ComCheck COMcheck Software Version 4.0.8.2
(111/1 Envelope Compliance Cep 0 M C
lj
LUN 18 2019
Project Information OF OUEENSBURY
Energy Code: 2015 IECC DING& CODES
Project Title: Renovation Ex. PEMB-Office/Warehouse
Location: Warrensburg, New York
Climate Zone: 6a
Project Type: Alteration 308.20-1-9.2 CC-0419-2019
Vertical Glazing/Wall Area: 2%
Angio Dynamics
24 Native Dr
Construction Site: Owner/Agent:
24 Native Drive Tim Barber Comm. Alterations 41,910 s.f.
Queensbury, NY JAG
518-812-0044
tim@jaggroupllc.com
Building Area Floor Area FILE COPY
1-Warehouse : Nonresidential 27738
Envelope Assemblies
R-Value Proposed Max.Allowed
Post Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
Roof 1:Metal Building,Standing Seam,[Bldg.Use 1 - -- — — -- — —
Warehouse],Exemption:Framing cavity not exposed.
Floor 1:Slab-On-Grade:Unheated,[Bldg.Use 1 -Warehouse] -- 11.0 0.474 -- 0.540 —
NORTH
Exterior Wall 3:Metal Building Wall, [Bldg. Use 1 -Warehouse], -- — -- -- -- —
Exemption:Framing cavity not exposed.
Window 1:Metal Frame:Operable,Other,Operable,Operable, --- -- 0.430 0.530 0.430 0.531
[Bldg.Use 1 -Warehouse]
Door 3: Insulated Metal,Swinging, [Bldg. Use 1 -Warehouse] --- -- 0.360 -- 0.370 —
Door 4: Insulated Metal,Swinging, [Bldg. Use 1 -Warehouse] -- — 0.360 -- 0.370 —
Door 5:Insulated Metal,Non-Swinging,[Bldg.Use 1 - --- — 0.360 -- 0.360 —
Warehouse]
Door 6:Insulated Metal,Non-Swinging,[Bldg.Use 1 - --- — 0.360 -- 0.360 --
Warehouse]
Door 7:Insulated Metal,Swinging, [Bldg.Use 1 -Warehouse] --- -- 0.360 -- 0.370 --
EAST
Exterior Wall 2 copy 1:Metal Building Wall, [Bldg.Use 1 - --- — -- -- — —
Warehouse],Exemption:Framing cavity not exposed.
SOUTH
Exterior Wall 4:Steel-Framed,24"o.c.,[Bldg. Use 1 - -- — — -- -- —
Warehouse],Exemption:Framing cavity not exposed.
WEST
Exterior Wall 1:Metal Building Wall,[Bldg. Use 1 -Warehouse], --- -- -- -- -- --
Exemption:Framing cavity not exposed.
Door 1: Insulated Metal,Swinging,[Bldg. Use 1 -Warehouse] --- -- 0.360 --- 0.370 ---
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 1 of 19
(a)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Project Notes
Envelope PASSES
Envelope Compliance Statement
Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name-Title Signature Date
Project is Renovation of approximately 61,110 SF out of an existing 115,892 SF
1995 PEMB which has been vacant and being Fit-Up with the ist Tenant within the front portion of the existing
building . Use was former factory production of the former Native Textiles.The warehouse is quite
comprehensibly adapted for this Tenant , proposed with only minor partition layout changes at the Office.
ADA separated Rest Room facilitys exists and are proposed to be shared
within the building consistent with the original Tenant Occupancy . Warehouse Unit Heaters and Electrical
Lighting demands already meet Tenant needs.
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 2 of 19
COMcheck Software Version 4.0.8.2
rist ii Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: Renovation Ex. PEMB-Office/Warehouse
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
24 Native Drive Tim Barber
Queensbury, NY JAG
518-812-0044
tim@jaggroupllc.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-Manufacturing:High Bay(25-50 ft.Floor to Ceiling Height) 28000 1.23 34440
Total Allowed Watts= 34440
Proposed Interior Lighting Power
A B C D E
Fixture ID: Description/Lamp I Wattage Per Lamp/Ballast Lamps! #of Fixture (C X D)
Fixture Fixtures Watt.
