ❑Complies (F151]3 provide combustion air to open ❑Does Not combustion fuel burning appliances, the appliances and combustion air :Not Observable opening are located outside the ❑Not Applicable building thermal envelope or enclosed in a room,isolated from inside the thermal envelope.Such rooms are sealed and insulated. C402.5.6 Weatherseals installed on all loading ❑Complies [F137]1 dock cargo doors. ❑Does Not ['Not Observable ❑Not Applicable C402.5.8 Recessed luminaires in thermal ❑Complies [FI26]3 envelope to limit infiltration and be IC ❑Does Not rated and labeled.Seal between interior finish and luminaire housing. ❑Not Observable ❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies [F127]3 capacity does not exceed calculated ❑Does Not loads. [Not Observable ❑Not Applicable C403.2.4. Heating and cooling to each zone is ❑Complies 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device per installed ❑Not Observable humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5°F ❑Complies 1.2 deadband. ❑Does Not [FI38]3 :Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies 1.3 overlap restrictions. Does Not [FI20]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies 2 controls using automatic time clock or ❑Does Not [FI39]3 programmable control system. [Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies 2.1, (heat)and 85°F(cool); 7-day clock,2- ❑Does Not C403.2.4. hour occupant override, 10-hour 2.2 backup ❑Not Observable [F140]3 ❑Not Applicable High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 16 of 19 Section Final Inspection Complies? Comments/Assumptions & Req.ID C404.3 Heat traps installed on supply and DComplies [F111]3 discharge piping of non-circulating ❑Does Not systems. ❑Not Observable DNot Applicable C404.4 All piping insulated in accordance with ❑Complies (FI25]z section details and Table C403.2.10. ❑Does Not ❑Not Observable ❑Not Applicable C404.6.1 Controls are installed that limit the DComplies (F112)3 operation of a recirculation pump ❑Does Not installed to maintain temperature of a storage tank. System return pipe is a :Not Observable dedicated return pipe or a cold water ❑Not Applicable supply pipe. C405.4.1 Interior installed lamp and fixture DComplies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans,demonstrating proposed watts :Not Observable are less than or equal to allowed ❑Not Applicable watts. C405.5.1 Exterior lighting power is consistent DComplies See the Exterior Lighting fixture schedule for values. [F119]1 with what is shown on the approved ❑Does Not lighting plans,demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ❑Not Applicable C408.2.1 Commissioning plan developed by DComplies [FI28]1 registered design professional or ❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ['Complies 1 ensure proper operation. ❑Does Not [FI31]1 :Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been DComplies 2 tested to ensure proper operation, ❑Does Not [FI10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report DComplies [F129]1 completed and certified by registered ❑Does Not design professional or approved agency. ❑Not Observable :Not Applicable C408.2.5. Furnished HVAC as-built drawings DComplies 1 submitted within 90 days of system ❑Does Not [FI7]3 acceptance. ❑Not Observable ❑Not Applicable C408.2.5. Furnished as-built drawings for DComplies 1 electric power systems within 90 days ❑Does Not (F116)3 of system acceptance. ❑Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system DComplies 3 balancing report is provided for HVAC ❑Does Not [FI43]1 systems. ❑Not Observable ❑Not Applicable 1]High Impact(Tier 1) 2 Medlum Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05R9/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 17 of 19 1 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.2.5. Final commissioning report due to ❑Complies 4 building owner within 90 days of EDoes Not (FI30]' receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies [FI33]1 ensure proper calibration,adjustment, ❑Does Not programming,and operation. [Not Observable ❑Not Applicable Additional Comments/Assumptions: High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 18 of 19 Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19 Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 19 of 19