Manufacturing:High Bay(25-50 ft. Floor to Ceiling Height)(28000 sq.ft.)
Linear Fluorescent 1:48"T8 32W(Super T8):Electronic: 2 42 40 1680
HID 1:High-Pressure Sodium:Standard: 1 60 60 3600
Total Proposed Watts= 5280
Interior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name-Title Signature Date
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 3 of 19
IPA COMcheck Software Version 4.0.8.2
Nfil Exterior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: Renovation Ex. PEMB-Office/Warehouse
Project Type: Alteration
Exterior Lighting Zone 3(Other)
Construction Site: Owner/Agent: Designer/Contractor:
24 Native Drive Tim Barber
Queensbury,NY JAG
518-812-0044
tim@jaggroupllc.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts/Unit Wattage (B X C)
Illuminated area of facade wall or surface 8 ft2 0.15 No 1
Total Tradable Watts(a)= 0
Total Allowed Watts= 1
Total Allowed Supplemental Watts(b)= 750
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 750 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Illuminated area of facade wall or surface(8 ft2):Non-tradable Wattage
LED 1:LED A Lamp 11 W: 1 8 60 480
Total Tradable Proposed Watts= 0
Exterior Lighting PASSES
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans,specifications,and other calculations submitted with this permit application.The proposed exterior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name-Title Signature Date
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 4 of 19
11141 COMcheck Software Version 4.0.8.2
‘fil Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: Renovation Ex. PEMB-Office/Warehouse
Location: Warrensburg, New York
Climate Zone: 6a
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
24 Native Drive Tim Barber
Queensbury, NY JAG
518-812-0044
tim@jaggroupllc.com
Mechanical Systems List
Quantity System Type&Description
1 HVAC System 1 (Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=95.00%Et,Required Efficiency=80.00%Et
Fan System: None
1 Water Heater 1:
Gas Storage Water Heater,Capacity:50 gallons,Input Rating:75 kBtu/h w/Circulation Pump
Proposed Efficiency:95.00 EF,Required Efficiency:0.58 EF
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name-Title Signature Date
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 5 of 19
COMcheck Software Version 4.0.8.2
II Inspection Checklist
Energy Code: 2015 IECC
Iirr6
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans and/or specifications provide all ❑Complies
[PR1]' information with which compliance ElDoes Not
can be determined for the building
envelope and document where ['Not Observable
exceptions to the standard are ONot Applicable
claimed.
C103.2 Plans,specifications,and/or ❑Complies
[PR2]' calculations provide all information ❑Does Not
with which compliance can be ['Not Observable
determined for the mechanical
systems and equipment and ONot Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2 Plans,specifications,and/or ❑Complies
[PR3]' calculations provide all information ElDoes Not
with which compliance can be
determined for the service water ONot Observable
heating systems and equipment and ONot Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C103.2 Plans,specifications,and/or ❑Complies
[PR4]' calculations provide all information ❑Does Not
with which compliance can be
determined for the interior lighting DNot Observable
and electrical systems and equipment ONot Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations,wattage of
bulbs and ballasts,transformers and
control devices.
C103.2 Plans,specifications,and/or ❑Complies
[PR8]' calculations provide all information ❑Does Not
with which compliance can be
determined for the exterior lighting ['Not Observable
and electrical systems and equipment ONot Applicable
and document where exceptions to
the standard are claimed.Information
provided should include exterior
lighting power calculations,wattage of
bulbs and ballasts,transformers and
control devices.
C402.4.1 The vertical fenestration area <= 30 ❑Complies
[PR10]1 percent of the gross above-grade wall ❑Does Not
area.
['Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 1Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\lag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 6 of 19
•
Section
Plan Review Complies? Comments/Assumptions
& Req.ID
C402.4.1 The skylight area <= 3 percent of the ❑Complies
[PR11]1 gross roof area. ❑Does Not
:Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 7 of 19
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C303.2 Slab edge insulation installed per ❑Complies
[FO4J2 manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1 Exterior insulation protected against ❑Complies
[FO6]1 damage,sunlight, moisture,wind, ❑Does Not
landscaping and equipment ❑Not Observable
maintenance activities.
❑Not Applicable
C402.2.5 Slab edge insulation R-value. ❑Complies See the Envelope Assemblies table for values.
[FO312 ODoes Not
[Not Observable
❑Not Applicable
C402.2.6 Radiant heating systems panels ❑Complies See the Envelope Assemblies table for values.
(FO12)3 insulated to>=R-3.5 on face opposite ❑Does Not
space being heated.
❑Not Observable
❑Not Applicable
C403.2.4. Snow/ice melting system sensors for ❑Complies
5, future connection to controls. Freeze ❑Does Not
C403.2.4. protection systems have automatic
6 controls installed. DNot Observable
(FO9]3 ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings'Jag\24 Native Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 8 of 19
Section
# Framing/Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C303.1.3 Fenestration products rated in ❑Complies
[FR1212 accordance with NFRC. ❑Does Not
['Not Observable
❑Not Applicable
C303.1.3 Fenestration products are certified as ❑Complies
[FR13]1 to performance labels or certificates ❑Does Not
provided. ❑Not Observable
❑Not Applicable
C402.4.3 Vertical fenestration SHGC value. ❑Complies See the Envelope Assemblies table for values.
[FR10]1 ❑Does Not
❑Not Observable
❑Not Applicable
C402.4.3, Vertical fenestration U-Factor. ❑Complies See the Envelope Assemblies table for values.
C402.4.3. ❑Does Not
4 1 ❑Not Observable
[FR8)
[Not Applicable
C402.4.4 U-factor of opaque doors associated ❑Complies See the Envelope Assemblies table for values.
[FR14J2 with the building thermal envelope ❑Does Not
meets requirements.
['Not Observable
❑Not Applicable
C402.5.1. The building envelope contains a ❑Complies
2.1 continuous air barrier that is sealed in ❑Does Not
[FR19]1 an approved manner and material
permeability<= 0.004 dfm/ft2.Air ❑Not Observable
barrier penetrations are sealed in an ❑Not Applicable
approved manner. _
C402.5.2, Factory-built fenestration and doors ❑Complies
C402.5.4 are labeled as meeting air leakage ❑Does Not
[FR1813 requirements.
['Not Observable
❑Not Applicable
C402.5.7 Vestibules are installed on all building ❑Complies
[FR17)3 entrances. Doors have self-closing ❑Does Not
devices.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\ag124 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 9 of 19
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
&Req.ID
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 :Not Observable
❑Not Applicable
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 ❑Not Observable
❑Not Applicable
C404.6.1, Automatic time switches installed to ❑Complies
C404.6.2 automatically switch off the ❑Does Not
[PL3]1 recirculating hot-water system or heat
trace. :Not Observable
❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating :Not Observable
cycle. ❑Not Applicable
C404.7 Water distribution system that pumps ❑Complies
[PL8)3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
C404.7 Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. Observable,....,
Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex.PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 10 of 19
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C402.2.6 Thermally ineffective panel surfaces of❑Complies
[ME41)3 sensible heating panels have ❑Does Not
insulation >= R-3.5.
❑Not Observable
❑Not Applicable
C402.5.5, Stair and elevator shaft vents have ❑Complies
C403.2.4. motorized dampers that automatically ODoes Not
3 close. Not Observable
[ME313 ❑
❑Not Applicable
C402.5.5, Outdoor air and exhaust systems have ❑Complies
C403.2.4. motorized dampers that automatically ODoes Not
3 shut when not in use and meet
(ME58)3 maximum leakage rates.Check ❑Not Observable
gravity dampers where allowed. ❑Not Applicable
C403.2.12 HVAC fan systems at design ❑Complies See the Mechanical Systems list for values.
.1 conditions do not exceed allowable ODoes Not
(ME65]3 fan system motor nameplate hp or fan
system bhp. [Not Observable
❑Not Applicable
C403.2.12 Fans have efficiency grade(FEG) >= ❑Complies
.3 67.The total efficiency of the fan at ODoes Not
[ME117]2 the design point of operation<= 15%
of maximum total efficiency of the DNot Observable
fan. ❑Not Applicable
C403.2.13 Unenclosed spaces that are heated ❑Complies
[ME71]2 use only radiant heat. ODoes Not
❑Not Observable
ONot Applicable
C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values.
[ME5512 ODoes Not
Not Observable
❑Not Applicable
C403.2.6. Demand control ventilation provided ❑Complies
1 for spaces>500 ft2 and >25 ODoes Not
(ME59)1 people/1000 ft2 occupant density and
served by systems with air side ['Not Observable
economizer, auto modulating outside ❑Not Applicable
air damper control,or design airflow
>3,000 cfm.
C403.2.6. Enclosed parking garage ventilation ❑Complies
2 has automatic contaminant detection ODoes Not
[ME115]3 and capacity to stage or modulate ❑Not Observable
fans to 50%or less of design capacity.
❑Not Applicable
C403.2.7 Exhaust air energy recovery on ❑Complies
(ME57]' systems meeting Table C403.2.7(1) ODoes Not
and C403.2.7(2). ❑Not Observable
❑Not Applicable
C403.2.8 Kitchen exhaust systems comply with ❑Complies
[ME116]3 replacement air and conditioned ODoes Not
supply air limitations, and satisfy hood
rating requirements and maximum ❑Not Observable
exhaust rate criteria. ❑Not Applicable
C403.2.9 HVAC ducts and plenums insulated. ❑Complies
[ME60]2 Where ducts or plenums are installed ODoes Not
in or under a slab,verification may
need to occur during Foundation ['Not Observable
Inspection. ❑Not Applicable
Li High Impact(Tier 1) ' 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) J
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings'Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 11 of 19
Section
Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.9 Ducts and plenums sealed based on ❑Complies
[ME10]2 static pressure and location. ❑Does Not
DNot Observable
DNot Applicable
C403.2.9. Ductwork operating >3 in.water ❑Complies
1.3 column requires air leakage testing. ❑Does Not
[ME11]3 ['Not Observable
DNot Applicable
C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls.
['Not Observable
DNot Applicable
C404.2.1 Gas-fired water-heating equipment ❑Complies
[ME111]2 installed in new buildings: where a ❑Does Not
singular piece of water-heating
equipment>= 1,000 kBtu/h serves [Not Observable
the entire building,thermal efficiency DNot Applicable
>=90 Et.Where multiple pieces of
water-heating equipment serve the
building with combined rating >=
1,000 kBtu/h,the combined input-
capacity-weighted-average thermal
efficiency>=90 Et.Exclude input
rating of equipment in individual
dwelling units and equipment<= 100
kBtu/h.
C408.2.2. Air outlets and zone terminal devices OComplies
1 have means for air balancing. ❑Does Not
[ME53]3 :Not Observable
DNot Applicable
C403.5, Refrigerated display cases,walk-in ❑Complies
C403.5.1, coolers or walk-in freezers served by ❑Does Not
C403.5.2 remote compressors and remote
[ME123]3 condensers not located in a DNot Observable
condensing unit, have fan-powered DNot Applicable
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 12 of 19
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.1 Lighting controls installed to uniformly ❑Complies
[EL15]1 reduce the lighting load by at least ❑Does Not
50%. DNot Observable
DNot Applicable
C405.2.1 Occupancy sensors installed in DComplies
[EL18]1 required spaces. Does Not
DNot Observable
❑Not Applicable
C405.2.1 Independent lighting controls installed DComplies
C405.2.2. per approved lighting plans and all ODoes Not
3 manual controls readily accessible and
[EL23]2 visible to occupants. ['Not Observable
DNot Applicable
C405.2.2. Automatic controls to shut off all DComplies
1 building lighting installed in all ❑Does Not
[EL22P buildings. ❑Not Observable
DNot Applicable
C405.2.3 Daylight zones provided with DComplies
[EL16]2 individual controls that control the Does Not
lights independent of general area
lighting. ['Not Observable
DNot Applicable
C405.2.3, Primary sidelighted areas are DComplies
C405.2.3. equipped with required lighting ❑Does Not
1, controls.
C405.2.3. :Not Observable
2 ONot Applicable
[EL2O]1
C405.2.3, Enclosed spaces with daylight area DComplies
C405.2.3. under skylights and rooftop monitors ❑Does Not
1, are equipped with required lighting
C405.2.3. controls. ['Not Observable
3 ❑Not Applicable
[EL21]1
C405.2.4 Separate lighting control devices for DComplies
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans.
DNot Observable
DNot Applicable
C405.2.4 Additional interior lighting power DComplies
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and DNot Observable
separated from general lighting. DNot Applicable
C405.2.5 Automatic lighting controls for exterior DComplies
[EL25]na0 lighting installed. Controls will be ❑Does Not
daylight controlled,set based on
business operation time-of-day,or DNot Observable
reduce connected lighting > 30%. DNot Applicable
C405.3 Exit signs do not exceed 5 watts per DComplies
(EL6]1 face. ❑Does Not
❑Not Observable
DNot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 'Medium Impact(Tier 2) 13 I Low Impact(Tier 3) J
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename; C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 13 of 19
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 14 of 19
Section
# Insulation Inspection Complies? Comments/Assumptions
& Req.ID
C303.1 Roof insulation installed per DComplies
[IN3)' manufacturer's instructions. Blown or ❑Does Not
poured loose-fill insulation is installed
only where the roof slope is<=3 in ❑Not Observable
12. ❑Not Applicable
C303.1 Building envelope insulation is labeled DComplies
[IN10)2 with R-value or insulation certificate ❑Does Not
providing R-value and other relevant
❑
data. Not Observable
❑Not Applicable
C303.2 Above-grade wall insulation installed ❑Complies
[IN7]' per manufacturer's instructions. ❑Does Not
['Not Observable
❑Not Applicable
C303.2.1 Exterior insulation is protected from DComplies
[IN14)2 damage with a protective material. ❑Does Not
Verification for exposed foundation
insulation may need to occur during ['Not Observable
Foundation Inspection. ❑Not Applicable
C402.1.3 Non-swinging opaque doors have R- DComplies
[IN19]3 4.75 insulation. ❑Does Not
['Not Observable
❑Not Applicable
C402.2.1 Insulation intended to meet the roof DComplies
[IN17]3 insulation requirements cannot be ❑Does Not
installed on top of a suspended
ceiling. Mark this requirement Not Observable
compliant if insulation is installed ❑Not Applicable
accordingly.
C402.2.3 Above-grade wall insulation R-value. DComplies See the Envelope Assemblies table for values.
[IN6]' ❑Does Not
❑Not Observable
❑Not Applicable
C402.2.5 Floor insulation R-value. DComplies See the Envelope Assemblies table for values.
[IN8)2 ❑Does Not
['Not Observable
DNot Applicable
C402.2.6 Radiant panels and associated DComplies
[IN18)3 components, designed for heat ❑Does Not
transfer from the panel surfaces to the ❑Not Observable
occupants or indoor space are
insulated with a minimum of R-3.5. ❑Not Applicable
C402.2.2 Roof R-value. For some ceiling DComplies See the Envelope Assemblies table for values.
[IN2)' systems,verification may need to ❑Does Not
occur during Framing Inspection.
❑Not Observable
❑Not Applicable
C402.5.1. All sources of air leakage in the ❑Complies
1 building thermal envelope are sealed, Does Not
[IN1]' caulked, gasketed,weather stripped
or wrapped with moisture vapor- ['Not Observable
permeable wrapping material to ONot Applicable
minimize air leakage.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\lag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 15 of 19
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, Furnished O&M instructions for ❑Complies
C408.2.5. systems and equipment to the ❑Does Not
2 building owner or designated
[FI17j3 representative. :Not Observable
❑Not Applicable
C303.3, Furnished O&M manuals for HVAC ❑Complies
C408.2.5. systems within 90 days of system ❑Does Not
3 acceptance.
[F18]3 ['Not Observable
❑Not Applicable
C402.5.3 Where open combustion air ducts ❑Complies
(F151]3 provide combustion air to open ❑Does Not
combustion fuel burning appliances,
the appliances and combustion air :Not Observable
opening are located outside the ❑Not Applicable
building thermal envelope or enclosed
in a room,isolated from inside the
thermal envelope.Such rooms are
sealed and insulated.
C402.5.6 Weatherseals installed on all loading ❑Complies
[F137]1 dock cargo doors. ❑Does Not
['Not Observable
❑Not Applicable
C402.5.8 Recessed luminaires in thermal ❑Complies
[FI26]3 envelope to limit infiltration and be IC ❑Does Not
rated and labeled.Seal between
interior finish and luminaire housing. ❑Not Observable
❑Not Applicable
C403.2.2 HVAC systems and equipment ❑Complies
[F127]3 capacity does not exceed calculated ❑Does Not
loads.
[Not Observable
❑Not Applicable
C403.2.4. Heating and cooling to each zone is ❑Complies
1 controlled by a thermostat control. ❑Does Not
[FI47]3 Minimum one humidity control device
per installed ❑Not Observable
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Thermostatic controls have a 5°F ❑Complies
1.2 deadband. ❑Does Not
[FI38]3 :Not Observable
❑Not Applicable
C403.2.4. Temperature controls have setpoint ❑Complies
1.3 overlap restrictions. Does Not
[FI20]3 ❑Not Observable
❑Not Applicable
C403.2.4. Each zone equipped with setback ❑Complies
2 controls using automatic time clock or ❑Does Not
[FI39]3 programmable control system.
[Not Observable
❑Not Applicable
C403.2.4. Automatic Controls: Setback to 55°F ❑Complies
2.1, (heat)and 85°F(cool); 7-day clock,2- ❑Does Not
C403.2.4. hour occupant override, 10-hour
2.2 backup ❑Not Observable
[F140]3 ❑Not Applicable
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 16 of 19
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
C404.3 Heat traps installed on supply and DComplies
[F111]3 discharge piping of non-circulating ❑Does Not
systems.
❑Not Observable
DNot Applicable
C404.4 All piping insulated in accordance with ❑Complies
(FI25]z section details and Table C403.2.10. ❑Does Not
❑Not Observable
❑Not Applicable
C404.6.1 Controls are installed that limit the DComplies
(F112)3 operation of a recirculation pump ❑Does Not
installed to maintain temperature of a
storage tank. System return pipe is a :Not Observable
dedicated return pipe or a cold water ❑Not Applicable
supply pipe.
C405.4.1 Interior installed lamp and fixture DComplies See the Interior Lighting fixture schedule for values.
[FI18]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans,demonstrating proposed watts :Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C405.5.1 Exterior lighting power is consistent DComplies See the Exterior Lighting fixture schedule for values.
[F119]1 with what is shown on the approved ❑Does Not
lighting plans,demonstrating
proposed watts are less than or equal ❑Not Observable
to allowed watts. ❑Not Applicable
C408.2.1 Commissioning plan developed by DComplies
[FI28]1 registered design professional or ❑Does Not
approved agency.
❑Not Observable
❑Not Applicable
C408.2.3. HVAC equipment has been tested to ['Complies
1 ensure proper operation. ❑Does Not
[FI31]1 :Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been DComplies
2 tested to ensure proper operation, ❑Does Not
[FI10]1 calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
C408.2.4 Preliminary commissioning report DComplies
[F129]1 completed and certified by registered ❑Does Not
design professional or approved
agency. ❑Not Observable
:Not Applicable
C408.2.5. Furnished HVAC as-built drawings DComplies
1 submitted within 90 days of system ❑Does Not
[FI7]3 acceptance.
❑Not Observable
❑Not Applicable
C408.2.5. Furnished as-built drawings for DComplies
1 electric power systems within 90 days ❑Does Not
(F116)3 of system acceptance. ❑Not Observable
❑Not Applicable
C408.2.5. An air and/or hydronic system DComplies
3 balancing report is provided for HVAC ❑Does Not
[FI43]1 systems.
❑Not Observable
❑Not Applicable
1]High Impact(Tier 1) 2 Medlum Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05R9/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 17 of 19
1
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C408.2.5. Final commissioning report due to ❑Complies
4 building owner within 90 days of EDoes Not
(FI30]' receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable
C408.3 Lighting systems have been tested to ❑Complies
[FI33]1 ensure proper calibration,adjustment, ❑Does Not
programming,and operation.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex.Comp Chk-01 Angio.cck Page 18 of 19
Project Title: Renovation Ex. PEMB-Office/Warehouse Report date: 05/29/19
Data filename: C:\Drawings\Jag\24 Native\Angio Fit Up\24 Native-Ex. Comp Chk-01 Angio.cck Page 19 of 19